Home / Financial Firm (Unknown - Insurer) / Determination 258159

Determination 258159

Claim declined under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for flood inundation of their Rocklea home, which the FSP declined under the flood exclusion. AFCA found the water was flood as defined in the policy and the FSP was entitled to decline.

Water overflowing a stormwater channel falls within the policy's flood exclusion rather than the storm and rainwater cover, and the policy disclosed the exclusion adequately under s35 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 258159 Determination Page 1 of 9 Case number: 258159 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 8 August 2012 Background 1. The Applicants hold a Home Building and Contents Policy of insurance with the Financial Services Provider (FSP). The policy covers the building for replacement cover and contents up to $97,650 and Personal Valuables up to $1,000. The policy is subject to an excess of $300. 2. On 13 January 2011 the Applicants made a claim for loss and damage resulting from the inundation by water of their insured property in Rocklea Queensland. 3. The FSP declined the claim on the basis that the damage had arisen from flood water which was excluded from cover under the policy. 4. The Applicants dispute the FSP‟s declinature on the basis that the inundation was from stormwater run-off which is covered by the policy. Further that the FSP failed to properly inform of the flood exclusion under section 35 of the Insurance Contracts Act 1984. Summary of Applicants’ position 5. The Product Disclosure Statement (PDS) was not forwarded to the Applicants. The Applicants were instead invited to look at the PDS on a website. The exclusion was not drawn to the attention of the Applicants. Accordingly the FSP failed to fully inform the Applicant under Section 35 of the Insurance Contracts Act 1984. 6. The Applicant states that flood is a prescribed event for the purposes of section 35 of the Insurance Contracts Act 1984, as defined by section 14 of the Insurance Contracts Regulations 1985. The Corporations Act 2001 further requires clear, concise and effective disclosure. 7. The Applicants contend the distinctions between the definitions that signify cover or exclusion are artificial and it is unreasonable to expect a consumer to understand them or to identify circumstances of cover. Accordingly, the Determination Case No: 258159 Determination Page 2 of 9 requirement to clearly inform under section 35 of the Act or to provide clear, concise and effective disclosure under the Corporations Act has not been met. 8. The FSP failed to properly advise the Applicants that the policy did not cover flooding. This was a breach of the FSP‟s duty of good faith as it failed to advise the Applicants of the unsuitability of this policy for the area of Rocklea in which flooding was a foreseeable event. 9. Alternatively, the Applicants note that storm is a covered event under the policy and the damage arose from storm. 10. The Applicants rely on rainfall data which indicates three day totals exceeded 200mm over most of the area bounded by Brisbane, Gympie and Toowoomba, including the majority of the Brisbane catchment. From Monday 9.00am to Tuesday 9.00am 15.4mm of rain was recorded and 40mm recorded from 9am Tuesday to 9am Wednesday. This evidence accords with the Applicants‟ recollection that very heavy rain o ccurred Tuesday morning and it was only as a result of this storm that the Applicants‟ property was inundated, within the definition of the FSP‟s policy. 11. It should also be noted the Applicants in correspondence to the FSP (described below) indicated the water came from drains. Summary of FSP’s position 12. The FSP has enclosed policy and claims enquiry notations from which the Panel notes the following:  Notation dated 11 December 2006 indicating that due to an administrative error the customer did not receive a contents supplementary product disclosure statement when their policy renewed during 2006. The notation indicates that a letter of explanation and the supplementary product disclosure statement was re-sent.  Notation dated 13 January 2011 confirming a claim was lodged. The claim description states: “There has been a lot of heavy rains and storms in my area. Water rose within my home to about a metre” 13. The FSP has enclosed an assessor report by “C” from which the Panel notes the following:  The property is a highset construction with Hardiplank external walls. The upper level is two metres from ground level.  Torrential rainfall of more than 160mm in the upper reaches of the Brisbane river catchment and from 9 January 2011 combined with massive releases of water from the Wivenhoe Dam caused river levels downstream to rise rapidly from 10-13 January 2011. The river peaked Case No: 258159 Determination Page 3 of 9 at a near record height of 4.46 metres on the afternoon of Thursday 13 January 2011.  The Applicants were not present at the property and have limited knowledge of the timing and extent of rainfall and flood heights. However, upon return to the premises it was evident that water had flowed through the ground floor level to a height of approximately 1 metre.  The water inundating the home was ground water from the creek which is proximate to the insured premise. 14. The FSP has enclosed an email from the Applicants which states the following: “.....I wish to have this finding reviewed and overturned as they themselves state that rain fall was the determining factor in the property being affected by water. We were not responsible for the release of the water from Wivenhoe dam and if this was as is implied a contributing factor then why does the policy allow for the following? Storm and rainwater including stormwater runoff from areas surround the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Clearly the water entering the property was caused by run off from rainwater that was mainly a result of storm water run off and this water escaping from the main drainage and entering our property” (sic) 15. The FSP has enclosed an explanatory statement from an employee “BB” whose role it is to ensure that documents are delivered by post to the correct postal address. BB provides the following information in relation to the building policy:  The request for policy document production was received by the mailing house on 3 June 2007 and processed on 4 June 2007.  There were no reported errors processing this transaction.  The documentation was lodged with Australia Post on 7 June 2007.  All the data was reconciled and there was no indication of a mail return. 16. The FSP has enclosed an explanatory statement from BB in relation to the:  The request for policy document production was received by the mailing house on 15 June 2008 and processed on 15 June 2008.  There were no reported errors processing this transaction.  The documentation was lodged with Australia Post on 19 June 2008.  All the data reconciled and there was no indication of a mail return. 17. The FSP disputes that it did not send the PDS to the Applicants. The FSP relies on its proof of dispatch for both the Home Building and Home Contents PDS documents sent in June 2007 and June 2008 respectively. The FSP maintains that it met its obligations under section 35 of the Act by sending the PDS on at least two occasions. Case No: 258159 Determination Page 4 of 9 18. The FSP contends that the policy wording defines what flood means and conversely what flood does not mean. The definition of flood is necessarily broad to ensure it covers phenomena consistent with overland floodwater flow. The FSP rejects the proposition that its wording contravenes section 35 of the Act or that this fails to meet the requirements espoused under the Corporations Act 2001 and the relevant ASIC guidelines. 19. The FSP disputes the Applicants‟ submission that the definition of flooding is artificial. The FSP confirms that in instances of water inundating the insured property by water solely from a drain that the policy will respond. This includes pipe backflow caused by water unable to escape. 20. The FSP has enclosed a site specific hydrology report from which the Panel notes the following:  A total of 127.3mm of rain was recorded at the Corina High School Alert gauge between 12am on 9 January 2011 and 5.00pm on Tuesday 11 January 2011.  The peak stormwater run-off at the property would have occurred within 15 minutes of the peak rainfall intensity. This rainfall is less than the 1 year ARI for Brisbane. The higher rainfall intensities which caused major flooding in the Brisbane and Bremer Rivers occurred further to the west of the subject property.  The insured property is located approximately 4.7km upstream of the confluence of Stable Swamp Creek and Oxley Creek and 400m from the confluence of an open stormwater drainage channel and Stable Swamp Creek. The open stormwater drainage channel that runs between Beatty Road and Beaudesert Road is a modified natural drainage path.  Urban drainage surrounding the insured property is well defined and would include underground pipe networks and street drains to direct stormwater run-off away from properties. Upstream catchments would drain along streets and around the subject property. The actual catchment that would direct stormwater runoff to the subject property would be minimal, only including a few adjoining allotments.  The peak water level of Stable Swamp Creek in the vicinity of the subject property was approximately 9.2mAHD. The peak water level is estimated to have occurred at approximately 2 -3am on Thursday 13 January 2011.  The ground levels of the property vary from 7.7mAHD at the corner of Beatty Road and Marshall Road to 8.8mAHD at the north-west corner. This indicates the entire property was inundated by the peak water level of 9.2mAHD. Initial inundation of the subject property by floodwater backing up from the Brisbane River, via Oxley Creek, Stable Swamp Creek and the nearby open stormwater drainage channel, would have occurred at 12.30pm on 12 January 2011 – about 16 hours after rainfall in the area had ceased. Case No: 258159 Determination Page 5 of 9  It is estimated that the floor level of the subject property is approximately 8.2mAHD given the flood peak of 9.2mAHD and 1m inundation level in the property.  Initial inundation above the ground floor level by floodwaters from the Brisbane River would have occurred at approximately 3.30pm on 12 January 2011. 21. The FSP cannot know all the circumstances of its policy holders and relies on its policy holders to advise of any specific issues/risks. The FSP notes that it is not authorised to provide Financial Product Advice as it is not appropriately licensed to do so under the Corporations Act 2001. The FSP further notes the onus rested with the Applicants to read their PDS. 22. The FSP maintains the inundation at approximately 3pm on Wednesday 12 January 2011 arose from flood rather than stormwater run-off. The Applicants informed the assessor the water came from the creek and no major rainfall had occurred since 5pm on Tuesday 11 January 2011. 23. The Applicants have produced no evidence that the inundation occurred from water escaping from drains. The hydrology evidence indicates the inundation did not arise from storm or rainwater run-off. Accordingly the FSP was entitled to decline the claim on the basis of flood. Issues 24. Whether the FSP breached section 35 of the Act. 25. Whether the FSP was entitled to decline the Applicants‟ claim. Reasons for decision 26. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 27. The Panel has read ea ch party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 28. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 29. The Panel considers that there are two discrete general issues (listed above) which will be dealt with separately below. Whether the FSP was entitled to rely on the policy terms and conditions 30. The Panel has reviewed the file notes indicating receipt of the home building policy in 2006 but not the contents policy. It appears the building and Case No: 258159 Determination Page 6 of 9 contents policies later changed and were sent to the Applicants. The Panel has reviewed the proof of dispatch and is satisfied from the evidence provided that the Applicants were sent the PDS documentation. 31. The case law supports that in most cases the provision of the policy document is sufficient to discharge an insurer‟s onus under section 35 of the Act. The document however must readily answer whether an event such as flood is covered for a person of average intelligence and education. 32. The Panel considers that the policy does provide information in the definition of flood as to what flood is and what flood is not. The policy is indexed and is written in plain English. The flood exclusion is mentioned multiple times across the PDS. 33. The Panel concludes the wording and structure of the policy is not such that it would fail the requirements under section 35 of the Act or the clear, concise and effective disclosure requirement under the Corporations Act 2001. 34. The Panel also accepts that if the FSP was to engage in providing circumstance specific advice to an insured, this could potentially constitute financial advice under the Corporations Act 2001. This would be problematic as the FSP is not authorised to provide such financial advice. The Panel consider that it would be inappropriate to require the FSP to provide such advice in contravention of the Corporations Act 2001. Accordingly, the Panel does not consider a failure to provide circumstance specific advice constitutes a breach of section 13 of the Act. Whether the FSP was entitled to decline the Applicants’ claim 35. The Panel notes the following policy terms and conditions are relevant to consideration of this claim: “What we cover - insured events This section describes under the heading: Yes - the insured events you are covered for, No - the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. No Damage or loss caused by flood. Flood means the inundation or covering of normally dry land by water which: Case No: 258159 Determination Page 7 of 9 escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” 36. The Panel has reviewed the rainfall data provided by the Applicants. The Panel considers rainfall data solely by itself is insufficient to demonstrate that stormwater run-off was the source of water inundation damage to the property. 37. The only expert evidence before the Panel regarding the source and method of inundation is from the FSP‟s hydrologist. In particular the Panel notes the hydrologist‟s finding that initial inundation of the subject property by floodwater backing up from the Brisbane River, via Oxley Creek, Stable Swamp Creek and the nearby open stormwater drainage channel. The Panel accepts that the water inundation arose from the stormwater drainage channel. 38. The terminology utilised by the hydrologist however is somewhat problematic for the Panel. The hydrologist has identified a hydrological feature as a „stormwater drainage channel‟. The hydrologist then further qualifies this feature by describing it as a „modified natural drainage path‟. The policy excludes water inundation from a stormwater channel but includes cover for water escaping from a drain. 39. The evidence before the Panel is somewhat ambiguous as to whether this feature from which water escaped should be treated as a stormwater channel, a stormwater drain or a modified natural drainage path. 40. The Panel notes the Applicants have argued that the inundation came from the drains which would establish a prime facie claim under the stormwater cover of the policy. The hydrologist‟s evidence has indicated that the water did in fact come from a stormwater drainage channel. The FSP has argued that the modified natural drainage path referred to by its hydrologist, answers to the policy definition of: „ watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or storm water c hannel’ ; insofar as water came from the stormwater channel, then it is entitled to rely on the flood exclusion in denying the claim. However the evidence from the hydrologist does not characterise the hydrological feature in terms which would properly establish the exclusion on which the FSP seeks to rely. 41. There is a potential argument of contra proferentum in relation to this claim as the policy does not define what a stormwater drain, stormwater channel Case No: 258159 Determination Page 8 of 9 or modified natural drainage path might represent. There is a potential for the stormwater drainage channel to act as both a channel for water and as part of a drainage system. It is therefore unclear precisely what the FSP‟s policy excludes or is the exception to the exclusion. 42. To assist in determining this dispute the Panel Chair Ombudsman met with the Applicants and the FSP representatives on site on 13 July 2012. 43. The Applicants confirmed they were not at the site at the time water first entered the home and are unable to say exactly where the inundation came from. The Applicants advised that they had returned to the house after it was inundated and saw water coming from the direction of the Stable Swamp Creek. 44. The Applicants‟ property has a large stormwater drain opposite and sits at an intersection with the “M” road at the front of the property running down towards the Stable Swamp Creek. The home itself is a two-level house with the ground level sitting lower than the crest of the main road. It also sits lower than the neighbouring property. 45. The Panel Chair Ombudsman took the opportunity of visiting the modified natural draining path described in the hydrologist‟s report as the open stormwater drainage channel. It is located approximately 300 metres from the Applicants‟ property. The drainage path is de fined by concrete banks and runs under the main road. On either side of the drainage path is parkland. The Applicants described the water rising from that area. 46. Whilst the Panel acknowledges the possible contra proferentum argument, the Panel accepts that the normal definition of a channel is a hollow or open bed for a natural or artificial waterway, while a drain is more of a pipe or conduit by which a liquid drains. Whilst the word drain and channel may sometimes have similar application, the Panel accepts that in this case, the modified natural draining path referred to in the hydrologist‟s report is in fact a stormwater channel within the normal definition of stormwater channel. The drainage path is open, with defined concrete banks designed to take stormwater from the area. Water overflowing the stormwater channel is properly excluded under the terms of the policy. 47. Whilst there is evidence of some water being observed exiting the nearby stormwater drains, given the topography of the area, most likely that water would not have inundated the Applicants‟ property until such time as the water from the Stable Swamp Creek and stormwater channel had reached the property. 48. In the circumstances, the Panel is satisfied that most likely the Applicants‟ property was first inundated by waters from the Stable Swamp Creek and stormwater channel that combined with local runoff from the stormwater drainage systems. Such inundation is properly classified as flood under the terms of the policy and in the circumstances the FSP is entitled to rely upon the terms of the policy to deny the claim. Case No: 258159 Determination Page 9 of 9 Determination 49. On the basis of the available information the Panel is satisfied, o n the balance of probabilities the property was inundated as a result of flood as defined within the terms of the policy and accordingly the FSP is entitled to rely upon the terms of the policy to deny the Applicants‟ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.