Home / Financial Firm (Unknown - Insurer) / Determination 258975

Determination 258975

Flood damage claim denied under flood exclusion; timber flooring removed by make-safe contractor

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Flood waters damaged the Applicant's home in January 2011 and the FSP denied the claim under the flood exclusion. AFCA found the exclusion applied but ordered the FSP to contribute 50% of the replacement cost of timber flooring that its make-safe contractor removed.

The policy clearly defines and excludes flood, so the exclusion applies; a fair 50% contribution is ordered for the make-safe removal of repairable flooring.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 258975 Determination Page 1 of 10 Case number: 258975 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 7 August 2012 Background 1. The Applicant held a home (complete replacement cover) and contents ($43,400 and extra cover of $1,000) insurance policy with the Financial Services Provider (FSP). 2. After her home in North Booval Queensland was inundated with water in January 2011, she lodged a claim with the FSP for the resultant damage. 3. The FSP denied liability for the damage on the basis that it was caused by flood, which is specifically excluded under the policy. 4. The Applicant disagrees with the decision and wants her claim to be paid. Summary of Applicant’s position 5. The Applicant is represented and for convenience hereafter throughout this Determination, the Applicant and her representative will be referred to as “the Applicant”. 6. The Applicant says the policy is confusing with respect to flood and stormwater run-off, particularly when the definitions for these events are read together and it is difficult to understand what is covered and what is not. As a result, the FSP has not fulfilled its obligations under The Insurance Contracts Act 1984 (the Act) to clearly inform her of the exclusion of flood from cover, and should not be able to rely on this exclusion. 7. She says the water which inundated her home came from the nearby stormwater drain. This means that the damage to her property resulted from stormwater runoff, rather than flood, and therefore her claim should be paid. 8. In addition, she says when the Applicant lodged the claim, the FSP arranged for someone to check the power points so the electricity supply could be reconnected. 9. The people who attended installed fans and a dehumidifier in the house and removed the curtains and the timber flooring from the home. Determination Case No: 258975 Determination Page 2 of 10 10. Although the curtains were dry cleaned and eventually returned to her, the flooring was thrown out. This is despite the fact that she considered that the flooring may have been salvageable. 11. She accepts that the FSP disposed of her floor with the intention of assisting her, but because the floor was repairable, it actually made the situation worse. For this reason, she would like the FSP to reimburse her for the cost of replacing the timber flooring. Summary of FSP’s position 12. The FSP says its policy wording clearly defines what is meant by flood, and also what it does not mean. It says that because it provided a copy of the policy wording to the Applicant, it had fulfilled its obligations under the Act to clearly inform her of the flood exclusion. 13. All the evidence available confirms that the water which inundated the Applicant‟s home was floodwater from the Bremer River, which backed up along and overflowed from Bundamba Creek. 14. The FSP says that its contractors removed the timber flooring from the Applicant‟s home as part of make -safe repairs. It says that according to the evidence available, the timber floorboards needed to be removed because they presented a safety risk. 15. It says that even if it had left the floorboards in place, they would have had to be pulled up eventually. In addition, the Applicant has not provided any evidence to establish that the floorboard were repairable, and has therefore not proven that she has suffered a prejudice as a result of the actions of its „make - safe‟ contractors. It says that for these reasons, it is not obligated to meet the costs of any loss the Applicant believes she has suffered in this regard. 16. The FSP relies on the following policy provisions: “ BUILDING POLICY What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. Yes You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: ... Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Case No: 258975 Determination Page 3 of 10 Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood ... CONTENTS POLICY What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. Yes You are covered for damage or loss to your contents while they are in your home or at the site, occurring during the period of cover, and caused by the following events: ... Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Case No: 258975 Determination Page 4 of 10 Damage caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood ... ” Issues 17. Whether the FSP clearly informed the Applicant of the exclusion of flood from cover. 18. Whether or not the damage to the Applicant‟s home was cau sed by flood. 19. Whether the make- safe actions of the FSP prejudiced the Applicant‟s interests. Reasons for decision 20. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 21. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 22. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Case No: 258975 Determination Page 5 of 10 Clearly Informed 23. The Applicant says that when the policy definition for flood is read with the definition of stormwater and runoff, the two definitions are likely to cause confusion for a reasonable consumer. 24. She says that this is because it is impossible for a reasonable consumer to identify when stormwater runoff becomes water that cannot enter a drain/watercourse because it is full or overflowing. 25. Furthermore, there are similar problems in identifying the difference between water that has overflowed from a stormwater drain because it cannot reach a watercourse as the water course is full (which is no t covered), and water that has escaped from a stormwater drain (which could be covered as part of stormwater runoff). 26. The FSP says it does not accept the Applicant‟s proposition that the policy is unclear, or that a reader of the policy would be confused, or that the wording contravenes Section 35 of the Act. 27. It says the policy clearly explains that where heavy rain enters a property through, for example, the roof, the policy will respond. Similarly, if heavy rain accumulates on the ground, and that rainwater runs off into a policyholder‟s home and causes damage, the policy will respond. 28. Further, if water were to escape from a drain and inundate a property, the policy would respond. This includes instances of where the water escaping from the drain came directly from a nearby watercourse. 29. However, if a river next to a policyholder‟s home was to overflow (which would be considered to be flooding), and this overflowing water was to flow over the ground and inundate the policyholder‟s home and result in damage, then the policy would not respond. 30. The Panel has reviewed the policy documents, and has considered the submissions from both parties on this matter; such review also included the additional submission dated 29 June 2012 submitted by the Applicant and the FSP‟s response dated 13 July 2012. 31. The Panel is satisfied that the policy wording with respect to the insured event of storm and rainwater clearly explains what is covered by that event. In addition, the policy also clearly defines flood, and explains that flood is not covered. 32. The Panel is not persuaded by the Applicant‟s argument that when the two definitions (i.e. that of „storm and rainwater‟, and that of flood) are read together, it would confuse a reasonable consumer. 33. The Panel is satisfied that the policy successfully delineates between what is covered by the storm and rainwater event, and what is not covered under this event. The policy explains that flood is among those things not covered Case No: 258975 Determination Page 6 of 10 by the storm and rainwater event, and a full definition what is meant by flood (for the purpose of the policy) appears immediately after this explanation. 34. In the view of the Panel, it is entirely appropriate that these definitions are read together if the reader is to gain a complete picture of what is covered and what is not. 35. Furthermore, flood is among the list of policy general exclusions, which means that not only is floo d not covered under the insured event of „storm and rainwater‟, but it is not covered under any other part of the policy. 36. The Panel has considered the Applicant‟s argument that it is impossible for a reasonable consumer to identify when stormwater runoff becomes water that cannot enter a drain or watercourse because it is full or overflowing, and that this identification difficulty means that the policy wording is confusing. 37. In the Panel‟s view, whether water is stormwater (covered under an insured event of the policy) or flood (which is not covered under the policy) is a matter of fact, and needs to be established based on the circumstances at the time. 38. However the Panel does not accept that the policy wording is confusing or unclear simply because inundating water can be classified differently depending on the circumstances at the time. 39. The Panel has also noted the Applicant‟s assertions in respect of previously issued FOS determinations 40607 and 41709, which it maintains supports its arguments in this regard. The Panel is aware of the finding made in Determination 40607 (and appreciates the concerns highlighted there); the Panel is not persuaded it assists the Applicant in this instance. In this respect, the Panel reiterates the position adopted in the more recent Determination 257702: “24. Determination 40607 should be confined to the particular facts of that dispute. Although the Panel acknowledges the concern raised in that Determination (with respect to a lack of distinction between concurrent and consecutive causes of a loss in the relevant exclusion), it is of the view that any perceived lack of clarity could be more fairly addressed by simply reading down the relevant exclusion so as to be consistent with the prevailing law. That is to say, to be consistent with the Wayne Tank principle. 25. The law, as it currently stands, does not require the FSP to advise the Applicants specifically of the impact of the Wayne Tank principle (see Hams v CGU Insurance Limited [2002] NSWSC 273) or other relevant case law. In the Panel’s opinion, the FSP’s attempt to inform policyholders of the impact of Wayne Tank (when it had no obligation to do so) should be commended and encouraged, rather than deterred and penalised.” 40. In regards to the Applicant‟s reference to Det ermination 41709, the Panel observes the following extract from Determination 245671 which was recently issued in respect of the Queensland floods of 2011: Case No: 258975 Determination Page 7 of 10 “In any event, in all the circumstances, the Panel determines the relevant clauses in the PDS dealin g variously with the excluded event of “flood”, and the listed events of storm and rainwater both as an individual listed event and as part of the Accidental Damage menu, are couched in language that is „clear, concise and effective‟ and accordingly the FS P is entitled to rely upon its flood exclusion in assessing the Applicants‟ claim. As such, the Panel does not propose to follow the conclusions referred to in the earlier Determination of 41709. The conclusion of this Panel is that it is satisfied that the relevant terms of the policy comply with Section 35 of the Act and the FSP is entitled to rely upon the flood exclusion in this matter”. 41. There is no dispute that the Applicant was provided with a copy of the policy wording, which explains that flood is e xcluded from cover. 42. For these reasons, the Panel accepts that the FSP has clearly informed the Applicant of the exclusion of flood from cover, and has fulfilled its obligations under Section 35 (2) of the Act. The FSP is therefore entitled to rely on this exclusion to deny or limit its liability with respec t to the Applicant‟s claim. Was the damage to the Applicant’s home caused by flood? 43. In considering the submissions of both the Applicant and the FSP in this regard, the Panel has again carefully noted the additional submission dated 29 June 2012 submitted by the Applicant and the FSP‟s response dated 13 July 2012. The Panel further observes that the Applicant has provided only general information and data in support of her position that the water inundating her home was other than the policy excluded event of flood. 44. In contrast the FSP has provided expert hydrological evidence of both a general and specific nature. The Panel has noted the Applicant‟s objection to the site specific hydrology report. The Panel does not accept that the hydrology report has no value due to time length since the flood occurrence, as the post event data would not alter and should not affect hydrological modelling. The hydrologist has also reviewed information provided by the Applicant to the assessor. The Panel is somewhat concerned that the hydrologist did not conduct a physical site inspection and will weigh the evidence accordingly. 45. The Applicant says that a storm passed over her property on the morning of Tuesday 11 January 2011, resulting in heavy rain that caused an enormous stormwater runoff which in turn damaged her property. 46. She describes the events of the morning of 11 January as follows: “It was raining a lot on Tuesday morning before we left the property. There is a creek in the area and a natural causeway near the property. There is a drain at the back of our neighbour‟s property (to the left facing when facing out onto the road from the house). This drain was bubbling because the rainwater was running-off so strongly. A stormwater drain runs under an easement (bitumen driveway that runs alongside to my property). A natural drain causeway is about 500- 600 meters down from that.” (sic) Case No: 258975 Determination Page 8 of 10 47. The FSP says that the cause of the inundation was water from the Bremer River which backed up along Bundamba Creek. The water overflowed from Bundamba Creek and flowed over normally dry land, causing inundation of the Applicant‟s home early in the morning of 12 January 2011. 48. To support its position with respect to the cause of the inundation, the FSP has submitted several pieces of evidence, including an assessor‟s report, an area hydrology report produced by the Insurance Council of Australia (ICA), aerial flood mapping, and a site-specific hydrology report. 49. The site-specific hydrology re port by “W” states that the inundation of the Applicant‟s home above floor level by floodwater would have started at approximately 4am on 12 January 2011. W also states that the inundation could not have been caused by stormwater runoff, as no rain had fallen in the area from approximately 6pm on 11 January 2011. 50. The FSP also points out that although the Applicant reported that the rain was heaviest on 9 and 10 January 2011, she was evacuated from her home before the inundation, so is unaware of the timing of the inundation. 51. The Applicant asserts that prior to her departing her home on 11 January 2011, the drain at the back of her neighbour‟s property was „bubbling because the rainwater was running off so strongly‟; she then surmises that as the policy prov ides cover for „water escaping from any water main, drain…‟ then the inundation of her property must have occurred in this fashion. However, the Panel notes the Applicant was not present at the time of the inundation and so her theory in this regard is not supported by either her own observations, of the water actually breaching her home, or any other witnesses who may have been present and could provide the Panel with reliable information in this regard. Accordingly, the Panel determines, on the balance of probabilities, the Applicant‟s version of events does not support her hypothesis, that the water was stormwater which had „escaped from any water main or drain‟. 52. Rather, the Panel is satisfied that the inundation of the Applicant‟s home was, on the balance of probabilities, caused by water overflowing from the nearby Bundamba Creek. 53. The Panel accepts the expert opinion of the FSP‟s hydrologist W that the timing of the inundation of the Applicant‟s home was approximately 4am on 12 January 2011, and that because the rainfall had ceased many hours beforehand, stormwater runoff did not play any part in the inundation. 54. The Panel therefore finds that the sole cause of the inundation was flood, which is excluded under the policy. 55. Consequently, the Panel finds that the FSP is entitled to deny liability for the damage to the Applicant‟s home building and contents. Case No: 258975 Determination Page 9 of 10 Did the actions of the FSP’s make - safe contractor prejudice the Applicant’s interests? 56. The Applicant says that the Sydney Blue Gum solid polished timber flooring of her home, which was removed by the FSP‟s contractor, was repairable and should not have been thrown out. 57. She says that she obtained two verbal quotes from builders who advised that the floorboards would have been salvageable. 58. The FSP says that its make- safe contractor “O” reported the following: “... 21/1 Carpet restorer re attended site and continued work where water damage occurred. Removed floorboards, and cleaned mud from the whole house, walls, floors etc, removed drying equipment. Job is now complete. Contractor arrived onsite and found the floating floors sticking 30cm from the ground. Left on hold for 30mins with AAMI. Contractor has been given permission as this is a dangerous situation and could cause major injury. Need to remove floorboards. They are dangerous and the insured could tip on the floorboards....” (sic) 59. The FSP says that because of the safety risk presented by the water damaged floorboards, even if its contractor had not removed the floorboards, the Applicant would have had to do so at a later stage. 60. Further, the FSP says that the Applicant has not substantiated her assertion that the floorboards were salvageable. 61. After reviewing the submissions from both parties, the Panel accepts the FSP‟s evidence that the floorboards were damaged by the water inundation and presented a safety risk to pedestrians entering the house. 62. However, the Panel also acknowledges the Applicant continues to assert most strenuously the floor boards were not protruding to a height of 30cms and that rehabilitation of the timber was a very viable option. In the circumstances of the emergency posed by the Queensland floods of January 2011, the Panel is conscious the opportunity for calm reflection, otherwise potentially attending an isolated water damage situation, was denied the parties in this instance; pursuant to its mandate of doing what is „fair in all the circumstances‟ the Panel determines a 50% contribution to the replacement cost of the discarded timber flooring by the FSP is appropriate. In assessing this figure, regard is only to be given to the cost of new timber, either the same or of similar quality to that discarded; the notional or actual cost of installing same is wholly to the account of the Applicant. Other issues raised 63. The Applicant has raised other issues about the conduct of the claim, including assertions that the FSP‟s contract staff, from the First Response Case No: 258975 Determination Page 10 of 10 Team were less than professional and that their actions were not authorised by the FSP, and that the FSP‟s assessor‟s report contained inaccuracies. 64. The Panel has considered these issues, however has concluded that they are not relevant to the outcome of this dispute. Accordingly, the Panel has not addressed these issues in this Determination. Determination 65. On the basis of the available information the Panel determines that:  The policy wording is clear and unambiguous in defining flood and explaining that flood is excluded from cover.  By providing a copy of the policy wording to the Applicant, the FSP clearly informed the Applicant of the exclusion of flood from cover in compliance with its obligation under Section 35 (2) of the Act.  The inundation of the Applicant‟s home building and contents was caused by flood water from the Bundamba Creek, which had backed up from the Bremer River.  The FSP is not liable for the damage that resulted from this flood inundation. 66. The FSP is required to reimburse 50% of the cost of replacing the timber flooring; In assessing this figure, regard is only to be given to the cost of new timber, either the same or of similar quality to that discarded; the notional or actual cost of installing same is wholly to the account of the Applicant. In these circumstances no interest is additionally payable by the FSP on this sum.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.