Text of the determination
Case No: 256574 Determination Page 1 of 8
Case number: 256574
General Insurance - Small Business Insurance - Commercial Property - FSP
Decision - Denial of claim - Exclusion/condition - Proximate cause
8 August 2012
Background
1. The Applicant held an asset protection insurance policy with the Financial
Services Provider (FSP) which was in force at the time of the loss.
2. The Applicant is represented. For the sake of clarity and brevity in the
Determination, the Applicant and his representative will be hereafter referred
to as the Applicant.
3. In February 2011, the Applicant lodged a claim for crack damage to the
insured building‟s southern wall.
4. The FSP denied the claim on the basis the cracks were caused by
subsidence and earth movement, which are excluded under the policy. The
Applicant disputes this decision and wants his claim paid in full.
Summary of Applicant’s position
5. In early December 2010, the Applicant noticed cracks in the southern wall at
the building‟s ground floor.
6. He consulted the builder (LBA) who reinstated the building in or about 2006
and then engaged a structural engineering company (BH) to carry out a
structural inspection. BH then engaged geologists SG to carry out a
geotechnical investigation.
7. The FSP says the cause of cracking is soil movement and inadequate
footings, but none of the expert evidence concludes this. However, the
expert evidence suggests that tree roots would have damaged the building.
8. In this case, the “but for” test is an acceptable test for causation. In his view,
the highly reactive soil alone would not have caused the damage, but had it
not been for the trees, the damage would not have been triggered.
9. This is clear from the fact the building has been on the same soil for 50
years and the trees were only recently introduced. It is likely the damage
Determination
Case No: 256574 Determination Page 2 of 8
was not caused by normal settling, shrinkage or expansion in the building,
but the introduction of trees started the chain of events causing the damage.
10. Accordingly, the proximate or dominant cause of damage is the encroaching
tree roots, which in turn caused the soil movement.
11. This cause must prevail over subsidence or earth movement which are a
consequence of the tree roots‟ action and not the cause. The roots would
have damaged the building, even if the soil movement had not occurred .
12. In case it is determined the property was damaged by an uninsured peril, he
relies on Prime Infrastructure (DBCT) Management Pty Ltd v Vero Insurance
Limited & Ors [2005] QCA 369 (Prime Infrastructure case) to say that the
only damages excluded from the policy would be the initial damages.
13. In this instance, the initial damage would be the initial movement, weakening
or damage to the building foundations which caused the first hairline cracks.
All other damage, such as the cracking and movement of the southe rn wall,
would be subsequent damage and should not be excluded from cover.
14. LBA simply followed BH‟s recommendations when quoting the repairs. No
inference about the adequacy of the building foundations should be made
from their quotation. BH did not make any reference to the adequacy of the
foundations either.
15. Further, any of SG‟s comments about the structure of the building should not
be relied upon as SG are not structural engineers.
16. The damage is also to the foundations and movement of the southern wall.
He has started the rectification works, in order to limit any further damage.
17. He wants the FSP to pay for the cost of repairing the property in the
approximate amount of $112,153.75.
Summary of FSP’s position
18. Based on BH and SG‟s findings, the FSP says th e present type of highly
reactive soil combined with changes in the soil moisture content have the
potential to cause damage to building foundations.
19. Further, based on LBA‟s quotation, it says the building footings were
inadequate for the type of soil. It infers that LBA would not have needed to
quote for the constructions of large pins, if the footings were adequate.
20. The tree roots may have contributed to the damage but the roots alone could
not have caused the damage. There is no evidence to suggest the b uilding
would have been damaged by tree roots independent of any other cause.
Case No: 256574 Determination Page 3 of 8
21. The proximate cause must be identified to see whether it comes within
cover. In this case, the “but for” argument is inadequate as it could be used
for the tree roots as well as any other factor contributing to the damage.
22. It is possible the tree roots might have influenced the moisture level in the
soil; however, they are not the dominant or only cause of the cracking.
Instead, the expert evidence indicates the immediate or proximate cause of
the cracking is movement in the soil exacerbated by inadequate footings.
23. The Applicant says there is a sufficient chain of causation between the
presence of trees and the damage. However, he overlooks the critical roles
of the highly reactive soil and the inadequate footings, which can sever any
chain of causation between the roots and cracks in the walls.
24. In this case, the proximate cause of damage is soil movement and
subsidence. This in turn is caused by the highly reactive soil, changes in
moisture levels and the inadequate building footings. As such, it is excluded
from cover under the policy exclusion for subsidence and earth movement.
25. The FSP is also entitled to rely on two other exclusions. The building
footings are undersized and inadequate. This constitutes an error in design.
To the extent the cracking was caused or contributed by this, the policy
exclusion for “dealing with errors or omissions in design” applies.
26. To a large extent, the damage is a natural consequence of the type of soil on
which it is constructed. The policy excludes damage caused by or happening
through normal settling, shrinkage or expansion in buildings or foundations.
In this case, this exclusion clause also operates to deny the claim.
27. As to the Prime Infrastructure case, it has no application because the
circumstances of this case are opposite to those of the Prime Infrastructure
case. In this case, the Applicant alleges the initial loss was caused by an
insured peril and there is no subsequent damage.
28. Further, th e “subsequent damage” argument has two weaknesses. First, it is
likely the cracking occurred at the same time as the damage to the
foundations. Second, there is no evidence to support this argument.
29. The Applicant has challenged the evidence of his experts. He questions
SG‟s competency to comment on the footings of the building and LBA‟s
ability to make an assessment of the pins necessary to support the existing
footings. However, he seeks to rely on LBA‟s repair cost estimates.
30. The FSP relies on the followi ng policy provisions:
“ General Definitions
The following General Definitions apply to all Sections of this Policy
unless noted to the contrary.
Damage or Damaged — physical loss, destruction or damage that is not
otherwise excluded by this Policy.
...
Case No: 256574 Determination Page 4 of 8
Section 1 — Property Damage
The Indemnity
In the event of any Damage (not otherwise excluded) happening at the
Situation to the Property Insured, We will, subject to the provisions of this
Policy including the limitation on Our liability, indemnify You in accordance
with the applicable Basis of Settlement.
...
Perils Exclusions
We shall not be liable under Sections 1 and/or 2 in respect of:-
2. Damage occasioned by or happening through:
(c) error or omission in design, plan or specification or failure of design.
(d) normal settling, seepage, shrinkage or expansion in buildings or
foundations, walls, pavements, roads and other structural
improvements, creeping, heaving and vibration.
...
5. Damage occasioned by or happening through:
(c) erosion, subsidence , earth movement or collapse resulting therefrom.”
Issue
31. Whether the FSP is entitled to deny the Applicant‟s claim on the basis the
cause of damage is excluded under the policy.
Reasons for decision
32. As advised to the parties, due to the nature of the dispute and the amount
claimed, the Financial Ombudsman Service (FOS) has considered it
appropriate to expedite the dispute to Determination by the Panel in
accordance with the Operational Guidelines to the FOS Terms of Reference.
33. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
34. The Panel is satisfied that a full exchange of information has taken place
between the parties and each party has had the opportunity to address the
issues raised.
35. There is no dispute between the parties that the property has sustained
damage to the southern wall and foundations. The central issue is identifying
the proximate cause of the damage and whether it is covered under the
policy.
Case No: 256574 Determination Page 5 of 8
36. Determining the proximate cause does not necessarily consist of identifying
the first or the last or the sole cause of the loss. The proximate cause is
instead the effective or dominant or operative cause of the loss.
37. The Applicant argues that the proximate cause is the action of roots of some
trees planted a few years ago. He says that as the action of roots is not
excluded under the policy, the claim should be paid. The FSP argues that
the proximate cause is the subsidence and earth movement on the
foundations, which is an excluded peril under the policy.
38. Both parties have based their allegations on BH and SG‟s expert reports and
LBA‟s quotation. Further, both parties have presented alternative arguments
in an effort to support their view on which is the proximate cause of damage.
39. The Panel has reviewed the expert reports and LBA‟s quotation. The Panel
notes that the most relevant information is contained in BH and SG‟s reports.
BH‟s first report dated 21 December 2010 says in sum mary the following:
On 19 December 2010, BH carried out a visual inspection of cracks
that had appeared in the southern wall at ground floor level of the
building.
The existing double brick building was built in the early 1950‟s and was
renovated in 2007 after fire damage.
During the renovation, two trees were planted at the front of the
southern entry wall.
There is a crack located at the main entrance of the building in the
curved return wall east of the entry. Its width is approximately 3mm at
floor level and reduces in width as it extends up the wall.
There is a similar crack inside the building and the wall is displaced
approximately 8mm at the window line.
At the top of the internal wall at the crack location, a gap has occurred
between the wall and the ceiling. Its width is approximately 8mm at the
crack location but reduces in width along the wall to the north. A similar
gap is at the wall and ceiling west of the main entrance.
It appears the southern wall of the building is settling and rotating into
the street. The maximum amount of movement is at the main entry and
reduces towards the east and west ends. No sign of movement in the
eastern wall.
A telecommunication pit and trench have been installed along the south
wall of the building. The pavement has cracked along the line of the
trench. This cracking also suggests movement in the soil.
The most likely cause of the cracking is the foundation movement due
to changes in the moisture content of the soil, caused by tree roots
taking moisture from the soil.
BH‟s second report, dated 22 August 2011, says the following:
The two trees in front of the building have grown larger.
Case No: 256574 Determination Page 6 of 8
The original cracks appear to be wider.
Recommendations to remove the trees and seal the cracks in the
pavement have not been carried out.
An alternative option to removing the trees would be to underpin the
existing footing.
40. SG‟s report dated 22 December 2010 says in summary the following:
The fill present is not considered a suitable foundation material.
There was no ground water problem evidenced.
The quaternary volcanic origin and the depth of the onsite clay
indicates a high soil reactivity and seasonal heave potential.
The site has abnormal moisture conditions problems due to the
presence of differential moisture and the presence of two medium-sized
juvenile trees at the front of the site.
The test site closer to the southern wall centre (test site one) is in much
drier state than the test site closer to the eastern wall (test site two).
There is presence of fine tree rootlets through the soil profile at test site
one. Tree rootlets were presented in the top 800mm of test site two.
The trees have grown significantly since planted and are in a good
health condition despite the prolonged drought period in the past.
The observed movement is most likely due to the differential moisture
regime over the site. This is possibly related to the presence of trees in
the vicinity. It may also be possible that some leaking services are
present in the vicinity, increasing the differential moisture over the site.
The undersized 50-year-old footings are not up to current day standard
for the highly reactive soil.
It is recommended to remove the trees and check all pipes and
services in the area.
41. The Applicant has said that LBA in subsequent inspections did not find any
leaking pipes within the vicinity. The FSP does not dispute this.
42. The Panel notes that both SG and BH conclude that the cause of the
movement is likely to have been abnormal changes of moisture levels due to
the action of tree roots and the type of highly reactive soil.
43. The Applicant says that the tree roots are the dominant cause of the
damage. The Applicant also says that no damage to the walls or foundations
occurred in the past 50 years and that only a few years after the trees were
planted, the soil movement occurred. Based on the available evidence, the
Panel is satisfied that the tree roots contributed to the damage.
44. As to the FSP‟s argument, the Panel does not accept that subsidence or
earth movement are the proximate cause. Based on the expert reports, the
Case No: 256574 Determination Page 7 of 8
Panel is not satisfied there are underlying causes that effectively triggered
chain of events resulting in the damage.
45. As to these underlying causes, the FSP has suggested that aside from
changes in moisture levels, the highly reactivity of the soil and the
inadequate foundations have contributed to the soil movement.
46. The evidence provided points to tree roots being the only cause of the
changes in moisture levels, as water pipes leaks have been discarded.
47. It is the Pane l‟s view that the highly reactivity of the soil is not an operative or
effective cause as the soil alone does not have any effect on the site, except
when its moisture or other properties are affected by external causes.
48. As to the inadequacy of the foundations, there is no expert evidence
concluding that the inadequacy of the foundations has caused or contributed
to the damage.
49. SG‟s report says that “the undersized 50 year old footings are not up to
current day standards for this highly reactive soil profil e”. In the Panel‟s view
this simply indicates that the footings were built at a time when the current
standards for that type of soil were not implemented.
50. The Panel notes that as a result, LBA quoted for the underpinning of the
footings. The Panel understands this would be to comply with current
building standards.
51. Further, when SG was informed about underpinning the footings, SG said on
a letter dated 2 December 2011:
“We have been informed that the building at the abovementioned site is to be
underpinned to address the moisture issue which has been created by the
presence of the fast growing street trees.
...
NOTE: While the existing trees are present the potential for future movement
exists. The large trees outlined should be considered when deciding on pin
location”.
52. As a result, LBA adjusted its estimate cost for the underpinning. The Panel
understands that this work‟s purpose is to address and prevent further
damage from the moisture issue created by the trees. At no point is it
mentioned that the footings have contributed to the damage.
53. Having discarded the influence of inadequacy of footings and the reactivity of
the soil, the Panel is satisfied that in the absence of evidence to the contrary
and on the balance of probabilities the likely effective ca use of the damage
was the action of the tree roots.
54. As the policy is an „all damage‟ one, unless subject to an exclusion, the FSP
bears the proof of onus of demonstrating the operation of an exclusion; it has
not convinced the Panel that the action of tree roots is susceptible to any
Case No: 256574 Determination Page 8 of 8
specific exclusion and accordingly the Panel is of the view the policy should
respond to the claim.
Determination
55. Accordingly, the Panel determines that the FSP is to settle the Applicant‟s
claim according to the terms and conditions of the policy.
56. In the event the Applicant has already carried out the repairs, the FSP is to
cash settle the Applicant, subject to the Applicant giving the FSP the
corresponding invoice(s) within 21 days of notification from FOS that the
Determination has been accepted by the Applicant.
57. In case the FSP cash settles the claim, the Panel determines that the FSP is
to pay interest on the settlement amount in accordance with Section 57 of
the Insurance Contracts Act 1984 from 23 May 2011, being the date of the
FSP‟s final decision, to the date of payment of the claim.
58. The FSP is to finalise the settlement of the claim within 45 days of
notification from FOS that the Determination has been accepted by the
Applicant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.