Summary

Floodwater and stormwater affected the tenanted property in January 2011 and the FSP declined the claim as flood. AFCA ordered the FSP to cover basement damage up to 100mm from stormwater, with interest if cash settled, held the rest excluded as flood, and refused non-financial loss compensation.

Stormwater runoff and drain overflow are covered under the policy, while flood above the initial 100mm level is excluded, and notice to the insured was given through the broker under Section 71 of the Insurance Contracts Act 1984.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 256369 Determination Page 1 of 10 Case number: 256369 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 23 July 2012 Background 1. The Applicant holds a Landlord‟s Insurance Policy with the Financial Services Provider (FSP) covering a residential property. 2. Between 11 and 12 January 2011 the insured property was inundated by water causing damage. 3. The FSP declined the claim on the basis the water inundation arose from floodwater which is excluded from cover under the policy. 4. The Applicant disputes the declinature on the basis stormwater runoff and not flood was the cause of damage. Further, the Applicant believes her claim was not assessed properly and the FSP has not dealt with her claim objectively. Summary of Applicant’s position 5. The Applicant relies on a Statutory Declaration dated 1 March 2012. The Panel notes the following from this document:  The Applicant does not recall receiving a PDS from the FSP or being alerted to the exclusions.  The Applicant has previously witnessed water travelling over the front tiled area and directly under the front veranda of the home.  The rain coupled with rain runoff coming down the street came across the front tiled section of the house like a „waterfall‟.  There is only a line of timber chamfer running between the bottom of the front veranda and the top of the tiles on the patio. This would not have prevented large amounts of rainwater from flowing under the house. It was not designed to and has never functioned as a „channel‟ to divert rain away from the front patio or from the side driveway. 6. The Applicant has enclosed a transcript of evidence provided by the Applicant to the Queensland Floods Commission Inquiry and the excerpts from the Commission‟s Final report dated March 20 12 relating to the same. The Panel has reviewed both reports. Determination Case No: 256369 Determination Page 2 of 10 7. Although the findings from the Commission were critical of the FSP and CEO, Commission‟s findings do not go to the cause of the loss in this dispute. They may however be relevant to any consideration of compensation payable to the Applicant. 8. The Applicant does not recall receiving a Product Disclosure Statement (PDS) from the FSP and renewal documentation does not state flood is excluded; the FSP cannot demonstrate it informed the Applicant of the flood exclusion by providing the PDS. 9. In the alternative, the Applicant argues that the insured property is at the lowest point in the street. There are large stormwater drains at the front and at the back of the property. Water at both ends of the street flows into the Applicant‟s backyard during heavy rain. 10. The tenant stated to the assessor that a significant amount of stormwater was flowing onto the property and filling up the yard with clear water before he was evacuated at approximately midnight on 11 January 2011. The property was affected by stormwater prior to any riverine flooding. 11. The hydrology reports should not be relied on as they do not adequately assist the investigation due to the following:  The hydrologist has inaccurately estimated the height of the small lip of concrete that runs down the western side of the house, where the driveway is located. The hydrologist contends that this concrete was of a sufficient height to channel water from the front of the house to the rear, preventing any water coming under the house. However, the narrowest part of this concrete is also the closest section to the front of the house and is only 2mm high. In times of significant rain, the water going across the tiled area will meet up with runoff coming down the street.  There is a history of problems with the drainage pit at the back of the property. The hydrologist does not appear to have had this information as he states there were no reported problems with the drains. 12. Water escaping from drains is not excluded as flood under the policy. The source of water contained in the drains is irrelevant as the FSP covers water damage as well as water overflow from fixed pipes. Accordingly, the evidence from the hydrologist that water from the drains affected the property and caused damage prior to overland flow is covered under the policy. 13. Further, the Applicant contends her claim was improperly assessed and insufficient weight was given to her statements regarding the stormwater drains. Further, it was not until a major newspaper ran a story regarding the damage to the Applicant‟s property that she received an email at 3.18pm on 10 February stating the claim was still being reviewed and an assessor would contact her. 14. The Applicant alleges that the hydrologist pre -determined the damage arose from flood. The Applicant further submits that the FSP has breached the General Insurance Code of Practice Clause 1.20 by failing to be open, fair and honest in the claims handling. Case No: 256369 Determination Page 3 of 10 15. The Applicant seeks $3,000 for financial or non-financial loss due to an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind. The delay and uncertainty caused by the FSP has led to anxiety and stress. The Applicant feels she was poorly treated and the FSP failed to listen to her in a time of trauma. The Applicant submits that she is still suffering from her interactions with the FSP and its CEO and feels personally victimised as a result of her media presence and public protests. Summary of FSP’s position 16. The FSP relies on the following policy terms and conditions: “Exclusions to your cover Any cover we provide is subject to the following exclusions. We will NOT cover any loss or damage as a result of, or caused by ... i. Flood ... Glossary of words with special meaning ... Flood The covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” 17. The FSP relies on an assessor report dated 16 February 2011 from which the Panel notes the following:  The Applicant advised she was not at the property at the time of the flood.  The Applicant contacted the Council and requested they pump the drains. The Council may have pumped the drains on a Monday.  The tenant has always been aware of a drainage problem at the property. He described the stormwater drain at the back of the property as a „basin plug hole‟ for the surrounding homes as they are at the lowest point, and the stormwater runoff heads to the back yard and street gutters at the front of the property.  The tenant noted that heavy rain came through the property from Monday 10 January 2011 to Tuesday 11 January 2011. By approximately midday on Tuesday 11 January 2011 the drain was unable to take on anymore water and water started to overflow and bubble out into the yard. The street had water starting to pool from the stormwater drain and the continuous rain. The tenant advised the water was not the muddy colour that the floodwater colour was by that stage it was just dirty stormwater with „nowhere to go‟. The tenant‟s father is a hydrologist and when the tenant contacted him, he advised them to evacuate. At midnight on Tuesday 11 January 2011 the tenant Case No: 256369 Determination Page 4 of 10 evacuated the residence, at this time the water was 1foot past the floorboards.  The tenant has expressed the opinion that flood and stormwater met on Wednesday at some stage. 18. The FSP relies on a Hydrology Report dated 4 March 2011 from which the Panel notes the following:  The property is 190m from the Brisbane River and within the flood extent of the River. Terrain mapping from the Brisbane City Council shows the site is approximately in the centre of a local depression.  The hydrologist obtained data from the Oxley Creek and Brisbane River gauges which are 8kms and 7kms away respectively from the property.  The river gauge information indicates the Brisbane River commenced rising on 9 January 2011 but at 6.00am on Tuesday 11 January 2011 a steep rise in flood levels occurred. A peak of about 9.2m around 12.00am on 13 January 2011 and 4.5m at 3.00am on 13 January 2011 occurred at the Oxley Creek and Brisbane River gauges.  The hydrologist believed that the property is located along a local drainage path or at a low point in the local terrain.  Photographs are included which indicate the backyard was inundated around midday on Tuesday 11 January 2011.  The minimum ground level elevation within the property is 2.3m AHD.  The rainfall data suggests a 1-2ARI and it is unlikely that there was sufficient local stormwater runoff for this to be a contributing factor to the inundation that occurred at the property.  The river level information indicates that at 12.00pm on Monday 10 January 2011 the river level was 1.9m AHD. The level rose to a level of approximately 4.0m AHD at 12.00am on Wednesday 12 January 2011.  The hydrologist concluded inundation occurred in two stages. The first being surcharging floodwaters along the sub-surface drainage pipes which commenced on 11 January 2011 and continued to the early hours of 12 January 2011. This is consistent with the evidence from the tenant. These initial flood-flows are likely to have entered the sub- surface drainage pipes via an outfall to the Brisbane River located to the south of the property.  The riverbank levels along the Brisbane River south of the site are often less than 4.0m AHD. Therefore, overbank flooding would also have been occurring in various locations along the river shortly after 12am on Wednesday 12 January 2011.  The peak of the Brisbane River occurred between 12-3am Thursday 13 January 2011. The interpolated level in the Brisbane River directly south of the property at 1.30am on Thursday 12 (sic) January 2011 was approximately 6.7m AHD.  The hydrologist concluded that the inundation of the property was from water escaping the confines of the Brisbane River through backflow in the drainage system and overland flow. However, it is possible that heavy rainfall on 9-10 January 2011 caused a small amount of Case No: 256369 Determination Page 5 of 10 stormwater to enter through the side of the basement level of the house and cause damage to items such as the air-conditioner prior to the site being inundated by floodwater. 19. To clarify the cause of inundation, the FSP requested a further hydrologist report. The report dated 15 April 2011 found:  The rainfall affecting the local drainage system was not abnormal. The urban drainage systems in residential areas are typically designed to accommodate ARIs between 2-5years.  The elevation of the drainage pit adjacent to the front of the property is 4.5m AHD. Levels in the Brisbane River over 9-10 January 2011 were less than 2.5m AHD, accordingly the backwater effects from the river should not have affected the hydraulic performance of the drainage system.  The kerb and footpath is in the order of 150mm above the road at the pit and the depth of the pooling on the road would have to exceed this amount to overflow adjacent properties.  On 9 January 2011 the depth of overflow that could have entered the driveway would have to be at the low end of possible overflows.  Any shallow overflow entering the top of the driveway would tend to run down the reasonably steep driveway as sheet flow, reducing the depth as the velocity of the water increased. The basement window sill is 30- 50mm above the driveway and depths in excess of these amounts could not have been sustained given the limited potential overflow conditions from the street for the moderate rainfall (less than 2year ARI on 9 January 2011.  The hydrologist concluded the inundation damage to items in the basement as a result of stormwater flows on 9-10 January 2011 is highly unlikely. 20. The FSP relies on a Statutory Declaration from the Applicant‟ s insurance broker from which the Panel notes the following:  On 13 July 2009 the insurance broker renewed the policy for the Applicant and attached a Landlord PDS to the renewal.  The policy has a status of working which means the document was created but not emailed. The policy was instead forwarded in the postal mail to the Applicant.  The Statutory Declaration attaches a screen shot of the record to support same. The Panel notes the record accords with the information provided in the Statutory Declaration. 21. The FSP has enclosed documentation to demonstrate that the insurance broker does not work under a binder but as an independent broker. 22. The FSP contends the Applicant‟s broker incepted the policy and has confirmed that it provided a PDS to the Applicant on 13 July 2009. 23. The FSP contends the insured property was not inundated until the early hours of 13 January 2011 more than a day after the peak intensity rainfall Case No: 256369 Determination Page 6 of 10 had fell and after the rain had completely stopped. The cause of the loss could therefore not have been localised flooding as this would have occurred at the same time as the peak rainfall. The hydrologist‟s evidence is that localised inundation could not have occurred. Backflow of drains could only have been caused by the rising floodwater and the proximate cause is therefore flood. The information provided by the tenant of the property concurs with the hydrologist. 24. The FSP notes the Applicant‟s contention that it was overflow from pipes and therefore covered. The FSP states the Applicant has reviewed this clause in isolation. Any rainwater which mixed with floodwater is deemed under common law to be floodwater or is still excluded by the Wayne Tank principle. As flood caused the damage to the property, the FSP cannot indemnify the loss which arose from an excluded cause of loss under the policy. 25. The FSP rejects that it handled the Applicant‟s claim poorly. The FSP has arranged for an assessment and two hydrologists‟ reports. The fact the Applicant does not agree with these professionals does not co nstitute bias. The hydrologists have no vested interests in the outcome of the claim. 26. The FSP has been open, fair and honest in its claim handling processes. It informed the Applicant quickly that cover did not extend for this claim. The FSP has been consistent in the claim and has not victimised the Applicant. 27. The FSP disputes that the material submitted by the Applicant is relevant to this particular issue of loss causation or any of the FSP‟s obligations under the Insurance Contracts Act (1984) (“the Act”). The post loss interaction between the Applicant and the CEO had no bearing on the cause of loss or the FSP‟s decision as to causation. The FSP‟s conclusions on the cause of loss are amply supported by expert evidence. Issues 28. Whether the FSP is entitled to rely on the policy terms and conditions. 29. Whether the FSP was entitled to decline the Applicant‟s claim. 30. Whether the Applicant is entitled to compensation. Reasons for decision 31. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 32. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 33. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. Case No: 256369 Determination Page 7 of 10 34. There are three discrete issues (listed above) which will be dealt with separately. 35. There is no dispute that the Applicant‟s policy was incepted through her insurance broker. Although the Applicant in the dispute notice maintains she cannot recall receiving the PDS, Section 71 of the Insurance Contracts Act 1984 (the Act) provides that notice or a document need not be provided to an insured where the contract was arranged through a broker. 36. As the policy was arranged through a broker (and the broker has provided information to indicate the policy was posted to the Applicant on 13 July 2009), the Panel accepts the FSP has met its obligation to clearly inform the Applicant of the flood exclusion. Whether the FSP was entitled to decline the Applicant’s claim 37. The policy provides cover for both storm damage and water or liquid damage, subject to the flood exclusion. It is therefore clear that if the source of water inundation arises from flood then the damage is excluded. 38. The tenant observed water in the pit in the backyard rising between 11.00am and 12.00pm on 11 January 2011. The Applicant argues that there was also water coming from the large stormwater drains at the front of the property with water from the street flowing towards the Applicant‟s property. 39. The FSP hydrologist considered the inundation occurred in two stages. The first was through drainage backflow on 11 January 2011 and then overland flow when the river broke the banks of the Brisbane River. This conclusion by the hydrologist would appear to accord with the tenant‟s description of the inundation. There was no flooding to the front of the home from rainfall at 12pm on Tuesday 11 January 2011, however there was inundation of the backyard caused by water rising and spilling into the backyard from the drainage pit. Further, whilst the tenant has noted heavy rain coming through the property between 10 and 11 January 2011 it is not until 11 January 2011 the drain starts to overflow. This water then joins with rainwater. 40. The hydrologist report identified the potential overflowing to the basement area by stormwater impacting the Applicant‟s property on 9 and 10 January 2011. The hydrologist noted that a small amount of rainfall may have entered the basement level of the property and damaged items such as the air conditioner prior to the subsequent flood. 41. The FSP requested the hydrologist clarify the stormwater issue. 42. The hydrologists‟ reports have provided inconsistent evidence in relation to the probability of water inundation to the basement. The Panel notes the author of the original and subsequent hydrology reports are different. The Panel, on the balance of probabilities favours the original report as this hydrologist appears to have spoken directly to the tenant and physically examined the property. The second hydrologist did not attend the property. 43. In order to assist in determining this dispute, a site inspection was conducted by the Panel Chair Ombudsman with the Applicant and representatives of Case No: 256369 Determination Page 8 of 10 the FSP on 5 June 2012. The FSP provided copies of photographs not previously provided to assist with the site inspection. 44. The Applicant‟s property sits at a sag point on the road and slopes steeply from the roadway to the backyard. There is a small lip in the concrete beside the driveway which is on the right hand side of the property as you look at the property. The concrete lip is described in the first hydrologist report. The report does not mention the neighbouring property. The neighbouring property on the left hand side of the Applicant‟s property as you look towards the property also slopes steeply down to the yard and towards the basement area of the Applicant‟s property. It is likely given the level of rainfall on 9, 10 and 11 January 2011 that stormwater runoff would have occurred from this side of the property into the basement area. 45. There is also a large stormwater drainage pit in the middle of the backyard of the property. There are similar pits in the neighbouring properties on either side of the Applicant‟s property. These pits are about 2m AHD. The information on file indicates that the elevation of the property was at 2.3m AHD whilst the Brisbane River reached 2m AHD by 9.00am on 11 January 2011 and 2.6m AHD by mid day on 11 January 2011. Based on this information, it is likely that any inundation from the stormwater drainage pits at the rear of the property would not have occurred until the morning of 11 January 2011. 46. The stormwater drains at the front of the Applicant‟s property are 4.5m AHD. The tenant in discussions with the assessor referred to in the assessme nt report of 16 February 2011 watched water come through the property from heavy rain on 10 and 11 January 2011. The Applicant advised that the tenant observed stormwater coming from the road on 10 January 2011. It is highly likely that any water observed exiting the stormwater drains at the front of the Applicant‟s property or the roadway and running down through the driveway or the neighbouring property into the basement would have been stormwater and not backflow and therefore covered under the terms and conditions of the policy. 47. The Panel is satisfied that the inundation of the basement from stormwater runoff given the location of the property would not have been significant. 48. Based on the information provided by the Applicant and the tenant and the site inspection the Panel considers it fair in the circumstances to determine the inundation of the basement area to a maximum level of approximately 100mm most likely occurred as a result of stormwater runoff on 10 January 2011 and early on 11 January 2011. 49. The assessment report does not identify the extent of damage sustained to the basement area. Whilst it is clear that the air conditioning would have been damaged, it is unclear what other items if any were damaged in that area. The parties are asked to work cooperatively together to determine the extent of any damage that would have been sustained as a result of an inundation of the basement area to a level of 100mm. 50. As for the balance of the damage, the Panel is satisfied based on the information exchanged that most likely any inundation above this point would be due to flood and therefore excluded under the policy. Case No: 256369 Determination Page 9 of 10 Whether the Applicant is entitled to compensation 51. The Applicant has sought compensation pursuant to paragraph 9.3 of the Terms of Reference. The Applicant has relied upon material submitted in relation to her interactions with the FSP‟s CEO to allege that she was victimised because she was involved with the media in protest against the FSP. The Applicant has sought compensation for delays in poor handling. 52. The Panel has considered the information exchanged and the findings of the Flood Commission. Whilst the Panel notes that the Flood Commission found the CEO‟s behaviour was unprofessional during a telephone call on 22 February 2011, there is no evidence to suggest that the telephone call deterred the Applicant in relation to her claim. Further, there is no evidence of the Applicant being adversely affected by the FSP‟s triage process. 53. The level of inconvenience and time taken to resolve the situation needs to be considered in the context of the circumstances at the time. It is well documented that there were a large volume of claims arising from several natural disasters, but in particular over 50,000 claims arising from the Queensland Floods that impacted on the ability of the FSP and other insurers to respond around the time of the Applicant‟s claim . The Panel notes that the FSP contacted the Applicant by 1 February 2011. Whilst in normal circumstances, this would be an unacceptable delay, given the peculiar circumstances involved in this event; the Panel accepts that this is not an unreasonable delay in contacting the Applicant. 54. The Panel also notes that at least some of the delay between 1 and 10 February 2011 may be attributed to the Applicant and/or her broker. First, because the broker failed to on-forward an email confirming the outcome of the discussions on 1 February 2011. Second, because the Applicant chose not to provide the tenant‟s details to the FSP to allow it to consider the claim further. 55. The Applicant was forwarded a claims decision letter dated 27 April 2011 which confirmed the declinature of the claim and reasons for the decision. This was after an assessment and two hydrology reports were obtained. In the Panel‟s experience of ti meframes and availability of experts at this time, this was not unusual. 56. To be entitled to compensation under 9.3 of the Terms of Reference, the Applicant needs to establish an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred . 57. The Panel appreciates that the Applicant felt that she was poorly treated by the FSP and that this has caused distress for her. The Panel however feels in the circumstances of this dispute and the decision making process conducted by the FSP, that the FSP has acted within a reasonable timeframe in responding to the Applicant‟s claim. In the circumstances, the Panel does not accept that the Applicant has es tablished a compensation claim for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference. Case No: 256369 Determination Page 10 of 10 Determination 58. On the basis of the available information the Panel determines the FSP was entitled to rely on the policy terms and conditions. 59. The Panel determines the FSP is liable for damage to the basement including the loss of the air conditioning unit up to the level of 100mm. The parties are asked to work cooperatively together to determine the extent of damage sustained to the basement area and contents contained in that area as a result of the inundation to the level of 100mm. Insofar as the FSP determines to cash settle the Applicant‟s claim for loss, the FSP is to pay interest in accordance with Section 57 of the Act from 27 April 2011 to date of payment of the claim. 60. The Panel determines insofar as the remaining damage is concerned that the FSP has established on the balance of probabilities that such damage was due to flood and therefore excluded under the terms of the policy. 61. The Panel determines the Applicant is not entitled to compensation under paragraph 9.3 of the Services‟ Terms of Reference.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.