Home / Financial Firm (Unknown - Insurer) / Determination 256937
Determination 256937
Denial of storm damage claim for barn under construction
Summary
The complainant's partly built barn was damaged in a storm and the FSP declined the claim because the policy excludes buildings under construction. AFCA found the exclusion applied, that no broker relationship or breach of good faith was shown, and that the barn was not a specified building.
The policy expressly excludes buildings in the course of construction and the uncompleted barn was not specified in the certificate of insurance.
Issues
- Claim denial primary · not upheld
“The policy simply excludes cover for any building under construction and therefore, the FSP is entitled to rely on its exclusion.”
- Failure to disclose secondary · not upheld
“The FSP is not obliged to contact the Applicant to discuss the details of the policy during the renewal process.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 256937 Determination Page 1 of 4
Case number: 256937
General Insurance - Farm Insurance - Commercial Property - FSP Decision -
Claim Amount
15 May 2012
Background
1. The Applicant held a farm insurance policy with the Financial Services
Provider (FSP) from 23 May 2010 and the policy was current at the time of
the loss.
2. On 19 October 2010, the Applicant lodged a claim with the FSP for damage
sustained to the property as a result of a storm on 15 October 2010.
3. The FSP accepted parts of the claim relating to the home and denied liability
to the damage sustained to a barn on the ground that the policy excluded
cover for any building under construction.
4. The Applicant expects the FSP to honour the claim.
Summary of Applicant’s position
5. The Applicant says had the FSP contacted him during policy renewal in
October 2010, he would have informed it of the construction of the barn.
6. If the FSP was unable to offer insurance cover for the barn, he would have
sourced another insurer who would have accepted the risk.
7. The sum insured of the property at the time was adequate to include value of
the barn as the loss assessor had advised his property was over insured.
8. The Applicant believes the FSP should accept the claim.
Summary of FSP’s position
9. The FSP accepts the Applicant‟s claim for the damage sustained to the
property (home) but maintains denial of the claim for the damage sustained
to the barn.
10. Had the Applicant requested the FSP to include/specify the barn in the policy
(whilst under construction); it would have declined to accept the risk.
Determination
Case No: 256937 Determination Page 2 of 4
11. The policy excludes cover for a building under construction and the FSP
relies on the following policy provision:
„“ Home Building ”
The buildings at the Premises used principally and primarily as a place of
residence including –
...
but not including
...
(n) a building that is in the course of construction;”
Issue
12. Whether the FSP is entitled to deny the Applicant‟s claim for damage
sustained to the barn.
Reasons for decision
13. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a F OS
Recommendation and has proceeded directly to Determination.
14. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
15. Subsequent to the lodgement of the claim, the FSP appointed a loss
assessor to investigate the circumstances surrounding the loss and to
assess the claim.
16. The loss assessor‟s reports are as follows:
First Report
“ In January 2010, [Applicant] commenced building what he describes a „Barn‟
– although this building was never designed to be utilised a „Barn‟. Rather, the
thought process was for [Applicant‟s wife] to eventually set up the structure to
be used for the „ultimate cooing experience‟, where you could stay in the
structure for a weekend and learn to cook/cook various different dishes,
eating what you had then prepared
The [Applicant] had spent $30,000.00 in purchasing materials prior to the
storm. At the time of the storm, piers had been installed, as too had the steel
bearers, termite treated joists, yellow tongue flooring, timber frame work, „C‟
section purlins and Colourbond corrugated iron roof sheeting.
...
Case No: 256937 Determination Page 3 of 4
It is this structure that has sustained the worst damage, with the roof having
been torn completely off, the southern wall blown out and significant
movement of the western wall.” (sic)
Second report
“ Barn
This structure was in the course of construction at the time of the storm and
comprises approximately 240m 2 .
...
[Applicant] indicated he had spent approximately $13,000.00 on purchasing
materials, and had provided the labour himself.”
17. The solicitor appointed by the Applicant says:
The FSP acted as the Applicant‟s broker ;
The definition of home building and its exclusions under Section 2 is
not relevant as the damaged property was a barn; and
The FSP has failed in its duty of utmost good faith by declining liability
to the claim.
18. Section 14 of the Insurance Contracts Act 1984 provides that if reliance by a
party to a contract of insurance on a provision of the contract would be to fail
to act with the utmost good faith, the party may not rely on the provision. In
deciding this issue the court shall have regard to any notification of the
provision that was given to the insured, whether a notification is required by
section 37 or otherwise.
19. There is no dispute regarding the Applicant receiving the Product Disclosure
Statement and I am satisfied the FSP ‟s decision to decline the claim could
not be construed as a breach of utmost good faith. The Applicant was made
aware of the terms and condition of the policy prior to the commencement of
the insurance contract and thereby, the FSP is entitled to rely on same.
20. Further, I am of the view the FSP is not obliged to contact the Applicant to
discuss the details of the policy during the renewal (of the insurance
contract) process. I accept that on certain occasions the FSP may have
done so, it is common with Farm Insurance but it cannot be considered to be
a requirement.
21. There is no evidence the FSP acted as the Applicant ‟s broker. The
construction of the barn commenced in January 2010, approximately 10
months prior to the renewal of the policy.
22. The onus rests on the Applicant to keep the FSP informed of the new
construction and to inquire whether the risk will be covered under the policy
as the PDS clearly excludes cover for buildings under construction.
23. Furthermore, the FSP indicates that had the Applicant informed it of the
construction of the barn, it would have declined to accept the risk.
Case No: 256937 Determination Page 4 of 4
24. However, it is not relevant to the dispute at hand as the policy simply
excludes cover for any building under construction and therefore, the FSP is
entitled to rely on its exclusion.
25. The response from the FSP has referred only to cover for Domestic Home
and Contents. I have therefore considered whether there might be,
alternatively, cover for the uncompleted Barn under Section 1 – “Fire and
other Defined Events”.
26. The problem confronting the Applicant here however, is that the word
“building” is defined as “Any building specified in the Certificate of Insurance
etc etc”.
27. Plainly, this uncompleted barn had not been specified in the Certificate of
Insurance. The Applicant has admitted this.
Determination
28. On the basis of the available information, I determine the FSP is not required
to indemnify the Applicant for damage sustained to the barn.