Text of the determination
Case No: 256096 Determination Page 1 of 15
Case number: 256096
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim (Flood)
13 June 2012
Background
1. The Applicants (NR & JR) operate a retail outlet offering the sale, repair and
support for computers, parts and associated equipment. The Applicants
entered into a contract of insurance with the Financial Services Provider
(FSP) that included property and business interruption cover. The relevant
period of insurance operated for 12 months beginning from 29 November
2010.
2. The Applicants lodged a claim under this policy due to extensive damage to
their premise in Ipswich from water inundation following severe weather
events in Queensland.
3. The FSP denied the claim on the basis the d amage was due to “flood” as
defined by the policy. The Applicants have disputed this.
4. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available, has been
exchanged with the other party.
Summary of Applicants’ position
5. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
a. The FSP has inappropriately handled their claim.
b. The business interruption cover underwritten by the FSP was contrary
to their instructions and expectations.
c. They sought flood cover when incepting the policy and were told it was
unavailable. They again requested flood cover by telephone on 10
January 2011 and were informed the FSP does not underwrite this
despite discovering this was available through a particular broker.
Accordingly, they lost an opportunity to be covered for flood at the time
of the claim.
d. Evidence that nearby residents were paid out by different insurers.
Determination
Case No: 256096 Determination Page 2 of 15
e. The cause of the inundation was stormwater runoff, which was
corroborated by various witnesses. Further, the FSP‟s hydrologist‟s
evidence should not be relied upon due to numerous anomalies and
inaccuracies.
6. The Applicants therefore seek indemnity for their losses.
Summary of FSP’s position
7. The FSP relies on its hydrologist‟s evidence and the following policy
provisions to substantiate its position:
“ General definitions applying to all sections of this Policy
…
Flood the inundation of normally dry land by water escaping from or released
from the normal confines of any natural water course or lake (whether
or not altered or modified) or any dam, reservoir or canal.
…
Insured events
…
3.3 Wind and water
Wind and water including water and any other liquid discharged from
mains, pipes, gutters, drains, tanks or fixed apparatus used to hold or
carry liquids, but not loss or damage:
(a) by sea, tidal wave, high water, flood, erosion, …
…
3.11 Accident damage
(a) Loss of or damage to buildings or contents caused by any
accident except loss or damage caused by:
(i) Insured events 3.1 to 3.10 or by any event or
circumstance excluded therein.”
8. In response to the Applicants‟ arguments, the FSP submits the following:
a. The claim was handled in an appropriate manner.
b. In relation to the conversation with the Applicants on 10 January 2011
about there being no flood cover available, this was correct as there
was an embargo in place for underwriting any flood cover to properties
located at various suburbs, one of which included the Applicants‟
property address.
c. FOS does not have jurisdiction to review disputes involving business
interruption cover.
d. The hydrologist‟s evidence is consistent with the eyewitness testimony
and available data.
Case No: 256096 Determination Page 3 of 15
Issues
9. Whether the FSP handled the claim appropriately.
10. Whether FOS has jurisdiction to review the Applicants‟ dispute regarding the
business interruption claim.
11. Whether payment for properties near the Applicants‟ business premises
assists them.
12. Whether the FSP misrepresented to the Applicants about the availability of
flood cover.
13. Whether the damage caused to the Applicants‟ property was “flood”.
Reasons for decision
14. Due to the nature of the dispute, the matter has been referred to the Panel
for De termination in line with the Operational Guidelines to FOS‟s Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. It is appropriate to consider the issues under the various headings.
Business Interruption Cover
17. The FSP has challenged F OS‟s jurisdiction to review this aspect of the
Applicants‟ dispute. The Applicants have not necessarily disputed the FSP‟s
submissions in this regard.
18. The Panel confirms that pursuant to the Terms of Reference, FOS has
jurisdiction to review issues involvi ng a “Small Business Insurance Product”.
This term is specifically defined and the Panel confirms the Applicants‟
property damage cover falls within this definition.
19. However, there are certain types of insurance cover that are specifically
excluded from this definition, one of which is business interruption, as
evident in the following extract of the Terms of Reference:
“20.1 Defined Terms
…
„Small Business Insurance Product‟ means:
…
but excluding cover in relation to any of the following:
…
Case No: 256096 Determination Page 4 of 15
(xii) Loss of Profits/Business Interruption.”
20. Given this, the Panel accepts it has no jurisdiction to deal with any issue
involving the business interruption cover. Accordingly, this Determination will
not comment on the issues and concerns raised by the Applicants in this
regard.
Availability of Flood cover
21. The Applicants submitted that they sought flood cover at inception. However,
they clearly acknowledged their awareness of not being covered for this
event given they called the FSP on 10 January 2011 seeking cover for this.
22. In relation to the conversation on 10 January 2011, the Applicants submit the
FSP misled them by stating it did not underwrite flood. The FSP has refuted
this although it has not provided a statement or any other corroborating
evidence from the representative who spoke to the Applicants at the time.
23. Regardless, the FSP has provided evidence to substantiate that there was
an embargo in place regarding the offer of flood cover and this included the
Applicants‟ business address.
24. The Applicants have submitted this embargo was misleading and constitutes
inappropriate practice on the FSP‟s behalf. However, even if the Panel was
to accept the Applicants‟ argument, this would not assist their position if the
Panel accepts the damage to the property was due to “flood”.
25. The reason, as highlighted by the FSP, is the Applicants sustained no
prejudice by these actions. That is, if the FSP had clearly explained why
flood cover was not available, this would have resulted in the same outcome,
namely that the Applicants would still not have been able to obtain flood
cover before the inundation.
26. The Applicants have also queried whether this embargo was legal. The
Panel considers it is. The FSP, like any insurer, has a commercial discretion
regarding what types of cover it wishes to provide. For instance, in relation to
offering flood cover in general, it is evident that insurers offered cover for this
event in various forms, such as:
Part of their standard cover,
As an option,
With various restrictions or exclusions, or
Not at all.
27. Accordingly, in circumstances when an insurer is well aware that certain
locations are likely to be prone to damage by a specific event, such as flood
or fire, embargoes are often implemented pursuant to prudent commercial
practice, given the increased likelihood these newly incepted policies will
result in significant claims.
Case No: 256096 Determination Page 5 of 15
28. The Applicants have also queried whether the FSP had a duty to disclose
this embargo. The duty of disclosure referred to by the Applicants in this
regard is a duty owed by an insured to the insurer. It is not a mutual duty.
29. Although an insurer does have certain obligations to inform an insured
regarding the terms and conditions of an insurance contract arranged, it
does not extend to an insurer disclosing why it is not prepared to offer cover
for certain events in the first place.
30. Given this, the Panel does not accept that there was any inappropriateness
behind the manner the FSP conveyed to the Applicants the unavailability of
flood cover; nor does this result in the Applicants being entitled to be
covered for flood, after the event.
Payment of other claims by another insurer
31. The Applicants have provided copies of correspondence received by other
individuals from their insurer accepting liability for their claims on the basis
the inundation was due to rain that fell within 24 hours.
32. The Panel is aware of this particular insurer‟s coverage. That policy provides
cover for an event described as “flash flood and stormwater runoff”, which is
defined as a sudden flood caused by heavy rain that fell within 24 hours of
the inundation of the risk address. The correspondence this insurer sent to
the parties presented by the Applicants, clearly demonstrates this was the
basis of their claims being paid.
33. The Panel therefore does not consider this allows any inference that the
insurer in question accepted the water which inundated those parties‟
properties was stormwater runoff. As explained above, the relevant insured
event allows for damage caused by flood, provided the flood was caused by
heavy rain that fell within 24 hours. In other words it constitutes an exception
to the general exclusion of flood, in the context of that insurer‟s policy.
34. There is no such corresponding event covered by the Applicants‟ insurance
contract. Accordingly, the Panel does not consider payment of these other
claims adds any probative value to this dispute.
35. The Panel notes the Applicants have also provided evidence from MB, the
owner and operator of a newsagency store located at 57 B Street, regarding
payment of his claim as a result of storm damage.
36. However, no corroboration has been provided regarding the basis that
insurer accepted the claim. That is, it is possible the insurer had a similar
provision to cover flood, or the circumstances behind the new sagency‟s
initial inundation had distinguishing features from the Applicants‟ situation,
that resulted in the acceptance of that claim.
37. The Panel considers it is more appropriate to focus its review on the
Applicants‟ entitlements under their insurance con tract with the FSP and the
circumstances and evidence specific to their case.
Case No: 256096 Determination Page 6 of 15
Water Inundation
38. The FSP engaged a hydrologist to provide a site specific report. The
hydrologist did so. Two additional reports were also provided by DN as a
result of the submissions and evidence provided by the Applicants regarding
the initial report.
39. The initial hydrologist, in summary, provided the following evidence
regarding the water inundation in her report; evidence which was
substantially maintained by DN‟s subsequent reports:
The building was inundated to a maximum depth of approximately 4.0m
above ground level.
Rainfall data was obtained from Brassall ( Hancocks Bridge ) alert
station, located approximately 2.1km north-west of the property. A total
of 188mm rainfall was recorded. The average recurrence interval (ARI)
of the recorded rainfall for storm durations of up to 2 hours was less
than 1 year. For storm durations of 3 to 72 hours, the ARI was between
1 and 5 years. No rainfall was recorded in the vicinity of the property
after 1800 hours on 11 January 2011.
The property is located on the northern side of B Street. The floor level
of the building is located at ground level. The ground level surrounding
the building is between 100mm and 200mm above the kerb and
channel levels in B Street. Information from the council shows that
ground levels at the property were between 15.2m AHD and 16.2m
AHD.
The Bremer River flows in an easterly direction approximately 350m
north of the property. Information from the council indicates it reached a
peak level of 19.6m AHD. River level data was obtained from Ipswich
Alert, located approximately 350m north-west (upstream) of the
property.
The Bremer River would overflow B Street to M Parade once the water
level reaches 8m AHD. In these circumstances, the Bremer River
would have overflowed M Parade between 1 and 2am on 11 January
2011. Further, floodwater would have initially inundated the property at
approximately 8pm on 11 January 2011.
Information obtained from the council indicates that between E Street
and M Parade along B Street, the pipes in the trunk drainage system
change from a 750mm diameter pipe to a 525mm diameter pipe in front
of the property and then to a 600mm diameter pipe that discharges into
the M Street system.
The piped stormwater system in B Street has a catchment area of
approximately 5.1ha to the property. The peak stormwater runoff would
be expected to reach the property within an hour of the peak rainfall.
Using the maximum 5 minute intensity of 92.2mm/hr (7.7mm of rain in
the 5 minutes to 12.15pm on 11 January), this would have exceeded
Case No: 256096 Determination Page 7 of 15
the estimated capacity of the piped drainage system in B Street.
However, this would not have been sufficient to inundate the property.
At 5pm on 11 January 2011, it is likely the elevated level of the Bremer
River (12.9m AHD) had reduced the capacity of the piped stormwater
drainage system in B Street and impeded the free drainage of
stormwater runoff from the local catchment. However, given it was
around 5 hours after the peak 5-minute rainfall intensity, it is unlikely
that any stormwater that could not drain into the piped system
inundated the property above floor level.
40. Based on this, the hydrologist concluded as follows:
“… it is concluded that the inundation above floor le vel was caused by
floodwater overflowing from the Bremer River. The subject property would not
have been initially inundated until around 8pm on Tuesday 11 January. Given
the intensity of the rainfall and the characteristics of the local catchment,
stormwater runoff could not have inundated the subject property above floor
level prior to the arrival of floodwater from the Bremer River.”
41. The Applicants have provided numerous statutory declarations from a
number of witnesses to substantiate their position tha t the hydrologist‟s
report contains inaccuracies and has relied on incorrect information. In
particular, they have relied on these witnesses to identify the source and
depth of inundation at various times.
42. Although the Applicants acknowledged they did not observe the initial
inundation as they evacuated the property at approximately 3pm on 11
January 2011, they initially submitted there was eyewitness evidence that
the property was inundated at approximately 5pm on 11 January 2011. In
this regard, the Applicants provided a number of photographs of B Street at
this time that they felt supported their case in this regard.
43. The Panel considers it is relevant to review the eyewitness evidence, along
with the relevant photographs, to determine whether the timing of the initial
inundation can be established. In the Panel‟s opinion, this is a substantial
factual issue that requires analysis before any reasonable reconstruction
process can be undertaken to determine the probable source of the water
inundation.
Eyewitness Evidence & Initial Inundation
44. The Applicants provided two photographs from an individual named “Theo”,
who owned the building MB‟s newsagency store occupied. The Applicants
state the photographs were taken at 5pm on 11 January 2011. There does
not appe ar to be any statutory declaration from “Theo” to corroborate this
evidence.
45. However, for the purposes of this analysis, the Panel will accept the
Applicants‟ evidence regarding the time and date of the photographs. In
addition, the Panel notes that the Applicants acknowledge Theo did not
witness their store being initially inundated.
Case No: 256096 Determination Page 8 of 15
46. The photographs show water accumulating on the southern side of B Street.
This water appeared to have come from an area south of B Street, which
various witnesses identified as the Coles Supermarket, whereas the Bremer
River is located to the north of B Street.
47. In the first photograph, the water appeared to have only reached a third of
the way across B Street at a length of approximately 4 car lengths. In the
second photograph, it appears further water has accumulated as the length
and width has increased. However, in this second photograph, vehicles were
still able to travel along the northern side of the street, which is where the
Applicants‟ store is located. Further, it doe s not appear any of this water
overtopped the kerb on the northern side of B Street.
48. This photograph was reviewed by the FSP‟s hydrologist who made the
following comments:
The photographs do not show the Applicants‟ property being inundated.
The hydrologis t provided a point highlighting the Applicants‟ property in
the context of the water.
Based on available survey data, the minimum level of B Street is
approximately 14.3m AHD. The waters shown in the photograph are
between 14.2m AHD and 14.5m AHD.
The esti mated floor level of the Applicants‟ property is 15.2m AHD. For
the water shown in the photographs to have eventually inundated the
property, it would have to be 0.9m above the road crown to do so. This
would result in the street being impassable for light vehicles.
49. The Applicants have provided confirmation that the council closed off B
Street at 6.44pm on 11 January 2011.
50. Having reviewed these photographs, the Panel accepts they clearly show
the property was not inundated. As such, the Panel is satisfied the evidence
establishes the property was not inundated at 5pm on 11 January 2011.
51. The Applicants have disputed the ground levels identified by the hydrologist
to the extent that topographical maps, according to the National Mapping
Council of Australia, contain a margin of error of approximately 0.25m. The
FSP‟s hydrologist responded to this point noting the data relied upon was not
contour data but a detailed digital elevation model.
52. Further, the hydrologist noted this information was a detailed digital elevation
model obtained from Airborne Laser Survey. Their levels contain a standard
deviation of vertical error of 0.15m. The hydrologist compared this with the
permanent survey marks at various locations throughout the Brisbane and
Ipswich areas and in nearly all cases, he found close agreement (less than
0.15 m difference).
53. In this regard, the Panel is inclined to prefer the hydrologist‟s expert
evidence. Although there is a possibility for a margin of error in the heights
identified, the Applicants have provided no specific evidence to indicate that
the heights referred to are incorrect to their particular circumstances.
Case No: 256096 Determination Page 9 of 15
54. Although the Applicants have attempted to argue that the height of their shop
and that of the newsagency are essentially the same, there is no survey or
other type of measuring tool they have relied on to corroborate this. In
contrast, the hydrologist has provided evidence corroborating the source of
the heights used. Given this, the Panel is inclined to accept that on the
balance of probabilities, the heights referred to by the hydrologist are
accurate.
55. The Panel notes this issue was in dispute between the parties due to the
Applicants‟ substantial reliance upon MB‟s evidence regarding the level of
water that inundated his store. MB has provided evidence in two statutory
declarations dated 21 January 2012 and 29 March 2012. The first
declaration states the following:
He initially tried to stop the water entering the store from the lower rear
door with sandbags and plastic sheeting but was unable to do so. He
kept working in the property to save his possessions but finally had to
abandon the premises at 6.30 pm.
As he left the property, he observed water overflowing from the
drainage system across the road from the Coles Supermarket car park
(this store is located on the southern side and is consistent with the
source of water pooling in “Theo‟s” photographs).
In his declaration dated 29 March 2012, MB added the following to his
previous evidence:
At 6.30pm on 11 January 2011, the water was halfway between his foot
and knee, which he has measured to be 0.26m. He was standing at the
highest part of the shop as identified by the FSP‟s hydrologist.
The crown of the road in B Street is higher than the shop floor level. He
believes the FSP‟s hyd rologist is incorrect in this regard.
56. In relation to the latter point, the Panel acknowledges the hydrologist‟s
reference to this phrase is confusing. MB has referred to the crown of the
road being higher than the level of the shop, which the Panel argues could
be technically correct. However, the Panel considers the reference to
“crown” in the hydrologist‟s report was to convey a different issue when you
consider its context:
“Based on the available survey data, the minimum level on [B] Street is about
14.3m AHD. We estimate that the water levels shown in the photographs are
at approximately 14.2m AHD and 14.5m AHD. The estimated floor level of the
subject property is approximately 15.2m AHD. For water to inundate the
subject property above floor level, water would have had to be 0.9m above
the road crown which would be impassable for light vehicles.”
57. In this regard, the Panel accepts the hydrologist‟s reference to “road crown”
was likely the minimum level of B Street given the 0.9m difference referred to
matches the difference between this height and the floor level of the
Applicants‟ property.
Case No: 256096 Determination Page 10 of 15
58. The photographs taken by “Theo” clearly show the water which accumulated
at 5pm on 11 January 2011 was pooling at a low point of B Street. Further,
even from a layma n‟s perspective, it is clear both the Applicants‟ and Theo‟s
properties are located higher than this point.
59. MB‟s evidence is that at 6.30pm on 11 January 2011, the water was at the
midway point between his foot and knee and from this, he has postulated
that the height would have been 15.26m AHD. The Panel considers it is
unlikely MB‟s evidence can be accepted at such a level of precision,
particularly given this evidence was provided more than one year after the
fact and he is not qualified to establish the AHD height.
60. However, the Panel does accept that the ground level of the newsagency
shop identified by the FSP‟s hydrologists and the level of the water identified
by MB was approximately 15.2m AHD, which is the approximate floor level
of the Applicants‟ property. Accordingly it appears likely, on balance, that
water first inundated the Applicants‟ property at or about 6.30pm on 11
January 2011.
61. Although this timing is inconsistent with the first hydrologist‟s estimate of the
initial inundation, the Panel does not necessarily accept that this infers the
property was inundated by stormwater or that the hydrology evidence should
be dismissed completely. Hydrology is not a precise science and the Panel
accepts some percentage of margins of error must be allowed. Although a
time differential of more than an hour is not ideal, the Panel considers it is
still appropriate to factor in this evidence, with the available witness
evidence, as well as the rainfall data and river levels.
62. MB‟s evidence about the source o f the water was that it came from M
Parade to inundate the store. This is at odds with the photographs provided
by Theo which show the water came from the southern side of B Street. M
Parade is a road that ends at B Street and is located on the northern side of
B Street.
63. MB did not state the water from Coles Supermarket inundated the property.
Instead, he refers to the fact water inundated the store from the rear, which
is also where M Parade is located.
64. Given this, if the Panel is to accept this same water also inundated the
Applicants‟ property, then it is probable this water also came from M Parade.
65. The Panel is not necessarily satisfied that this water does not fall within the
definition of “flood”. In this regard, the Panel refers to the following evid ence
to support its concerns:
AA provided evidence in his statutory declaration dated 4 November
2011 that water was coming through the drains from M Parade at 4pm
on 11 January 2011.
The hydrologist provided evidence that the lowest point of M Parade
was located under a bridge measured at approximately 7.5m AHD.
Case No: 256096 Determination Page 11 of 15
Further, water from the river can flow back up the stormwater pipe
system to inundate the low point of this parade.
The hydrologist also found that given the levels of the Bremer River
earlier on 11 January 2011, it is likely M Parade was inundated by
these waters earlier that day.
66. It appears that the evidence is consistent in that the water which initially
inundated the Applicants‟ property likely came from behind it, namely from M
Parade.
67. The Applicants have postulated that as the Bremer River levels had not
reached the sufficient height at the measuring station to match that of MB‟s
evidence, it must be stormwater.
68. However, the Panel disagrees. It is not unusual that due to the elevated
levels of a local river system, this can cause that water to back up through
the stormwater drains and discharge water at various low points, such as M
Parade. This is also consistent with MM‟s evidence who stated he observed
water rising from the drains “which seemed to back up”. This is also
consistent with waters from the Bremer River backing up through the
stormwater system and accumulating at M Parade.
69. In contrast, it would be unusual to expect that stormwater runoff would
continually discharge from drains a number of hours after intense rainfall.
This is particularly the case when this phenomenon continues to occur
numerous hours after the peak rainfall has ceased.
70. Instead, the Panel accepts it is clear some other factor has caused this water
to continually discharge from the drains to such an extent that it inundated
the Applicants‟ property at a height of almost one metre at 8pm on 11
January 2011. Further, there is no evidence to suggest that the water which
continued contributing to the inundation of the Ap plicants‟ property came
from a different source to the initial inundation. That is, if stormwater runoff
had initially inundated the property, it is unlikely it would have travelled along
the same course as that of floodwater.
71. In addition to this, the Panel notes the following:
There is no actual witness to the initial inundation of the Applicants‟
property. The other witnesses the Applicants relied upon mainly
commented on events that occurred during various hours preceding or
following the likely time of inundation. Accordingly, their evidence was
limited when seeking to establish the source of the initial inundation;
The levels in the Bremer River were proximate to the property‟s floor
level at 6.30pm on 11 January 2011. Although the levels were not
precise, the difference was only marginal;
There was no rainfall after 6pm and minimal rainfall in the hour
preceding that.
Case No: 256096 Determination Page 12 of 15
72. Given the totality of the evidence, the Panel finds that on the balance of
probabilities, the water which inundated the Applicants‟ prop erty came from
the Bremer River escaping its normal confines, either by backing up through
the drainage system or overland or both.
73. Although the timing of the inundation may not be strictly consistent with that
postulated by the hydrologist, the Panel notes it is not this evidence alone
that it has relied upon in reaching this conclusion. Instead, it relies on the
available witness evidence, the measurement of rainfall and river levels
proximate to the Applicants‟ property, the topography and the hydrologist‟s
comments consistent with the witness evidence (e.g. the accumulation of
floodwater backing up through the drains, discharging at M Parade and
continually backing up).
74. Further and in the alternative, even if the Panel was inclined to accept that
stormwater runoff initially inundated the property because it could not drain
into a watercourse as it was full of floodwater, case law has corroborated this
stormwater runoff would still be flood ( Hams v. CGU Insurance Ltd (2002 )
NSWSC). Accordingly, the elevated levels of the Bremer River on or about
6.30pm on 11 January 2011, and the lack of intense rainfall for a number of
hours, leaves this as the remaining plausible explanations for the inundation;
if it is hypothesised that it was not solely floodwaters from the Bremer River.
75. Accordingly, the Panel is satisfied the FSP was entitled to deny the
Applicants‟ claim.
FSP’s handling of the Claim
76. The Applicants set out a timeline of events regarding the claim lodgement
and the progress of their dispute to substantiate their concerns about the
FSP‟s handling of the claim. This is set out in their correspondence dated 30
January 2012.
77. The FSP responded to this in a letter dated 17 February 2012. In this letter,
the FSP acknowledged the accuracy of the timeframes leading up to the
Applicants‟ request for the dispute to be reviewed via the FSP‟s Internal
Dispute Resolution (IDR) process.
78. In this regard, the Panel notes that the claim was reported to the FSP on 11
January 2011 and the claim decision was not provided until 12 May 2011.
During this process, the Applicants stated the following:
9 Feb 2011 Copy of assessor‟s report was sent to the FSP
14 April 2011 Applicants contacted the assessor who advised they
were unable to assist as they were waiting for FSP.
27 April 2011 Applicants contacted the Insurance Council of Australia
(ICA) for assistance. Two hours later, the FSP called
them stating the claim was rejected and a letter
Case No: 256096 Determination Page 13 of 15
confirming this would be forthcoming.
12 May 2011 Letter rejecting the claim finally received by the
Applicants.
79. The FSP has provided no explanation regarding the delay between receiving
the assessor‟s report and verbally informing the Applicants that the claim
was denied. The Panel recognises the extreme weather events significantly
impa cted insurers‟ resources to deal with the large volume of claims.
Further, many insurers were awaiting completion of the ICA hydrology
reports before providing a claim decision.
80. However, these reports became substantively available in late February
2011. I n addition, as much as these events may have impacted the FSP‟s
resources, it has to be acknowledged and recognised that greater impact
was sustained by the Applicants given they are a small business and their
livelihood had been substantially compromised.
81. Given this, it is reasonable for the Applicants to have expected more regular
contact by the FSP. For whatever reason, this did not occur and the FSP has
not adequately explained why.
82. In respect of the conduct following the claim decision, the Panel notes the
following:
The Applicants‟ solicitors contacted the FSP on 14 June 2011 to initiate
the IDR process. The solicitors sent further information following this on
29 June 2011.
As a result of not hearing anything from the FSP, the Applicants
contacted the ICA again for assistance on 19 July 2011.
The FSP contacted the Applicants‟ solicitors on 21 July 2011 ; two days
after the Applicants contacted the ICA.
83. The FSP does not dispute it failed to make contact between 29 June 2011
and 21 July 2011. Further, the FSP does not dispute that it contacted the
Applicants shortly after the Applicants again contacted the ICA.
84. Given the lack of explanation behind this delay, the Panel considers the FSP
has not appropriately handled the Applicants‟ claim during this timef rame.
85. Following this, there was some regular communication between the parties.
For instance, the FSP sought further information from the Applicants on 29
July 2011 and the Applicants responded on 17 August 2011.
86. However, from 17 August 2011, it appeared the FSP did not make contact
with the Applicants until 14 September 2011. During this time, the Applicants
made contact with the FSP‟s representative on 5 September 2011 seeking
an update. The FSP‟s representative informed them that he had received
their documents and would review it. As the Applicants were dissatisfied with
this response, they contacted FOS for assistance.
Case No: 256096 Determination Page 14 of 15
87. The FSP has failed to adequately explain why its representative had
undertaken no action 19 days after receipt of the Applicants‟ info rmation.
88. Shortly after the Applicants‟ contact with FOS, another representative from
the FSP took responsibility for the IDR review and initiated a site specific
hydrology report on 21 September 2011. This report was not completed until
27 October 2011. Given the significant demand on hydrologists following the
extreme weather events, the Panel does not consider this timeframe is
unreasonable.
89. However, the FSP did not email the IDR decision until 24 November 2011,
almost a month after receipt of the report. Again, no explanation behind this
timeframe was provided.
90. Following this, the dispute progressed through FOS‟s process.
91. Under clause 9.3(b)(i) of FOS‟s Terms of Reference, the Panel is
empowered to award compensation up to $3,000 for non-financial loss but
only where:
“an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred;”
92. Given the analysis above, the Panel accepts there were numerous and
unexplained delays in the FSP‟s handling of the claim such that it constituted
an unusual degree and/or extent of physical inconvenience to the Applicants.
93. Further, given the already significant impact these events had on the
Applicants‟ live lihood, these delays would have substantially contributed to
this, such that the Panel considers it is appropriate that an award of $2,000
be allowed.
94. Accordingly, the Panel will exercise its discretion under clause 9.3(b)(i) of the
Terms of Reference to award compensation to the Applicants in the amount
of $2,000.
Determination
95. On the basis of the available information the Panel determines that:
The FSP is entitled to deny the Applicants‟ claim on the basis the
damage was due to “flood”.
The FSP is to pay $2,000 to the Applicants in compensation due to the
unusual extent of inconvenience suffered as a result of its handling of
the claim.
Case No: 256096 Determination Page 15 of 15
96. In the event the Applicants accept this Determination, the FSP is to pay the
relevant amount within 7 days of receiving notification of same.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.