Determination 258340
Flood exclusion denial of commercial premises inundation claim
Summary
The Applicants' business premises were inundated in January 2011 and the FSP refused the claim under its flood exclusion. The Panel found hydrology evidence showed river backflow caused the damage and that PDS provision was the broker's responsibility, so the refusal stood.
Water backflowing from a river through drains is floodwater excluded under the policy, and the FSP proved the exclusion on the balance of probabilities.
Issues
- Claim denial primary · not upheld
“the Panel is satisfied the FSP has established on the balance of probabilities that the initial inundation of the Applicants' property was due to the floodwaters from the Brisbane River”
- Failure to disclose secondary · not upheld
“the circumstances the responsibility of the broker, not the FSP, to provide the document to the Applicants”
Subjects and remedies
broker or intermediarynatural disastersmall businessno remedy
Text of the determination
Case No: 258340 Determination Page 1 of 7
Case number: 258340
General Insurance – Small Business/Farm Insurance – Commercial Property -
FSP Decision - Denial of claim-Exclusion/ condition
18 June 2012
Background
1. The Applicants held a commercial insurance policy, providing accidental
damage cover over the business premises they owned, with the Financial
Services Provider (FSP). They arranged the policy through a broker „AP‟
acting on their behalf.
2. After their business premises were inundated with water in January 2011,
they lodged a claim for the resultant damage with the FSP through „AP‟.
3. The FSP denied liability for the damage on the basis it was caused by flood,
which is specifically excluded under the policy.
4. A review of the claim was undertaken by the FSP at the Applican ts‟ request,
however the FSP maintained its decision to deny liability for the damage.
Summary of Applicants ’ position
5. They say the inundation of their premises commenced in the morning of 12
January 2011 well before the river broke its banks, and they have video
footage to substantiate this.
6. In addition, they have photographic evidence showing that by about midday
on 13 January 2011, the inundating water had receded.
7. Although the FSP says that their premises were flooded by water from the
nearby river, this position is not consistent with video and photographic
evidence relative to the publicly available river height information.
8. A hydrology report produced for the purpose of establishing the cause of
inundation for properties in two neighbouring streets s hows that stormwater
was the cause of the damage for both properties.
9. They find it inconceivable that the damage experienced in buildings in
streets either side of their own street would not be duplicated in their own
situation.
Determination
Case No: 258340 Determination Page 2 of 7
10. They say that their broker arranged a new policy with the FSP at the end of
2010, but they were not provided with a Product Disclosure Statement (PDS)
for the policy until March 2011, which is well after inundation damaged their
property.
Summary of FSP’s position
11. The hydrology evidence available clearly indicates that flood water from the
Brisbane River was the cause of the damage, and that stormwater could not
have been the cause.
12. The hydrology report provided by the Applicants is of limited relevance to
their claim, as there are v arious differences between the Applicants‟ property
and the two properties which are the subject of that report.
13. The Applicants‟ policy which was in force at the time of the inundation event
was a renewal of their existing policy, and as the terms and conditions of the
policy had not changed, there was no requirement for the Applicants to be
provided with PDS at the time of renewal.
14. The FSP relies on the following policy provisions:
“ Flood means the covering of normally dry land with water released or that
has escaped from the normal confines of:
1. Any watercourse, whether natural or altered;
2. Any lake, whether natural or altered; or
3. Any reservoir, canal or dam.
...
Cover
We pay up to the limit of liability in accordance with the Basis of Settlement
for property that is damaged at the premises during the period of
insurance .
...
Exclusions
...
3. We will not pay for damage caused by or arising from:
...
(g) flood ; ”
Issues
15. Whether the initial damage to the Applicants‟ property was caused by flood.
16. Whether the FSP had an obligation to provide the Applicants with a Product
Disclosure Statement for the policy.
Case No: 258340 Determination Page 3 of 7
Reasons for decision
17. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
19. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
20. It is a principle of general insurance law that the onus rests with an insured
to establish, on the face of the facts, that they have suffered a loss caused
by an incident to which their policy responds. Once this is so established,
the onus shifts to the insurer to prove that a policy exclusion applies.
21. The Panel notes that the Applicants‟ policy is an accidental damage policy,
which provides cover for damage to the property during the period of
insurance, subject to certain terms and conditions.
22. The policy contains a definition of damage as follows:
“damage or damaged means accidental physical damage, destruction or
loss.”
23. It is not disputed that the Applicants‟ premises were physically damaged by
water inundation, and the Panel accepts that this damage was accidental,
insofar as it would have been unforeseen and unexpected by the Applicants.
24. As such, the Panel is satisfied that the Applicants have established, on the
face of the facts, that they have suffered a loss caused by an incident to
which the policy responds.
25. The onus therefore shifts to the FSP to prove that a policy exclusion applies.
Cause of the Damage
26. The Panel has reviewed the policy wording, and is satisfied that flood is
excluded from cover.
27. The F SP has provided a copy of a report by hydrologist „A‟ which examines
the cause of the damage to the Applicants‟ property.
28. It has also provided a copy of an area hydrology report titled „Flooding in the
Brisbane River Catchment – January 2011‟, commission ed by the Insurance
Council of Australia and produced by three established hydrology firms.
Case No: 258340 Determination Page 4 of 7
29. Further, the FSP has provided flood mapping, produced by the Queensland
Government, depicting the extent of the flooding in the vicinity of the
Applicants‟ property .
30. The Panel notes that the report by „A‟ states the following:
“The TUFLOW modelling results indicate that the underground stormwater
network has sufficient capacity to drain the „K‟ St catchment runoff in the
network pipes until approximately 3:30am on the 12 January 2011 without
affecting the site. At that time the Brisbane River caused water to back up
above the site‟s estimated road level of 4.5m AHD through the underground
pipe network.
Peak water levels due to increasing Brisbane River levels are predicted to
have exceeded the estimated site‟s minimum habitable building floor level
(estimated at 4.8 mAHD) on Wednesday 12 January 2011 at 7:30am. At that
time, the local stormwater catchment stormwater runoff contribution to
inundation had fully ended. ”
31. The report by „A‟ concludes with the following:
“Based on the conducted modelling, it can be concluded that the site at
[address] was not affected by local stormwater runoff inundation. The
methodology includes conservative assumptions ensuring that the stormwater
inundation levels are more likely to be over predicted.
Whilst some overland runoff could have contributed to some inundation in the
early time of the event, the possible affected areas would have been away
from [address].
The runoff flows in the underground drainage network would not have
exceeded the capacity of the branch in front of [address].
The Brisbane River would have flooded the site firstly through backing up in
the underground stormwater network then through the overtopping of its
ban k.”
Applicants’ Alternative Evidence Regarding Inundation
32. The Applicants say that their claim that stormwater caused the initial damage
to their property is justifiable, regardless of the detailed information provided
by the FSP.
33. They say that the hydrological, video and photographic information they
have provided calls into question the accuracy of the FSP‟s findings.
34. The hydrology report produced by „M‟ examines the cause of damage
experienced in a property in „J‟ Street and „F‟ Road, which run pa rallel to the
Applicants‟ street, and are located approximately 700m to the north -east and
400m to the south- west of the Applicants‟ „K Street‟ property, respectively.
35. The Panel notes that the hydrology report by „M‟ concludes that the initial
inundation e xperienced at the properties in „F‟ Road and „J‟ Street resulted
from stormwater overflow and local stormwater runoff at a time when the
discharge capacity of the stormwater drainage system was compromised by
high water levels from the Brisbane River.
Case No: 258340 Determination Page 5 of 7
36. Howe ver the Panel further notes that the report by „M‟ acknowledges that the
accuracy of some of the estimates made within the report is not high.
37. The Panel is also aware that the report by „M‟ was prepared with regard to
the circumstances that applied to the properties at „F‟ Road and „J‟ Street. As
would be expected, the report by „M‟ did not consider the circumstances of
the Applicants‟ property, or the differences in terms of topography or
drainage characteristics between the Applicants‟ property and the pr operties
which were its subject.
38. In view of the issues raised, the Panel Chair Ombudsman conducted a site
meeting with the Applicants and FSP representatives on 23 March 2012.
The Panel Chair was able to observe the location and discuss with the
parties the information exchanged.
39. During the site meeting, the FSP‟s representative MB advised that the FSP
did not argue that the water backflowing and surcharging the stormwater
drains was the cause of the inundation but rather it was the overtopping of
the banks of the Brisbane River that caused the inundation of the Applicants‟
property. MB conceded that he had not viewed the video footage prior to
providing the FSP‟s Notice of Response and maintained that he was unable
to open the relevant document.
40. The Panel has also reviewed the video footage and photographs provided by
the Applicants.
41. The Panel accepts that the video footage, taken from a television
programme, depicts a situation at 9.13am on 11 January 2011 in „V‟ Street
(behind the Applicants‟ property), an d shows that a large pool of water has
developed in a low point in „V‟ Street, and is across the road surface and
extends into the grounds of the properties in „V‟ Street, and also into
adjoining properties. The material is of limited value in determining whether
the property in „K‟ Street was first inundated by stormwater inundation, rather
than flood.
42. The Applicants advised that on 13 January 2011, they asked a friend to take
the photograph which they subsequently provided. The photograph shows
the front carpark area of the Applicants‟ property to be free of water.
According to the Applicants, the photograph was taken by their friend at
12.47pm on 13 January 2011.
43. The Applicants‟ have compared the video footage and photograph to a
graph, produced by the Bureau of Meteorology, of the water level of the
Brisbane River over the period 11-14 January 2011.
44. They say that the graph shows the river level at 9.13am on 11 January 2011
(when the video footage shows inundation of their premises had
commenced) was lower than at 12.47pm on 13 January 2011 (when the
front of their premises is shown to be clear of water.)
Case No: 258340 Determination Page 6 of 7
45. According to the Applicants, if river flooding were responsible for the initial
inundation of their property at 9.13am on 12 January 2011, they would have
expected that while the river remained at that level or higher, and their
property would still be inundated, but the photograph of their property on 13
January 2011 shows that this was not the case.
46. They highlight that their evidence casts doubt on the methodology and /or
the data used by the FSP‟s hydrologist to establish the cause of the initial
inundation.
47. The Panel notes MB‟s comments regarding reliance on water backflowing
and surcharging the stormwater drains is inconsistent with the comments in
the Notice of Response and inconsistent with the hydrology. The site specific
hydrology obtained by the FSP confirms that the inundation was most likely
due to the Brisbane River causing the water to backup through the
underground pipe network causing the i nundation above the Applicants‟ site
by 7.30am on 12 January 2011.
48. It is well established insurance law that water backflowing from a river
through an underground drainage system that causes inundation is still
classified as flood water. The FSP‟s policy is clear in that it does not extend
to cover flood. The question is therefore whether the site specific hydrology
report of A is sufficient for the FSP to establish on the balance of
probabilities that the inundation of the Applicants‟ property was due to flood
and therefore excluded under the terms of the policy.
49. The Panel notes there is conflicting hydrology information provided. The
reports provided by the Applicants are not for the Applicants ‟ property
although they are for properties that run parallel to the Applicants‟ street. The
Panel however has considered the relative weight of the hydrology
information provided and in this matter is persuaded by the hydrology report
provided by A based on a detailed modelling of the event together with site
specific consideration of the cause of the inundation.
50. In the circumstances the Panel is satisfied the FSP has established on the
balance of probabilities that the initial inundation of the Applicants‟ property
was due to the floodwaters from the Brisbane River backing up through the
underground stormwater network and inundating the Applicants‟ property. In
the circumstances the Panel is satisfied that the FSP is entitled to rely upon
the exclusion flood within the terms of the policy to refuse payment of the
claim.
51. A question has also arisen in this dispute as to the provision of the PDS. The
Applicants accept that the policy was incepted through a broker and the
circumstances by virtue of section 71(i) of the Insurance Contracts Act 1984
any requirement on the FSP to provide a document to the Applicants
becomes a responsibility of the broker, not the FSP.
Case No: 258340 Determination Page 7 of 7
Determination
52. Accordingly the Panel determines that the FSP is entitled to refuse payment
of the claim in accordance with the terms of the policy.