Denial of storm damage claim for slate roof replacement
Summary
The applicants claimed the FSP should pay to replace a storm-affected slate roof and $3,000 compensation for delays. AFCA found the roof was deteriorated and excluded, but ordered $750 non-financial loss for delay caused partly by the FSP.
The roof damage was caused by gradual deterioration and wear and tear rather than an accidental storm event, which the policy excludes.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny the claim for the cost of replacing the Applicants' roof.”
- Delay secondary · upheld“The FSP's failure to provide a copy of the report from IL to the Applicants has contributed to the delay; compensation of $750 is appropriate.”
Subjects and remedies
pay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 258621 Determination Page 1 of 6
Case number: 258621
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
3 January 2014
Summary
Description: A claim under a Home Building Policy for damage to a roof following a
storm event.
Basis for Determination: A consideration of the events covered by and/or excluded
under the terms of the policy.
Determination: The Applicants have not established that the damage to the roof is
covered by the terms of the policy.
Background
1. The Applicants held a home building insurance policy with the Financial
Services Provider (FSP), from 28 September 2010.
2. The Applicants lodged a claim with the FSP, for water damage to their
property which occurred after heavy storms on 15 and 16 October 2010.
3. The FSP accepted the internal damage to the property and this has now
been repaired. However, the FSP denied the cost of replacing the slate roof
as the FSP says it had not been damaged due to the storm itself but was
deteriorated and required maintenance.
4. The Applicants seek a review of the FSP‟s decision to deny the claim for the
replacement of the roof.
Summary of Applicants ’ position
5. The Applicants completed settlement on the subject property on 6 October
2010 and had visited the property on several occasions between then and
the date of loss. Despite there being rainfall after settlement, there had been
no ingress of water.
Determination
Case No: 258621 Determination Page 2 of 6
6. The Applicants say the cause of the water ingress was a tile which had been
disturbed during the storm causing it to fall into the gutter box. This in turn
caused the gutter to overflow and water to run under the roof.
7. The Applicants therefore contend the FSP should pay the cost of replacing
the roof or at the very least pay a contribution to the cost of the scaffolding
and the part of the roof which was damaged by the storm.
8. The Applicants say the FSP has caused significant delays in repairing the
interior of the property. As such they seek $3,000 compensation from the
FSP.
Summary of FSP’s position
9. The FSP says the Applicants‟ roof require d replacing as it was in a
deteriorated state. The Applicants had been informed of this when the
property was inspected prior to purchase.
10. There is no evidence the roof was damaged as a result of a storm , rather it
had been deteriorating over a period of time and required maintenance.
11. The FSP informed the Applicants on 28 January 2011, that the cost of
replacing the roof was denied.
12. Repairs to the interior of the property took place after the Applicants
replaced the roof and attended to any maintenance issues.
13. Accordingly, it says the Applicants are not entitled to compensation.
14. The FSP relies on the following policy provisions contained within the
Product Disclosure Statement (PDS), which the Applicants do not dispute
receiving:
“ Exclusions to your cover
...
We will NOT cover any loss or damage as a result of, or caused by
...
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
....
any incident that does not occur within your period of insurance. ”
Issues
15. Whether the FSP is required to reimburse the Applicants all or some of the
cost to repair their roof.
16. Whether the FSP is required to pay the Applicants compensation.
Case No: 258621 Determination Page 3 of 6
Reasons for decision
17. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference (“TOR”). This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
18. I consider the FOS Terms of Reference relevant to this dispute are:
“ 9.3 Other compensation
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may
decide that the Financial Services Provider compensate the
Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with
the Applicant‟s expectation of enjoyment or peace of
mind has occurred
...
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute. ”
19. As there are two distinct issues in dispute, I will address each separately.
Is the FSP required to pay anything toward the cost of replacing the roof?
20. Following lodgement of the claim, the FSP appointed IL to attend the
A pplicants‟ property and report on the extent and cause of the damage. IL
reported:
“The main part of the dwelling to which the slate tiles are installed is in a poor
state of repair with slippage prevalent throughout its entirety. The ridge
cappings are ageing and have surface rust which in time will allow water
ingress into roofing cavity.
The section which houses the corrugated iron is in a good condition with
flashings in a continuous length with no concerns with water entry.
The hip section facing east on the corrugated roof has slate installed and this
area has slippage consistent with maintenance issues.
The box gutter installed to the three parapets on the upper section have
debris littering the base and is restricting efficient water movement towards
the outlet.
No storm created openings have been detected whilst conducting roof
inspection.
...
Water ingress has occurred within the area of master bedroom due to the
excessive rains encountered coupled with debris which is strewn across the
box gutters composition. Slate tile slippage is evident and this in our opinion
is due to maintenance issues rather than a specific storm related event.
Case No: 258621 Determination Page 4 of 6
The Insureds (sic) agent has stated that within the rear bedrooms a slate tile
has caused a severe blockage to the rainhead and thus has allowed water to
accumulate to the rear of this obstruction and enter the roofing cavity.
Flashing concerns are prevalent to the junction of the rear corrugated section
of roof and the extreme upper level to which a box gutter is installed.
At the outlet of the lower box gutter, previous attempts at roof repairs have
taken place, it is here where water ingress is the most likely cause.”
21. The Applicants‟ policy provides cover for accidental damage to their
property. There is no dispute the interior of the property was accidentally
damaged by the ingress of water, which the FSP has accepted as being
covered under the terms of the policy.
22. The onus lies with the Applicants to demonstrate, on the balance of
probabilities, that the loss claimed is covered under the terms of the policy.
23. The policy provides coverage for accidental damage. The policy itself
provides the following definition of „accidental loss or damage‟ :
“accidental loss or damage
Damage to, loss or destruction of the buildings that make up your home, or
your contents and valuable items, when it is caused by an unintentional act, or
an unforeseen and uncontrollable incident.”
24. The policy also contains exclusions to the limit of the cover, which I have
detailed previously in this Determination.
25. It is necessary to consider the Applicants‟ claim by viewing the evidence
presented in light of the policy provisions relevant to the claim.
26. I am satisfied that the Applicants were aware prior to purchasing the property
that the roof was not in a good condition. Their inspection report details:
“Property appears to be generally sound. Defects that could be regarded as
significant include:
Deteriorated slate roof.
...
Covering 04 Valleys Ridges 04 Flue Vent Flashing
Chimney Vents Box Gutter
...
Roof is not accessible for inspection from exterior and only limited access to
inspect from replaced (with sounds second hand slates). Alternatively the
slate roof could be reclad with corrugated steel. In any case all associated
roof plumbing should be replaced at the same time. Eaves gutters and
downpipes generally appear to be in reasonable condition. Roof plumbing to
front verandah is incomplete.”
27. On the basis of the information detailed within this inspection report I am
also satisfied that prior to the purchase of the property, the Applicants were
fully aware of the maintenance required to the roof.
Case No: 258621 Determination Page 5 of 6
28. In my view, the Applicants have been unable to demonstrate that the roof
was accidentally damaged in the course of a storm other than possibly the
slipping of one roof tile (although no evidence of this has been presented).
29. Rather, the evidence confirms that the roof was already, prior to the storm, in
a poor state of repair, required maintenance and allowed for water ingress.
30. Even if I am mistaken in my view that the Applicants have not established a
loss arising from an event covered under the terms of the policy, on the
basis of the evidence presented, I am satisfied that the FSP is entitled to
exclude coverage on the basis that the loss to the roof arises as a result of
gradual deterioration and wear and tear, which is specifically excluded by the
terms of the policy.
31. In this regard, I note IL‟s report to the effect that slippage throughout the roof
is part of the roof‟s poor state of repair.
32. Accordingly, the FSP is entitled to deny liability for the cost of replacing the
roof.
Are the Applicants entitled to compensation?
33. The Applicants say the damage to the interior of the property was only
completed to their satisfaction on 4 July 2012, despite the claim being
lodged on 16 October 2010.
34. I note there was disagreement on the extent of the interior damage and
revised Scopes of Work had to be obtained.
35. Repairs to the interior of the property only commenced after the Applicants
had the roof replaced and the home made watertight. This only occurred on
31 August 2011, despite the Applicants being informed on 28 January 2011
that the claim for the roof would not be considered and that the Applicants
would be required to attend to the roof maintenance.
36. In my opinion, it was prudent for the FSP to wait until the roof had been
replaced as further damage could have occurred during rain events.
Therefore, I am not satisfied all of the delay was the fault of the FSP.
37. However, despite the FSP being advised on 6 September 2011, that the
home had been made water tight, the repairs were not completed until 4 July
2012.
38. I have had the opportunity of carefully examining the evidence in respect to
this 10 month period.
39. The evidence confirms that an additional Scope of Works had to be obtained
and that the Applicants were originally offered a cash settlement but declined
the offer and requested that the FSP attend to repair the interior of the home,
which the FSP ultimately did.
Case No: 258621 Determination Page 6 of 6
40. On the other hand, the FSP‟s file notes confirm that they did not provide their
report from their expert IL to the Applicants until January 2012, over a year
after it was prepared on 10 December 2010.
41. The file notes reveal that the representative of the FSP regarded it as
unfortunate that the report was not provided and the same representative
was concerned about the FSP‟s position in denying the entire insured claim
for the internal repairs.
42. The file notes go on to confirm that the report from IL was not available till
January 2012 and as a result, the insured suffered additional internal repairs
as a result of other storm activity and the FSP accepted the insured claim for
those additional internal repairs.
43. There are also a number of delays not explained by the FSP‟s internal file
notes.
44. In this regard, I note the entry of 23 November 2011, wherein the FSP
requested that its builder prepare a variation of the Scope of Works.
45. The next entry does not appear to be until 27 January 2012, some two
months later, wherein the note confirms that the contents claim is finalised.
46. Whilst I accept that all of the delay between September 2011 and July 2012
is not attributable to the actions of the FSP, I am concerned that, in
particular, the FSP‟s failure to provide a copy of the report from IL to the
Applicants has contributed to the delay and as a consequence, the
Applicants have experienced an unusual degree of time taken to resolve the
situation.
47. Having considered the evidence, I am satisfied that it is appropriate for the
FSP to pay the Applicants $750, by way of compensation for this delay.
Determination
48. On the basis of the available information, I determine the FSP is entitled to
deny the claim for the cost of replacing the Applicants‟ roof.
49. I further determine the FSP pay the Applicants $750 compensation.