Home / Financial Firm (Unknown - Insurer) / Determination 258412

Determination 258412

Roof repair claim denied as damage pre-dated policy

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$82,080
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for roof damage from Cyclone Tasha and Yasi, but the FSP denied the roof because lap stretching predated the policy. AFCA upheld the denial and said the FSP should immediately pay the accepted $82,080 internal water damage if it has not already done so.

Expert evidence and the undamaged replaced sheeting showed the lap stretching occurred before the policy period, so the roof damage was not covered.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 258412 Determination Page 1 of 5 Case number: 258412 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 7 March 2012 Background 1. The Applicant was insured under a home building and contents insurance policy with the Financial Services Provider (FSP) for the period 2 September 2010 to 2 September 2011. 2. A claim was lodged under the policy as a result of Cyclone Tasha which occurred on or around 25 December 2010. It was reported that damage had been caused to the roof and there was internal water damage. 3. The FSP appointed a loss adjuster to attend the property to inspect and report on the damage. The loss adjuster in turn appointed a b uilding consultant to report on the cause of damage to the roof. A scope of works was obtained as well as reports and repair quotes from builders. 4. On 8 September 2011, the FSP advised the Applicant that it was unable to accept roof repairs as the damage pre-existed and pre-dated his policy with the FSP. It was noted roof sheeting had been lap – stretched allowing water to penetrate into the house. 5. The FSP advised it would accept the internal water damage to the property quoted for the amount of $82,080 despite its consultant recommending that it only accepts 50% of the resultant damage. 6. The FSP has maintained its decision not to accept roof repairs following the Applicant‟s request for review through its internal dispute resolution procedures (IDR). Summary of Applicant’s position 7. Cyclone Tasha caused damage to the roof which did not leak prior to this event. 8. He also says that following Cyclone Tasha the roof sustained further damage from Cyclone Yasi. Determination Case No: 258412 Determination Page 2 of 5 9. He says he has had the original roofer and builder inspect the roof and they agree the damage was caused by the cyclones. 10. He has not been paid any money for the repair of the internal damage which the FSP says it would pay. Summary of FSP’s position 11. Two separate building consultants have inspected the roof damage and both opined that:  Cyclone Tasha was of insufficient intensity to have caused the subject damage; and  The subject damage was most likely the result of Cyclone Larry which occurred in March 2006. 12. Based on the available evidence, the roof damage occurred outside the period of insurance and as such is not covered by the policy. Issues 13. Whether the claimed roof damage has been caused by an event that is covered by the period of insurance. Reasons for decision 14. Due to the nature of the dispute, this matter has been referred to the Panel for a Determination in line with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 15. The Panel consists of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 16. The Applicant is insured for accidental loss and damage for occurrences that take place within the period of cover as shown in the policy schedule, other than for occurrences or i tems that are referred to in “What you are not insured for”. 17. The FSP accepted a claim for the internal water damage caused by Cyclone Tasha but has not accepted the damage to the roof on the basis the roof damage did not occur in the period of insurance. 18. The FSP states that, based on the expert information obtained, the damage to the roof most likely resulted from Cyclone Larry which occurred in March 2006. Case No: 258412 Determination Page 3 of 5 19. The Applicant disputes the FSP‟s decision to deny the repair of the roof. He maintains the roof damage resulted from Cyclone Tasha and that further damage was caused to the roof by Cyclone Yasi. 20. The Panel has considered the arguments put forward by the parties and the material submitted for consideration. The Panel notes that Cyclone Tasha was a Category 1 event which occurred on 24 December 2010 and that Cyclone Larry was a Category 4 event when it made landfall in March 2006. 21. The Applicant did not own the property at the time of Cyclone Larry but purchased it in 2008. Apparently no pre-purchase inspection was undertaken when the Applicant purchased the property. There is no dispute that several roof sheets had been replaced prior to the Applicant purchasing the property. 22. It is believed roof sheets were replaced as a result of debris impact caused by Cyclone Larry. 23. The FSP has relied upon expert opinion as to the cause of the roof sheets lifting. The roof builder‟s report dated 11 February 2011stated that : 90% of the roof sustained significant damage in the form of “lap stretch” which is a type of damage that occurs to laps of iron between rows of screw fixings;  This type of damage would require some form of cyclonic event;  Once stretching has occurred it allows water, usually accompanied by some wind, to flow over the corrugation and enter the roof;  The sheet that had been replaced following Cyclone Larry showed no signs of lap stretch;  Cyclone Tasha had a maximum gust of 100km per hour and sustained speed of 70km per hour.  It was fair and reasonable to conclude that the wind of Cyclone Tasha had no visual impact on the replaced roof sheeting given the remainder was severely damaged;  A cyclone force similar to Larry would more likely be required to cause such damage. 24. A building consultant, on behalf of the FSP, attended the property on 10 March 2011 to report on the relationship of the cyclonic events. He noted that sheeting replaced following Cyclone Larry had not sustained lap stretching. The Applicant is said to have advised the building consultant that he purchased the property at a “bargain price”. 25. The building consultant concluded “… the stretching of the original roof sheeting is not (original emphasis) likely to have occurred as a result of cyclone Tasha on 25 th December 2010 as the wind gust were recorded at only 100k/h and is considered to be damage sustained from the 2006 Tropical (sic) cyclone Larry event.” Case No: 258412 Determination Page 4 of 5 26. The Applicant has not accepted the findings of the FSP‟s experts. The Applicant says he had the original roofer and a shed builder inspect the roof and they both agree the roof was damaged by Cyclone Tasha and Yasi. 27. The Panel notes the original roofer‟s report dated 26 October 2011. The roofer concurs with the generally accepted opinion that the damage to the roof was due to a cyclonic event. 28. The roofer does not state in his report the roof damage was caused by Cyclone Tasha but rather states „ The customer asserts that Cyclone Tash (sic) in December of 2010 caused considerable damage to the premises …”. In view of the lack of specificity in this report as to the cause of damage, the Panel cann ot attach any weight to the roofer‟s opinion. 29. The Applicant also relies on a report dated 2 November 2011 from a builder who sheeted a shed on the property on 6 December 2010. The builder says the roof was in good condition. The builder says he inspected the roof following Cyclone Tasha and it was evident that sheet laps had been stretched and that the degree of lap stretching was not evident at the time of his inspection on 6 December 2010. He believed the damage had been caused by Cyclone Tasha. 30. However he makes no mention of the replaced roof sheeting which, according to the FSP‟s experts, had not sustained damage. 31. Nonetheless, critical to this issue is the sheeting replaced following Cyclone Larry. This sheeting has not been lap stretched. No explanation has been provided by the Applicant as to why the replaced sheeting has not been lap stretched when the original sheeting has. 32. The FSP‟s experts have indicated that it is unlikely the original sheeting was lap stretched by Cyclone Tasha but rather from Cyclone Larry. This is based on the comparative recorded wind speeds of Cyclone Larry and Cyclone Tasha. 33. The Panel notes the Applicant asserts the roof sustained further damage from Cyclone Yasi. It is unclear what damage was caused to the roof from this cyclone but it is accepted rainwater entered the home during Cyclone Tasha only. 34. The Panel notes the roof was not inspected prior to Cyclone Yasi occurring and the inspections show the replaced sheeting had not been lap stretched. 35. The Panel has sighted photographs showing lap stretching to original roof sheeting. There is no evidence of lap stretching to the roof sheets that were replaced following Cyclone Larry. 36. The Panel has difficulty accepting that only the original roof sheeting would have been damaged by Cyclone Tasha. The Panel would expect that roof damage as a result of a cyclone would show consistent damage over the Case No: 258412 Determination Page 5 of 5 whole of the roof. In this case, only the original roof sheeting showed evidence of lap stretching. 37. The Panel is satisfied, on the balance of probabilities that the lap stretching did not occur as a result of Cyclone Tasha but most likely resulted from Cyclone Larry. 38. Accordingly the Panel is satisfied the lap stretching occurred prior to the Applicant taking out the policy with the FSP. Determination 39. On the basis of the available information the Panel determines the FSP was entitled to deny the roof repairs as the damage did not occur within the period of insurance. 40. The FSP accepted the internal damage but it has not been confirmed if payment for such has been paid as yet. If the FSP has not made payment to the Applicant for internal repairs the FSP should immediately do so as he may need to utilise these funds towards the roof repair.