Flood inundation claim denied; flash flood cover not established

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's Yeronga home was damaged by floodwater in January 2011 and the insurer denied the claim as excluded flood. AFCA found the insured had not proved inundation within the 24-hour flash flood window and ordered nothing.

Under the defined-event policy the insured must prove flash flood inundation within 24 hours of the heavy rain, and the evidence showed inundation after that window.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 257230 Determination Page 1 of 7 Case number: 257230 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation by Floodwater 2 November 2012 Background 1. The Applicant insured his home and contents with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 11 May 2010. During this period, the building was insured up to a sum of $450,000 and the contents for $200,000. 2. On or about 12 January 2011, the Applicant‟s home in Yeronga was damaged as a result of extensive water inundation following severe weather events in Queensland. He subsequently lodged a claim. 3. The FSP denied the claim on the basis the damage was due to “flood”. 4. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant ’s position 5. The Applicant submits the following as alternative arguments in response to the FSP‟s decision:  The damage was due to “flash flood and stormwater run - off”, which is an insured event.  The FSP settled a neighbour who had the same policy and was subject to the same conditions as the Applicant and therefore he should be indemnified for his loss. Summary of FSP’s position 6. In response to the Applicant ‟ s arguments, the FSP submits the following:  The loss was caused by the flooding of the Brisbane River, which is an excluded event under the policy. Determination Case No: 257230 Determination Page 2 of 7  The payment of the neighbour‟s claim has no bearing on this matter but was done in error in any event. 7. The FSP relies on a number hydrology reports authored by SC. 8. In the event the Panel was to conclude the circumstances of the inundation did in fact enliven its defined policy event of „flash flood and stormwater run - off‟, it asserts, notwithstanding SC‟s estimated time of inundation of the risk address as being 3.19am on 12 January 2011 (to a height of 0.1m above the dwelling‟s floor level) if, as submitted by the Applicant, the true time of inundation was approximately 6.20am on 12 January 201, then the Applicant‟s property is in category D, thereby providing the F SP a more compelling case to refuse cover, as the estimated time of 6.20am places the „flash flood‟ some 26 hours after the rainfall event. 9. The FSP relies upon the following policy provisions to deny the Applicant‟s claim: Page 4 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by h eavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong w inds including a cyclone, light ning, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Case No: 257230 Determination Page 3 of 7 Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What i s covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher , but not exceeding your contents sum insured . ... ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Case No: 257230 Determination Page 4 of 7 Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the:  home sum insured, i f your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool and spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas... ...” Issues 10. Whether the settlement of the neighbours‟ claim should have any bearing on the consideration of the Applicant‟s loss. 11. Whether the cause of the Applicant‟s loss was covered under the policy. Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. Case No: 257230 Determination Page 5 of 7 14. On 30 October 2012 the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 15. It is appropriate to consider the issues under the various headings. Neighbours’ Claim 16. It is not in dispute that neighbours (the Bs) of the Applicant were settled by the FSP and that the circumstances of their loss virtually mirrored that of the Applicant. 17. The FSP states that this claim was settled in error due to a “mapping error” by its hydrologist, SC. 18. The admission of an error by SC and the FSP notwithstanding, the Panel accepts that each claim must be considered on its merits and therefore the evaluation of the Applicant‟s loss is dependent on the evidence presented and separately from any payments made on other claims. 19. The Panel further accepts that the admission of an error in the payment of the other claim does not in any way commit the FSP to payment of each additional claim involving similar circumstances. 20. On this basis, the Panel is satisfied that the outcome of the neigh bours‟ claim has no bearing on the consideration of this matter. 21. Notwithstanding this conclusion, the Panel may still analyse the technical data applied by SC in relation to the Bs claim, insofar as it may assist the Panel better understand the timing issues in respect of inundation to the Applicant‟s property . Water Inundation 22. The Applicant‟s evidence, provided through personal observation and photographs from the scene, attests to the home not being inundated with water prior to at least 5.52am on 12 January 2011. 23. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 release strategy at the Wivenhoe Dam by its operating engineers. 24. The Wivenhoe Dam employed four stages of strategy to ensure the safety of water storage at the site. These strategies are identified as W1, W2, W3 and W4. As of early morning on 11 January 2011 and pursuant to the rainfall over previous days, the dam was operating under strategy W3. 25. When it is considered by the dam‟s ope rating engineers that the dam level is to peak at or above 74m, the operating manual for the dam recommends that the strategy is upgraded to W4. Case No: 257230 Determination Page 6 of 7 26. The rate of rising water in the lake‟s level and inflows into the dam on 11 January 2011, together with the confirmation of continuing heavy rain meant that the dam‟s water level could not be contained by strategy W3. Strategy W4 was invoked at Wivenhoe Dam at 8am on 11 January 2011. 27. The implementation of this strategy was directly related to the heavy rainfall from 4.00am on 11 January 2011. The Panel has previously determined that the implementation of W4 as a result of this heavy rain was the proximate cause of inundation of many properties downstream of the Wivenhoe Dam. 28. In consideration of the FSP‟s policy definition for “flash flood”, the Panel accepts that inundation of the property within 24 hours of 4.00am on 11 January 2011 would entitle the Applicant to cover. 29. Pursuant to the Panel‟s reasoning, SC was asked to provide hydrological assessments for each risk address, as to his expert opinion of the approximate time and height the W4 water wave would have reached a particular location. 30. In respect of the Applicant‟s address, SC‟s „Key Conclusions‟ report of 7 June 2012, estimated the river level at 4.00am on 12 January 2011 would have been at approximately 5.8m AHD, which is 0.1m above the benchmark level. In the case of this property, as it is on stilts, but with the underneath section sitting on a „Slab on Ground‟, effectively SC‟s conclusion means the Applicant would be entitled to policy indemnification for interior damage (whether to the building or any contents kept there) to a height of 100mm on the ground floor of the house. 31. However, the Applicant by letter dated 1 July 2012 has provided a chronology and photograph s which purport to demonstrate the „inundation waters entered my property (the benchmark lev el) at approximately 6.20am‟. In the event the Panel was to prefer the Applicant‟s evidence in this regard, then the policy does not respond, as the timing falls outside the policy‟s event window of 24 hours, as that closed at 4.00am on January 12, 2011. 32. When he met with the Panel Chair Ombudsman, the Applicant confirmed his belief, supported by time stamped photographs taken by his son, that water first entered the home “a little after 6.00am” on Wednesday 12 January 2012. 33. SC having been asked to comment on the timing discrepancy, by Statement dated 17/7/12, relevantly observed: “ In addition, for the purposes of calculating the approximate elevation of the Benchmark Level at the Subject Property, a value of RL 5.7m AHD was adopted. This level was conservatively estimated in favour of the Applicant (in other words, the level as derived from the available terrain information was rounded down). If further site specific consideration was undertaken with respect to the Benchmark Level, it is possible that a slightly higher level would be adopted which would lead to a further difference (ie in the order of half an hour per difference in elevation of the Benchmark level of 0.1m) in the calculated time of inundation of the Benchmark Level at the Subject Property .” Case No: 257230 Determination Page 7 of 7 34. Additionally the FSP by letter dated 12 July 2012 asserted: “The Member submits that to the extent that the Member‟s position was previously based on an inundation time of 3.19am on 12 January 2011, it was in the Applicant‟s favour. If the true time of in undation was approximately 6.20am on 12 January 2011 as submitted by the Applicant, then the Applicant‟s property is in category D which provides a more compelling case for the Member to refuse cover as it means that the Subject Property was inundated over 26 hours after the rainfall event that occurred in the morning on 11 January 2011 over the Wivenhoe Dam catchment. ” 35. In regards to insurance policies that provide cover pursuant to a series of defined events, as arises in this matter, the legal onus of pro ving the loss falls within a defined event devolves initially upon the Applicant. Here, the Applicant must first establish a prima facie case exists demonstrating his loss was caused by „flash flood and stormwater run - off‟; in this instance, he must prove on the balance of probabilities the inundation occurred within 24 hours of 4.00am on the 11 January 2011. On the materials presented by the Applicant, the Panel cannot do other than determine he has not discharged that onus of proof, as his evidence leads to the conclusion the inundation of his property above the benchmark level, commenced at approximately 6.20am on 12 January which is outside the 24 hour window of opportunity as provided by the policy. 36. As to the inconsistency between the evidence of the FS P‟s hydrologist SC, and the photographs taken by the Applicant‟s son, the Panel is satisfied that the evidence of SC is an estimation based on available data. The Panel is also satisfied that reliable eye witness evidence is to be preferred where appropriate. Determination 37. On the basis of the available evidence, the Panel accepts that the FSP is not liable for the Applicant‟s loss.