Home / Financial Firm (Unknown - Insurer) / Determination 257846

Determination 257846

Partial denial of storm damage claim under earth movement and wear exclusions; quantum of repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$280,605
Non-financial loss—
Amount claimed$305,000
SourceAFCA PDF

Summary

A severe 2010 storm flooded a rural homestead and outbuildings, and the FSP partly denied the claim as earth movement or pre-existing damage. AFCA rejected those exclusions and ordered $217,750 for the disputed damage, the $42,854.50 accepted repairs, $14,000 in expert fees and $6,000 for accommodation, plus interest.

The insurer bears the onus of proving an exclusion applies, and the proximate cause of the damage was the storm rather than earth movement or wear.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 257846 Determination Page 1 of 31 Case number: 257846 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 5 June 2013 Background 1. The Applicants were insured with the Financial Services Provider (FSP) under a farm insurance policy that covered their home building, which was insured in the sum of $400,000, sheds insured in the sum of $60,000, fences insured in the sum of $5,000, and barns insured in the sum of $20,000, together with cover for “additional increased costs ” of $5,000 . The relevant period of insurance was 19 February 2010 to 19 February 2011. 2. A claim was lodged under the policy as a result of storm damage to the property which occurred on 7 December 2010. The FSP appointed a loss adjuster to attend and inspect the property. The loss adjuster MJ of C&C attended the property on 10 and 11 December 2010. He indicated that substantial damage had been caused by water and hail. 3. As a result of the inspection by the adjuster, various tradesmen were engaged to carry out inspections and rectify immediate damage to the property. The FSP has paid out the sum insured for fencing. 4. Following several reports from the adjuster, the decision was taken by the FSP to arrange for a structural engineer to conduct an inspection of the property. The engineer Mr B of MP has furnished a series of reports including the provision of a scope of works for work which the engineer believed would cover all of the damage caused by the c laimed event. 5. As a consequence of the engineer’s first report, the FSP wrote to the Applicants on 27 July 2011 advising that parts of the claim would be excluded. The partial denial by the FSP was in a letter which referred to policy exclusions setting out why all damage was not covered. 6. The Applicants disagreed with the FSP’s decision to partially deny the claim. Ultimately after many submissions from the Applicants to the FSP, the Applicants requested review through its internal dispute resolution procedures (IDR). However following the IDR review, the FSP maintained its partial denial of the claim. Determination Case No: 257846 Determination Page 2 of 31 7. Further submissions were made by the Applicants to the FSP which resulted in further requests by the FSP that MP review its earlier reports. Nevertheless, the FSP has maintained its partial denial of the claims. 8. The FSP obtained quotations for the repairs originally estimated by MP to be required as a result of the damage sustained in the storm. Initially quotations were obtained in the sum of approximately $12,000. 9. However, by August 2012 and in response to continued submissions by the Applicants, a further firm “M” was engaged by the FSP to prepare two scopes of works. The first was a scope of works (number 1) for the work to be carried out, in order to complete the repairs which the FSP agreed should be approved, as a consequence of the storm. 10. Two quotes were obtained for the completion of that work from scope of works number 1. One quotation, from a firm “B” was in the sum of $57,970. The second quotati on, from the firm “C”, was in the sum of $42,854.50. (Both quotations included GST). 11. Simultaneously with the preparation of a scope of works in respect to work for which the FSP had admitted liability, M was also asked by the FSP to prepare further scopes of works in respect to the work which was required to be carried out to the property, but for which the FSP denied liability. Again, two quotations were received from B in the sum of $247,390, and from C in the sum of $188,127.26 (both quotations included GST). 12. Shortly before the preparation of the two scopes of works by M, the Applicants, for the first time, engaged an expert for an opinion as to the damage sustained to their property as a result of the storm. On 26 November 2012 the consulting engineer PC furnished a first report to the Applicants. In summary, that report expressed conclusions which were largely at odds with the conclusions reached by MP in their various reports. 13. In a subsequent report PC provided a commentary on the scopes of works provided by M. But the FSP has maintained its partial denial. Summary of Applicants ’ position 14. The Applicants submit that all of the damage which is referred to in both of the scopes of works, is related to the storm, and is damage for whic h they are entitled to be indemnified by the FSP. 15. They point to the initial assessment by MJ from the firm C&C and the fact that MJ who inspected the property within a few days of the storm, appeared to have no doubt about the magnitude of the damage which had been caused to the property by the storm. MJ has since died and his work was subsequently carried out by another adjuster at C&C. 16. They point to the fact that the first adjuster had attempted to illustrate to the FSP the magnitude of the storm. Whilst it appears that MP have accepted Case No: 257846 Determination Page 3 of 31 that indeed the storm was severe, the Applicants doubt that the FSP has ever accepted the true magnitude of what happened on 7 December 2010. 17. They rely upon statutory declarations by KH and CK, two friends who assisted them when they bought the property and who have declared that after the storm they attempted to reach the Applicants by road but were unable to do so. In the statutory declarations they state that “the main bitumen road that runs past the front of the property had completely erupted and was torn apart and lifted and it was impassable and so was the unmade dirt road that runs alongside. A car had been swept across the other side of the main road and was turned on its side on the land adjacent to the road. ” 18. After being turned back by attendants, KH and CK made their way to the subject property on foot. They found that the driveway had completely washed away and was full of huge holes, the entry gates were forced shut with debris and earth fill, concrete was holding the gate posts which had been pushed up and out and the surface of the veranda was covered in water. Even when the water was removed from the top of the veranda, water was still coming through to the surface from underneath the concrete and the veranda was very badly cracked and damaged. 19. CK and KH have also commented that “the basement and the beautiful cottage directly next to the house are at a lower level and the inside kitchen floor surfaces were completely inundated. The basement used for storage was completely flooded. The force and massive volume of water had forced its way through the window above ground level and ruined the inside walls ” . They helped the Applicants pump the water out and remove the contents. The outbuildings/shed gutters had failed because of the storm and sheer weight of the water and hail. All communications and power services were destroyed and a generator was required to provide power. Domestic water service and irrigation pipe were destroyed, all paddock and perimeter fencing was ripped out of the ground and taken with the storm. Many farm animals were lost. 20. CK and KH also commented upon the condition of the property at the time that it was purchased by the Applicants. They have declared that the description of the property made by the Applicants is true and accurate. 21. Regarding the condition of the property before the storm, the Applicants in their statutory declaration state that the surface appearance of the return veranda surrounding the entire main residence was even, flat and without any raised areas, perfectly sound and entirely consistent with normal use and normal insignificant surface marks. There were no visible signs of open cracking or deterioration as a result of wear and tear. Neither were there visible signs during any of the inspections which they made prior to the purchase of the property some ten months before the storm. 22. The pillars and posts and the balustrade walls showed no visible signs of cracking or deterioration. The integral properties of the fascia, the gutter or its fixings were also not deteriorated. They had consistently and continuously Case No: 257846 Determination Page 4 of 31 served their intended purposes up until the events of 7 December 2010. The gutters and fixings collapsed during that event. 23. The Applicants further state that prior to their purchase, there was no evidence whatever of any dampness anywhere. There was no evidence whatever of mould or mildew growth and no evidence to indicate there ever had been. The house did not smell of damp and the atmosphere was not representative or indicative of damp. There were no happenings or events between 25 February 2010 (when they moved into the property) and 7 December 2010, which changed the very good condition or appearance of the property as described. 24. After the inspection of the property by “B” of MP whose initial inspection was in the absence of the Applicants, they queried and disputed a number of the points made by Mr B. At various times they have pointed out numerous errors in the original report of Mr B - errors which they suggest cast great doubt upon the reliance which should be placed upon his various reports. As examples, Mr B said “there are photographs o f the cracked northern veranda slab two days after the rain event with weeds growing within the cracks. An inspection of the edges of the cracked surface suggest the cracks are weathered and fretting. They do not look to be of a recent origin.” 25. After correspondence from the Applicants, Mr B belatedly (12 months later) admitted that in making this statement, he was in error, and that the “weeds growing within the cracks” was in fact debris washed in by the storm. 26. Mr B also commented that the condition of the eaves, gutters and timber fascia to the nearby south-eastern shed was always likely to collapse. The gutters were severely rusted and the timber fascia and fixing into the end grain of the timber rafters were rotted. The weight of a rapid build-up and the continuing impact of the rainwater from the roof overloaded a structurally inadequate fixed gutter and fascia. Mr B subsequently admitted that he had not inspected the site of the gutters but had remained on the ground when making this observation. 27. When commenting on the homestead, Mr B stated that “the solid masonry dwelling has generally timber floors throughout”. In fact the property has predominantly concrete floors, a fact which made impossible his suggestion (when later commenting upon the dampness i n the kitchen) that a hole should be cut in the floor to judge the degree of dampness under the kitchen floor. 28. The Applicants say that the FSP’s handling of the matter must have been influenced by that report, and that even though they made many submissions to the FSP, it remained inflexible and not prepared to revisit its opinion. This is despite the fact that one of the Applicants is a qualified builder and therefore well able to make comment on the matters contained in Mr B’s report. 29. In their submission the Applicants say the damage was caused by the destructive effect of the inundation of water which became deep and which Case No: 257846 Determination Page 5 of 31 proceeded across their property, in circumstances outlined by KH, and by MJ of C&C. 30. The Applicants also rely upon the pre -purchase report obtained from M and H (National Valuers). In this report, which was produced some ten months before the storm event, it was stated that  “ the main building external condition is good;  the main building internal condition is good;  essential repairs – no essential repairs required;  additional comments – the property presents in good condition and at the time of our inspection we did not observe any major problems or faults with the property;  additional comments – we confirm that the property is readily saleable at the assessed value herein and that there are no adverse features. ” 31. Accordingly, the Applicants say that this report, together with their own submissions, the statutory declarations by KH and CK, combined also with the initial assessment report of MJ of C&C, provide the best evidence of the condition of the property prior to the storm, and that this evidence as to the pre-storm condition of the property should be preferred to the conclusions reached by Mr B of MP. 32. Regarding the two scopes of works prepared by MCS, the Applicants believe that they are entitled to be compensated in respect to all of the items referred in both scopes of works and that in addition to those scopes of works, allowance must be made for the damage sustained to the outbuildings described as the cottage and barn respectively. 33. The Applicants rely upon the expert opinions of “ P C”, an engineer whom they engaged in September 2012. Summary of FSP’s position 34. The FSP has relied upon the opinions of Mr B of MP. 35. Following the initial report by MP, the FSP partially denied the Applicants’ claim, and it has maintained that decision ever since. 36. The FSP relies on the following policy provisions: “Section A – Home Cover What you are not insured for Under Section A – Home Cover, we will not pay for: A. ... B. Loss or damage to your property caused by: a. ... Case No: 257846 Determination Page 6 of 31 b. earth movement, vibration, erosion, landslide or subsidence (except when caused by earthquake); c. settling shrinkage or expansion in the Building, its foundations, or any walls or pavement; d. ... e. ... f. wear, tear, rust corrosion, depreciation, gradual deterioration, mildew, dampness of atmosphere or variations in temperature;” 37. The FSP points out that for a substantial period, the Applicants did not s ubmit any expert opinion to dispute MP’s findings. 38. The FSP has received a significant number of submissions from the Applicants challenging the MP findings, but the FSP has not seen fit to change its earlier position. 39. Now that the Applicants have engaged the services of PC, the FSP has considered the two opinions prepared by PC but it still maintains its partial denial based upon the original MP report, and other information which has been supplied to the FSP by MP, in response to the various submissions of the Applicants. 40. In late 2012, the FSP instructed M to prepare two scopes of works. The first is for work which the FSP acknowledges it is responsible. In response to that scope of works, two tenders have been produced, in the sum of $42,000 and $57,000 respectively and the FSP is prepared to permit the work proposed in scope of works one, to be carried out by the lowest tenderer. Alternatively, and now that the Applicants have left the property, it accepts its liability to pay to the Applicants the sum of $42,000 being the lowest of the two tenders submitted. 41. As to the second PC report, the FSP makes the following comments. 42. As to the significant reference which is made to the pre-purchase report referred to above. The FSP replies that the firm which prepared the pre- purchase report, is a firm of property valuers and not civil engineers. 43. The FSP again relies upon the opinion from Mr B of MP, that the 7 December 2010 rain event was “the str aw that broke the camel’s back”. In other words, the bond between the surface of the wall and the underlying stone work had been gradually weakened over period of time and the inundation was simply the last event in the chain of causation. ” 44. It again submits that the dominant or effective cause (or the proximate cause) was gradual water entry over a number of years. “The stormwater runoff was simply a contributing factor without being the proximate cause”. It is an established principle that a policy of insurance will only respond to the “proximate cause” of a loss. Case No: 257846 Determination Page 7 of 31 45. The FSP notes that the photographs appearing in the original MP report of 20 May 2011 clearly demonstrate where pre -existing damage had undergone cosmetic repairs. 46. As to other aspects of the PC reports, the FSP argues that there are inconsistencies in them. PC alleged originally that the cause of damage to the veranda floors, pillars, posts and the balustrades, is “soil consolidation settlement”, in other words , earth movement or the settling of a bu ilding’s foundations. The FSP points out that even if PC is correct and the cause of damage is “soil consolidation settlement” , then the policy exclusion for foundation movement/settlement would nevertheless exclude cover. ” 47. If PC is now changing his opinion and is expressing the view that the cause of the damage has been hydrostatic pressure from the stormwater runoff, i.e., that the stormwater was the direct cause of the damage, the FSP argues that this is inconsistent with his e arlier report. The FSP says “ the FSP continues to refute this suggestion on the basis of Mr B’s opinion which has been discussed in detail in its earlier submissions. However, in a letter of 17 December 2012, it pointed out that even if PC was correct and the cause of damage was “soil consolidation settlement”, then the policy’s exclusion for foundation movement/settlement would nevertheless exclude cover. 48. The FSP refutes PC’s claim that it has acted inconsistently by admitting liability for the cracking and structural damage to the north facing exterior wall, together with various cracks around window frames and ledges in that region, but otherwise denying the claim. 49. It submits that its decision to allow those items of damage was based upon the opinion of Mr B as set out on page 7 of his report dated 20 May 2011, that in the case of that damage, the underlying cause was the inundation event itself which the FSP concedes would be covered under the policy. 50. Thus, there is no basis for arguing that the FSP has waived its right to decline damage caused by foundation movement, to other parts of the property. Issues 51. The fundamental issue in dispute in this case, relates to the extent of the damage to the Applicants’ property, caused by the 7 December 2010 storm. 52. If it is determined that any particular item of damage is referable to the storm, a secondary question arises as to whether the exceptions contained within the FSP’s policy, enable it to deny liability for any part of the damage. Case No: 257846 Determination Page 8 of 31 Reasons for decision 53. There has been an exchange of material between the parties. However, I do not intend to recite information in this Determination except where considered relevant. 54. Ultimately, and since the Applicants have had the benefit of expert advice provided by PC, I am of the opinion that the matters in dispute between the parties have been adequately set out and that each has had ample opportunity to address the contention of the other. Preliminary Comments 55. This is a very complex matter which follows a storm of unprecedented magnitude. The evidence conclusively establishes that more rain fell in the area of the Applicants’ property than on any previous recorded occasion. The photographs produced by the Applicants showing the devastation to their property are dramatic. 56. Whilst this issue is not now relevant to this dispute, I note that the Applicants have effectively lost the entire benefit of the property due to the damage which was sustained to it. Apparently a ravine now runs through the property whereas there was no such creek, water course or physical feature previously. 57. There have also been other most unfortunate matters which have affected this dispute. The first assessor who inspected the property on behalf of the FSP, MJ of C&C, unfortunately died shortly after his inspection. The Applicants have claimed that his successor at C&C, who has been responsible for preparation of some eight reports for that firm, has never, nevertheless, inspected the property. It is unfortunate that the expert personal knowledge of MJ, who had immediate knowledge of the post-storm effects upon the property, was lost. 58. Based upon the original comments of MJ, the Applicants believed that they had a reasonable expectation that the claim would be favourably dealt with by the FSP. In making this comment I do not suggest MJ in any way made representations on behalf of the FSP which it has not honoured but the clear thrust of M J’s first report was to highlight the extent of the damage, to alert the FSP to the fact that certain policy limits would undoubtedly be met (for example fencing) and also to point out the likelihood that further damage would become evident with the passage of time. Vitally, MJ also reported on the generally very good condition of the homestead. 59. Thus, the partial denial of the claim, after Mr B of MP had inspected the property, and had reported to the FSP in May 2011, came as a considerable shock to the Applicants. Because of the background of the male Applicant as a builder, the course adopted by the Applicants was to continue to endeavour to negotiate with the FSP by means of very lengthy submissions in an endeavour to point out that the MP report was incorrect. Some sixteen months elapsed between the MP report (upon which the FSP has placed so Case No: 257846 Determination Page 9 of 31 much reliance) and the obtaining of the first report by the Applicants from PC. The MP Reports 60. At the recommendation of the adjusters C&C, the company MP was appointed and Mr B of that firm provided his first report in May 2011. 61. Mr B apparently first attended the site on 15 February 2011. According to one of the submissions from the Applicants, they were not present at the time of his first inspection, but before he furnished his report of 20 May 2011, he had met with the Applicants, who had provided to him photographs of the scene of the damage, and a video which shows quite extraordinary damage to the land. It also showed the torrent of water flowing down towards the Applicants’ front gate and Mr B had no difficulty in accepting that a water inundation event occurred. He commented that there appeared to be no natural watercourse which overflowed, but the long and gentle uphill sloping topography of the land north of the Applicants’ dwelling had acted to collect and channel some of the torrent of water towards the northern and western faces of the veranda. He commented that water was reported to have flowed over the concrete pavement between the dwelling’s northern side and the outbuilding which contained a basement. Water had conti nued to flow south and to wash away the gravel driveway. 62. The report indicated that the Applicants had advised that there had been no inundation of water above the kitchen/meals door threshold and that no surface water was reported to have covered the floor. It was reported that there was an approximate 180mm step between the concrete pavement and the veranda slab located in front of the kitchen external door and that the Applicants had reported water seeping out of the cracked vertical face of the veranda slab. 63. Mr B reported that initially “the only dwelling cracking was to the northern wall of the office.” Between his first inspection on 15 February 2011, and the 13 April 2011 inspection, other cracks had appeared “adjacent to the office window”. He also re ported that the Applicants had advised that veranda slab cracking had got progressively worse and that there was now cracking damage to the masonry pillars, perimeter balustrade and the clear roof tiles, that there was flaking/pitting damage to the reddit face of the southern masonry pillars, that there was a washout to some of the sand matrix and the internal rendered surface to the nearby northern building’s basement walls and to the dwelling’s perimeter balustrade, that there was minor cracking to some of the ground level masonry walls to the building north of the dwelling (the cottage) and that a stone rendered timber framed sheet roof shed had lost a number of its eaves and gutters which had fallen to the ground including some sections of the timber fascia. He reported that over subsequent months, the remaining gutters had discharged water down the external face of the rendered wall leaving a noticeable damp outline and that the external wall had now cracked. Case No: 257846 Determination Page 10 of 31 64. Importantly, Mr B included in his report a h eading “Evidence of previous damage, relationship to the rain event and general observations”. 65. In this section, Mr B commented that the Applicants acknowledged that there had been some existing cracking of the veranda slab. Vitally, he reported that “there are photographs of the cracked northern veranda slab two days after the rain event with weeds growing within the cracks. An inspection of the edges of the cracked surface suggest the cracks are weathered and fretting. They do not look to be of a recent origin. ” In making these comments he either disregarded or was unaware of the first report by MJ of C&C. 66. He commented that although the Applicants believed that the pillar and balustrade cracking had only appeared after the rain event, the majority of the cracking had occurred where there had been a previous repair. He did concede that a section of horizontally cracked balustrade at the northeast corner was overly damp. 67. He reported that although the Applicants believe that the timber veranda posts had inclined as a result of the rain event, there was no indication of any recent movement of the timber post at the top of the masonry pillar. There was also no indication that the veranda slab at the base of the pillar or balustrade had recently moved. The edges of the veranda slab were generally uncracked against the balustrade-pillar stucco pattern finished rendered surface. 68. He commented that the condition of the basement walls was severely structurally compromised and deteriorated and that the basement walls had been exposed to long-term moisture ingress over many years. He commented that a heavy and rapid saturation of hydrostatic water pressure behind the wall would have caused any loose or compromised material within the stonewalls matrix to push out from the wall face. 69. He also commented that the condition of the eaves, gutters and timber fascia to the nearby south-eastern shed (the barn) was always likely to collapse. “The gutters were severely rusted and the timber fascia and fixing into the end grain of the timber rafters were rotted. The weight of a rapid buildup and the continuing impact of the rainwater from the roof overloaded a structurally inadequately fixed gutter and fascia .” 70. He then made comments about soil types and the possibility of soil testing, to which I shall refer subsequently. 71. In the section of his report entitled “Discussion”, Mr B made comments in relation to the basement. The basement is in the cottage which is the building immediately to the north of the property. In commenting upon this b uilding, he stated that “over many years of water entry or from the influence of dampness, the walls crystallise salt matrix within the stone and can expand resulting in a fretting of the surfaces of the wall. Over time the walls ’ rendered internal surface can de-bond its walls or weaken off from the stone work. ” Case No: 257846 Determination Page 11 of 31 72. “In the writer’s opinion the 7 December 2010 rain event was effectively the straw that broke the camel’s back in relation to the partial collapse of the rendered internal wall finish. ” 73. In summary, he commented thereafter that any repairs done to the wall would likely exceed the condition of the wall prior to the 7 December 2010 storm. 74. Similarly, he commented that the damage to the gutters and fascia of the shed, being the building to the south-east of the homestead, was a result of water rapidly filling the gutters and overloading the fixing to either the fascia and/or fascia to the rafters’ ends. He commented that the condition of both the gutters and fascia was severely compromised as were a number of the other gutters and fascia around the property. “Their collapse was inevitable given the amount of rust and the rotting of the timbers”. 75. As indicated earlier, when discussing the homestead, Mr B did comment that the damage to the northern elevation of the dwelling adjacent to the northern “office room window” was most likely the result of the 7 December 2010 inundation. He commented that before any repairs could be considered, the soil needed to dry out and the crack patterns needed to stabilise. 76. He repeated his view that the vertical cracking to the perimeter veranda pillars was not the result of the 7 December 2010 inundation. 77. He commented that the horizontal cracking to the infill balustrade be tween the pillars had also been previously repaired and that in his opinion the water inundation was not the proximate cause of the cracking. 78. In dealing with the veranda, he commented that the concrete slabs were highly likely to have had a history of prev ious cracking. “The edges of the cracks are not recent. There were weeds growing between the cracks in an area of the veranda which is severely uneven. The veranda slab in front of the external kitchen door is likely to have replaced a previous slab. The s lab is of a different colour. The newer slab has also cracked and there is a horizontal crack to the vertical face of the step-up slab as shown in the accompanying photograph. ” 79. There is a great deal more along similar lines in Mr B’s report. For the assistance of the FSP, Mr B did prepare a scope of works for repairs which he considered were the responsibility of the FSP. 80. I shall make reference to Mr B’s subsequent reports, but because of the significance of this first report, I think that some comments sho uld be made at this point. 81. I have absolutely no reason to question the honesty of Mr B, and indeed his reports impressed me as being prepared by an engineer with a desire to be as accurate as possible but I think that even he would concede that there were some significant errors in this initial report. First, Mr B has subsequently apologised for his comment that “there were weeds growing Case No: 257846 Determination Page 12 of 31 between the cracks in an area of the veranda which is severely uneven ”. When he made this comment, it was to demonstrate his belief that there had been a history of previous cracking. In my view anyone reading this comment must be affected by it. If there were cracks of sufficient width for weeds to be growing out of them, it would demonstrate to the average reader two things. The first is that the condition of this property prior to the storm was not very good. If the cracks were wide enough to demonstrate weeds, it would also tend to indicate that the Applicants were not too concerned about the condition of their property. 82. I think it is clear also that Mr B was entirely incorrect in his reference to the fact that “the veranda’s slab in front of the external kitchen door is likely to have replaced a previous slab.” I am satisfied that part of the slab had been painted thus giving him the impression that some part of the slab may have been earlier replaced. 83. Mr B, as stated earlier in this report, made no reference to the findings of MJ (see paragraph 109). 84. Of less significance is his categorisation of the room on the north side of the property in the region of the damage which he considered was storm related, as an office, whereas the Applicants have pointed out that it was a bedroom. 85. It is important to stress also the thrust of the first MP report. In this report there was no suggestion that any damage whatsoever had been brought about by earth movement. Rather, it was suggested, that the proximate cause of much of the damage was the pre-existing condition of the areas affected. In effect, Mr B was saying that but for the condition of these items, such as the guttering and fascia on the barn, the damage which was sustained to them would not have occurred. 86. It was to these contentions of Mr B that the Applicants directed their attention, in very detailed submissions to the FSP whic h they addressed through C&C. Indeed at one point the Applicants attended the offices of C&C in the nearest capital city in order to discuss the matter. 87. The immediate contention of the Applicants was that the scope of works which had been prepared for the reinstatement of the damage was incomplete and did not in any way represent the extent of the damage to date. They went further and suggested that it did not represent all of the damage noted in the body of the report by Mr B. 88. The Applicants raised (in the opinion of the FSP for the first time) the issue of damp which had been created in the kitchen saying “we have a valid claim for the damage resulting from the moisture and damage attributed only as a result of the storm which has caused the wood surrounding the door frame to move and also cause damage to the door. The kitchen flooring has also been affected as a consequence. We have concerns that the areas of damp are spreading and evidenced by a damp and musty smell in the kitchen and other areas adjacent (hall and bathroom) .” They commented that “ both the paintwork and flooring were new and as part of the renovations undertaken Case No: 257846 Determination Page 13 of 31 by the previous owners ” . They point out that the renovations had been both documented and photographed in the document prepared by the Real Estate Agent and submitted. 89. They further pointed out that although “impact” damage to the northern veranda skylights had been repaired, the repair was not suitable as a permanent measure. The submission is too detailed to be summarised here. What is important is that the submission of 3 August 2011 was given to Mr B who, on 5 August, replied with a “bullet point reply” to the adjusters. In this bullet point reply, he did acknowledge several minor errors in his report also, but as to a number of items commented that further inspection of the property was required. 90. Critically, he returned to what he described as a threshold issue. (At this time he was dealing with the pillars in the homestead, not the cottage in respect to which he had made his “straw that broke the camel’s back” comments ). 91. In dealing with the pillars and balustrade cracking, he posed the question “the whole matter revolves around the answer to the following question – has the water inundation provided a mechanism to support the evidence of the pillar and balustrade cracking? Is it the proximate cause of the damage or is it just the “straw that broke the camel’s back , however in the Applicants’ defence, the straw that broke the camel’s back was a significant single weather event. Soil testing is strongly recommended. This will require coring a number of holes in the veranda slab and penetrating the veranda soffit lining and removing root tiles to get the depth of tube we need to embed into the soil. ” 92. Thus, again, Mr B was presenting to the FSP a picture whereby the primary cause for a partial rejection of the property might be the pre-existing condition of the property. His ref erence to “the straw that broke the camel’s back” is not consistent with any other possible exclusion. In short, the damage discussed by Mr B in the reports to which I have referred thus far is described as being exluded by paragraph 14.2 (f) of the policy, namely wear/tear, rust, gradual deterioration etc. 93. The FSP asked Mr B to examine the property again which he did on 30 November 2011. He first dealt with kitchen dampness and airborne testing, and conceded that in his earlier report (in which he had described the homestead as having a wooden floor), he was incorrect. After a detailed discussion about changes in the kitchen since he had last inspected it, he then went on to the question of the masonry pillars. Two masonry pillars had been cut into by a jackhammer exposing corroded vertical reinforcing bars. He commented that the damage to these bars was a function of long term corrosion of the vertical reinforcement which had resulted in an increase in volume around the reinforcing bar due to the formation of a rust layer. It was his view that the masonry pillar crack pattern is not consistent with an impact from the inundation of water or from an in-plan vertical movement (either a settlement or a lifting of the pillar and balustrade). Case No: 257846 Determination Page 14 of 31 94. When discussing soil sampling, he commented that in his view the samples taken in relation to the veranda slab indicated that “it has not undergone a heave caused by an increase in soil moisture due to the inundation. “ He repeated his earlier observation that “as discussed in the first report, photograph taken by the loss adjuster two days after the 7 December 2010 inundation shows the veranda slab had some weed growth within the cracks. ” Thus, this error which I regard as highly prejudicial to the Applicants’ position, was perpetuated. 95. He summarised his opinion as to the soil tests, which was that the soil was not reactive and would not heave with an increase in soil moisture. “There is no evidence of a perimeter settlement consistent with the veranda slab and pillar/balustrade cracking. The lack of any recent movement to the junction between veranda slab and pillar/balustrade, post and pillar and post and pitching beam supports the premise that inundation is not the proximate cause of the reported damage ” . 96. In his “ summary ” he commented that the proximate cause of the damage to the veranda slab and masonry pillar/balustrade was not the result of the 7 December 2010 inundation and that the cracking to the masonry pillar was due to corroding steel reinforcement and that the inundation had not led to the cracking to the veranda slab. 97. By this time the FSP had received another submission from the Applicants and this was again referred to Mr B of MP. On this occasion, Mr B acknowledged in his report that a detailed examination of the shed, timber fascia and gutter at roof height was not made, and that he had made the judgement that the condition of the timber fascia and guttering appeared deteriorated based on his view from ground level. He referred to a photograph which did appear to display one very small area of deterioration in the condition of the gutter. He had therefore concluded that the deteriorated condition was the proximate cause of the guttering failure. 98. He commented that to be more accurate in the assessment of the mechanism of the gutter’s failure, an examination of the fixing of the gutter straps would need to be made. “ Given the volume of water impacting on the shed roof, it would only have taken a failure of one or two gutter straps for the weight of water or hail to exceed the remainder of the gutter straps fixing ” . 99. He did comment that the section of timber fascia on the ground (approximately 1metre long) which he had examined, had been sound. Examination of the gutter straps and the mechanical fixing had not been made at that time. 100. In his most recent inspection of the property, Mr B said he had conducted a detailed examination inside the house. He had commented that “the relatively good condition of the dwelling’s walls suggest that the dwe lling’s foundations were more protected from the influence of the flow of water or undermining of the foundation. “Damage to the dwelling appears confined to the reopening of some previously repaired cracking to the dwelling’s Case No: 257846 Determination Page 15 of 31 northern elevation, although there was an argument that the cracking could b e the result of a slight settlement to the dwelling’s north -eastern corner and not related to the inundation ” . 101. In his report he repeated his view that the cracking of the concrete veranda slab, masonry balustrade and pillars had not been caused by an impact force of water. He did concede that some susceptible areas of the rendered stucco finish at the bottom of the balustrade could have been dislodged due to the flow of water. He commented that “the corrosion o f the masonry pillars vertical reinforcement is the cause of the pillar cracking.” 102. In response to still further submissions from the Applicants, Mr B prepared a further report on 2 May 2012. He reiterated his previous opinions as to the cause of damage to the veranda slab and the cracking of the pillars. He maintained that photographs showed previous repairs to the face of the veranda slab near the north-eastern corner, and thus he did not agree that the cracking of the pillars had only occurred since the storm event of 7 December 2010. 103. On this occasion, and for the first time, Mr B did acknowledge a number of errors. First he acknowledged the error in referring to weed growth two days after the 7 December 2010 inundation. He also acknowledged several other errors which had been pointed out in the Applicants’ submission of 11 March 2012 but he still maintained that the proximate cause of the damage to the dwelling and veranda was not the result of the storm. 104. Notwithstanding the concessions which he had made as to his absence of above ground inspection (in his previous report) he maintained his contention that the cause of the outbuilding’s gutter collapse was correct. 105. At this time he did acknowledge that he had incorrectly assessed that the kitchen floor had a sub-floor space where it might have been possible for mould and bacteria spores to form. However he stated that after the 30 November 2011 inspection, he had not maintained in this suggestion. 106. I find it un surprising that in the face of Mr B’s persistence, the FSP essentially remained unmoved by all of the submissions by the Applicants. However, once Mr B conceded his errors, I think the FSP should have re - assessed its position. 107. It must be conceded that there were significant errors in Mr B’s original report, and that for almost twelve months he persisted in the incorrect view that there had been cracks in the veranda slab of such significance that weeds had been growing out of them. I also find it concerning that his comments in relation to the fascia and guttering appeared to have been based upon very inadequate information. Indeed, even in the absence of the reports which were subsequently provided by PC for the Applicants, I would have reached the conclusion that Mr B’s treatment of the two “outbuilding” was perfunctory. It may be true that they were old and that they would be difficult to repair, but it does not mean that they did not exist, or that they performed no useful function (indeed there is evidence that the cottage was Case No: 257846 Determination Page 16 of 31 used for accommodation). Further, significant values were attributed to both of these buildings in the cover provided by the FSP. The Loss Adjuster’s Reports 108. Throughout the course of the matter, C&C, the loss adjusters, have prepared some nine reports. The first two reports were prepared by MJ who subsequently died. Whilst MJ has set out details of the rainfall and storm event in dramatic detail, I do not think it necessary to deal further with that subject. But it is important to record what he observed on his first inspection, two days after the storm –  “ Boundary and subdivisional fencing for an estimated 3kms has been uprooted and dragged through the property.  Debris from the fencing had uprooted the mains water supply both to the dwelling and sheds and the watering system in the paddock.  Concrete lined cellar and the cottage behind the dwelling was filled with water and suffered damage to its walls and wall lining.  The nine metre section of the veranda floor on the western side of the dwelling has been raised up and has subsequently substantially cracked. The undamaged veranda flooring around the other sides of the dwelling indicate that the flooring was in a pre-loss good condition.  The dwelling walls and the veranda walls are coated with pebble and concrete and the hail has stripped a lot of the paint from the southern side of the building and veranda. Hail has also broken skylights in the rear of the dwelling.  Several gates have been pushed out of alignment – new remote controlled gates had been installed - - - -  Some minor damage to buildings where doors have been pushed in by the flow of water and there is debris strewn across the southern section of the property.  It is not known exactly how much water went underneath the dwelling which has timber flooring and the insured will monitor the area and advise us should any movement in doors or walls become evident. ” 109. I regard as significant the fact that MJ specifically commented that apart from the nine metre section of veranda floor which had been raised up and substantially cra cked “the undamaged veranda flooring around the other sides of the dwelling indicated that the flooring was in a pre -loss good condition”. 110. This is quite inconsistent with the report of Mr B. I am somewhat surprised that he did not take MJ’s initial report more seriously into consideration when he furnished his first report. Case No: 257846 Determination Page 17 of 31 The FSP’s response to this Service 111. In the summary of facts in the response (which was dated 5 December 2011) after three of Mr B’s reports were to hand, the response included the following statement “Mr B inspected the damage and determined that some of the damage was due to the storm, but other damage may have been pre - existing or caused by a non-covered event (such as corrosion and wear and tear). “Based on Mr B’s report, the FSP partia lly rejected the Applicants’ claim ” . I note that in this response, although all of the relevant sections of the policy were set out, there was no actual reference to any reliance upon an exclusion or loss of or damage to the property caused by earth moveme nt or erosion or subsidence or loss of damage caused by settling, shrinkage or expansion in the building, its foundations or any walls or pavements. Rather, the FSP was relying upon the “pre - existing damage.” 112. Although there have been a number of responses from the FSP thereafter, it was only after the receipt of the first report from PC (on behalf of the Applicants) that the FSP has adverted to the possibility that the claim may be (at least partially) defeated by reference to the “earth movement” exception . 113. At this point, I should comment upon the most recent submission from the FSP dated 21 May 2013. In this submission, when commenting upon the significance of the pre-purchase inspection report, the FSP has again relied on the wording used by Mr B. After saying that all that can be drawn from the pre-purchase inspection report, is that the basement walls contained no grossly visible defects at the time of their inspection, t hey state “Mr B clearly opined that the 7 Decemb er 2010 rain event was the “straw that broke the camel’s back” i.e. the bond between the surface of the wall and the underlying stone work had been gradually weakened over a period of time and the inundation was simply the last event in the chain of causation. It can be clearly seen how influenced was the FSP by the earlier reports of Mr. B. 114. The FSP also said: “ In other words, the dominant or effective cause (or the proximate cause in insurance law) was gradual water entry over a number of years. The stormwater runoff was simply a contributing factor without being the proximate cause. It is an established principle that a policy of insurance will only respond to the proximate cause of a loss. ” 115. There is no question that the statement of law contained in the paragraph above is accurate. But I find it hard to apply that statement to the circumstances following the 7 December 2010 storm, when the wall to which Mr B was referring, was a wall of a building which was inundated by water. It has been clearly established that the cellar in this building filled up with water. I must say that I consider that the proximate cause of the damage to the wall of the cottage was plainly the storm event of 7 December 2010. 116. I shall deal in due course with the other responses of the FSP, to the report supplied by Mr C on behalf of the Applicant. Case No: 257846 Determination Page 18 of 31 Reports provided by PC on behalf of the Applicants 117. As the Applicants had been making no progress in their dealings with the FSP, they eventually consulted Mr PC of C Consulting Engineers. His first report was dated 26 November 2012. 118. In the report, PC set out the fact that in addition to inspecting the property, he had read some 41 documents many of which are the documents to which I have referred in this Determination. This was plainly an essential part of his task. 119. PC first noted the information which was available as to the condition of the property pre-storm. 120. He specifically noted the findings of MJ of C&C that other than the nine metres of direct impact damage to the veranda, his onsite inspection revealed that the flooring of the veranda was in a pre-loss good condition. MJ further suggested that the nine metres of damaged floor that he observed would also have been in that same pre-loss good condition but for the storm. 121. To use the expression of PC “M J provides us with an informed industry practitioner written firsthand account of the initial observation of the site directly after the event, that settlement based movements had yet to commence around all of the veranda areas except for in the first nine metres and that only the force of water, hail damage and water flow scour effects were observed, including the nine metre section of damage to the veranda floor. ” 122. PC then points out that by the time of MJ’s next report following a subsequent inspection, it was now becoming plain that significant movement of the building may have occurred, and that the concrete pillars of the veranda were showing severe cracking as well as some of the walls. MJ noted that a concrete contractor who had been engaged to examine the scene, had expressed concern as to possible structural damage to the veranda area, and MJ commented that he agreed with those concerns. 123. Stating his reasons for disagreement with the conclusions of Mr B, as to the significance of the soil test, PC set out the following as to the veranda slab “there are two effects the water had upon the soils of this site. Neither are related to soil reactivity. To explain, firstly this was a hydrostatic flowing water event. The lifting of the veranda slab at the joints in the veranda slab in the first nine metres as noted in the MJ first inspection, was due to flowing water hydrostatic pressure related uplift of the veranda slab. The status of the soil non- reactivity is irrelevant in this consideration.” Thereafter he also commented that “the fact that the observations (by MJ) were made immediately following the event, is completely consistent with the fact that the uplift and damage response of the slab was a direct and immediate response to the effect of the flowing water.” 124. Then, in dealing with the subsequent cracking which had occurred, PC has opined that “secondly in relation to the subsequent cracking that has Case No: 257846 Determination Page 19 of 31 occurred in the remainder of the veranda slab in the weeks following the inundation, as observed by MJ in his second report, the effect of the inundation and consequent settlement of the site, sand and silt soil has caused a drop, an outward rotation and a n outward lateral displacement effect upon the footings of the pillars and balustrade walls due to the volume (evidently some 170mm of rain in two hours) of water. “ He went on to say “the effect of the consolidation settlement and associated reduction in l oad bearing support of this site’s sand and silt soil given the heavy masonry structure of the pillars and the masonry balustrade walls is in itself enough to explain the movement and related cracking in the balustrade walls, pillars and the associated veranda slab cracking. This would have been an unprecedented inundation on the sands and silts including calcareous silts at this site that would have caused consolidation of the site soils as the unnatural excess water dissipated through soil profile in the weeks that follow the event. ” 125. P C went on to deal with the concept known as “collapse settlement” which is known to occur in the region with which we are dealing. 126. P C’s report is too long and too detailed to set it out entirely, but he commented “in summ ary, in relation to the veranda slab cracking, reference to and focus on whether or not the soil is reactive, is in my opinion to completely misunderstand the response of the sandy and silty soils (including calcareous silt soils with possible collapse potential) of this site in the face of this unprecedented rainfall event. It is my clear opinion that the storm event is the cause of the extent of the veranda slab cracking at this site. ” 127. When dealing with the pillars, PC was able to comment upon a core of the three/eight rod taken from the same sample of the rod that Mr B from MP considered to be the source of the related cracking. 128. PC commented that “whilst there is understandable surface rust, it is my view with all my over 30 years of experience that this light level of surface rust is not going to cause the extent of damage to the pillars in the manner that now can be observed (by way of some tangential force as mentioned by Mr B). What is a defining difference in the opinion expressed by Mr B and the opinion expressed by me and what is of great importance here, is the clear evidence that supports my description as to cause of the damage apparent in this veranda ” . He then points out the good condition of the pillars and balustrade wall and the outstandingly good condition of the veranda floor that all joined to create the structural buttressing of the thus structurally buttressed entrance-way on the south side of the building. These pillars and their associated walls are exposed to even more rusting potential than the remainder of the plain veranda areas as this area of buttressed pillars is more “out in the open”. 129. However, he points out that “these buttressed pillars and their associated walls (and the associated veranda floor) show none of the tangential force related cracking damage that Mr B suggests is caused by the rusting reinforcement rods. “If Mr B was right, then the same cracking in the plain Case No: 257846 Determination Page 20 of 31 veranda areas would be apparent even more so in the more “out in the o pen” exposed buttressed pillars and walls of the front steps area even if only in the direction perpendicular to the line of the pillars. No such damage has occurred in this area. Quite the opposite. Look at the completely acceptable current condition of the buttressed pillars, balustrade walls and particularly the outstanding associated veranda slab conditions provided in photos which are in clear contrast to the areas of damage in this dispute ” . 130. In short, the area in the south side of the homestead had remained intact and in extremely good condition notwithstanding that if Mr B’s conclusions had been correct, the rusting force effect would apply equally, if not more so, to those pillars. 131. On this subject, he concludes “it is my certain opinion, which is sup ported by the evidence from the site as discussed above, that the cracks in dispute in relation to this item have developed due to the rotation and settlement of the pillars and the balustrade wall (and thus the associated floor) due to the inundation and not on basis of pre-existing general wear and tear and rust. ” He commented that whilst there was no doubt some areas had been repaired in the past, it is the inundation which was responsible for the development of the visible cracking in the pillars and balustrade walls of the veranda, as well as the same development in the veranda slab cracking . 132. When dealing with the box gutter underneath the skylights, PC comments as follows : “in the (FSP) response item 40 dated 3 August 2012, note 7 states “box gutter underneath skylights declined see Mr B’s report dated 20 May 2011 at page 9 “rusted gutters and rotted timbers collapsed under the weight of water within the gutter. Their deteriorated condition is the proximate cause of the collapse, not the rain event.” ” 133. PC then pointed out that the reference by Mr B to the collapsed gutter, was a reference to the outbuilding walls. C commented that “in my repeated reading of the MP 20 May 2011 report, I can find no reference to the box gutter drain located between the house and the cottage. The box gutter drains the veranda outside the kitchen window of the main house and has no relationship at all to the fascia gutter that collapsed on the outbuilding which was discussed in the report. So the FSP has used the (incorrect) assessment made by Mr B on the outbuilding gutter to decline this box gutter matter claim. ” 134. Even then, as PC pointed out, in his correspondence of 21 February 2012, Mr B had acknowledged that he had not made a detailed examination of the shed timber fascia and gutter and that a judgement was based on a view from ground level that the condition of the timber fascia and gutter appeared deteriorated. 135. By contrast, PC inspected and photographed the gutter straps, both of the gutters that had now come away fully as a result of subsequent weather damage, and portions of the gutter that remained in place. He commented that the straps and timbers supporting both the removed and the still in situ gutters were in quite sound, serviceable, good condition. Nothing in his Case No: 257846 Determination Page 21 of 31 inspection showed any such “rusted and rotted timbers” (this reference being to the FSP’s reasons for the claim refusal of 3 August 2012). He noted that whilst Mr B had acknowledged that no proper examination was made of the outbuilding gutter, he still claimed that the gutter’s poor condition was the cause of the failure and not the storm event. 136. In conclusion as to the box gutter, P C commented “I am confident that the box gutter damage is due to the storm and related water damage. I have also assessed the outbuilding gutter condition and it is also in good condition as noted above as are the associated outbuilding timbers.” He commented, based upon the original assessment by C&C, that if 130mm of rain in the district fell over a very short time and 170mm of rain was recorded at the insureds’ property including an evident 15 minute hail storm, no box gutter is going to handle this situation and the damage that needs to be repaired to the box gutter and the associated framing is the damage caused by the storm event. 137. Regarding the cracked walkway between the main house and cottage, PC commented that this area was most evidently exposed to the quickly running free water and that he believed repair of this area was required and consistent with coverage under the policy. 138. He also commented on the possibility of damage to the building arising as a consequence of the process of building work, and the fact that the Applicants had raised legitimate concerns about the effect of any building work to make good the damaged areas. He commented on the suggested use of some sort of vibrating plate as mentioned in Mr B’s repair recommendations, and stated his view that under no circumstances should vibrating equipment be used, nor should any bobcat or such mechanical lifting machines be used in the demolition and removal of the slab. It would have to be saw cut into sections and removed by hand. 139. He also commented on the extent of damage under the building which had not been inspected by Mr B. He photographed water stains due to dripping water down the inner wall face of the formal lounge area particularly over the door into the main corridor and compared it with a photo which was taken in the same room from the same location prior to the storm event. There was no such staining or damage at that time. He commented that this direct before and after photographic evidence clearly shows this damage. 140. When dealing with the damage to the kitchen, vinyl/lino, he commented upon Mr B’s error in stating that the kitchen floor had a timber fl oor covering. “ It does not have a timber floor covering. It has a lino type vinyl floor covering. ” He pointed out that Mr B states t hat “ he does not retract the possibility that some moisture from the inundation may have been attracted under the kit chen’s concrete floor slab. “So on this basis we have a damp concrete floor and a vinyl floor covering and in those circumstances the vinyl lifts up. This has happened and the areas remain damaged that need repair.” 141. PC commented that the damage in the main formal lounge room cracking and water related damage, was in his view covered by the policy. Case No: 257846 Determination Page 22 of 31 142. As to the “ nursery bedroom wall cracking” which was described by Mr B as “the office”, PC found that Mr B’s findings were impossible to reconcile because Mr B had marked on the wall the extent of the crack on 15 February 2011 and then on 13 April 2011 he again marked the wall where the crack had developed during the ensuing two months. He commented that “it defies belief that in the face of such evidence of crack development, it is rejected by Mr B and thus by FSP on the basis of exclusion 2 (f) “ wear, tear, rust, corrosion etc. ” 143. He commented “this is the same crack that had appeared on the outside face of the same wall, and for which the FSP had accepted the claim.” 144. PC then dealt with the outbuildings. He commented that the shed is a large implement store site shed with an elevated timber floor platform with damaged roofing and gutters from the storm whereas the barn is an open roof structure that has a flat and an associated toilet attached. 145. As to the shed, and the box gutter issues, he commented that none of the alleged poor condition rusted and damaged gutter and rotted timber elements exist and that Mr B appeared to have somehow incorrectly and assessed and advised the FSP on this matter. PC commented on the fact that twelve months earlier Mr B had indicated that inaction on this matter would cause further damage and that such further damage has indeed occurred and that it included damage to the walls, the roof, the flooring of the elevated deck and to the tank roof door. 146. He stated that the shed gutters and the associated damage that had developed do need repair. 147. He was of the view that both the shed and barn were not beyond economical repair and commented tha t “on the co ntrary, it is these such buildings that define the character of the area and proper maintenance as is now required is at the core of the ongoing service of the performance of these structures. To write them off for unrealistic reasons is inappropriate and these structures can be repaired and desperately do need repair to the storm related damage. In the carrying out of repairs to the roofing, this needs to include renailing of the roofing iron because the now wind exposed edge has caused lifting of the shee ts. Likewise, cracks in the barn need to be repaired.” 148. When dealing with the cottage, he commented that based upon his 30 plus years as a professional engineer and in particular with experience consulting to heritage architects and the National Trust of the relevant State, he can confidently state that the cottage including the basement (once repaired to the condition it was in prior to the storm event) is in quite structurally serviceable condition. 149. In dealing with Mr B’s suggestion that the cottage was li kely to be beyond practical or economic repair and that repairs to reinstate the damage to its pre-event conditions, could not be guaranteed without substantial improvements being made, PC considered that such statements were misleading and inappropriate for such an existing building. Had the storm Case No: 257846 Determination Page 23 of 31 event not occurred, the basement condition would have remained serviceable with ongoing maintenance; it would have remained serviceable for as long as that ongoing maintenance is provided as had been the case quite evidently for the past 85 years. 150. Further on he commented that to write off this building on the basis that it does not meet current Australian standards is a nonsense. “This house (the homestead) and its outbuildings currently are approved structures by the Building Act (of State) and to the extent that storm damage has occurred, this storm damage needs to be repaired. He commented that the barn which had insured value of $60,000 and the cottage both required professional scope of repair works to be prepared. 151. It is unfortunate that the preparation of PC ’s report coincided with the FSP arranging for M Consultants to prepare two separate scopes of works. 152. The first was to particularise the damage which the FSP had agreed to cover, and the second was to set out the (in the opinion of the FSP) uninsured loss. 153. The FS P’s appointed loss assessor C&C , was then to arrange for two separate repair quotations to be prepared for each scope of works. 154. When writing to this Service advising of these two scopes of works which had been prepared, the FSP did admit liability for additional damage, notably to the box gutter located underneath the skylight. 155. The FSP did respond to the PC report. Notwithstanding the significant areas in which PC indicated his disagreement with the findings of Mr B, and in some cases his rather serious criticisms of the MP reports, it does not appear that the PC report from which I have quoted so extensively above, was referred back to MP, or to any other engineer for an opinion. 156. By this stage, the FSP was drawing attention to the fact that in the event that the PC report was accepted, it would still be the case that many areas of damage, or in need for repairs, would be excluded under the policy this time because of paragraphs 2(b) and 2(c) of the policy (see above). The FSP suggested that if loss or damage to the property was caused by earth movement etc, it would be excluded even in situations where the preceding clause was an event which is itself the subject of cover under the policy, such as rainwater runoff. The FSP stated “t he policy has been carefully drafted to achieve this effect.” The Applicants’ argument – that the dominant cause of land movement was rain water runoff which is covered under the policy – is precisely the type of argument which the exclusion clause is designed to overcome. Therefore even if P C’s opinion on the cause of damage is preferred over that of Mr B’s, the loss would not attract cover ” . 157. In the event, the two scopes of works prepared at the instigation of the FSP and carried out by M produced the following results: Case No: 257846 Determination Page 24 of 31 a. Scope of works – Part 1(for damages for which the FSP admits liability) produced two quotations, one from CS and one from BEB, in the sums of $42,854.50 and $57,970 respectively. b. Scope of works – Part 2 (said to describe items for which cover would not be offered), produced quotations from CS in the sum of $188,127.26 and from BE Building Services in the sum of $247,390. All sums include GST. 158. These scopes of work were then referred back to the Applicants’ expert PC for further comment. At the same time, the further response from the FSP to which I have referred, dated 17 December 2012 was also referred to PC. In an email to the Applicants, P C said: “earth movement, vibration, erosion, landslide or subsidence (except where caused by an earthquake) – none of these caused your damage. There was no earth movement circumstance, or vibration event, or erosion causing the ground to split apart or landslide from sloping ground or subsidence by earthquake or subsurface mine implosion or rabbit burrow failure or otherwise. It was caused by stormwater runoff which as the FSP said “does attract cover under the policy.” ” 159. He subsequently commented that “the building did not settl e, the building did not shrink and the building did not expand to cause the damage.” None of these potential causes preceded the stormwater runoff event. He said that the building remains static for its entire life. The stormwater runoff damaged the building in a one-off event. Without the runoff there would be no event, no cause and no damage. 160. In commenting upon the claim by the FSP that it would not pay for settling, shrinkage or expansion in the foundations or any walls or pavements, PC commented “the fo undations have not settled in the preceding 80 or so years, foundations did not shrink or expand to cause the damage and the walls did not settle, shrink or expand to cause the damage. There was no preceding damage in any evidence I saw on the building ins pection.” As noted above, the stormwater runoff damaged the structure in a one -off event cause. The policy does not presumably say stormwater run-off cover only applies to the roof and not the walls, and the rest of the property. 161. PC then pointed out the FS P’s change of position whereby he considered it was “distancing itself from the prior position that there was no solid engineering evidence that proved the house was damaged by the 7 December 2010 event, whereas, the FSP now states “even if P C’s opinion is preferred over that of Mr B, i.e. all the previous engineering effort was pointless.” 162. In his final report dated 4 April 2013, PC commented that in his view the Scope of Works No. 2 should be accepted by the FSP completely. In fact he commented as to a number of areas in which he considers that the scope of works was inadequate and pointed out that those responsible for drawing up these scope of works were responding to a specific request from the FSP. Case No: 257846 Determination Page 25 of 31 163. In his view, omissions to the scope of works included wall and ceiling damage in the house, house roof damage causing leaks, repairs to the cottage roof, walls and floors, termite barriers and slab moisture barrier detailing, barn walls and floor and door slabs specifications. 164. Much of P C’s commentary in the final report relates to the other buildings which he considered were not the subject of the Scope of Works No. 2, or at least have not been dealt with adequately. 165. I must say that I cannot agree with this conclusion. Examining, for example, the quotation from CA (for $188,127, some $26,000 has been included in relation to the barn, the cottage and the basement.) Whilst the quotation from BE does not list specific figures for all of these items, it is plain that in the quote from BE amounting to $247,390, signi ficant allowance has also been made for the barn, cottage and the basement. 166. In his final report, PC has also highlighted a number of inconsistencies, several of which I have already referred to. 167. In summary, in the final report, whilst PC recommends that the work set out in Statement of Works No. 2 (SOW) would need to be carried out by the FSP, it is his view that the SOW is far too brief and fundamentally flawed. He summarises by saying that the higher of two SOW quotations should be used and then with an e scalation of at least 25% to allow for “inappropriate specifications, incomplete specifications, and their irregularities and omissions in the specifications at FSP SOW. 168. Crucially, PC does also highlight the fact that over the period of time, in the C&C reports, for a reason which is unstated, the sums insured for sheds and barn, were deleted. As set out previously, the sum of $60,000 was provided for sheds, and $20,000 for barns. Yet, by the time of the ninth report by C&C, the only items which are referred to are the building homestead (which must include the cottage) of $400,000, and fences of $5,000. 169. Bearing in mind that in November 2012, PC had expressed the view that the “outbuildings” were clearly of economic value and that they were capable of repair, I do find it extraordinary that no allowance has been made for these items in the ninth report from C&C. Previous FOS Decision 287408 170. Both PC, and in their final submission, the Applicants drew attention to a previous FOS decision in case number 287408. Having read the decision, I do agree that it relates to facts which are not dissimilar to those with which we are dealing. 171. In Case 287408, the effect of stormwater runoff damaged the slab because water flowed in the soil under the slab of the hayshed, thus causing material loss in the soil under the slab. The Ombudsman allowed the claim in that matter, rejecting the “earth movement exclusion”. Case No: 257846 Determination Page 26 of 31 172. In this dispute, PC’s contention is that the extreme speed of the water flowing over the ground caused a great deal of damage, such as that sustained by the cottage basement, the pillars, balustrade walls, front veranda slab and barn . 173. PC commented that a common feature of both this dispute and dispute number 287408 was the loss of material in the surface sand y soils of this site. In both cases, the soil had for the previous 80 years been a perfectly good foundation base for the houses, including through numerous heavy rainfall events that would have occurred through those 80 plus years. 174. PC summarises his view by saying the following: “ For a building that is at least 80 years old, this illustrates how the idea that this was foundational movement from a ground and water effect is not sound as this problem would have occurred already which was demonstrably not the case for this prior good condition building”. 175. He went on to say “t he damage to this property was due to this singular extreme water event on 7 December 2010. Of course, so much of the damage was just due to surface flooding of the site including the veranda and pillar out of edge damage, the filling up of the cottage basement and upper floor with running water and the damage to the barn floor and door by surface flowing water and is unrelated in any way to foundational movement.” The Engineering Reports – Conclusions 176. I must say again that I have no reason to doubt the veracity of the comments of Mr B and I am satisfied that his reports were written in a genuine attempt to address the issue which arose following the storm event. 177. But I believe that the matters which I have set out above and specifically the very detailed findings in the PC reports, are sufficient to establish that on a number of matters, the initial report of Mr B from MP, was incorrect. I will not list again the matters about which I consider he was in factual error. 178. However I again state that I am satisfied that some of these errors must have been of fundamental importance in the decision making of the FSP. I point specifically to the acknowledged error wherein Mr B suggested that at the time of the storm, weeds had been growing out of one of the cracks on the veranda. This was plainly incorrect, but it was 12 months before he corrected that error which, was incidentally, entirely inconsistent with the initial inspection of the property by MJ. Mr B was also incorrect in relation to the suggestion that half of the slab had been replaced. His inspection of the box guttering and the fascias was, to say the least, inadequate, and his persistent in stating that he maintained his conclusions on that subject, is hard to understand. 179. What is also important to stress is that the reports from MP, a most experienced and reputed firms of engineers, did not suggest a partial denial of the claim on the basis of the “earth movement” exclusion. Case No: 257846 Determination Page 27 of 31 180. Rather, the reports from MP concluded that the property had not been in good condition at the time of the storm event, and that therefore the proximate cause of much of the damage was the pre-existing state of various parts of the property. 181. To rely on such an exclusion, the onus of proof is on the FSP. It is clear that the FSP has failed to discharge that onus, having regard to the various errors to which I have referred. The evidence regarding the pre-storm condition of the property is wholly adverse to the FSP’s contention that there were significant faults at the property, whether to the slab, the pillars, the balustrades, or particularly to the box guttering and fascias. 182. It was as recently as December 2012 that the FSP first suggested that it might rely upon the exclusions contained in paragraph 2(b) and (c), which I will loosely describe as the “earth movement exclusion”. 183. The opinions of PC strongly negate such a conclusion. I refer to the commentary which P C forwarded to the Applicants after he saw the FSP’s contention of December 2012. 184. Whilst, as the FSP suggests, the earth movement exclusions in paragraphs b & c are drawn very widely, they must be subject to some limitations. 185. To provide an example, if a flag pole is situated immediately adjacent to the corner of a veranda and, if the flag pole is blown over during the course of a storm, the “inground portion” of the flag pole will lift. If it lifts under the veranda causi ng damage to the veranda, can it be said that the proximate cause of the damage to the veranda is earth movement? The immediate pressure upon the veranda would be caused by earth movement. But it utterly defies good sense to suggest that in such circumstances the proximate cause of the damage to the veranda would be earth movement. Plainly in the circumstances set out above, the proximate cause was the storm which caused the flagpole to blow over. 186. In this dispute, PC is overwhelmingly of the opinion that it is the force of the inundation of the property by the water which has caused the damage. It has caused certain soils to move. It caused quite plainly a 9 metre portion of the veranda to lift. The movement of the water, of itself, has caused a huge proportion of the damage. In most circumstances, it is difficult to imagine that this may be the case, and difficult to accept that, for example, pylons or balustrades would be affected by the rain storm. 187. But this was a rainstorm of a kind never previously experienced (as Mr B very appropriately comments). A rainstorm causing runoff (as opposed to a flood emanating from a water course) which causes a vehicle to turn on its side or which picks up all of the fencing on the property and sweeps it away, is, one would imagine, at least a one in one hundred year event, and hopefully is even less likely. 188. As to the “earth movement exclusion , ” first I am of the opinion that the onus is upon the FSP to establish that the damage to which PC refers is in fact Case No: 257846 Determination Page 28 of 31 due to earth movement or the other matters described in sub-paragraphs (b) or (c). Because of the extraordinary effect of the inundation, I am satisfied that the FSP has not discharged that onus. 189. If it is the case that some parts of the damage have been caused by lingering effects of water permeating the soils and causing movement, I remain of the opinion that the proximate cause of the damage to this property was not earth movement, but rather the storm on 7 December 2010. 190. As PC commented, if this were not the case, why has the property remained so successfully intact for so long. Mr B also stated, upon his inspection of the interior of the property, that the interior of the property was in remarkably good condition. For a house of its age, in a country area, this is a quite significant finding. The Position of the Applicants 191. From time to time during the conduct of this matter, the Applicants drew attention to their plight, pointing out that they did not have the funds to carry out repairs which were necessary (if the FSP was not prepared to pay for them). 192. The FSP obtained an original scope of works for approximately $13,000, and then a subsequent scope of works in November 2012 (for a minimum of $43,000). It appears that neither of these sums has been paid to the Applicant. Perhaps, had the FSP’s chosen adjuster been inclined to deal more directly with the Applicants, it might have been realised that the payment of such sums might enable the Applicants to “hold the fort” until the matter could be determined. 193. Ultimately, I am satisfied that until the Applicants obtained the two reports by PC, it was not possible for the Applicant to rebut the evidence provided by Mr B. 194. Regrettably, the position has now been reached that the Applicants have left the property. This ensures that the Determination I make may only apply to the payment of a monetary sum, rather than the effecting of the repairs, which would have been by far the preferred option. 195. PC commented that the full SOW No. 2 quote must be accepted by the FSP. He adds that figure to the sum for which a tender was provided for SOW No. 1 and produces a figure of $305,000. 196. I note that the FSP has already agreed to payment of the works contained in Scope of Works No. 1. There has been no attempt to challenge the figures contained in the quote from CA in respect of Scope of Works No. 1. I therefore treat the value of the work described in Scope of Works No. 1 as not being in dispute. The only dispute therefore remains as to the sums necessary to compensate the Applicants for the expense which would have been incurred in Scope of Works No. 2. Case No: 257846 Determination Page 29 of 31 197. Whilst PC comments that it should be escalated by 25% to allow for all the omissions which he has identified, as I have commented already, I do not consider that he is correct on this subject. In my opinion, the two quotations supplied in respect to Scope of Works No. 2, in the sum of $188,127.26, and $247,390, do make significant allowance for the other buildings which PC believed had been, essentially overlooked. Accordingly, as the quotations were provided reasonably recently, I do not propose to provide an escalation percentage to them. Whilst PC comments that the higher of the two quotations should be accepted, in the absence of any specific commentary as to why the lower quotation may not be acceptable, I consider that the appropriate step is to average the two quotations. This produces a figure of $217,750. 198. I accept the evidence of PC that for a period had the repairs been carried out, the FSP would have been obliged to pay for alternative accommodation nearby. I consider that six months would have been adequate, and I make an allowance of $6,000. The Costs of the Reports from PC 199. The FOS Terms of Reference provide that allowance may be made for the fees of professional advisers but that save in exceptional circumstances, an allowance should not be made of more than $3,000. The FSP has submitted that, indeed, no greater sum should be awarded. 200. I have to determine whether special circumstances exist in this case. Ultimately I have decided that they do. I have noted the extremely large sums which the FSP has paid in fees to MP and C&C, and ultimately a fee in excess of $8,700 to M, for preparation of the scope of works. 201. These matters highlight the extraordinary complexity of this matter. I am not critical at all of the FSP’s actions in obtaining the various reports from MP, and I consider that the course they followed in obtaining the two separate quotes arranged by M, was absolutely appropriate. It has enabled a resolution of this matter (albeit in a manner which may not have been the preferred solution for the FSP). But in my view this case did present exceptional circumstances. A vast amount of material had to be considered. The quantum of the claim was large. There was a huge variance between t he opinions of the FSP’s expert , and the Applicants which PC had to comment on. 202. I was initially surprised about the quantum of the fees charged by PC but note that his first report did involve an analysis of all of the documentation, and upon reflection it was utterly appropriate that this took place. Much of his first report has consisted of an analysis of the various contentions advanced by the FSP, and it is for this very issue that the Applicants most required his assistance. Ultimately, I have reached the conclusion in respect to his first report for which a fee of $11,803 was charged, an allowance should be made of $9,000. Case No: 257846 Determination Page 30 of 31 203. Once the M scopes of works were provided, it was obviously essential for the Applicants to seek expert opinion as to these scopes of works, and the quotations which had been provided. Without the assistance of PC, they would have been in a very unequal position in dealing with quo tations for considerable sums of money. I do not think that the second report was of such significant value, but I am still satisfied that exceptional circumstances apply and that in the circumstances a figure of $5,000 should be allowed in respect to the second report for which PC charged $9,305. I will therefore include a total sum of $14,000 in respect to the reports for PC. Interest 204. Upon the sum which I consider the FSP must pay to the Applicants, interest must be calculated. The normal principle is that interest runs from the date upon which the FSP’s IDR response was furnished to the Applicants, which in this case is August 2011. 205. I have given thought to the question as to whether this date is too early, having regard to the fact that there was increasing evidence of damage at this time. 206. I consider that the normal principle should apply. Essentially what has happened is that the FSP has disagreed with the proposition that all of the damage should be recognised as being carried by the storm. It was this decision which has given rise to the dispute thereafter. 207. The Determination which I make will therefore apply the usual principle. Determination 208. I determine that the FSP must pay to the Applicants the sum of $217,750 in compensation for the damage that w as caused to the Applicants’ property by the storm on 7 December 2010. (I note that this sum is to be paid in addition to the sum of $42,854.50 being the cost of the work referred to in Scope of Work Part 1, for which the FSP has already accepted liability). 209. I further determine that the FSP should pay to the Applicants interest upon the above sums ($42,854.50 and $217,750, respectively), from 30 August, 2011, at the statutory rate, until the date of settlement. Case No: 257846 Determination Page 31 of 31 210. I further determine that pursuant to the FOS Terms of Reference, the FSP is to pay to the Applicants the sum of $14,000 in partial recompense of the fees owing by the Applicants to PC Engineers. 211. I further determine that the FSP pay to the Applicants the sum of $6,000 to compensate them for a period of six months during which they would have been obliged to vacate their property while repairs were carried out.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.