Home / Financial Firm (Unknown - Insurer) / Determination 257264
Determination 257264
Refusal of flood damage claim and stormwater settlement limit at 150mm
Summary
The applicant's home and Pool Room were flooded in January 2011 and the FSP paid about $70,000 in total, limiting stormwater to 150mm. AFCA held river flood was excluded but ordered stormwater cover up to 500mm and a review of the partial settlements.
The site-specific hydrology showed river flood caused the main inundation, but the 150mm stormwater cap was unfair given earlier stormwater events of 300 to 400mm.
Issues
- Claim denial primary · not upheld
“the FSP is entitled to refuse liability for damage to the home building and its contents because it has established flood was the cause of the loss.”
- Claim amount dispute secondary · upheld
“the Panel determines the FSP should cover stormwater damage in the Pool Room up to 500mm.”
- Failure to disclose secondary · not upheld
“the Panel is satisfied the definitions and exclusions are clear and meet the requirements to clearly inform, as per section 35 of the Act.”
Subjects and remedies
natural disasterpay claimreassess claim
Text of the determination
Case No: 257264 Determination Page 1 of 9
Case number: 257264
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
7 March 2012
The Applicant is represented. For clarity and convenience in the Determination, the
Applicant and her representative will hereafter be referred to as “the Applicant”.
Background
1. The Applicant held a home building and contents insurance with the
Financial Services Provider (FSP).
2. In January 2011, the Applicant‟s property was inundated with water following
severe weather events in Queensland.
3. The FSP assessed the claim and agreed to cover damage up to 150mm in
the Pool Room on the basis it was caused by sto rmwater run-off, but
excluded the remaining damage to the home on the basis the loss was
caused by river flood, which is an exclusion under the policy.
4. The Applicant disputed the decision; however, the FSP maintained it is only
liable for damage up to 150mm in the Pool Room.
Summary of Applicant’s position
5. The FSP has failed its obligations under section 35 of the Insurance
Contracts Act 1984 (the Act) to clearly inform her of the flood exclusion.
6. The drafting of the policy is poor and fails to clearly outline the derogation
from standard flood cover. The Financial Ombudsman Service has
previously determined in case 41709 that the drafting of a policy with flash
flood and river flood was inadequate.
7. She does not recall receiving a copy of the PDS before she purchased the
policy. She does not recall sending the proposal form to the FSP in
December 2006.
8. Despite the FSP‟s submissions, it was reasonably practicable for the FSP to
orally disclose that flood was not covered as it is a common event and a
reason why people insure their homes.
9. When she called to arrange the insurance she asked if the policy covered
flood because there is a storm easement at the rear of the property. The
Determination
Case No: 257264 Determination Page 2 of 9
operator told her she was covered for flood but did not specify what type of
flood. Had she been aware flood from rivers was excluded she would have
sought insurance elsewhere.
10. The FSP is unable to provide a copy of the call recording or any evidence to
indicate that the representations were not made.
11. Since purchasing the policy, she has had three water inundation claims for
the Pool Room and they have all been paid, confirming her impression that
flood was covered under the policy.
12. Another insurer is paying claims as „flash flood‟ from the Bremer Rive r and
as the FSP‟s policy covers flash flood she should be covered.
13. The FSP has agreed to cover up to 150mm of stormwater in the Pool Room,
yet the stormwater was already up to her knees in the Pool Room at around
2:30pm on 11 January 2011 and it was still raining heavily.
14. The hydrologist indicates the inundation from the Bremer River did not occur
until 6:30pm on 11 January 2011; however, the Applicant states the graph
would indicate the inundation occurred closer to 8:00pm.
15. The hydrologist also acknowledges previous stormwater inundations in the
Pool Room of up to 400mm, yet the FSP has made the decision to limit the
stormwater inundation from this event to only 150mm.
16. It is impossible to effectively determine the extent of damage caused by
stormwater and floodwater and therefore the FSP should pay the whole
claim.
17. The Bureau of Meteorology data around the time of the event indicates there
was significant rain and storm activity on 11 January 2011.
18. The FSP has paid $13,511 as partial payment of the claim for stormwater in
the Pool Room and a further payment of $56,413.44. In some cases it has
only offered to pay a portion of the value of the damaged items. The
Applicant states she does not understand the basis for the settlement that
has been made to date.
Summary of FSP’s position
19. The policy excludes loss from river flood.
20. The evidence to hand indicates that while the Applicant‟s Pool Room was
inundated with stormwater run-off before the flood, the main inundation to
the home was from river flood and therefore it is entitled to refuse liability for
that part.
21. It has settled stormwater run-off loss of up to 150mm in the Pool Room.
Case No: 257264 Determination Page 3 of 9
22. In relation to the PDS and section 35 of the Act, the Financial Ombudsman
Service has previously determined in case 240581 that the wording is clear.
23. In providing the PDS within 14 days of the contract of insurance being
entered into it has complied with its obligations under the Act. The Applicant
had plenty of opportunity to read and review the terms and conditions of the
policy during the 21 day cooling off period.
24. It denies there was a misrepresentation made by its staff member at the time
of the purchase of the policy. The Applicant has held two policies for a period
of almost five years and has had plenty of opportunity to review the terms
and conditions of the policy.
25. The FSP relies on the following policy provisions:
The Building Policy
“ Definitions (The Meaning Of Some Words)
…
“flash flood” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home .
but does not include when rainwater on the site :
cannot run off into a water catchment system , because it is
overflowing in a flood; and
mixes with the flood water coming from the water catchment system
and then flows into your home .
…
“rain” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
…
“river flood” means when water that is normally contained in a water
catchment system increases because of rainfall or snow melt (whether in the
immediate region or elsewhere) or is deliberately released by an authority and
the water overflows onto land that is not normally covered by water into your
home.
For example water may be deliberately released by an authority from a dam
or reservoir .
…
“storm” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including cyclone, tornado or willy willy.
…
“water catchment system” means;
a river, creek, other natural watercourse or lake, whether they are in
their original state of have been modified, are named or unnamed, or
normally dry that only run during periods of rain;
Case No: 257264 Determination Page 4 of 9
a dam, reservoir, stormwater channel or canal.
…
INSURED EVENTS
CAUSING LOSS OR DAMAGE
…
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your home caused by storm , rain , or flash
flood .
…
We will not pay for damage caused by :
…
river flood ;”
The Contents Policy - has the same definitions section
“ INSURED EVENTS
CAUSING LOSS OR DAMAGE
…
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your contents caused by storm , rain , or
flash flood .
…
We will not pay for damage caused by :
…
river flood ;”
Issues
26. Whether the FSP clearly informed the Applicant of the flood exclusion.
27. Whether the FSP misrepresented the cover under the policy at the time of
purchase.
28. Whether the loss was caused by river flood, as defined by the policy.
29. Whether the FSP‟s settlement for stormwater damage is appropriate.
Reasons for Decision
30. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
Case No: 257264 Determination Page 5 of 9
31. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
32. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
Was the Applicant clearly informed of the flood exclusion?
33. The Applicant states the FSP has failed its obligation under section 35 of the
Act to clearly inform her of the river flood exclusion. She also states the
policy wording is unclear.
34. The FSP states it sent the PDS within 14 days as required under section 69
of the Act and therefore it has complied with its obligations. The FSP states
the wording is clear as has been confirmed by the Financial Ombudsman
Service in a previous determination.
35. The Panel has reviewed the evidence and notes that the Applicant
acknowledges receiving the PDSs (building and contents) although she
notes this was received after the policy was in place. The FSP has also
submitted that the Applicant signed a declaration at the time she applied for
the policy noting that she had read and understood the Duty of Disclosure as
stated in the PDS.
36. There is also evidence in the FSP‟s Internal Disputes Resolution (IDR) letter
that the Applicant was sent a proposal form with the PDSs in 2006, after
taking a cover note, although the Applicant has indicated she does not
remember this.
37. In any case, it is not in dispute that the Applicant did in fact receive copies of
the PDSs.
38. The parties have referred to previous determinations where the Financial
Ombudsman Service has determined that certain PDSs have and have not
met the onus to clearly inform the consumer.
39. The Panel notes that each matter is considered on its own merits and the
particular case raised by the Applicant (41709) related to different wording
and a definition of „flood‟ rather than „river flood‟. The Panel does not
consider the comments made in 41709 relate to the FSP‟s wording in this
case.
40. The Panel has reviewed the policy wording of the building and contents
PDSs. The policies cover loss from rain, storm and flash flood but
specifically exclude loss from river flood. The Panel is satisfied the
definitions and exclusions are clear and meet the requirements to clearly
inform, as per section 35 of the Act.
Case No: 257264 Determination Page 6 of 9
Did the FSP misrepresent to the Applicant that the policy covered flood?
41. The Applicant says that she spoke to a staff member of the FSP in 2006 who
told her flood was covered under the policy and therefore she tr usted she
had the appropriate cover.
42. The Applicant also states she has had three claims for water inundation that
have been covered, further confirming her view that she had the appropriate
cover.
43. The FSP‟s IDR letter addresses the issue. It states the F SP did not record
phone calls at that time but there is an acknowledgment a phone call took
place on 15 November 2006 (this would appear to be the call where the
Applicant took the cover note).
44. The FSP states the employee who spoke to the Applicant left the company a
number of years ago. The FSP notes the Applicant has not outlined what
was said to her to induce her belief there was flood cover.
45. The Applicant submits that flood insurance was important to her and she
would have said that the home was in a low lying area. Conversely, the
FSP‟s IDR letter questions whether the Applicant failed in her duty of
disclosure to advise she lived in a flood prone area; however, the FSP has
not made this submission in its Notice of Response nor provided evidence to
support this position. The Panel does not intend to consider the duty of
disclosure issue further.
46. Often in matters where there is an allegation that an insurer has misled an
Applicant there is a recording upon which to check the representations
made. In this case there is no recording.
47. The FSP has acknowledged a call took place on 15 November 2006. The
evidence to hand indicates the cover note for the policy began on that date.
48. Simply put, given the lack of probative evidence the Panel is unable to come
to any conclusion about the conversation that took place on that date. It may
be that the FSP incorrectly told the Applicant she had flood cover or that the
FSP told the Applicant she had flash flood cover and there was a
misunderstanding. In the absence of any evidence this can only be
speculated upon.
49. The FSP has failed to make any submission about the reported water
inundation claims that occurred before January 2011; however, the Panel
accepts that each case should be treated on its merits and it may well be the
case they were considered flash flood events and covered on that basis.
50. The Applicant acknowledges receiving the PDSs after the cover note was
taken out. Therefore, the Panel is persuaded that the Applicant was provided
a copy of the terms and conditions of the cover and she was obligated to
read the PDSs.
Case No: 257264 Determination Page 7 of 9
51. In looking at the evidence as a whole, the Applicant had almost five years to
read and consider the terms of the policies and also reportedly made three
water inundation claims that may have prompted her to check the terms and
conditions of cover.
52. In the circumstances, the Applicant had ample opportunity to review the
cover and exclusions to see if the cover offered met her needs.
53. As noted previously, the Panel finds the exclusion relating to river flood is
clear and can be distinguished from a flash flood event.
54. In conclusion, the Panel is satisfied that in the absence of any evidence that
a misrepresentation occurred which would have the effect of overriding the
subsequent written information, the Applicant has been provided with the
terms and conditions of cover and the FSP may rely on the exclusions.
Was the loss caused by flood, as defined by the policy?
55. The FSP has paid for stormwater loss up to 150mm in the Pool Room. The
Applicant states the water was already up to her knees between 2:30pm and
3:00pm on 11 January 2011 and the water from the river would not have
reached the property until 8:00pm.
56. The FSP on the other hand states the inundation over 150mm was caused
by river flood and therefore it is entitled to refuse liability.
57. The Panel has reviewed the site specific hydrology report, dated 10 June
2011. It includes the following information:
The Bremer River is 450m south of the property.
The home is a raised single storey structure with a large detached Pool
Room.
Stormwater began to inundate the yard on 10 January 2011.
Stormwater to a level of 150mm had inundated the Pool Room by the
afternoon of 11 January 2011.
The peak inundation occurred over the evening of 12 January to 13
January 2011.
The Applicant has been fighting with the Council for 2 years to address
drainage issues in the area. Two new pipes were installed to address
drainage issues.
In the past 10 years the Pool Room had been inundated with water on
four occasions up to a height of 300 - 400mm resulting in the loss of
contents.
Observation indicated the floorboards of the home building are
approximately 1.45m above ground level.
The site was inundated to a level of approximately 5.2m above ground
level.
The evidence indicates the water from the Bremer River would have
inundated the site by 6:30pm on 11 January 2011.
Case No: 257264 Determination Page 8 of 9
The stormwater inundation of the Pool Room to a height of
approximately 150mm reportedly occurred about 3:00pm on 11
January 2011 but the depth of stormwater could not be confirmed due
to the subsequent river flooding.
The home building was not affected by the stormwater but was later
inundated by flooding from the Bremer River.
58. In reviewing the evidence and in particular having regard to the reported
height of the floor above the ground (1.45m), the Panel is persuaded the
inundation of the home building would have been caused by floodwater from
the Bremer River.
59. However, the Panel does question the limit of 150mm of stormwater applied
to the Pool Room. The evidence indicates there was at least 150mm at
around 3:00pm (the Applicant has stated it was up to her knees) and the
floodwater would not have inundated the property until at least 6:30pm.
60. Given that previous events (that were likely less severe) resulted in
stormwater up to 300 - 400mm in the Pool Room, the Panel is surprised the
limit of 150mm has been applied in this case.
61. The hydrologist also acknowledges that it cannot be accurately determined
how high the stormwater rose before the floodwater inundated the property.
62. Having regard for what is fair in all the circumstances, the Panel determines
the FSP should cover stormwater damage in the Pool Room up to 500mm.
This accounts for the fact that in the past, stormwater has been as high as
400mm and the January 2011 event was an extreme event.
63. It is acknowledged that the payment of the initial 150mm may well include
damage to items that extend past 150mm.
Settlement figure
64. The Applica nt has also raised concerns with the FSP‟s settlement of $13,511
and $56,413.44 stating in some cases the FSP has only settled a portion of
items.
65. The FSP has not responded to the Applicant‟s submission on the settlement
issue at all. The Panel is therefore not completely clear on the figures and
why only a percentage on some items has been paid; however, upon
reading the policy wording it may be the case that the FSP has cash settled
items based on their depreciated value.
66. The policy states that where a person requests a cash settlement of items
rather than a replacement, the FSP will pay the value of the item if it was
sold to a licensed second hand dealer.
67. In this case it is simply not clear if the Applicant requested a cash settlement
or whether the FSP has cash settled the claim for ease, in consideration of
the large number of claims that have been lodged in response to recent
natural disasters.
Case No: 257264 Determination Page 9 of 9
68. In any case, given the FSP‟s failure to address the issue, the Panel
determines the FSP is to pay the replacement cost of items deemed to be
lost up to 500mm in the Pool Room.
69. The FSP is required to review the claim and its settlement to date and make
the appropriate adjustments. Unfortunately, the Panel is unable to determine
the final figure as there is insufficient evidence to hand to accurately clarify
the loss up to 500mm in the Pool Room or adjustments that need to be
made for items that have only had a partial settlement.
Determination
70. On the basis of the available information the Panel determines the FSP is
entitled to refuse liability for damage to the home building and its contents
because it has established flood was the cause of the loss.
71. The Panel determines the FSP is to cover stormwater damage to the
building and contents of the Pool Room up to a height of 500mm.
72. The Panel determines the FSP review the settlement of the items it has only
partially covered and bring the settlement up to the reasonable replacement
value for those items.
73. Noting that further review of the claim settlement will now be required, the
Panel trusts both parties will act reasonably and in good faith in negotiating
any further damage between the original 150mm and the additional 350mm
allowed for in the Pool Room. This review may require a further assessment
or for the Applicant to provide further information.
74. If the parties are unable to come to an agreement on the loss up to 500mm
in the Pool Room or the final settlement figure, the matter may be referred
back to the Panel to determine those issues only. However, as stated , the
Panel trusts the parties will co-operate and the matter can be settled without
further need for determination.