Home / Financial Firm (Unknown - Insurer) / Determination 257264

Determination 257264

Refusal of flood damage claim and stormwater settlement limit at 150mm

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home and Pool Room were flooded in January 2011 and the FSP paid about $70,000 in total, limiting stormwater to 150mm. AFCA held river flood was excluded but ordered stormwater cover up to 500mm and a review of the partial settlements.

The site-specific hydrology showed river flood caused the main inundation, but the 150mm stormwater cap was unfair given earlier stormwater events of 300 to 400mm.

Issues

Subjects and remedies

natural disasterpay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 257264 Determination Page 1 of 9 Case number: 257264 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 7 March 2012 The Applicant is represented. For clarity and convenience in the Determination, the Applicant and her representative will hereafter be referred to as “the Applicant”. Background 1. The Applicant held a home building and contents insurance with the Financial Services Provider (FSP). 2. In January 2011, the Applicant‟s property was inundated with water following severe weather events in Queensland. 3. The FSP assessed the claim and agreed to cover damage up to 150mm in the Pool Room on the basis it was caused by sto rmwater run-off, but excluded the remaining damage to the home on the basis the loss was caused by river flood, which is an exclusion under the policy. 4. The Applicant disputed the decision; however, the FSP maintained it is only liable for damage up to 150mm in the Pool Room. Summary of Applicant’s position 5. The FSP has failed its obligations under section 35 of the Insurance Contracts Act 1984 (the Act) to clearly inform her of the flood exclusion. 6. The drafting of the policy is poor and fails to clearly outline the derogation from standard flood cover. The Financial Ombudsman Service has previously determined in case 41709 that the drafting of a policy with flash flood and river flood was inadequate. 7. She does not recall receiving a copy of the PDS before she purchased the policy. She does not recall sending the proposal form to the FSP in December 2006. 8. Despite the FSP‟s submissions, it was reasonably practicable for the FSP to orally disclose that flood was not covered as it is a common event and a reason why people insure their homes. 9. When she called to arrange the insurance she asked if the policy covered flood because there is a storm easement at the rear of the property. The Determination Case No: 257264 Determination Page 2 of 9 operator told her she was covered for flood but did not specify what type of flood. Had she been aware flood from rivers was excluded she would have sought insurance elsewhere. 10. The FSP is unable to provide a copy of the call recording or any evidence to indicate that the representations were not made. 11. Since purchasing the policy, she has had three water inundation claims for the Pool Room and they have all been paid, confirming her impression that flood was covered under the policy. 12. Another insurer is paying claims as „flash flood‟ from the Bremer Rive r and as the FSP‟s policy covers flash flood she should be covered. 13. The FSP has agreed to cover up to 150mm of stormwater in the Pool Room, yet the stormwater was already up to her knees in the Pool Room at around 2:30pm on 11 January 2011 and it was still raining heavily. 14. The hydrologist indicates the inundation from the Bremer River did not occur until 6:30pm on 11 January 2011; however, the Applicant states the graph would indicate the inundation occurred closer to 8:00pm. 15. The hydrologist also acknowledges previous stormwater inundations in the Pool Room of up to 400mm, yet the FSP has made the decision to limit the stormwater inundation from this event to only 150mm. 16. It is impossible to effectively determine the extent of damage caused by stormwater and floodwater and therefore the FSP should pay the whole claim. 17. The Bureau of Meteorology data around the time of the event indicates there was significant rain and storm activity on 11 January 2011. 18. The FSP has paid $13,511 as partial payment of the claim for stormwater in the Pool Room and a further payment of $56,413.44. In some cases it has only offered to pay a portion of the value of the damaged items. The Applicant states she does not understand the basis for the settlement that has been made to date. Summary of FSP’s position 19. The policy excludes loss from river flood. 20. The evidence to hand indicates that while the Applicant‟s Pool Room was inundated with stormwater run-off before the flood, the main inundation to the home was from river flood and therefore it is entitled to refuse liability for that part. 21. It has settled stormwater run-off loss of up to 150mm in the Pool Room. Case No: 257264 Determination Page 3 of 9 22. In relation to the PDS and section 35 of the Act, the Financial Ombudsman Service has previously determined in case 240581 that the wording is clear. 23. In providing the PDS within 14 days of the contract of insurance being entered into it has complied with its obligations under the Act. The Applicant had plenty of opportunity to read and review the terms and conditions of the policy during the 21 day cooling off period. 24. It denies there was a misrepresentation made by its staff member at the time of the purchase of the policy. The Applicant has held two policies for a period of almost five years and has had plenty of opportunity to review the terms and conditions of the policy. 25. The FSP relies on the following policy provisions: The Building Policy “ Definitions (The Meaning Of Some Words) … “flash flood” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your home . but does not include when rainwater on the site :  cannot run off into a water catchment system , because it is overflowing in a flood; and  mixes with the flood water coming from the water catchment system and then flows into your home . … “rain” means water that has fallen from the sky on to your building and the site but not water from flash flood . … “river flood” means when water that is normally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority and the water overflows onto land that is not normally covered by water into your home. For example water may be deliberately released by an authority from a dam or reservoir . … “storm” means violent weather and high winds, sometimes accompanied by rain, hail or snow including cyclone, tornado or willy willy. … “water catchment system” means;  a river, creek, other natural watercourse or lake, whether they are in their original state of have been modified, are named or unnamed, or normally dry that only run during periods of rain; Case No: 257264 Determination Page 4 of 9  a dam, reservoir, stormwater channel or canal. … INSURED EVENTS CAUSING LOSS OR DAMAGE … 1.12 Storm, Rain Or Flash Flood You are insured for damage to your home caused by storm , rain , or flash flood . … We will not pay for damage caused by :  …  river flood ;” The Contents Policy - has the same definitions section “ INSURED EVENTS CAUSING LOSS OR DAMAGE … 1.12 Storm, Rain Or Flash Flood You are insured for damage to your contents caused by storm , rain , or flash flood . … We will not pay for damage caused by :  …  river flood ;” Issues 26. Whether the FSP clearly informed the Applicant of the flood exclusion. 27. Whether the FSP misrepresented the cover under the policy at the time of purchase. 28. Whether the loss was caused by river flood, as defined by the policy. 29. Whether the FSP‟s settlement for stormwater damage is appropriate. Reasons for Decision 30. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. Case No: 257264 Determination Page 5 of 9 31. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 32. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Was the Applicant clearly informed of the flood exclusion? 33. The Applicant states the FSP has failed its obligation under section 35 of the Act to clearly inform her of the river flood exclusion. She also states the policy wording is unclear. 34. The FSP states it sent the PDS within 14 days as required under section 69 of the Act and therefore it has complied with its obligations. The FSP states the wording is clear as has been confirmed by the Financial Ombudsman Service in a previous determination. 35. The Panel has reviewed the evidence and notes that the Applicant acknowledges receiving the PDSs (building and contents) although she notes this was received after the policy was in place. The FSP has also submitted that the Applicant signed a declaration at the time she applied for the policy noting that she had read and understood the Duty of Disclosure as stated in the PDS. 36. There is also evidence in the FSP‟s Internal Disputes Resolution (IDR) letter that the Applicant was sent a proposal form with the PDSs in 2006, after taking a cover note, although the Applicant has indicated she does not remember this. 37. In any case, it is not in dispute that the Applicant did in fact receive copies of the PDSs. 38. The parties have referred to previous determinations where the Financial Ombudsman Service has determined that certain PDSs have and have not met the onus to clearly inform the consumer. 39. The Panel notes that each matter is considered on its own merits and the particular case raised by the Applicant (41709) related to different wording and a definition of „flood‟ rather than „river flood‟. The Panel does not consider the comments made in 41709 relate to the FSP‟s wording in this case. 40. The Panel has reviewed the policy wording of the building and contents PDSs. The policies cover loss from rain, storm and flash flood but specifically exclude loss from river flood. The Panel is satisfied the definitions and exclusions are clear and meet the requirements to clearly inform, as per section 35 of the Act. Case No: 257264 Determination Page 6 of 9 Did the FSP misrepresent to the Applicant that the policy covered flood? 41. The Applicant says that she spoke to a staff member of the FSP in 2006 who told her flood was covered under the policy and therefore she tr usted she had the appropriate cover. 42. The Applicant also states she has had three claims for water inundation that have been covered, further confirming her view that she had the appropriate cover. 43. The FSP‟s IDR letter addresses the issue. It states the F SP did not record phone calls at that time but there is an acknowledgment a phone call took place on 15 November 2006 (this would appear to be the call where the Applicant took the cover note). 44. The FSP states the employee who spoke to the Applicant left the company a number of years ago. The FSP notes the Applicant has not outlined what was said to her to induce her belief there was flood cover. 45. The Applicant submits that flood insurance was important to her and she would have said that the home was in a low lying area. Conversely, the FSP‟s IDR letter questions whether the Applicant failed in her duty of disclosure to advise she lived in a flood prone area; however, the FSP has not made this submission in its Notice of Response nor provided evidence to support this position. The Panel does not intend to consider the duty of disclosure issue further. 46. Often in matters where there is an allegation that an insurer has misled an Applicant there is a recording upon which to check the representations made. In this case there is no recording. 47. The FSP has acknowledged a call took place on 15 November 2006. The evidence to hand indicates the cover note for the policy began on that date. 48. Simply put, given the lack of probative evidence the Panel is unable to come to any conclusion about the conversation that took place on that date. It may be that the FSP incorrectly told the Applicant she had flood cover or that the FSP told the Applicant she had flash flood cover and there was a misunderstanding. In the absence of any evidence this can only be speculated upon. 49. The FSP has failed to make any submission about the reported water inundation claims that occurred before January 2011; however, the Panel accepts that each case should be treated on its merits and it may well be the case they were considered flash flood events and covered on that basis. 50. The Applicant acknowledges receiving the PDSs after the cover note was taken out. Therefore, the Panel is persuaded that the Applicant was provided a copy of the terms and conditions of the cover and she was obligated to read the PDSs. Case No: 257264 Determination Page 7 of 9 51. In looking at the evidence as a whole, the Applicant had almost five years to read and consider the terms of the policies and also reportedly made three water inundation claims that may have prompted her to check the terms and conditions of cover. 52. In the circumstances, the Applicant had ample opportunity to review the cover and exclusions to see if the cover offered met her needs. 53. As noted previously, the Panel finds the exclusion relating to river flood is clear and can be distinguished from a flash flood event. 54. In conclusion, the Panel is satisfied that in the absence of any evidence that a misrepresentation occurred which would have the effect of overriding the subsequent written information, the Applicant has been provided with the terms and conditions of cover and the FSP may rely on the exclusions. Was the loss caused by flood, as defined by the policy? 55. The FSP has paid for stormwater loss up to 150mm in the Pool Room. The Applicant states the water was already up to her knees between 2:30pm and 3:00pm on 11 January 2011 and the water from the river would not have reached the property until 8:00pm. 56. The FSP on the other hand states the inundation over 150mm was caused by river flood and therefore it is entitled to refuse liability. 57. The Panel has reviewed the site specific hydrology report, dated 10 June 2011. It includes the following information:  The Bremer River is 450m south of the property.  The home is a raised single storey structure with a large detached Pool Room.  Stormwater began to inundate the yard on 10 January 2011.  Stormwater to a level of 150mm had inundated the Pool Room by the afternoon of 11 January 2011.  The peak inundation occurred over the evening of 12 January to 13 January 2011.  The Applicant has been fighting with the Council for 2 years to address drainage issues in the area. Two new pipes were installed to address drainage issues.  In the past 10 years the Pool Room had been inundated with water on four occasions up to a height of 300 - 400mm resulting in the loss of contents.  Observation indicated the floorboards of the home building are approximately 1.45m above ground level.  The site was inundated to a level of approximately 5.2m above ground level.  The evidence indicates the water from the Bremer River would have inundated the site by 6:30pm on 11 January 2011. Case No: 257264 Determination Page 8 of 9  The stormwater inundation of the Pool Room to a height of approximately 150mm reportedly occurred about 3:00pm on 11 January 2011 but the depth of stormwater could not be confirmed due to the subsequent river flooding.  The home building was not affected by the stormwater but was later inundated by flooding from the Bremer River. 58. In reviewing the evidence and in particular having regard to the reported height of the floor above the ground (1.45m), the Panel is persuaded the inundation of the home building would have been caused by floodwater from the Bremer River. 59. However, the Panel does question the limit of 150mm of stormwater applied to the Pool Room. The evidence indicates there was at least 150mm at around 3:00pm (the Applicant has stated it was up to her knees) and the floodwater would not have inundated the property until at least 6:30pm. 60. Given that previous events (that were likely less severe) resulted in stormwater up to 300 - 400mm in the Pool Room, the Panel is surprised the limit of 150mm has been applied in this case. 61. The hydrologist also acknowledges that it cannot be accurately determined how high the stormwater rose before the floodwater inundated the property. 62. Having regard for what is fair in all the circumstances, the Panel determines the FSP should cover stormwater damage in the Pool Room up to 500mm. This accounts for the fact that in the past, stormwater has been as high as 400mm and the January 2011 event was an extreme event. 63. It is acknowledged that the payment of the initial 150mm may well include damage to items that extend past 150mm. Settlement figure 64. The Applica nt has also raised concerns with the FSP‟s settlement of $13,511 and $56,413.44 stating in some cases the FSP has only settled a portion of items. 65. The FSP has not responded to the Applicant‟s submission on the settlement issue at all. The Panel is therefore not completely clear on the figures and why only a percentage on some items has been paid; however, upon reading the policy wording it may be the case that the FSP has cash settled items based on their depreciated value. 66. The policy states that where a person requests a cash settlement of items rather than a replacement, the FSP will pay the value of the item if it was sold to a licensed second hand dealer. 67. In this case it is simply not clear if the Applicant requested a cash settlement or whether the FSP has cash settled the claim for ease, in consideration of the large number of claims that have been lodged in response to recent natural disasters. Case No: 257264 Determination Page 9 of 9 68. In any case, given the FSP‟s failure to address the issue, the Panel determines the FSP is to pay the replacement cost of items deemed to be lost up to 500mm in the Pool Room. 69. The FSP is required to review the claim and its settlement to date and make the appropriate adjustments. Unfortunately, the Panel is unable to determine the final figure as there is insufficient evidence to hand to accurately clarify the loss up to 500mm in the Pool Room or adjustments that need to be made for items that have only had a partial settlement. Determination 70. On the basis of the available information the Panel determines the FSP is entitled to refuse liability for damage to the home building and its contents because it has established flood was the cause of the loss. 71. The Panel determines the FSP is to cover stormwater damage to the building and contents of the Pool Room up to a height of 500mm. 72. The Panel determines the FSP review the settlement of the items it has only partially covered and bring the settlement up to the reasonable replacement value for those items. 73. Noting that further review of the claim settlement will now be required, the Panel trusts both parties will act reasonably and in good faith in negotiating any further damage between the original 150mm and the additional 350mm allowed for in the Pool Room. This review may require a further assessment or for the Applicant to provide further information. 74. If the parties are unable to come to an agreement on the loss up to 500mm in the Pool Room or the final settlement figure, the matter may be referred back to the Panel to determine those issues only. However, as stated , the Panel trusts the parties will co-operate and the matter can be settled without further need for determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.