Home / Financial Firm (Unknown - Insurer) / Determination 256369
Determination 256369
Flood exclusion applied to tenanted home water damage claim
Summary
Floodwater and stormwater affected the tenanted property in January 2011 and the FSP declined the claim as flood. AFCA ordered the FSP to cover basement damage up to 100mm from stormwater, with interest if cash settled, held the rest excluded as flood, and refused non-financial loss compensation.
Stormwater runoff and drain overflow are covered under the policy, while flood above the initial 100mm level is excluded, and notice to the insured was given through the broker under Section 71 of the Insurance Contracts Act 1984.
Issues
- Claim denial primary · upheld
“The Panel determines the FSP is liable for damage to the basement including the loss of the air conditioning unit up to the level of 100mm.”
- Poor claim handling secondary · not upheld
“The FSP has acted within a reasonable timeframe in responding to the Applicant's claim, and no non-financial loss was established.”
- Failure to disclose secondary · not upheld
“The Panel accepts the FSP has met its obligation to clearly inform the Applicant of the flood exclusion through the broker.”
Subjects and remedies
broker or intermediaryhome or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 256369 Determination Page 1 of 10
Case number: 256369
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
23 July 2012
Background
1. The Applicant holds a Landlord‟s Insurance Policy with the Financial
Services Provider (FSP) covering a residential property.
2. Between 11 and 12 January 2011 the insured property was inundated by
water causing damage.
3. The FSP declined the claim on the basis the water inundation arose from
floodwater which is excluded from cover under the policy.
4. The Applicant disputes the declinature on the basis stormwater runoff and
not flood was the cause of damage. Further, the Applicant believes her claim
was not assessed properly and the FSP has not dealt with her claim
objectively.
Summary of Applicant’s position
5. The Applicant relies on a Statutory Declaration dated 1 March 2012. The
Panel notes the following from this document:
The Applicant does not recall receiving a PDS from the FSP or being
alerted to the exclusions.
The Applicant has previously witnessed water travelling over the front
tiled area and directly under the front veranda of the home.
The rain coupled with rain runoff coming down the street came across
the front tiled section of the house like a „waterfall‟.
There is only a line of timber chamfer running between the bottom of
the front veranda and the top of the tiles on the patio. This would not
have prevented large amounts of rainwater from flowing under the
house. It was not designed to and has never functioned as a „channel‟
to divert rain away from the front patio or from the side driveway.
6. The Applicant has enclosed a transcript of evidence provided by the
Applicant to the Queensland Floods Commission Inquiry and the excerpts
from the Commission‟s Final report dated March 20 12 relating to the same.
The Panel has reviewed both reports.
Determination
Case No: 256369 Determination Page 2 of 10
7. Although the findings from the Commission were critical of the FSP and
CEO, Commission‟s findings do not go to the cause of the loss in this
dispute. They may however be relevant to any consideration of
compensation payable to the Applicant.
8. The Applicant does not recall receiving a Product Disclosure Statement
(PDS) from the FSP and renewal documentation does not state flood is
excluded; the FSP cannot demonstrate it informed the Applicant of the flood
exclusion by providing the PDS.
9. In the alternative, the Applicant argues that the insured property is at the
lowest point in the street. There are large stormwater drains at the front and
at the back of the property. Water at both ends of the street flows into the
Applicant‟s backyard during heavy rain.
10. The tenant stated to the assessor that a significant amount of stormwater
was flowing onto the property and filling up the yard with clear water before
he was evacuated at approximately midnight on 11 January 2011. The
property was affected by stormwater prior to any riverine flooding.
11. The hydrology reports should not be relied on as they do not adequately
assist the investigation due to the following:
The hydrologist has inaccurately estimated the height of the small lip of
concrete that runs down the western side of the house, where the
driveway is located. The hydrologist contends that this concrete was of
a sufficient height to channel water from the front of the house to the
rear, preventing any water coming under the house. However, the
narrowest part of this concrete is also the closest section to the front of
the house and is only 2mm high. In times of significant rain, the water
going across the tiled area will meet up with runoff coming down the
street.
There is a history of problems with the drainage pit at the back of the
property. The hydrologist does not appear to have had this information
as he states there were no reported problems with the drains.
12. Water escaping from drains is not excluded as flood under the policy. The
source of water contained in the drains is irrelevant as the FSP covers water
damage as well as water overflow from fixed pipes. Accordingly, the
evidence from the hydrologist that water from the drains affected the
property and caused damage prior to overland flow is covered under the
policy.
13. Further, the Applicant contends her claim was improperly assessed and
insufficient weight was given to her statements regarding the stormwater
drains. Further, it was not until a major newspaper ran a story regarding the
damage to the Applicant‟s property that she received an email at 3.18pm on
10 February stating the claim was still being reviewed and an assessor
would contact her.
14. The Applicant alleges that the hydrologist pre -determined the damage arose
from flood. The Applicant further submits that the FSP has breached the
General Insurance Code of Practice Clause 1.20 by failing to be open, fair
and honest in the claims handling.
Case No: 256369 Determination Page 3 of 10
15. The Applicant seeks $3,000 for financial or non-financial loss due to an
unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind. The delay and uncertainty caused by the FSP has led to
anxiety and stress. The Applicant feels she was poorly treated and the FSP
failed to listen to her in a time of trauma. The Applicant submits that she is
still suffering from her interactions with the FSP and its CEO and feels
personally victimised as a result of her media presence and public protests.
Summary of FSP’s position
16. The FSP relies on the following policy terms and conditions:
“Exclusions to your cover
Any cover we provide is subject to the following exclusions.
We will NOT cover any loss or damage as a result of, or caused by
...
i. Flood
...
Glossary of words with special meaning
...
Flood
The covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.”
17. The FSP relies on an assessor report dated 16 February 2011 from which
the Panel notes the following:
The Applicant advised she was not at the property at the time of the
flood.
The Applicant contacted the Council and requested they pump the
drains. The Council may have pumped the drains on a Monday.
The tenant has always been aware of a drainage problem at the
property. He described the stormwater drain at the back of the property
as a „basin plug hole‟ for the surrounding homes as they are at the
lowest point, and the stormwater runoff heads to the back yard and
street gutters at the front of the property.
The tenant noted that heavy rain came through the property from
Monday 10 January 2011 to Tuesday 11 January 2011. By
approximately midday on Tuesday 11 January 2011 the drain was
unable to take on anymore water and water started to overflow and
bubble out into the yard. The street had water starting to pool from the
stormwater drain and the continuous rain. The tenant advised the water
was not the muddy colour that the floodwater colour was by that stage
it was just dirty stormwater with „nowhere to go‟. The tenant‟s father is a
hydrologist and when the tenant contacted him, he advised them to
evacuate. At midnight on Tuesday 11 January 2011 the tenant
Case No: 256369 Determination Page 4 of 10
evacuated the residence, at this time the water was 1foot past the
floorboards.
The tenant has expressed the opinion that flood and stormwater met on
Wednesday at some stage.
18. The FSP relies on a Hydrology Report dated 4 March 2011 from which the
Panel notes the following:
The property is 190m from the Brisbane River and within the flood
extent of the River. Terrain mapping from the Brisbane City Council
shows the site is approximately in the centre of a local depression.
The hydrologist obtained data from the Oxley Creek and Brisbane River
gauges which are 8kms and 7kms away respectively from the property.
The river gauge information indicates the Brisbane River commenced
rising on 9 January 2011 but at 6.00am on Tuesday 11 January 2011 a
steep rise in flood levels occurred. A peak of about 9.2m around
12.00am on 13 January 2011 and 4.5m at 3.00am on 13 January 2011
occurred at the Oxley Creek and Brisbane River gauges.
The hydrologist believed that the property is located along a local
drainage path or at a low point in the local terrain.
Photographs are included which indicate the backyard was inundated
around midday on Tuesday 11 January 2011.
The minimum ground level elevation within the property is 2.3m AHD.
The rainfall data suggests a 1-2ARI and it is unlikely that there was
sufficient local stormwater runoff for this to be a contributing factor to
the inundation that occurred at the property.
The river level information indicates that at 12.00pm on Monday 10
January 2011 the river level was 1.9m AHD. The level rose to a level of
approximately 4.0m AHD at 12.00am on Wednesday 12 January 2011.
The hydrologist concluded inundation occurred in two stages. The first
being surcharging floodwaters along the sub-surface drainage pipes
which commenced on 11 January 2011 and continued to the early
hours of 12 January 2011. This is consistent with the evidence from the
tenant. These initial flood-flows are likely to have entered the sub-
surface drainage pipes via an outfall to the Brisbane River located to
the south of the property.
The riverbank levels along the Brisbane River south of the site are
often less than 4.0m AHD. Therefore, overbank flooding would also
have been occurring in various locations along the river shortly after
12am on Wednesday 12 January 2011.
The peak of the Brisbane River occurred between 12-3am Thursday 13
January 2011. The interpolated level in the Brisbane River directly
south of the property at 1.30am on Thursday 12 (sic) January 2011 was
approximately 6.7m AHD.
The hydrologist concluded that the inundation of the property was from
water escaping the confines of the Brisbane River through backflow in
the drainage system and overland flow. However, it is possible that
heavy rainfall on 9-10 January 2011 caused a small amount of
Case No: 256369 Determination Page 5 of 10
stormwater to enter through the side of the basement level of the house
and cause damage to items such as the air-conditioner prior to the site
being inundated by floodwater.
19. To clarify the cause of inundation, the FSP requested a further hydrologist
report. The report dated 15 April 2011 found:
The rainfall affecting the local drainage system was not abnormal. The
urban drainage systems in residential areas are typically designed to
accommodate ARIs between 2-5years.
The elevation of the drainage pit adjacent to the front of the property is
4.5m AHD. Levels in the Brisbane River over 9-10 January 2011 were
less than 2.5m AHD, accordingly the backwater effects from the river
should not have affected the hydraulic performance of the drainage
system.
The kerb and footpath is in the order of 150mm above the road at the
pit and the depth of the pooling on the road would have to exceed this
amount to overflow adjacent properties.
On 9 January 2011 the depth of overflow that could have entered the
driveway would have to be at the low end of possible overflows.
Any shallow overflow entering the top of the driveway would tend to run
down the reasonably steep driveway as sheet flow, reducing the depth
as the velocity of the water increased. The basement window sill is 30-
50mm above the driveway and depths in excess of these amounts
could not have been sustained given the limited potential overflow
conditions from the street for the moderate rainfall (less than 2year ARI
on 9 January 2011.
The hydrologist concluded the inundation damage to items in the
basement as a result of stormwater flows on 9-10 January 2011 is
highly unlikely.
20. The FSP relies on a Statutory Declaration from the Applicant‟ s insurance
broker from which the Panel notes the following:
On 13 July 2009 the insurance broker renewed the policy for the
Applicant and attached a Landlord PDS to the renewal.
The policy has a status of working which means the document was
created but not emailed. The policy was instead forwarded in the postal
mail to the Applicant.
The Statutory Declaration attaches a screen shot of the record to
support same. The Panel notes the record accords with the information
provided in the Statutory Declaration.
21. The FSP has enclosed documentation to demonstrate that the insurance
broker does not work under a binder but as an independent broker.
22. The FSP contends the Applicant‟s broker incepted the policy and has
confirmed that it provided a PDS to the Applicant on 13 July 2009.
23. The FSP contends the insured property was not inundated until the early
hours of 13 January 2011 more than a day after the peak intensity rainfall
Case No: 256369 Determination Page 6 of 10
had fell and after the rain had completely stopped. The cause of the loss
could therefore not have been localised flooding as this would have occurred
at the same time as the peak rainfall. The hydrologist‟s evidence is that
localised inundation could not have occurred. Backflow of drains could only
have been caused by the rising floodwater and the proximate cause is
therefore flood. The information provided by the tenant of the property
concurs with the hydrologist.
24. The FSP notes the Applicant‟s contention that it was overflow from pipes and
therefore covered. The FSP states the Applicant has reviewed this clause in
isolation. Any rainwater which mixed with floodwater is deemed under
common law to be floodwater or is still excluded by the Wayne Tank
principle. As flood caused the damage to the property, the FSP cannot
indemnify the loss which arose from an excluded cause of loss under the
policy.
25. The FSP rejects that it handled the Applicant‟s claim poorly. The FSP has
arranged for an assessment and two hydrologists‟ reports. The fact the
Applicant does not agree with these professionals does not co nstitute bias.
The hydrologists have no vested interests in the outcome of the claim.
26. The FSP has been open, fair and honest in its claim handling processes. It
informed the Applicant quickly that cover did not extend for this claim. The
FSP has been consistent in the claim and has not victimised the Applicant.
27. The FSP disputes that the material submitted by the Applicant is relevant to
this particular issue of loss causation or any of the FSP‟s obligations under
the Insurance Contracts Act (1984) (“the Act”). The post loss interaction
between the Applicant and the CEO had no bearing on the cause of loss or
the FSP‟s decision as to causation. The FSP‟s conclusions on the cause of
loss are amply supported by expert evidence.
Issues
28. Whether the FSP is entitled to rely on the policy terms and conditions.
29. Whether the FSP was entitled to decline the Applicant‟s claim.
30. Whether the Applicant is entitled to compensation.
Reasons for decision
31. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
32. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
33. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
Case No: 256369 Determination Page 7 of 10
34. There are three discrete issues (listed above) which will be dealt with
separately.
35. There is no dispute that the Applicant‟s policy was incepted through her
insurance broker. Although the Applicant in the dispute notice maintains she
cannot recall receiving the PDS, Section 71 of the Insurance Contracts Act
1984 (the Act) provides that notice or a document need not be provided to
an insured where the contract was arranged through a broker.
36. As the policy was arranged through a broker (and the broker has provided
information to indicate the policy was posted to the Applicant on 13 July
2009), the Panel accepts the FSP has met its obligation to clearly inform the
Applicant of the flood exclusion.
Whether the FSP was entitled to decline the Applicant’s claim
37. The policy provides cover for both storm damage and water or liquid
damage, subject to the flood exclusion. It is therefore clear that if the source
of water inundation arises from flood then the damage is excluded.
38. The tenant observed water in the pit in the backyard rising between 11.00am
and 12.00pm on 11 January 2011. The Applicant argues that there was also
water coming from the large stormwater drains at the front of the property
with water from the street flowing towards the Applicant‟s property.
39. The FSP hydrologist considered the inundation occurred in two stages. The
first was through drainage backflow on 11 January 2011 and then overland
flow when the river broke the banks of the Brisbane River. This conclusion
by the hydrologist would appear to accord with the tenant‟s description of the
inundation. There was no flooding to the front of the home from rainfall at
12pm on Tuesday 11 January 2011, however there was inundation of the
backyard caused by water rising and spilling into the backyard from the
drainage pit. Further, whilst the tenant has noted heavy rain coming through
the property between 10 and 11 January 2011 it is not until 11 January 2011
the drain starts to overflow. This water then joins with rainwater.
40. The hydrologist report identified the potential overflowing to the basement
area by stormwater impacting the Applicant‟s property on 9 and 10 January
2011. The hydrologist noted that a small amount of rainfall may have entered
the basement level of the property and damaged items such as the air
conditioner prior to the subsequent flood.
41. The FSP requested the hydrologist clarify the stormwater issue.
42. The hydrologists‟ reports have provided inconsistent evidence in relation to
the probability of water inundation to the basement. The Panel notes the
author of the original and subsequent hydrology reports are different. The
Panel, on the balance of probabilities favours the original report as this
hydrologist appears to have spoken directly to the tenant and physically
examined the property. The second hydrologist did not attend the property.
43. In order to assist in determining this dispute, a site inspection was conducted
by the Panel Chair Ombudsman with the Applicant and representatives of
Case No: 256369 Determination Page 8 of 10
the FSP on 5 June 2012. The FSP provided copies of photographs not
previously provided to assist with the site inspection.
44. The Applicant‟s property sits at a sag point on the road and slopes steeply
from the roadway to the backyard. There is a small lip in the concrete beside
the driveway which is on the right hand side of the property as you look at
the property. The concrete lip is described in the first hydrologist report. The
report does not mention the neighbouring property. The neighbouring
property on the left hand side of the Applicant‟s property as you look towards
the property also slopes steeply down to the yard and towards the basement
area of the Applicant‟s property. It is likely given the level of rainfall on 9, 10
and 11 January 2011 that stormwater runoff would have occurred from this
side of the property into the basement area.
45. There is also a large stormwater drainage pit in the middle of the backyard of
the property. There are similar pits in the neighbouring properties on either
side of the Applicant‟s property. These pits are about 2m AHD. The
information on file indicates that the elevation of the property was at 2.3m
AHD whilst the Brisbane River reached 2m AHD by 9.00am on 11 January
2011 and 2.6m AHD by mid day on 11 January 2011. Based on this
information, it is likely that any inundation from the stormwater drainage pits
at the rear of the property would not have occurred until the morning of 11
January 2011.
46. The stormwater drains at the front of the Applicant‟s property are 4.5m AHD.
The tenant in discussions with the assessor referred to in the assessme nt
report of 16 February 2011 watched water come through the property from
heavy rain on 10 and 11 January 2011. The Applicant advised that the
tenant observed stormwater coming from the road on 10 January 2011. It is
highly likely that any water observed exiting the stormwater drains at the
front of the Applicant‟s property or the roadway and running down through
the driveway or the neighbouring property into the basement would have
been stormwater and not backflow and therefore covered under the terms
and conditions of the policy.
47. The Panel is satisfied that the inundation of the basement from stormwater
runoff given the location of the property would not have been significant.
48. Based on the information provided by the Applicant and the tenant and the
site inspection the Panel considers it fair in the circumstances to determine
the inundation of the basement area to a maximum level of approximately
100mm most likely occurred as a result of stormwater runoff on 10 January
2011 and early on 11 January 2011.
49. The assessment report does not identify the extent of damage sustained to
the basement area. Whilst it is clear that the air conditioning would have
been damaged, it is unclear what other items if any were damaged in that
area. The parties are asked to work cooperatively together to determine the
extent of any damage that would have been sustained as a result of an
inundation of the basement area to a level of 100mm.
50. As for the balance of the damage, the Panel is satisfied based on the
information exchanged that most likely any inundation above this point would
be due to flood and therefore excluded under the policy.
Case No: 256369 Determination Page 9 of 10
Whether the Applicant is entitled to compensation
51. The Applicant has sought compensation pursuant to paragraph 9.3 of the
Terms of Reference. The Applicant has relied upon material submitted in
relation to her interactions with the FSP‟s CEO to allege that she was
victimised because she was involved with the media in protest against the
FSP. The Applicant has sought compensation for delays in poor handling.
52. The Panel has considered the information exchanged and the findings of the
Flood Commission. Whilst the Panel notes that the Flood Commission found
the CEO‟s behaviour was unprofessional during a telephone call on 22
February 2011, there is no evidence to suggest that the telephone call
deterred the Applicant in relation to her claim. Further, there is no evidence
of the Applicant being adversely affected by the FSP‟s triage process.
53. The level of inconvenience and time taken to resolve the situation needs to
be considered in the context of the circumstances at the time. It is well
documented that there were a large volume of claims arising from several
natural disasters, but in particular over 50,000 claims arising from the
Queensland Floods that impacted on the ability of the FSP and other
insurers to respond around the time of the Applicant‟s claim . The Panel
notes that the FSP contacted the Applicant by 1 February 2011. Whilst in
normal circumstances, this would be an unacceptable delay, given the
peculiar circumstances involved in this event; the Panel accepts that this is
not an unreasonable delay in contacting the Applicant.
54. The Panel also notes that at least some of the delay between 1 and 10
February 2011 may be attributed to the Applicant and/or her broker. First,
because the broker failed to on-forward an email confirming the outcome of
the discussions on 1 February 2011. Second, because the Applicant chose
not to provide the tenant‟s details to the FSP to allow it to consider the claim
further.
55. The Applicant was forwarded a claims decision letter dated 27 April 2011
which confirmed the declinature of the claim and reasons for the decision.
This was after an assessment and two hydrology reports were obtained. In
the Panel‟s experience of ti meframes and availability of experts at this time,
this was not unusual.
56. To be entitled to compensation under 9.3 of the Terms of Reference, the
Applicant needs to establish an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
Applicant‟s expectation of enjoyment or peace of mind has occurred .
57. The Panel appreciates that the Applicant felt that she was poorly treated by
the FSP and that this has caused distress for her. The Panel however feels
in the circumstances of this dispute and the decision making process
conducted by the FSP, that the FSP has acted within a reasonable
timeframe in responding to the Applicant‟s claim. In the circumstances, the
Panel does not accept that the Applicant has es tablished a compensation
claim for non-financial loss pursuant to paragraph 9.3 of the Terms of
Reference.
Case No: 256369 Determination Page 10 of 10
Determination
58. On the basis of the available information the Panel determines the FSP was
entitled to rely on the policy terms and conditions.
59. The Panel determines the FSP is liable for damage to the basement
including the loss of the air conditioning unit up to the level of 100mm. The
parties are asked to work cooperatively together to determine the extent of
damage sustained to the basement area and contents contained in that area
as a result of the inundation to the level of 100mm. Insofar as the FSP
determines to cash settle the Applicant‟s claim for loss, the FSP is to pay
interest in accordance with Section 57 of the Act from 27 April 2011 to date
of payment of the claim.
60. The Panel determines insofar as the remaining damage is concerned that
the FSP has established on the balance of probabilities that such damage
was due to flood and therefore excluded under the terms of the policy.
61. The Panel determines the Applicant is not entitled to compensation under
paragraph 9.3 of the Services‟ Terms of Reference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.