The insured's garage and shed were inundated by water on 11 January 2011 and the insurer declined the claim as flood damage. AFCA found the insurer had not shown the damage was caused by flood rather than stormwater run-off, rejected the estoppel and non-disclosure arguments, and ordered indemnity with statutory interest on any cash settlement.
The insurer failed to discharge its onus of proving the flood exclusion applied, since the inundation pattern was consistent with stormwater run-off, while the insured was adequately informed of the flood exclusion.
Issues
- Claim denial primary · upheld
“the FSP is to indemnify the Applicants for their loss, subject to any excess or policy limits that may be applicable”
- Failure to disclose secondary · not upheld
“the Applicants had been clearly informed and should have been aware of the flood exclusion”
- Misleading conduct secondary · not upheld
“The Panel is not persuaded that the FSP is estopped from declining the current claim simply because it may have previously accepted a similar claim”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 257702 Determination Page 1 of 7
Case number: 257702
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
10 April 2012
Background
1. The Applicants’ home and contents have been insured with the Financial
Services Provider (FSP) since 16 May 2008.
2. They claimed for damage caused to their property as a result of water
inundating their garage and shed on 11 January 2011.
3. The FSP declined liability, contending that the damage was caused by flood
which was excluded under the policy.
Summary of Applicants’ position
4. Their property was damaged by stormwater run-off on 11 January 2011. The
female Applicant’s (BN) account of the event is as follows:
There was heavy rain between 8.30am and 9.00am on 11 January 2011.
Sh e noticed drains in front of the property “were starting to fill up” at
8.30am.
Her street is on a slope and water was gushing from the gully down the
street. It was fast flowing and was heading towards the Bremer River, a
few kilometres from the property.
Water entered her property from the front at 9.30am and inundated the
garage to the height of its skirting.
Water also inundated the shed to a height of 43cm.
Water did not inundate the residence.
The garage was only inundated for about 15 to 20 minutes.
Her property has had a similar inundation in 2008 and the FSP has
accepted that claim.
5. The Applicants are under the impression that they were covered for their
loss because the FSP had settled a claim which occurred in similar
circumstances in 2008 on the basis the damage was caused by stormwater
run-off. They were not informed that future claims may be treated differently.
Determination
Case No: 257702 Determination Page 2 of 7
6. The FSP is therefore estopped from declining the claim because it had led
them to believe their claim would be covered.
7. The FSP failed to clearly inform them of the flood exclusion.
Summary of FSP’s position
8. The Applicants’ property was damaged by flood as defined in the policy.
9. It has clearly informed the Applicants of the flood exclusion.
10. The prior claim was accepted because its assessor had said that the
damage was caused by stormwater.
11. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement:
“ ‘flood’ means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
lake or lagoon whether or not altered or modified from any reservoir, canal or
dam.
Note: This policy does not cover loss, liability, injury or damage caused by or
arising from flood to buildings and/or contents.
…
‘rainwater’ means rain falling naturally from the sky onto the buildings and/or
ground.
…
‘run - off’ means rainwater that has collected on or has flowed across normally
dry ground or has overflowed from swimming pools or spas.
…
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
‘storm’ means violent wind (including cyclones and tornadoes),
thunderstorms and hail which may be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings
and/or ground.
‘run - off’ means rainwater that has collected on or has flowed across
normally dry ground or has overflowed from swimming pools or spas.
We will not pay for loss or damage:
a. caused by:
flood, or
flood water combined with run-off and/or rainwater
‘flood’ means the inundation of normally dry land by water that
has escaped or has been released from the normal confines of
Case No: 257702 Determination Page 3 of 7
any natural watercourse, lake or lagoon whether or not altered or
modified from any reservoir, canal or dam.”
12. The FSP also relies on the following policy provisions contained in its policy
schedules/renewal notices:
“Please note: Flood is not covered by this policy.”
Issues
13. Whether the Applicants were clearly informed that their policy excluded flood
damage.
14. Whether the FSP is estopped from declining the claim on the basis it had
previously accepted a similar claim occurring under similar circumstances.
15. Whether the damage to the Applicants ’ property was caused by rain or storm
water run-off and/or flood as defined in the policy.
Reasons for decision
Preliminaries
16. Due to the nature and urgency of the dispute, it has been directly referred to
the Panel for Determination in accordance with the Operational Guidelines to
the Financial Ombudsman Service’s (FOS) Terms of Reference.
17. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
18. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
19. The Panel has taken note of sections 35 and 69 of the Insurance Contracts
Act, 1984 (the Act) in the course of considering this dispute. It is
unnecessary to restate these provisions because the FSP is an insurer (and
should be aware) while the Applicants are legally represented.
Clearly inform
20. The Applicants say they were not clearly informed of the flood exclusion
because:
They were only provided with a PDS after they had paid their insurance
premium. They argue that flood is a “significant risk” in Southeast
Queensland and as such, they should have been informed of the flood
exclusion at policy inception and not after.
Case No: 257702 Determination Page 4 of 7
In Determination 40607, the Panel found that the same set of policy
wordings (currently relied on by the FSP) had failed to clearly inform the
Applicant in that dispute of the flood exclusion.
21. In the Panel’s view, neither circumstance assists the Applicants.
22. Section 69 of the Act entitles an insurer to provide written information of its
terms of cover after policy inception if it is not reasonably practical for it to do
so at policy inception. In the Panel’s opinion, all policy exclusions are
generally of equal importance. It is not reasonable and practical to require an
insurer to recite every policy exclusion orally at inception.
23. It is not reasonable to say a particular exclusion should have been informed
at the outset after the fact and when one has already had the benefit of
hindsight.
24. Determination 40607 should be confined to the particular facts of that
dispute. Although the Panel acknowledges the concern raised in that
Determination (with respect to a lack of distinction between concurrent and
consecutive causes of a loss in the relevant exclusion), it is of the view that
any perceived lack of clarity could be more fairly addressed by simply
reading down the relevant exclusion so as to be consistent with the
prevailing law. That is to say, to be consistent with the Wayne Tank principle.
25. The law, as it currently stands, does not require the FSP to advise the
Applicants specifically of the impact of the Wayne Tank principle ( see Hams
v CGU Insurance Limited [2002] NSWSC 273 ) or other relevant case law. In
the Panel’s opinion, the FSP’s attempt to inform policyholders of the impact
of Wayne Tank (when it had no obligation to do so) should be commended
and encouraged, rather than deterred and penalised.
26. The Panel has carefully reviewed the PDS and notes that it is appropriately
indexed and referenced, it contains a definition of flood and within the
appropriate listed event states that damage caused by flood is excluded from
cover.
27. Having carefully considered the matter, the Panel is of the view that the
Applicants had been clearly informed and should have been aware of the
flood exclusion for the following reaso ns:
They have had the policy since 2007 and as far as the property under
consideration is concerned, since 2008.
They do not dispute receiving the PDS, which clearly and
unambiguously states that they were not covered for flood damage on
several occasions.
They have not disputed receiving their renewal notices, all of which
contained a specific statement confirming they were not covered for
flood damage.
Case No: 257702 Determination Page 5 of 7
Estoppel
28. The Panel is not persuaded that the FSP is estopped from declining the
current claim simply because it may have previously accepted a similar
claim.
29. It is plain the prior claim was accepted because the FSP concluded that the
damage then was caused by stormwater. This does not prevent the FSP
from investigating future claims, nor does it prevent it from concluding
differently.
30. Even had the FSP erred in making payment for a previous claim (which it
does not accept) such action of itself would not commit it to accepting all
subsequent claims of a similar nature.
Proximate cause of damage
31. Turning to the cause of damage to the Applicants ’ property, the Applicants’
case is that their property was damaged by storm or rain water run-off while
the FSP says it was damaged by flood as defined in the policy.
32. In support of its position the FSP has provided a report from the hydrologist
company “W”.
33. The Panel has carefully reviewed the material and is not persuaded that the
FSP satisfactorily discharged its onus of establishing that the damage to the
Applicants’ property was caused, or concurrently caused, by flood (as
defined).
34. It is not in dispute BN witnessed the inundation and her account of the
incident appears consistent with a view that her property may have been first
inundated by storm or rain water run-off. The essence of her evidence is
that:
The inundation occurred very soon after a heavy rainfall;
It did not affect the whole property;
The inundation was not particularly significant; and
The inundation only lasted for a short period of time – less than 30
minutes.
35. Turning to the FSP’s evidence, it is unclear who authored the report that has
been identified as a site specific hydrology report for the Applicants’ location,
which is simply noted “Engineer: CLC”. However, the Panel accepts that the
hydrology company “W” is experienced in assessing instance s of water
inundation.
36. However, although the author concludes that the Applicants ’ property was
damaged by flood, it has not been explained (and the Panel is unclear):
Case No: 257702 Determination Page 6 of 7
What led the author to believe that O’Shea Gully and another unnamed
gully were in fact watercourses.
Assuming O’Shea Gully is a watercourse, what led the author to believe
there were in fact “breakout flows” from it on the morning of 11 January
2011 and that this was the principal cause of inundation at the
Applicants’ property.
When the all eged “breakout flow” first occurred, if at all it occurred.
What was the nature of “anecdotal evidence” relied on to support the
author’s findings.
Who were the persons from whom the author obtained such “anecdotal
evidence”.
How the author was able to derive an overland flow path for the area
when there is nothing in the report to suggest that he had the benefit of a
proper topographical layout for the area.
37. Conversely, it is a generally accepted hydrology principle that when
stormwater inundation occurs, it is likely to be within 30 minutes of
heavy/peak rainfall. In this instance it is attested by BN that water entered
the property at about 9.30am on 11 January 2011.
38. The W report states that records from the two closest rainfall gauges show
that there were short rainfall intensities at the relevant time, noting
particularly a burst of rainfall between 8.00am and 9.30am on 11 January
2011. Clearly this occurred contemporaneously with the inundation as
reported by BN.
39. The report from W does not specifically address this, other than to postulate
that stormwater alone would have been of insufficient volume and flow rate
to inundate the property, relative to the O’Shea Gully catchment. Despite this
conclusion, W does not address the details of the local catchment area.
However, he does note that the local area is very flat and has no formal
urban drainage system, and states “ Run-off from the urban area itself (i.e.
stormwater not watercourse breakout flows) is being discharged along local
swales and down to the railway embankment then travelling east to
Unnamed Gully”.
40. That description is entirely consistent with B N’s report.
41. The Panel also notes BN’s description that she saw water “gushing from the
gully”. It appears that she refers to water gushing from the west , being the
approximate direction of O’Shea Gully. However, it is not clear whether she
was referring to the direction rather than actually from the Gully itself.
42. Nevertheless, the evidence indicates that the inundation occurred very
quickly and immediately following heavy rainfall. The water level rose and fell
again within 30 minutes. Despite the water reportedly coming from the
(direction of the) gully, the fact the water fell again so quickly indicates, in the
Case No: 257702 Determination Page 7 of 7
Panel’s experience, such an occurrence is indicative of stormwater run-off
which built up and then dissipated.
43. Having considered all of the above, the Panel is inclined to the view that it is
more likely than not that the water which damaged the Applicants’ property
was stormwater run-off which arrived prior to any inundation from any
watercourse and the FSP has failed to discharge the onus that rest with it to
show, on the balance of probabilities, that the damage was caused by flood.
Determination
44. The Panel determines that the FSP is to indemnify the Applicants for their
loss, subject to any excess or policy limits that may be applicable in the
circumstances.
45. In the event the Panel elects to settle any portion of the claim in cash, the
Panel further determines that the FSP is required to pay interest on the
amount settled in cash at the statutory rate from 9 May 2011, the date it first
declined the claim, until the claim has been paid.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.