Determination 257060

Claim denial - home and contents inundation attributed to excluded flood

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$53,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insureds' home and contents were inundated in the January 2011 floods and the FSP denied the claim as flood. The panel found the loss covered only under the flash flood provisions, ordering $53,000 for contents and 50% of the rebuild cost up to $139,000 for the building, with interest and no legal costs.

The inundation up to 0.4 metres was caused by rain within 24 hours and is covered as flash flood, while damage above that level falls outside the 24-hour flash flood coverage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 257060 Determination Page 1 of 11 Case number: 257060 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 19 September 2012 Background 1. The Applicant insured her home and contents in Jindalee Queensland with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 19 May 2010. During this period, the building was insured up to a sum of $320,000 and the contents for $106,000. 2. On 13 January 2011, the Applicant lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicant, through her solicitors, has disputed this. 4. For the sake of simplicity, reference to the Applicant will include her legal representatives. 5. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant ’s position 6. The Applicant submits the following as alternative arguments in response to the FSP‟s decision: a. The FSP‟s policy failed to clearly inform her that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). b. The damage was due to “Flash flo od and stormwater run- off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated her property. Determination Case No: 257060 Determination Page 2 of 11 c. The FSP is unable to discharge its onus in establishing the loss was caused by “flood”. 7. The Applicant seeks to be indemnified for her claim. Summary of FSP’s position 8. The FSP submits it has provided evidence from an appropriately qualified individual to corroborate that a PDS was sent to the Applicant prior to the claim. Further, the policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “flood” pursuant to section 35(2) of the Act. 9. The FSP relies upon this, a number hydrology reports authored by SC and the following policy provisions to deny the Applicant‟s claim : Page 4 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Case No: 257060 Determination Page 3 of 11 Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming Case No: 257060 Determination Page 4 of 11 address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. pool or spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas ... ...” Issues 10. Whether the Applicant was “clearly informed” about what the policy did and did not cover. 11. Whether the cause of the Applicant‟s loss was covered under the policy. Reasons for Decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommenda tion and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. It is appropriate to consider the issues under the various headings. Consideration of ‘Flood’ Definition in PDS 15. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 16. There is no dispute that contracts of insurance covering a person‟s home and contents are a “prescribed contract” and damage due to flood is a “prescribed event”. Case No: 257060 Determination Page 5 of 11 17. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 18. In relation to the policy structure itself, the Applicant has provided numerous submissions to argue that the relevant terms relied upon by the FSP is ambiguous. In particular, the Applicant has highlighted the fact the definition of “flood” is so wide that it encompasses the definition of “Flash flood and stormwater run- off”. 19. The FSP has provided evidence explaining its processes of dispatching documents and how it was applied in the Applicant‟s case. Based on these documents, the FSP has stated the PDS was sent to the Applicant on 20 April 2009 and 21 April 2010. The Applicant has stated she cannot recall receiving the policy before paying the initial premium. This implies that she did receive the policy at some point. 20. According to the FSP‟s do cuments, the PDS was sent before the policy was renewed in 2009 and 2010. Pursuant to both the Act (section 11(9)(b)) and common law ( Sleith v State Insurance General Manager (1985) 3 DCR 180 and CE Heath Underwriting & Insurance (Australia) Pty Ltd (1993) 7 ANZ Ins Cases 61-655), the renewal of an insurance contract in effect creates a new insurance contract. 21. The Panel is satisfied in the circumstances that most likely the Applicant had received a copy of the relevant policy documentation. 22. It is well established law that a fair reading of Section 35(2) requires that the relevant exclusions and limitation be in clear and unambiguous language and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if they read the policy. The Panel has carefully read the policy and finds it is relevantly indexed with the definitions and exclusions clearly identified. The policy and Certificate of Insurance clearly identify flood and storm surge is not included. 23. The policy clearly identifies cover for flash flood and stormwater runoff and the limitations imposed. 24. Given this and the FSP‟s evidence, the Panel is satisfied the Applicant received the PDS before the contract was renewed and well before the claim arose and if the Applicant had read the policy she would have been informed of the relevant exclusions and limitations. Water Inundation The Evidence 25. The Applicant has provided a description of the events on 11 January 2011. In particular, she has stated: Case No: 257060 Determination Page 6 of 11  Her house is situated close to a number of large stormwater drains. As Jindalee is a hilly suburb, these drains have a history of overflowing during significant rain or storms.  Rain and stormwater runoff started coming down from the around the hills and blocked up the nearby stormwater drains. The stormwater drain at the rear of the property had risen approximately 5 metres by the time she and her husband evacuated the property at 6pm on 11 January 2011.  She is uncertain when the water entered the house but believes it would have occurred soon after they evacuated. 26. The FSP has provided a number of hydrology reports from SC. The latest one is dated 24 July 2012 and this contains the hydrologist‟s latest conclusion regarding the likely method of inundation. 27. In summary, SC identified that the likely cause of the inundation was due to the elevated levels of the Brisbane River that were substantively caused by the releases of water from the Wivenhoe Dam. SC believes the cause of the large releases from Wivenhoe was due to the rainfall and storms that occurred between 9 and 11 January 2011. 28. The Applicant has raised a number of different theories as to the likely method of inundation. For instance, she initially believed the inundation was due to the storms in her local areas. This later was amended to the rainfall that fell over the Wivenhoe Dam starting from 4am on 11 January 2011. 29. The Applicant appears to have settled on this last version. This is consistent with SC‟s conclusion to the extent that she accepts the inundation to the property was due to the elevated levels of the Brisbane Rive r, which were in turn caused by the releases of water from the Wivenhoe Dam. 30. However, the parties strongly dispute whether the rainfall that fell from 4am on 11 January 2011 was the proximate cause of the Applicant‟s loss. In particular, the FSP have provided numerous submissions on this issue, which the Panel shall now review. Releases from Wivenhoe Dam & Proximate Cause 31. The central issue for Determination in this dispute is whether the inundation of the Applicant‟s home on 11 January 2011 was due to flash flood as defined within the terms of the policy, that is whether rain that fell no more than 24 hours prior to the inundation of the Applicant‟s property was the proximate cause of the inundation. 32. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 Case No: 257060 Determination Page 7 of 11 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 33. At that time, the Panel noted that in relation to the approach, each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 34. In view of this, the FSP provided detailed further submissions to FOS on 19 June 2012 in relation to this dispute. Included with the submissions were the following documents:  A Reference document for the Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document are relevant to the current dispute;  Letter from the FSP‟s hydrologist attaching a key information sheet for the Applicant‟s property;  Hydrologist report titled “Investigations of Ja nuary 2011 inundation event – Brisbane” dated March 2011;  Statement from hydrologist SC dated 7 June 2012. 35. The Panel has reviewed the reference document. Insofar as the reference document relates to the current issues in dispute, those matters have been considered. 36. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 s trategy from 8.00am that day. 37. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and parts of the Brisbane River from approximately 4.00am on 11 January 2011. It is not disputed that in addition to this there was heavy rain over the Bremer River which influenced the level of the Brisbane River and that rain commenced at approximately 6.00am on 11 January 2011. 38. The FSP‟s hydrologist has referred to data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. Case No: 257060 Determination Page 8 of 11 39. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 40. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. There is no dispute that following the second spike that the W4 strategy was adopted. 41. The FSP has argued that the switch to W4 strategy was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 42. The ICA‟s Hydrology Panel and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 43. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 44. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 as the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 45. With due respect to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January Case No: 257060 Determination Page 9 of 11 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 strategy. The Panel accepts that the heavy rain that commenced falling at 4.00am on 11 January 2011 combined with the heavy rain the fell over the Brisbane and Bremer rivers that day was the proximate cause of the inundation of the A pplicant‟s property. The Applicant’s Inundation 46. SC‟s 7 June 2012 „Key Conclusions‟ in respect of the risk address notes the minimum land level at RL 8.2m AHD and a maximum of RL 9.9m AHD with an „Approximate Benchmark level‟ of RL 9.5m AHD and an accompanying notation that the Benchmark level is constituted by „Slab on Ground‟. 47. SC‟s statement indicates the effect of the W4 releases first reached the vicinity of the Applicant‟s property at 1.39pm on 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 2.43am on 12 January 2011; and by 4am on 12 January 2011 the river would have been at approximately 9.9m AHD which is 0.4m above the benchmark level. 48. The Panel notes that the ultimate inundation of the property was 2.7m above the benchmark level. SC identified this peak inundation occurred at approximately 8.50pm on 12 January 2011. 49. The Panel accepts the possibility that these assessments may not be entirely accurate. However, given the lack of eyewitness evidence to contradict SC‟s estimate of the level of inundation at 4am on 12 January 2011, the Panel intends to accept SC‟s conclus ions in this regard, particularly given it is based on appropriate data. 50. SC has speculated that if the W3 strategy had been maintained, then the Applicant‟ s property would still have been initially inundated by approximately 6.20am on 12 January 2011. 51. The Panel is concerned however that to reach such a conclusion it must be speculated that the releases from the dam would have continued at the same rate at the W3 level in the absence of any additional rainfall. 52. The available information indicates the W3 strategy that was in place prior to 8.00am on 11 January 2011 had been successful in limiting the outflows and flooding below the Wivenhoe Dam. Whether the outflows would have continued at the same rate had the inflows continued to reduce is not known. As indicated earlier in this determination the Panel having considered all of the relevant material is satisfied that it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. This combined with the heavy rain over the Brisbane and Bremer rivers on that same day led to the inundation of the Applicant ‟ s property. Case No: 257060 Determination Page 10 of 11 53. The Panel is satisfied that the inundation of the Applicant ‟ s property up to a level of 0.4 metres was caused by flood that occurred within 24 hours of the heavy rainfall. Any damage higher than 0.4 metres however would have occurred beyond the 24 hour period required under the insured event of “Flash flood and stormwater runoff” and would be excluded as flood damage. Quantum 54. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $320,000 for the home and $106,000 for the contents. The policy cap for the insured event of “Flash flood and stormwater runoff” limits the liability under both home building and contents cover to 50% of the insured sum or $25,000 whichever is higher. Therefore under the terms of the A pplicant‟s policy the FSP is liable up to an amount of $160,000 for the damage to the building and $53,000 for the contents. 55. The Pane l notes the FSP‟s assessor pursuant to an inspection on 25 January 2011 recorded that the building was a total loss and that all the contents were „partially damaged – major‟. Further pictures taken of the site dated 16 May 2011 bear the caption: „Existing location of (risk address) before demolition and removal‟. 56. Whilst the property was ultimately inundated to 2.7m above benchmark level and this would have led to the demolition of the property, the Panel accepts that the inundation to a height of 0.4m in a single storey dwelling would cause significant damage to the building and the majority of damage to the contents. 57. As the assessor has assessed the contents as a total loss then the Panel determines the FSP is to meet its liability under the “flash flood” provisions and pay the Applicant the sum of $53,000. As for the building damage the maximum liability under the “flash flood” provisions is $139 ,000. In the absence of any accurate estimate of the damage due to “flash flood” but acknowledging that the flash flood caused significant damage the Panel determines it is fair in the circumstance that the FSP pay the Applicant the sum of 50% of the cost of rebuilding the property up to a maximum of $139,000 being the limit payable under the policy. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum agreed to. Legal Costs 58. The Applicant has requested that FOS award the maximum amount of legal costs. FOS‟s Terms of Reference do allow for the awarding of legal costs pursuant to clause 9.4 of the Terms of Reference. 59. The Applicant is represented by a community legal centre. It is commonly understood that community legal centres do not charge their clients for their legal services although there are exceptions to this. Case No: 257060 Determination Page 11 of 11 60. For instance, the Panel is aware that legislation does allow fo r pro bono schemes such as Legal Aid and Community Legal Services (if acting under a Legal Aid Grant) to seek an award for costs. The case of Desmond Francis Lewis and Telstra Corporation Limited [1995] AATA 94 is also authority that a Community Legal Service may seek its costs in limited circumstances. This case indicated that the legal service in question was able to do so because it reserved the right to recover costs from the Applicant. 61. There is no evidence of any such agreement between the representative and the Applicant. 62. Further, although legislation may allow pro bono schemes to seek an award for costs, the Panel‟s ability to provide such an award is not founded in statute. Instead, the sole basis it can provide such an award is pursuant to clause 9.4 of the Terms of Reference which states: “FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute.” (Panel emphasis) 63. As evident, this provision is only enlivened if the Applicant has incurred the legal costs. It does not entitle a third party to seek its costs for advocating a dispute on behalf of the Applicant from the FSP. 64. As there is no evidence that the solicitors have any entitlement to recover its costs from the Applicant, the Panel has no jurisdiction to award legal costs in these circumstances. Determination 65. The Panel determines the FSP settle the Applicant‟s claim in accordance with the policy provisions for “flash flood and stor mwater runoff”. 66. The Panel determines the Applicant is not entitled to any award for legal costs. 67. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 9 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.