Determination 257779

Service quality

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$6,059
Non-financial loss—
Amount claimed$117,475
SourceAFCA PDF

Summary

The applicant claimed $117,474.90 for storm and water damage across several claims over five years, including full roof replacement. AFCA found the roof replacement and most water ingress damage not covered, but ordered the FSP to repaint the master bedroom walls and pay the bedroom furniture and swag quotations.

The insured must show storm damage to the roof or an opening made by the storm, and no such evidence was shown, so water ingress and roof replacement claims fail.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 257779 Determination Page 1 of 14 Case number: 257779 General Insurance - Domestic Insurance - Home Building - Service - Service quality 15 August 2012 Background 1. This dispute arises from several claims made under the Applicant’s household insurance policy issued by the Financial Services Provider (FSP) spanning a period of five years from 2006 to 2011. The claims involve storm and water damage to the building and contents. 2. The Applicant claims that the FSP has failed to settle the claims appropriately. 3. The FSP maintains that it has properly and fully indemnified the Applicant for his losses in line with the terms of the policy. 4. The Applicant is now claiming: a. replacement of the roof $ 68,952.40 b. interior of the building $ 22,129.50 c. balance of contents claim $ 26,393.00 Total $117,474.90 in satisfaction of his claims. Summary of Applicant’s position 5. The Applicant is represented by his daughter. Any reference in this determination to the Applicant will include his daughter. 6. The Applicant states:  The bathrooms have been left looking like a patchwork quilt since his claim was made following burst pipes in 2009.  Payment for the damaged contents claim was made in the sum of $3,255.95. Their claim was for $23,000. Photographs were provided to the FSP and quotes were obtained for replacement of curtains in the bedroom and lounge to the same quality as the damaged curtains. The other furniture was matched as near as possible. Determination Case No: 257779 Determination Page 2 of 14  Carpets in the main bedroom and lounge were destroyed and they want them replaced.  The ensuite and main bedroom is to be fully restored to the condition it was in before it was gutted.  The office/bedroom walls were water damaged during cyclone Yasi and required repairing. Roof  Three assessors had informed them that the roof had to be replaced. They have been told this type of roof cannot be built any more as they are too flat.  He requires the FSP to pay for replacement of the roof as it took responsibility to repair the damage after the cyclone years ago.  The plumber did not do the job properly. 7. A new roof has been installed at a cost of $48,050 plus $5,000 for painting and $538 for disconnection of power. This is evidence it was not the gutters, drain pipes or maintenance that caused the water to enter the two corner rooms (ensuite and office/bedroom). 8. It was the toilet air vent that was damaged in the 2006 cyclone and other cyclones since then that allowed water to enter the home. The water ran along the timber truss to the corner rooms. 9. The Applicant has also provided a history of the claims and events leading to their dissatisfaction. Summary of FSP’s position 10. The FSP advised the following claims had been made by the Applicant: 1. xxx66H. Date of loss 12 October 2006. Rainwater flooded the house. 2. xxx01h. Date of loss 15 January 2008. Rainwater through the roof. 3. xxx388. Date of loss 12 January 2009. Water entered during storm. 4. xxx616 Date of loss 13 September 2010. Mould and fungus growing from wall repaired in claim 388. 5. xxx278. Date of loss 2 February 2011. Damage to awnings and other outdoor property, water on inside wall, dampness in main bedroom, possible further damage to roof. 11. The FSP states.  Each claim was assessed and settled according to the assessment. Case No: 257779 Determination Page 3 of 14 Roof  The Applicant appears to require it to replace the roof to make it compliant with changing building regulations.  Following cyclone Larry (March 2006) the roof was inspected by a building services contractor. The contractor reported the roof was in good condition with no rust.  A further report was obtained stated that very minor damage was repaired with sealant. The roof sheets had been installed incorrectly.  The roof was repaired at a cost of $3,036 in accordance with the scope of works.  During claim xxx616 the roof was again inspected and found to be in excellent condition with no signs of leaking anywhere from the top.  Following a further inspection on 25 November 2010 it was reported water damage appeared to be water overflowing from gutters or blowing in from the ends of roof sheeting. The roof leaks are a maintenance problem and not a result of impact or storm. Water entry  A number of reports indicated the entry of water to the building was due to incorrect installation of the roof sheets; overflow slots in the gutter were above the level of thee back of the gutter; entry through a window or panel below; heavy rain on the very shallow roof pitch and height of gutters; 12. The FSP states that it has not authorised any repairs to the roof. It was suggested that the roof may need to be lifted to establish the source of the leaks. This is not indicative of storm damage to the roof. 13. The FSP states the roof has not been damaged as a result of an insured event and as such it is not responsible to replace it. Contents claims settlement 14. The Applicant’s contents claim was settled based on invoices provided by the Applicant. 15. The claim for the air conditioner was denied as the unit had not been damaged by a storm. 16. The carpet contractor confirmed the carpet did not need replacing and was able to be restored. 17. The barbeque cover, camping swag and bedroom furniture were paid according to a reasonable replacement cost. 18. The lamp tables were refused as there was no proof provided; the curtains, TV cabinet and lounge were refused as there was no water entry to the lounge. Case No: 257779 Determination Page 4 of 14 Bathroom repairs 19. A claim (xxx616) was accepted as a result of a burst/leaking pipe. 20. Minor retiling was required. The policy provides that if the tiles cannot be matched no payment will be made to match undamaged parts to create a uniform appearance. Internal works 21. All works were carried out according to an agreed scope of works. 22. The claim for a pergola, fencing, gate and carpet (claim No xxx278) was accepted. Issues 23. Whether the FSP has discharged its obligations according to the terms of the policy. Reasons for decision 24. As advised to the parties, this matter has been expedited in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. The dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 25. There has been an exchange of material between the parties. Each party is therefore aware of the issues and had the opportunity to respond. 26. The decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 27. When making a claim under an insurance policy the responsibility rests with the policyholder to establish on the balance of probabilities that the loss claimed falls within the cover provided by the policy. 28. An FSP relying on a clause in the policy to deny liability has the burden of establishing on the balance of probability that the terms of the relevant clause apply to defeat the claim. Roof 29. The roof of the Applicant’s premises has been examined a t various times by contractors since 2006. The following information was provided in the reports. Case No: 257779 Determination Page 5 of 14 30. M building services report dated 10 February 2007  The roof was of aluminium construction and in good condition. There was no rust.  The roof had been installed incorrectly with the sheets being lapped the wrong way. The gutter at the rear has no slots. They suspect the water was coming over the top and through the soffit in monsoonal rains. 31. Contractor PCG report dated 28 March 2007.  The Applicant advised that a large bougainvillea had impacted the roof during a severe weather in March and April 2006.  A very minor repair to the roof was undertaken in the vicinity of the bougainvillea. 32. Contractor PCG report dated 9 May 2008  Other than the very minor repair there was no further permanent damage to the roof or gutters that related to the storm event. 33. Contractor PCG report dated 9 May 2008  Wind had lifted two lap sheets allowing water to penetrate the roof cavity and seep through concrete blocks.  The insured agreed to improve the roof to prevent any further occurrences during severe weather events. 34. Consultant Engineer S – report dated 10 March 2009  No problem was found with the roof sheeting.  Overflow slots cut in the face of the gutter are above the level of the back of the gutter and the first point of overflow is over the back of the gutter.  Removal of the roof sheeting may be required to check for leakage or travel path for rainwater over flow from gutter. 35. Building Consultant MS - report dated 14 August 2009  The roof was identified as shallow pitched, near flat but found to be in very good condition.  The entire roof rainfall runoff system is not considered restricted with sufficient downpipes and runoff.  The type of construction is not considered effective in preventing surface water entry during heavy rainfall due mainly to the very shallow roof pitch and height of gutters.  This has been a problem previously with numerous attempts to improve the roof water runoff system. 36. CB building contractor report undated (job No E19649) Case No: 257779 Determination Page 6 of 14  The roof is a very flat gable style roof constructed of aluminium deck. The roof is in excellent condition with no signs of leaking anywhere from the top. 37. Consultant building assessor S report dated 12 May 2011  Storm conditions including high winds and heavy rain have resulted in rainwater entering the home through flashings.  The roof is in good condition overall and is well maintained. 38. Plumbing contractor RH report dated 20 June 2011  All fixings are loosened by Cyclone Yasi. Roof is aluminium and fixings cannot be removed without damaging sheets. 39. Consultant building contractor CB – report dated 27 July 2011  Roof condition good.  Flashings, vent, barges, and gutters – fair  No direct impact damage noted  Sheets have kinks between batten supports  Evidence of water ponding  Combination of old nails and new screws.  Condition of roof contributes to water build up on roof during heavy rain causing possible leaks 40. While the policy provides cover for loss or damage caused by storm, for the claim to succeed there must be evidence the roof sustained damage as a result of an insured event, in this instance by a storm. 41. The Applicant’s roof has been inspected on at least ten occasions by appropriately qualified contractors and consultants over a period of four years. Apart from the plumber RH, in each case the contractor or consultant reported the roof was in good to very good condition with no evidence of any damage having been caused by a storm. 42. A minor repair was carried out as a result of damage caused by the bougainvillea. However the Panel does not accept that a repair, described as very minor, would result in the need for the entire roof to be replaced. 43. The general consensus was that the fall of the roof which was almost flat, was a major contributing factor in the water problems experienced by the Applicant. This is a structural issue and although potentially contributing to the ingress of water into the home, losses which result from the ‘design’ of an existing roof are not covered by the policy. 44. Although the plumber RH stated Cyclone Yasi loosened all the fittings, this finding is inconsistent with the reports on the roof condition described by the significant number of other qualified contractors. Case No: 257779 Determination Page 7 of 14 45. Moreover the roof was again inspected on 27 July 2011 being after the plumber’s report was received. On this occasion the contractor reported the roof was in good condition and the valleys, flashings, barges and gutter were in fair condition. He noted no direct impact damage was observed. 46. Furthermore, that contractor identified a number of issues with the roof, including: the pitch of the roof being only 1 degree, 80% of sheets are joined, battens are up to 1600mm between centres, sheets have kinks between batten supports, evidence of ponding and combination of old nails and new screws. He considered these factors contributed to water building up during heavy rain and causing leaks. 47. The Panel is persuaded by the weight of evidence that the roof was generally in good condition and free from any storm/cyclone damage; in the Panel’s view there is insufficient evidence that the roof was required to be replaced as a result on an insured event. 48. The Applicant says that since the roof was replaced water continued to enter the premise through the toilet air vents which were damaged by the storms. 49. Nevertheless, the consultant builder CB observes in its report of 27 July 2011 that vents were included in the inspection and were noted as being in fair condition. 50. For these reasons the Panel concludes that the Applicant has not discharged the onus that rests with him to show the cause for the roof replacement falls within the cover provided by the policy. Internal building damage 51. The relevant policy provision provides cover for loss or damage caused by storm as follows. “What is covered Storm What is not covered Loss or damage; ... x caused by rain, or wind entering the home unless it enters through an opening in the windows, walls or roof made by a storm.” 52. The policy also provides cover for loss or damage caused by bursting, leaking, discharging or overflowing of liquids from a number of items including pipes, gutters and drains. 53. The Applicant is claiming: a. Main bedroom - repairs and painting to two walls where water came down the wall Case No: 257779 Determination Page 8 of 14 b. Bathroom/ensuite – louvers were damaged during cyclone Yasi by a branch allowing water to run into the bathroom and bedroom. c. Office/bedroom – water damage to wall 54. It is not disputed that water entered the premises during intense rainfall at various times since 2006. 55. However, such claims will only succeed as a result of storm damage if there is evidence that the ingress of water during the storm was through an opening in the windows, walls or roof made by the storm. Alternatively that the damage occurred as a result of water leaking from a pipe or overflowing from a gutter. 56. The Panel again refers to the various reports obtained by the FSP since 2006. 57. M report dated 10 February 2007  Water was coming over the top and through the soffit in monsoonal rains. 58. PCG report dated 9 May 2008  Wind lifted lap sheets allowing water to penetrate the roof cavity and seep through the concrete block walls.  Damage caused to two internal walls in master bedroom. Quote obtained. 59. Engineer S report dated 10 February 2009  Not possible to identify the source of water. Thought to be through a window panel below a window.  The loss adjuster advised this panel was a window which had been boarded up and as such formed part of the wall. 60. Loss adjuster report dated 14 August 2009  Water entry was from a leaking pipe.  Moisture and water straining within the built-in cupboard of bedroom 2 was directly caused by a small minor leak from the plumbing pipe work.  Additional water staining and damage to the eaves/soffit and fascia and minor staining to external block work walls internally of bedroom 2 was caused by overflowing gutters during extremely heavy rainfall. 61. Quotations were obtained and authorised for rectification of damage in the office, bedroom 2 and 3 and tiles in bathroom. 62. Consultant building services contractor T report dated 26 November 2010  Roof leaks were a maintenance issue and not the result of storm or impact. Case No: 257779 Determination Page 9 of 14 63. Consultant building assessor S report dated 28 September 2010  Damage was caused by a split body washer on the cold water spindle in the shower.  Damage included installation of plasterboard patches to exploratory holes. 64. Consultant building assessor S report dated 5 November 2010  Applicant reported since previous repairs were carried out to the roof water is still entering the ceiling over the garage.  In their opinion the water was not a result of a storm created opening. 65. Consultant building assessor S report dated 12 May 2011  Damage was caused by cyclone Yasi on 2 February 211.  Rainwater entered the home through flashings damaging paintwork in B1, B2.  Patio shade cloth, window awnings, side gate and fence were also damaged. 66. The Panel accepts that in the main, water ingress during the storm and weather events was due to factors other than through an opening made by the storm. As such, the Panel is satisfied that the FSP is not responsible for rectification of any damage as a consequence of such water ingress. Main bedroom 67. However, according to the assessment report by PCG on 9 May 2008 water penetrated the roof cavity as a result of wind lifting to lap sheets. The resultant damage included two walls in the master bedroom. While the assessor reported a quote was obtained, the Panel has no evidence to show the damage was rectified at about that time. 68. Based on the evidence before it, the Panel considers the Applicant is entitled to have the water damage stains on the walls in the main bedroom removed and repainted. Office/bedroom 69. In August 2009, a leak was found responsible for water damage to the building. The claim was accepted and the rectification works included bedroom 2 and 3. 70. No evidence has been presented to show further damage caused by storm or further water leaks. 71. Accordingly the Panel considers the FSP is not liable for water damage to the office/bedroom Case No: 257779 Determination Page 10 of 14 Bathroom/ensuite 72. The Applicant says louvre windows were broken by flying debris during cyclone Yasi allowing water to enter the ensuite. 73. The Applicant’s home was inspected by the consultant assessor S on 27 March 2011 following cyclone Yasi. The damage listed in the assessment report makes no reference to broken louvres or water having entered the bathroom at that time. 74. In the absence of any supporting evidence the Panel is unable to find in the Applicant’s favour in relation to the bathroom/ensuite component of the dispute. Matching material in the bathroom 75. The Applicant says that repairs affected in 2009 following discovery of he burst pipe, left the bathroom with a patchwork appearance. 76. The policy condition relative to the FSP’s responsibility to match new material with existing material states: “ What is covered What is not covered Rebuilding or repairing that part of the home that was damaged or destroyed We will not pay for; X additional expenses for replacing or matching undamaged parts to create a uniform appearance ,or 77. According to the evidence, repairs to the bathroom included installation of plaster patches in the exploratory holes and repainting. 78. In 2009 repairs to the bathroom included replacing 4 wall tiles under the bathroom vanity and replacing 12 tiles to the tap end of the bathroom. 79. It is clear that according to the terms of the policy the FSP is not responsible to match undamaged parts to create a uniform appearance. 80. Accordingly the Panel considers the FSP is not liable for the cost of replacing the undamaged tiles in order to create a match with the new tiles. Settlement for damaged contents 81. The Applicant informed a FOS Case Manager that during cyclone Yasi a louvre window had been broken which allowed water to enter the ensuite. The louvres had been replaced. Case No: 257779 Determination Page 11 of 14 82. The Applicant also advised that the carpet vanity and built-in cupboard in the ensuite, were removed by him on instruction from the FSP. The claim was subsequently denied. 83. The lounge room carpet had been damaged when power failed during the cyclone and the fridge and freezer defrosted causing water to enter the lounge room and onto the carpet. 84. The Applicant’s complaint largely stems from settlement of the damage claimed arising from cyclone Yasi. 85. The A pplicant says that the FSP’s payment of $2,500 for rep lacement of the damaged bedroom furniture was inadequate and does not allow replacement. The camping swag was ‘dome canvass’ and had a sand fly screen which cost over $1,000. 86. The Applicant has provided quotations for: a. Mattress $4,199 Bar base and top $1,999 Lamp table $1798 Delivery $ 55 Total $8,051 b. Swag $1,008 87. The Applicant is seeking payment for: a. Lounge/dining room carpet b. Main bedroom/ensuite carpet and double door built in cupboards c. Vanity unit replaced d. TV cabinet was damaged from water caused by the refrigerator/freezers defrosting e. The cost of replacing furniture according to the quotes provided to the FSP. 88. Conversely, the FSP advised payments following cyclone Yasi claim included: I. Food spoilage $500 II. Replacement carpet $2,560 based on quote III. BBQ Cover $108 as per Applicant IV. Phone $196 based on invoice V. Swag $500 reasonable replacement VI. Bedroom furniture $2,500 reasonable replacement Case No: 257779 Determination Page 12 of 14 89. The FSP refused payment for a. Lamp table no proof provided b. Curtains no water entry to lounge c. TV cabinet no water entry to lounge d. Lounge no water entry to lounge Lounge room carpet and TV cabinet 90. The Applicant explained the carpet payment in the sum of $2,560 related to the kitchen area and did not include the lounge. 91. Following cyclone Yasi an inspection of the Applicant ’ s home was carried out by an assessor. Although noting the extent of damage to the property, there is no report of damage to the lounge room areas. 92. In the absence of supporting evidence following a site assessment by a pr ofessional assessor the Panel is unable to find in the Applicant’s favour in relation to the claim for additional damage to the lounge room carpets and TV cabinet. Bedroom furniture, swag 93. The onus rests with the Applicant to establish ownership and value of the property claimed. This may be achieved by production of photographs and information in relation to from where it was purchased, when it was purchased and the amount paid. 94. The Applicant says photographs of the bedroom furniture and swag were submitted to the FSP. 95. While the FSP says the sums of $2,500 (bedroom furniture) and $500 (swag) paid to the Applicant were based on a reasonable replacement cost, it has not provided any explanation or information to show on what it based its assessment or how this sum was calculated given the Applicant had submitted a quotation for replacement items consistent with the damaged items. 96. The relevant policy condition provides; “Settling your claim ... We may choose at option to;  ...  replace the item with a new item (regardless of brand or supplier) which is available in Australia and which is its nearest equivalent (in terms of quality and price) at the time of the loss or damage,” Case No: 257779 Determination Page 13 of 14 97. The Applicant has provided evidence to the FSP to establish ownership of the bedroom furniture and swag, The Panel has been given no reason to consider the items listed on the quotations obtained by the Applicant are not of similar style and quality to the damaged goods. 98. In these circumstances the Panel considers the Applicant has discharged the onus that rests with him to establish the value of these items. 99. Accordingly the Panel determines the Applicant is entitled to be reimbursed for the full sum of the quotations for the bedroom furniture and swag. Summary 100. This matter has been complicated by the number of claims having been made over a period of about five years and the nature of the damage. It is evident that there is a history of problem arising from the ingress of water principally due to the type of roof construction and its inability to withstand the severe weather events experienced in the area. In addition to the weather events water damage was also caused by a leaking pipe. 101. In considering the issues raised by the Applicant it is important to recognise that there must be damage caused to the roof by an insured event to justify its replacement under the policy insuring the Applicant’s home. 102. In relation to internal damage and damage to household contents, there must be evidence that the storm created an opening which allowed water to enter and damage the building or the contents, or by overflowing of gutters. It is not enough that water may have entered the premises from other openings such as roof leaks, or have been blown in due to wind strengths. 103. In the Applicant’s case this means there must be evidence that a storm or cyclone damaged the roof to such an extent that it required replacement as a result of that damage to fall within the cover provided by the insurance policy covering the A pplicant’s home. However, it is clear from the evidence that the roof was in good condition and no residual damage caused by a storm or cyclone. 104. The Applicant considers the roof should have been peeled back to find the source of the leaks. However, there was no evidence of storm damage to the roof. Further the policy does not provide cover for loss or damage caused by leaks. Accordingly in the absence of any insured damage to the roof, the FSP was under no obligation to source the leaks. 105. There was no substantive evidence that the need to replace the roof was due to damage caused by a storm or cyclone. 106. It is also clear that the flat roof with little fall was contributing to the ingress of water into the home. Case No: 257779 Determination Page 14 of 14 107. The Panel is satisfied that water entry to building was not a result of an opening in the roof windows or walls, other than the event reported in May 2008. 108. Nevertheless, the FSP accepted damage to household contents arising from Cyclone Yasi in February 2011. 109. The FSP accepted damage to the interior of the building arising from the burst water pipe and authorised rectification of any damage caused by that event. Determination 110. On the basis of the available information the Panel determines: a. The FSP was entitled to deny liability for the cost of replacing the roof; b. The FSP is not liable for the cost or replacing carpet or the vanity in the ensuite; c. The FSP is not liable for water damage to the office/bedroom; d. The FSP is not liable for the cost of matching the bathroom tiles; e. The FSP is not liable for the cost of repairing the TV cabinet or replacing carpet in the lounge room; f. The FSP is to remove the mould and repaint the walls in the master bedroom; g. The FSP is to pay the cost of the quotations obtained by the Applicant for the bedroom furniture and swag.