Home / Financial Firm (Unknown - Insurer) / Determination 258292
Determination 258292
Flood damage settlement - repair or rebuild
Summary
The complainants' flood-damaged home was to be repaired rather than replaced, and the FSP's cash settlement was accepted as fair. AFCA ordered continuing rent, advance rent and the $2,500 solar contribution, and rejected the claim for a new home.
Under the new-for-old policy the FSP has discretion to repair or cash settle, and the evidence shows the property can be repaired.
Issues
- Claim amount dispute primary · not upheld“the Panel is satisfied that the FSP is entitled to exercise its discretion to either repair the property or cash settle the claim”
- Delay secondary · upheld“given the bulk of the delays in this dispute can be attributed to the initial engineering advice relied on by the FSP, the Panel considers it reasonable that the FSP pay the rent”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 258292 Determination Page 1 of 12
Case number: 258292
General Insurance - Domestic Insurance - Home Building - Claim settlement
20 May 2013
Background
1. The Applicants held a home building and contents policy with the Financial
Services Provider (FSP) that provides building cover for the sum of $616,700
plus home contents in the sum of $134,100.
2. On or about 12 January 2011, the Applicants’ property in Ken more was
inundated by flood waters to a level of approximately 2 metres above the
lower section of the house. The Applicants contacted the FSP on 19 January
2011 and lodged a claim under the terms of the policy for the home building
damage and loss of home contents.
3. The FSP accepted liability for the Applicants’ claim. Under the terms of the
Applicants’ policy, the FSP paid emergency payments and temporary
accommodation payments. Initially the FSP paid the Applicants the sum of
$128,255.31 with respect to their loss of contents, temporary
accommodation expenses for a period of 12 months and a lump sum to
cover building repair costs in the sum of $217,728.42.
4. The Applicants disputed the FSP’s settlement and maintained that based on
expert advice, the home needed to be demolished. The initial dispute lodged
by the Applicants related to delays in the FSP making a Determination as to
whether the property could be repaired.
5. Following lodgement of the dispute with the Service the Panel Chair
Ombudsman conducted a site inspection of the Applicants’ property on 16
January 2012. Present were the Applicants, representatives from the FSP
and the Applicants’ engineer. The major issue in dispute was whether the
property was repairable and if so, whether it is appropriate for the property to
be cash settled or whether the FSP should conduct the repairs.
6. Following the site inspection, it was agreed that further investigation would
occur to determine the integrity of the concrete slab and the nature of
damage sustained by the floods. The Applicants were invited to discuss with
the FSP the various issues and the FSP was to arrange for further inspection
and tests to be conducted so a proper assessment of the loss could be
determined. The Applicants were advised to obtain their own Scope of
Works if they disagreed with that provided by the FSP.
Determination
Case No: 258292 Determination Page 2 of 12
7. The parties obtained further engineering and Scope of Works assessments.
As the parties were unable to reach agreement, a further site inspection was
conducted by the Panel Chair Ombudsman on 15 February 2013. Present
were the Applicants, representatives from the FSP and engineer JVD from
the Applicants’ engineering company and CB from the FSP’s engineering
company. The purpose of the site inspection was to discuss with the
respective engineers the differences that appeared in their reports, in
particular with respect to the movement of the slab and the repairability of
the property.
8. Following the site inspection it was agreed that the Applicants’ engineer
would prepare a full engineering Scope of Works based on all damage to
the property including flood and non-flood related damage. JVD was happy
to prepare the Scope of Works and suggested it be checked by the FSP’s
engineer so that the parties could agree on an ultimate Scope of Works for
repair of the property. It was agreed that the FSP would contract the
Applicants’ engineer to prepare the Scope of Works. It was also agreed that
the parties would obtain their own costings.
9. A full Scope of Works was subsequently prepared by JVD and costings for
the Scope of Works provided by QBI, authorised building inspectors. The
FSP has agreed to abide by the report of JVD, the Scope of Works and the
costing.
10. The FSP has now paid the Applicants, settlement monies calculated as
follows:
Damage to Home $592,227.54
(less landscaping provision
in quote
-$15,000.00
Less payment for repairs
received
-$217,728.00
$359,499.54
Adjustment for interest $30,116.70
$389,616.24
Rent reimbursement $39,330.00
Interest on rent $2,654.78
Future rent $19,665.10
Compensation $6,000.00
$67,649.88
Total Building $389,616.24
Total Additional costs $ 67,649.88
Total Payment $457,266.12
Case No: 258292 Determination Page 3 of 12
11. The Applicants have rejected the FSP’s settlement offer. They believe the
settlement is unsatisfactory.
Summary of Applicant s’ position
12. The Applicants maintain that the FSP has offered to pay the sum of
$577,227.54 (in total) for repair costs of the building against an insured value
of $616,700. They believe the FSP acknowledged the damage to the slab is
due to an insurable event and therefore they are entitled to a new home on
three grounds:
a) Before the home can be deemed repairable, the slab levels will have to
be retaken and found to have no significant difference to the reference
base line levels taken in July 2012. This would mean a further 15
months, before repairs could commence and the possibility of
substantial rework if the levels were to change.
b) The policy provides new for old and the Applicants believe in these
circumstances, they are entitled to a new slab rather than a repaired
slab. As there is no relevant technology available to replace the slab
with the remainder of the home in situ, then the new for old provision
should apply and the property replaced.
c) The offer does not include extra costs to comply with the latest home
building regulations, one of which requires the entire bottom floor to be
raised to the minimal habitable floor level. The entire bottom floor of the
home is currently below the minimum habitable floor level. Whilst the
Applicants acknowledge the Government has offered a waiver for
people rebuilding, the Applicants do not wish to take advantage of that
waiver.
13. Further, the offer does not provide for additional costs such as the costs of
temporary fencing, fees for quantity surveyors, land surveyors, architects
and engineers or building application fees. The Applicants maintain that such
fees on a new home would easily exceed 15%.
14. In the event that they are unable to settle for an amount sufficient to fund
reconstruction of an equivalent standard new home, the Applicants request
that the Service rule that they have the option of repaying any monies
received for repairs and requesting the FSP to manage the repair process.
15. Insofar as interest is concerned, the Applicants maintain that although they
were paid some money in December 2011, that interest should be paid from
the date of the insured event 12 January 2011, on the entire amount of the
repairs.
16. Insofar as rental income is concerned, the Applicants believe six months to
demolish and rebuild would be inadequate and they request eight months
future rent.
Case No: 258292 Determination Page 4 of 12
17. The Applicants acknowledge the FSP has offered $6,000 compensation as
the maximum allowable within FOS’s jurisdiction and accept the $6,000 but
not as full compensation.
18. As the policy provides for a $2,500 contribution towards solar hot water if the
home receives a greater than 80% repair, then the FSP should pay the
additional $2,500 contribution.
19. The Applicants also seek a refund of premium paid for home insurance since
January 2011.
20. The Applicants seek a total of $656,591.01 made up as follows:
Damage to home
(less landscaping provision
in quote)
$616,700.00
Less payment for repairs
received
-$217,728.42
$398,971.58
Interest $93,661.31
Less interest received -$9,302.80 $ 84,358.51
$483,330.09
Architectural, permits,
professional fees,
temporary fencing etc. @
15%
$ 92,505.00
Rent reimbursement $39,330.00
Interest on rent $ 2,654.78
Future rent $26,220.13
Compensation $ 6,000.00
$166,709.91
Contribution towards solar
hot water
$ 2,500.00
Refund of premiums $ 4,050.00
$6,550.00
$656,591.01
Summary of FSP’s position
21. The FSP maintains whilst the property levels require monitoring and that the
first usable data commences from 20 July 2012, it is not uncommon for
rectification works to commence despite the fact that the specific monitoring
has not been completed.
22. The FS P also relies upon the report from the Applicants’ engineer that it is
not uncommon for rectification works to commence despite the fact that
specific monitoring has not been completed.
23. The FSP maintains it will assess any further damage that may occur as a
result of any footing movement within the two year monitoring period and
Case No: 258292 Determination Page 5 of 12
repair any damage found to have occurred as a result of flood related
movement.
24. Insofar as the Applicants claim that they are entitled to a new slab in
accordance with the terms of the policy, the FSP notes the Scope of Works
provide for the repair of the slab topping and that by repairing the slab
topping using new materials, they are fulfilling the terms of the policy.
25. With respect to the claim for additional costs to comply with the latest home
building regulations, the FSP submits the building regulations in relation to
minimum habitable floor levels at the property apply to new buildings and not
existing buildings. The regulation does not apply to the Applicants’ home.
Further, the State government offered a waiver of this requirement for
residents wishing to build a like for like home after the 2011 floods.
26. They have accepted the Scope of Works to repair the flood damaged
property provided by the Applicants’ engineer and are sa tisfied the Scope of
Works details all required work to repair the home. They do not believe the
additional costs raised by the Applicants are required.
27. Insofar as the Applicants state that they will refund the money and request
the FSP manage the repair process, the FSP acknowledges that upon
repayment of the settlement monies provided to the Applicants in the
settlement of their claim, the FSP would be prepared to manage the repair
process.
28. The FSP agrees to pay an additional $2,500 contribution towards a solar hot
water system.
29. The interest rate paid to the Applicants, has been correctly calculated as
have the additional rental costs.
30. They dispute the Applicants are entitled to a refund of their home insurance
premium and note that the FSP has borne the risk of insuring the property
since that time and is therefore entitled to the premium charge.
Relevant policy provision
31. The FSP relies on the following policy provisions:
“ Insured events 1 to 12
…
1. Storm and flood
Some key points
We cover
Damage caused by rain, wind, hail, storm (eg. your roof is torn off during a
storm) and damage caused by flood from rivers, streets and canals.
…
Case No: 258292 Determination Page 6 of 12
Home claims
How we settle home claims
Of we agree to pay a claim for loss, theft or damage to your home, we will
decide if we will:
- repair damage new for old or
- rebuild your home new for old or
- pay you what it would cost us to repair or rebuild your home new for old
…
Dealing with defects
If a known defect is the cause of the damage
We do not pay for loss or damage caused by a defect, structural fault or
design fault at your home that you knew about (or should reasonably have
known about) and did not fix before the loss or damage occurred.
If an unknown defect is the cause of the damage
If an insured incident damages your home and an unknown defect was the
cause or part of the cause, we will pay for the resulting damage. If the
unknown defective part is also damaged by the same incident, we will fix this
as well.
We do not rectify structural or design faults
When we accept a claim, we will not pay extra to rectify a structural or design
fault at your home that existed before the damage occurred. We will only pay
you what it would have cost us to fix the damage from the insured incident or
if we agree, you can pay us the extra to rectify the structural or design fault at
your home.
If undamaged defective parts of your home will not support repairs
If undamaged defective parts of your home will not support repairing the
damage caused by an insured incident, we will only pay what it would have
cost us to repair the damage had your home not been defective.
For known defects or faults
Once you become aware of a defect, structural or design fault at the home,
you must rectify it as soon as possible because there is no cover for loss or
damage due to that defect. If you do not rectify the defect or fault, we will not
offer a renewal of your policy. ”
Issues
32. Whether the home’s slab was structurally damaged by the flood?
33. Whether the FSP’s cash settlement meets its obligations to the Applicants
under the policy?
Case No: 258292 Determination Page 7 of 12
Reasons for decision
34. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to refer this dispute directly to the Panel in accordance with the
Operational Guidelines to the Service’s Terms of Reference. This is because
of the potential amount of the claim and the issues to be considered. This
dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
35. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
36. The Panel notes the parties have provided a large volume of technical
evidence to support their submissions. The Panel has reviewed all the
material provided; however, will only address the evidence relevant to its
decision.
37. As indicated in the background information to this Determination, the Panel
Chair Ombudsman has conducted two site inspections of the property, the
first on 16 January 2012 where it was agreed that the parties are to obtain
further technical information and attempt to resolve the dispute and the
second on 15 February 2013 where the parties agreed to the Applicants’
engineer preparing an appropriate Scope of Works for the repair and/or
rebuilding of the property and that the parties agreed to have the Scope of
Works costed.
38. Following the February 2013 site inspection, the detailed Scope of Works
has been provided and costed by the building inspector QBI appointed by
the Applicants’ engineer. Despite the parties’ agreement with respect to this
process and the efforts of the parties, the parties have been unable to agree
on the final settlement of the claim.
39. The Panel does not propose reciting the various submissions or reports
provided in this dispute. Each party has provided significant submissions and
much of the technical evidence in support of the submissions is no longer
relevant given the agreement between the parties to rely upon the Scope of
Works prepared by engineer JVD.
40. Although the parties have now agreed to accept the Scope of Works for the
purpose of the continuing dispute, it is worth noting that there was
considerable resistance by the FSP to the issues raised by the Applicants,
following the FSP’s decision to cash settle the Applicants’ claim in January
2012. Although it was clear from information provided by the Applicants
through their own engineer that there were differing opinions between the
engineers, it would appear that the FSP was persuaded by the engineering
report provided by its engineer M with respect to the loss suffered.
41. It was not until the site inspection conducted on 16 January 2012 that the
matter progressed and in fact, not until the opportunity of discussing the
matter with the engineers in February 2013 that it became clear that the view
being offered by the Applicants’ engineer with respect to the flood related
Case No: 258292 Determination Page 8 of 12
damage and Scope of Works was, in the Panel’s view, and agreed to by the
parties, a more preferabl e view than that being expressed by the FSP’s
engineer.
42. It was on this basis that JVD was engaged to provide a Scope of Works with
respect to the damage to the property and on this basis that the FSP agreed
not only to JVD providing the Scope of Works but JVD arranging for the
costing of the Scope of Works to be prepared by an independent person.
43. The policy clearly provides the FSP has discretion whether to repair the
property new for old or rebuild the home new for old or pay the costs of what
it would cost to repair or build the home. This is a discretion to be reasonably
exercised by the FSP, based on the information that is available to it.
44. The Applicants note the policy provides new for old cover and argue in these
circumstances they are entitled to a new home. Whilst the Panel
understands the argument made by the Applicants, the policy is subject to
the policy limitations with respect to the building sum insured. Where it is
determined that a repair can occur, the repair is with new materials not
second hand. If it is a rebuild then it is with new materials. Contents are
replaced with new items.
45. The first issue of concern for the Panel is whether the property was
structurally damaged by the flood such that it cannot be repaired. During the
site inspection with the parties on 15 February 2013, JVD correctly noted
that anything can be repaired; it is a question of preparedness to pay to
cover the cost of those repairs.
46. JVD has detailed various points of damage. Included within the Scope of
Works is the inspection of all plywood wall bracing and replacement of
damaged bracing required to match original. It is not suggested that this
internal damage is of a significant structural impact. There is the removal
and replacement of all concrete and brick pavements left, refinishing of the
deck at the front and the rear of the dwelling and the replacement of the
concrete driveway. Again, these are not significant structural features.
47. The Scope of Works refers to the slab topping requiring the installation of
new concrete topping to allow for a minimum of 40ml thick topping to the full
extent of the lower ground floor. Although this is clearly related to foundation,
it is not, in the Panel’s view, related to structural or non -structural framing.
48. The Applicants have argued that BSA requirements (post floods) require a
permit in the event of substantial repairs to structural and non-structural
framing members. The Panel is not satisfied that such a permit would be
required for the topping of the slab. The Panel accepts that the waiver
offered by the Queensland Government would be applicable in the
Applicants’ case in the event that the property was to be rebuilt.
49. In the circumstances, the Panel is satisfied on the balance of probabilities
that the property could be repaired and is not satisfied that the Applicants
Case No: 258292 Determination Page 9 of 12
have established that the bottom floor area of the home if rebuilt would be
required to have building permits under the new building regulations.
50. The Panel has carefully examined the latest information provided by JVD.
51. It is clear that JVD has provided a Scope of Works for the proposed property
covering all works considered necessary to return the property to its pre
flood condition. The Panel notes from the report of 22 March 2013 that JVD
recognised that some of the items may not specifically be related to cover
provided by the relevant flood insurance, that is, some of the items may not
be related to the flood event.
52. The budget estimate was provided by QBI after receiving the proposed
Scope of Works, verbal information from JVD and a site inspection. The
FSP’s original engineer was present during part of the site inspection but
according to the report, left half way through and did not provide any specific
input.
53. It is acknowledged that the budget estimate contained some duty of care
items, not specifically related to the flood. It is also acknowledged that
included in the quotation is a replacement of the driveway, although whether
this was flood related had not been assessed. This also applied with respect
to the rear shed, rear deck and other external changes.
54. JVD has explained the method of reaching the estimate and the various
allowances and noted that QBI allowed for a builder’s overhead profit of
20%, when 15 to 20% would be fair and reasonable, together with a further
contingency of 15%.
55. The Panel has carefully reviewed the Scope of Works. The Panel notes that
the FSP’s offer covers the entire Scope of Works save for $15,000
landscaping which is not covered under the terms of the policy. Other items
which the engineer indicates may be duty of care items and not necessarily
covered under the policy have been included in the FSP’s offer.
56. There is nothing in the latest material exchanged to suggest that the
Applicants’ property could not be repaired. Whil st the Applicants had
provided a Scope of Works for a new property, the Panel is satisfied that this
is not applicable in the current dispute as the available evidence satisfies the
Panel that the property can be repaired.
57. In the circumstances, the Panel is satisfied that the FSP is entitled to
exercise its discretion to either determine to repair the property in
accordance with the terms of the policy or to cash settle the claim based on
the reasonable costs to effect the repairs of the property, in accordance with
the terms of the policy.
58. Insofar as the FSP’s offer to pay for the building costs, the Panel notes this
offer stands at $577,227.54. This amount has now been paid to the
Applicants, plus interest at the statutory rate, being $30,116.70. The total
payments to the Applicants with respect to the building costs including
Case No: 258292 Determination Page 10 of 12
interest is therefore $607,343.24. The Panel notes that in addition to this
amount, the FSP has agreed to pay the Applicants the sum of $2,500 as its
contribution towards a solar panel.
59. In the Panel’s view, the offer by the FSP based on the agreed Scope of
Works is fair and reasonable in all the circumstances. The interest paid is
consistent with Section 57 of the Insurance Contract Act and the Applicants
have not presented any persuasive evidence to suggest any additional
interest should be paid.
60. The evidence presented by the Applicants does not establish that they would
incur any further costs as claimed with respect to planning fees, inspection
fees, legal fees or surveyor fees given that the property would be repaired,
nor is the Panel satisfied that the Applicants have established that additional
costs such as temporary fencing are not included within the Scope of Works.
The Panel accepts however that if the Applicants choose to repair the
property and these costs were necessarily incurred over and above that
allowed under the Scope of Works, then the Applicants would be entitled to
recover the reasonable costs, subject to notifying the FSP beforehand or
supplying the relevant receipts and agreeing those costs.
61. The policy also provides for additional costs such as rental accommodation.
The Applicants’ rental payments, in accordance with the terms of the policy
ceased after 12 months. Given the bulk of the delays in this dispute, can be
attributed to the initial engineering advice relied on by the FSP, the Panel
considers it reasonable that the FSP pay the rent whilst this dispute is
ongoing. The Panel understands from the FSP that such payments are
continuing. Although the offer to the Applicants provides for a further 12
months rental at $756.35 per week totalling $39,330 plus interest of
$2,654.78, the Panel understands this has been paid to the Applicants. It is
unclear from the information whether this covers any arrears in rent to date,
although the Panel believes following further discussion with the parties that
rental payments have been paid to date. Subject to the rental payment
having been paid to date the Panel accepts the offer is reasonable in the
circumstances. The FSP has further offered the sum of $19,665.10 being six
months advance rent at $756.35 per week. The FSP has advised that this is
a rea sonable period of time for the Applicants’ property to be repaired.
Although the Applicants suggest eight months would be more reasonable,
there is no evidence that the repair of the Applicants’ property would take
longer than this or that the property would not be habitable within that time.
In the circumstances, the Panel accepts that the offer of advance rent of
$19,665.10 is reasonable, subject to it being paid from the date of
acceptance of this Determination.
62. With respect to the compensation offered in the sum of $6,000, the Panel
notes that this is the maximum amount that the Panel can award for
consequential loss ($3,000) and non-financial loss ($3,000). In the
circumstances, the Panel accepts that the FSP’s offer is fair and reasonable.
63. The Panel notes from discussion with the Applicants and with the FSP, that
considerable concern has been expressed by the Applicants as to possible
Case No: 258292 Determination Page 11 of 12
future movement of the structure due to movement of the slab. The
Applicants are concerned that the FSP would not be liable with respect to
such costs incurred in any future rectification works.
64. The FSP has agreed in its latest submission, that in the event of there being
further damage that may occur as a result of any footing movement within
the two year monitoring period, that it will repair any damage found to have
occurred as a result of flood related movement. The Panel understands from
this that the FSP agrees to meet the costs incurred of any additional repair
required as a result of any movement in the footing as a result of the floods.
65. In the circumstances, the Panel accepts and determines that should the
parties agree to the repair of the premises, then the FSP in addition to the
building costs incurred would be liable for the reasonable costs associated
with any additional repairs required as a result of movement of the footing
within the relevant two year monitoring period.
66. The Panel further notes from the Applicants’ submission that the Applicants
invite the Panel to determine that the Applicants have the option of returning
the monies paid thus far for the repairs and to request that the FSP manage
the repair process.
67. Again, the Panel notes that the FSP is prepared, subject to repayment of the
money provided to the Applicants in settlement of the claim, to manage the
repair process.
68. The Panel notes that the FSP has already paid the Applicants for both
building and additional costs, the sum of $674,994.12. The Panel determines
that in the event the Applicants are not prepared to accept payment of this
amount plus the additional rental payments if any, referred to above, that the
Applicants may chose to have the property repaired in accordance with the
agreed Scope of Works subject to the Applicants agreeing to repay the FSP
the total building costs including interest paid to the Applicants to date.
69. Should the Applicants chose to either conduct the repairs to the property
themselves or to rebuild the property, then the Applicants are entitled to
retain the monies paid to date by the FSP together with the additional
monies with respect to the rental payments payable if any, subject to the
Applicants’ acceptance of this Determination.
70. The Panel has considered the Applicants’ claim regarding refund of the
premium but notes the FSP has continued to be on risk with respect to the
property. No refund is applicable in these circumstances.
Determination
71. On the basis of the available information the Panel determines the amount
offered and paid to the Applicants $674,994.12 plus additional rental
payments as referred to in the Determination is a fair settlement of the claim,
in accordance with the terms of the policy.
Case No: 258292 Determination Page 12 of 12
72. The Applicants must notify the FSP within 30 days of this Determination
whether they accept the Determination in full satisfaction of their claim and if
so, whether they wish to accept the money in settlement of the dispute, or
refund the total building costs received including interest and have the FSP
conduct the repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.