Home / Financial Firm (Unknown - Insurer) / Determination 258974
Determination 258974
Denial of Queensland flood claim for home and contents; flash flood cover applied
Summary
Queensland flood-affected homeowners were denied a home and contents claim because flood was excluded, after alleging a telephone misrepresentation. AFCA found no misrepresentation and clear wording, but held the inundation was flash flood, awarding 50% of the home and contents sums insured plus interest.
Heavy rain from 4am on 11 January 2011 was the proximate cause of the W4 dam release and the inundation, so the flash flood provisions apply, capped at 50% of the sum insured.
Issues
- Claim denial primary · upheld
“the Panel determines the FSP is to meet its liability up to a maximum sum of $113,000 being 50% of the home building sum insured.”
- Misleading conduct secondary · not upheld
“there was no misrepresentation of the available cover under the policy by the FSP's representative.”
- Product terms interpretation secondary · not upheld
“The Panel is satisfied the FSP has met its obligation in these circumstances to clearly inform the Applicants of the relevant exclusion and limitations.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 258974 Determination Page 1 of 9
Case number: 258974
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision – Flood - Denial of claim – Sections 13 & 35 Insurance Contracts Act
1984
28 September 2012
Background
1. The Applicants insured their home and contents in Goodna Queensland with
the Financial Services Provider (FSP). The relevant period of insurance
operated for twelve months beginning from 14 November 2010. During this
period, the building was insured up to a sum of $226,000 and the contents
for $76,000.
2. On 12 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants, through their solicitors “L”, have disputed this.
4. For the sake of simplicity, reference to the Applicants will include their legal
representatives.
5. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicants ’ position
6. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
a. The FSP misrepresented to them during a telephone conversation prior
to the renewal of the policy that they were covered for “flood”.
b. The FSP‟s policy failed to clearly inform them that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
c. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
Determination
Case No: 258974 Determination Page 2 of 9
resulted in massive discharges of water into the Brisbane River that
ultimately inundated their property.
d. The FSP is unable to discharge its onus in establishing the loss was
caused by “flood”.
e. Alternatively, the wording of the policy does n ot satisfy the FSP‟s
obligations to „Clearly inform‟ the Applicants of the scope and/or
limitations of the cover.
f. The wording of the contract creates confusion for a reasonable person
and especially the definition of the term “flood” as defined is too wide .
7. The Applicants seek to be indemnified for their claim.
Summary of FSP’s position
8. In response to the Applicants‟ arguments, the FSP submits the following:
a. It is not in dispute that the Applicants were provided with the relevant
policy documentation including the Product Disclosure Statement
(PDS) and Certificate of Insurance (COI). Further, the policy structure
and layout in conjunction with this evidence enables it to rely on the
exclusion clause of “flood” pursuant to Section 35(2) of the Act.
b. Further, the PDS clearly informs an insured of the scope and limitations
of the policy.
c. It denies any of its telephone consultants misrepresented to the
Applicants that their policy included cover for loss or damage arising
from flood. Further, the transcript/recording of the telephone in question
establishes an actual awareness of the Applicants that the policy did
not include flood cover.
d. The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicants‟ needs.
e. The FSP relies upon the opinion of its hydrologist that considered the
cause of the loss to be flooding from the Brisbane River and was not
due to the insured event „flash flooding‟.
f. The mere fact that the inundation of the insured property occurred at a
time after the W4 water releases from the Wivenhoe Dam (the dam)
commenced, does not in itself establish that the inundation of the
property was due to these significant releases from the dam.
9. The FSP relies on a number of hydrology reports authored by “SC” and the
following policy provisions to deny the Applicants‟ claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Case No: 258974 Determination Page 3 of 9
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Case No: 258974 Determination Page 4 of 9
Flash flood and stormwater run - off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Issues
10. Whether the FSP misrepresented to the Applicants prior to the claim that
they were covered for flood.
11. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
12. Whether the cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. It is appropriate to consider the issues under the various headings.
Misrepresentation
16. The Applicants maintain that during a telephone conversation held on 8
November 2010 with a representative of the FSP (prior to policy renewal)
they were led to believe that the policy included flood cover.
17. The FSP has refuted the allegation and made available a call recording and
transcript of the above noted telephone call. The FSP maintains that at no
stage did the representative advise the Applicant “MN” that the policy
included flood cover. It however does accept that the advice was that the
policy included automatic flash flood cover.
18. The Panel is satisfied that the call recording establishes that the Applicant
“MN” was not advised the policy included flood cover. Further, having noted
the content of the telephone call there is an obvious acknowledgement by
the Applicant “MN” that the policy did not include flood co ver. Also, in his
conversation he refers to the policy documentation making reference to the
Case No: 258974 Determination Page 5 of 9
event “Flood and Storm surge” which establishes he was in possession of
the policy terms.
19. Accordingly, having regard to the available evidence, the Panel is satisfied,
there was no misrepresentation of the available cover under the policy by the
FSP‟s representative. Rather, it is clear that the Applicants were aware their
policy did not provide cover for loss or damage arising from the event
„Flood‟.
20. It is well established that a fair reading of Section 35(2) of the Act requires
that the language of a policy relating to any relevant exclusion or limitation
be clear and unambiguous so that a person of average intelligence and
understanding would be capable on reading the policy of finding and
understanding the extent of the exclusion or limitation.
21. In this dispute, the policy is relevantly indexed and cross referenced. The
telephone conversation held by the Applicants on 8 November 2010
confirms that the Applicants had read the policy and understood the nature
of the exclusion being flood and limitation. The Panel is satisfied that in the
circumstances, a person of average intelligence and understanding would be
able on reading the policy to understand the extent of the exclusions and
limitations.
22. The Panel is satisfied the FSP has met its obligation in these circumstances
to clearly inform the Applicants of the relevant exclusion and limitations.
Water Inundation
The Evidence
23. The Panel has been provided with multiple hydrology reports commissioned
by the FSP. As there has been an exchange of material between the parties
both having had the opportunity to comment, information from the various
reports relied on will only be reiterated, where considered relevant.
Assessor’s Report dated 23 February 2011
The insured property was inspected on 31 January 2011.
The assessor estimated the loss to be in the vicinity of $100,000
(Building) and $76,000 (Contents – total loss).
The entire home was affected with the upstairs developed and downstairs
is a semi developed Queenslander style.
Water inundation peaked at the property at approximately 4.4m just under
the eaves.
Case No: 258974 Determination Page 6 of 9
Evidence and Consideration of releases from Wivenhoe Dam & Proximate
Cause
24. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considered deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
25. At that time, the Panel noted that in relation to this approach, that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
26. In view of this, the FSP provided detailed further submissions to FOS on 19
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicants‟ property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
27. Subsequent reference documents were provided on 11July 2012 and 28
August 2012.
28. In summary, the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011but the combined effect of all of the rainfall that
fell from 9 January 2011 (and earlier) leading to the implementation of the
W4 strategy from 8.00am that day.
29. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that the rain commenced at approximately 6.00am on 11 January 2011.
30. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase i n releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
Case No: 258974 Determination Page 7 of 9
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
31. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am on 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
32. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
33. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
the W4 strategy was not taken in accordance with the Wivenhoe Dam
manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry
final report does not find the adoption of W4 strategy at 8.00am on 11
January 2011 was inconsistent with the manual. Although there may be
issues as to how the Wivenhoe Dam had been managed prior to this time,
there is nothing in the material that has been provided to the Panel to
suggest that the earlier management of the Wivenhoe Dam influenced to any
significant degree, the adoption of the W4 release strategy at 8.00am on 11
January 2011.
34. The ICA‟s Hydrology Panel and the information provided by the FSP‟s
hydrologist confirms that the increased releases from the Wivenhoe Dam,
after the adoption of the W4 strategy, led to the development of a flood wave
that ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
35. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
36. The Panel accepts that in examining the proximate cause, it is necessary to
determine as a matter of fact the cause that was the dominant or effective
cause of the loss and not necessarily the “last in time”.
37. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam from the rainfall that commenced falling on or about 9
Case No: 258974 Determination Page 8 of 9
January 2011 or earlier, the Panel is satisfied having regard to the
information that has been exchanged and the relevant legal principles, that
the heavy rain that commenced falling on or about 4.00am on 11 January
2011 was a proximate or effective cause of the adoption of the W4 strategy.
38. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day. The W4 release combined with
the heavy rain that fell over the Brisbane River and the heavy rain that fell
over the Bremer river commencing at about 6.00am that same day ultimately
caused the i nundation of the Applicants‟ property.
The Applicants’ Inundation
39. The Key Conclusion Statement produced by SC establishes that the land
level of the Applicants‟ property was 10.6m AHD and the benchmark level of
the Applicants‟ property 11.5m AHD. According to the Key Conclusion
Statement dated 7 June 2012, the Applicants‟ property was inundated to a
level of 3m above benchmark by 4.00am on 12 January 2011. According to
the Applicants and confirmed by a senior hydrology statement, the house
was ultimately inundated to close to roof height.
40. The Panel Chair Ombudsman met with the Applicants and the FSP‟s
representative at a site inspection on 21 September 2012. During the
inspection, the benchmark level was identified as the slab of the garage or
underground section of the house. It was 2.4m from that level to the floor of
the upper level of the house. Based on the relevant hydrology and the Key
Conclusion Statement by 4.00am on 12 January 2011, the house would
have been inundated to a level of at least 600mm above floor level on the
second level. This would fall within cover under the flash flood provisions of
the policy.
41. The ground floor level of the property is used largely for storage and
included the air conditioning, hot water service and a number of other items.
These items were all lost before 4.00am on 12 January 2011. Inundation to a
level of 600mm above floor height on the first level would have caused
significant damage to all fittings and fixtures as well as all contents.
42. The flash flood provisions of the Applicants‟ policy provide cover for 50% of
the home building or $25,000 whichever is higher. The home building was
insured for the sum of $226,000 and therefore the FSP is liable to pay up to
$113,000 being 50% of this amount to satisfy the claim.
43. The Panel notes that there is no assessment or Scope of Works as to the
total loss suffered by the Applicants. During the site inspection, the FSP
confirmed that they would arrange a Scope of Works to be conducted. The
Applicants confirm they had already repaired the majority of the property.
The parties are asked to work cooperatively together to determine the total
loss and therefore the FSP‟s liability. Should the parties be unable to agree
Case No: 258974 Determination Page 9 of 9
on the settlement amount, the parties may make further submissions to the
Panel and the Panel will determine the extent of liability.
44. Insofar as contents are concerned, the policy provides cover for up to 50% of
the sum insured or $25,000 whichever is greater. The policy insures
contents for a total sum of $76,000 and the Panel accepts that the
Applicants have suffered a total loss of contents as a result of the inundation
of the property to a level of 3m above benchmark.
45. In the circumstances, the Panel determines the FSP is liable to pay the
Applicants loss of contents in the sum of $38,000 being 50% of the total sum
insured.
46. The FSP has already paid the Applicants $12,500 from a compassionate
fund set up by the FSP. Payment from the compassionate fund is not subject
to FOS jurisdiction but the Panel accepts the FSP is e ntitled to take into
account this amount when determining the sum payable to the Applicants.
Determination
47. Accordingly, the Panel determines the FSP is to meet its liability up to a
maximum sum of $113,000 being 50% of the home building sum insured
subject to a Scope of Works being completed. The Panel further determines
the FSP is to meet its liability in the sum of $38,000 under the terms of the
policy being 50% of the total sum insured for home contents.
48. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
15 August 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with Section 57 of the Act.