Home / Financial Firm (Unknown - Insurer) / Determination 256079
Determination 256079
Flood claim declined under policy exclusion
Summary
The applicant's home claim for January 2011 Queensland flood damage was declined under the flood exclusion, and she sought full indemnity. AFCA found the PDS was dispatched in time, the exclusion was clear, and the damage was river flood, so the decline stands.
The insurer complied with sections 35 and 69 of the Insurance Contracts Act 1984 by providing the PDS within 14 days, and the loss was caused by excluded river flood.
Issues
- Claim denial primary · not upheld“the FSP is entitled to deny liability to pay the claim in accordance with the terms of the policy”
- Failure to disclose secondary · not upheld“the FSP has established compliance with section 35 of the Act”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 256079 Determination Page 1 of 11
Case number: 256079
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Sections 35 & 69 Insurance Contracts Act 1984.
14 March 2012
Background
1. The Applicant held a Home Cover (Building and Contents) Insurance policy
(the policy) with the Financial Services Provider (FSP).
2. The insured property suffered extensive damage arising from the significant
weather events experienced in Queensland (Qld) during January 2011.
3. The Applicant lodged a claim under the policy seeking indemnity for her loss.
The FSP proceeded to decline the claim on the basis the damage was due
to the event “Flood”, which is excluded from cover under the policy.
4. The Applicant remains dissatisfied with the FSP’s decision to decline the
claim and is seeking complete indemnity under the policy.
Summary of Applicant’s position
5. The Applicant in disputing the FSP’s decision to decline the claim has sought
the assistance of legal representatives “C”. In the interest of brevity and the
easy understanding of the parties, both the Applicant and C will be referred
to as “the Applicant” for the purpose of this determination.
6. The Applicant maintains that the FSP has failed to “Clearly Inform” her of the
flood exclusion within the policy in line with its obligations set out under
section 35 of the Insurance Contracts Act 1984 (the Act). She acknowledges
the FSP’s contention that it provided her with the Pro duct Disclosure
Statement (PDS) however, she does not recall ever receiving a PDS.
7. It was reasonably practical for the FSP to verbally inform the Applicant of the
flood exclusion included within the policy, prior to her taking out the policy.
8. Flood is not an uncommon event and is often one of the reasons people
obtain insurance cover. Pursuant to section 69(1) of the Act, the FSP was
required to orally inform the Applicant of the flood exclusion prior to the
inception of the policy, in addition to written notification of the exclusion.
Determination
Case No: 256079 Determination Page 2 of 11
9. The Applicant maintains that the PDS due to its inadequate drafting does not
clearly inform one of the exclusions contained within the policy pertaining to
flood. The combination of exclusions pertaining to flood in the Applicant’s
policy (i.e. river flood as well as flood exclusion contained within the flas h
flood definition), effectively retains the same artificiality of the flood definition
in the policy.
10. The Applicant maintains that the water responsible for the inundation of her
property occurred as a result of flash flooding. The Hydrologist “W”’s report
relied upon by the FSP, has not addressed the fact that the property was
inundated by flash flood as defined within the policy.
11. The Applicant has been a long term customer with the FSP, having held a
policy for her property in Toowoomba, which was then rolled over to the
property subject to this dispute. The Applicant moved to her current property
on 3 August 2010 after having informed the FSP of her intention to move
residence. However, she was not in receipt of the PDS at the old or new
address, even though she had left the Post Office in Toowoomba with her
forwarding address.
12. The insured property is situated on the banks of the Bremer River (the River)
and according to the Applicant she had every incentive to insure her most
valuable asset and place of residence. Had her attention been drawn to the
exclusion by the FSP, she would have arranged insurance cover elsewhere.
13. The FSP had a duty of utmost good faith to inform the Applicant of the
unsuitability of the cover selected.
14. The Hydrologist did not inspect the property until 27 June 2011, 23 weeks
after the date of loss. The Applicant maintains she is entitled to review the
complete hydrology report relied upon by the FSP.
15. The Applicant recalls it was raining heavily on 11 January 2011, which
caused a substantial amount of water to flow down the roadway towards the
River. The Applicant evacuated the property between 1.30 – 2.00pm on 11
January 2011, by this stage the River had risen, however, it would have had
to overcome a significant rise before it inundated the property.
16. The loss adjuster “C”’s report contains many errors, especially that the
assessment occurred before the actual date of loss. The report provides no
evidentiary value towards the assertion that the damage sustained to the
property w as due to “River Flood”, as defined within the policy and merely
provides the event as “Flood”.
17. The Applicant is seeking complete indemnity under the policy on the basis
that the FSP failed to provide her with the relevant policy wording, thereby
preventing it from relying upon the flood exclusion. Further, that the damage
to the insured property was due to flash flooding as opposed to the event of
river flood as claimed by the FSP.
Case No: 256079 Determination Page 3 of 11
Summary of FSP’s position
18. It is not practical and/or reasonable to expect the FSP to orally disclose the
flood exclusion to the Applicant prior to taking out the policy. The policy
needs to be read as a whole and it would be absurd for the FSP to outline
one or more exclusions prior to the Applicant reading and understanding the
“Insured events” and /or scope of the policy.
19. The definition of flood used in the policy is not materially different to the
definition used throughout the industry and is similar to definitions that have
been used in the Courts.
20. In respect to the Hydrology report addressing flash flood, the FSP maintains
the consultant was instructed to report on the origin(s) and cause(s) of the
inundation of the property. The report does not outline flash flood as a cause
because there was no flash flood at the property, rather the inundation was
due to river flooding.
21. The FSP maintains that the PDS was sent to the Applicant on 27 July 2010
when the policy was taken out over the telephone. It was not reasonably
practical to inform the Applicant of the policy exclusions at this time.
22. Section 69(2) of the Act permits the FSP to meet the requirements set out
under section 35 of the Act by providing the PDS within 14 days of the
contract being entered into by the parties.
23. The policy also has a 21 day cooling off period and if the Applicant felt that it
did not meet her requirements, she could have cancelled the policy with a
full refund of the premium.
24. The FSP maintains that the Applicant was provided with the PDS which
clearly outlines that cover for loss or damage arising from river flood is
excluded. The policy in plain English:
contains a table of contents on the inside cover of the document
outlining the important sections of the policy.
provides a summary on page 5 of “What you are covered for” and this
relevantly states as item “ 1 Damage caused by the seas or river flood
(see Section 1.12 )”.
page 1 requires the insured to read the PDS to “… understand the
features, benefits and risks of this insurance and to determine if it is
appropriate for you; it is important that you read all of the Product
Disclosure Statement… ”
25. The FSP’s investigation coupled with the hydrology evidence establishes on
the balance of probabilities, that inundation of the insured property was
caused by river flood.
26. Damage arising from river flood is specifically excluded from cover and
accordingly the FSP is not liable to make payments towards the loss under
the policy.
Case No: 256079 Determination Page 4 of 11
27. The FSP does not consider the duty of good faith extends to the FSP
investigating the propensity of the property to flood damage at inception of
the policy.
28. The FSP relies on the following policy provisions:
“ Definitions (The Meaning Of Some Words)
…
“flash flood” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home .
but does not include when rainwater on the site :
cannot run off into a water catchment system , because it is
overflowing in a flood; and
mixes with the flood water coming from the water catchment system
and then flows into your home .
…
“rain” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
…
“river flood” means when water that is normally contained in a water
catchment system increases because of rainfall or snow melt (whether in the
immediate region or elsewhere) or is deliberately released by an authority and
the water overflows onto land that is not normally covered by water into your
home.
For example water m ay be deliberately released by an authority from a dam
or reservoir .
…
“storm” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including cyclone, tornado or willy willy.
…
“water catchment system” means;
a river, creek, other natural watercourse or lake, whether they are in
their original state of have been modified, are named or unnamed, or
normally dry that only run during periods of rain;
a dam, reservoir, stormwater channel or canal.
…
INSURED EVENTS
CAUSING LOSS OR DAMAGE
…
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your building and/or your contents caused
by storm , rain , or flash flood .
Case No: 256079 Determination Page 5 of 11
…
We will not pay for damage caused by :
…
river flood ;”
Issues
29. Whether the Applicant was clearly informed as to the river flood exclusion
contained in the policy.
30. Whether damage to the Applicant’s property was caused by river flood water
as defined by the policy or stormwater run-off.
Relevant Law
31. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Section 69 provides that section 35 will be deemed to have been complied
with if it is not reasonably practicable to give the information in writing before
the contract is entered into but it is reasonably practical to give the
information orally. If the insurer gives the information orally, the insurer is
deemed to have complied with section 35 if the information is given in writing
within 14 days after the contract of insurance (including an interim contract)
has been entered into. Provided the oral information is confirmed in writing
within 14 days, compliance with section 35 will be established.
Reasons for decision
32. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
33. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Case No: 256079 Determination Page 6 of 11
34. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
35. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
36. The Panel notes the parties do not dispute the following:
The Applicant held an active home cover policy with the FSP at the
time of loss.
The policy provides cover for loss arising from specified insured events
and excludes cover for loss arising from river flood.
The FSP on lodgement of the claim appointed loss adjusters C and
hydrology consultant W to the claim.
The insured property (both building and contents) suffered damage on
or about 12 January 2011.
The Applicant evacuated the property on 11 January 2011 between
1.30-2.00pm, at which time the property had not yet been inundated.
The insured property is in very close proximity to the Bremer River
(approx 100m).
The policy provides indemnity for loss or damage arising from storm
and rainwater including flash flood, however, excludes from cover loss
or damage arising from the event “river flood”.
37. The Panel notes that the Applicant has raised multiple concerns in respect to
the FSP’s decision to decline the claim. In the interest of brevity and the
easy understanding of the parties, these matters will be considered
independently by the Panel under the below sub-headings.
Clearly Inform
Prior to the inception of the policy
38. The Applicant maintains that the FSP failed in its obligation to inform her of
the flood exclusion during the telephone conversation between the parties
(during which the policy was transferred from the old property to current
property) prior to the inception of the policy.
39. The FSP refutes the Applicant’s contention and maintains that in line with the
relevant section of the Act, it is entitled to provide the applicable policy
wording to an insured within 14 days of the policy inception. Further, that it is
both unreasonable and impractical to expect the FSP to orally inform the
Applicant of the policy exclusions over the telephone prior to inception of the
policy.
Case No: 256079 Determination Page 7 of 11
40. The Panel has considered the Applicant’s concerns in this respect, however,
it is satisfied the FSP’s position in this respect is accurate, as:
it is not a reasonably practical expectation for the FSP to have to orally
provide potential and/or existing policyholders with the policy
exclusions at or before the inception of the policy.
Section 69 of the Act does provide that in the instance it is not practical
for an insurer to give information orally at inception, it is deemed to
have complied with its obligations under section 35 of the Act, if it
provides such information in writing to the insured within 14 days of
inception of the policy.
41. Accordingly, the question before the Panel in respect of whether the FSP
had fulfilled its obligations under sections 35 and 69 of the Act, to provide the
Applicant with the relevant policy terms, is subject to whether the FSP
provided the Applicant with the PDS within 14 days of inception. This has
been considered under the below sub-heading.
Providing the PDS
42. The Applicant maintains that she does not recall having received the PDS
from the FSP. She maintains that she left the Toowoomba address on 3
August 2010 after having informed the FSP of her intention to move to the
property subject to this dispute. Further, she had also left her forwarding
address with the Post Office in Toowoomba, however, still does not recall
receiving the PDS at the new or old address.
43. The FSP maintains having made the requested amendments to the policy on
26 June 2010, it lodged the relevant policy documentation including the PDS
with Australia Post addressed to the Applicant (Toowoomba address) on 27
July 2010. Further, that in line with the evidence it has made available in
respect to “Proof of Dispatch” of these documents, the ordinary course of
post from a metropolitan area to a country area takes three days. On this
basis, the PDS would have reached the Applicant on 30 July 2010.
44. The Panel notes that there is no dispute and/or concerns raised in respect to
why the PDS and policy documents were sent to the Applicant’s previous
(Toowoomba) address and accordingly the Panel can only presume this was
in line with arrangements between the parties.
45. Further, the Panel also notes that the Applicant maintains she remained at
the Toowoomba address till 3 August 2010, in addition to leaving a
forwarding address with the Post Office.
46. Where a decision in relation to a dispute depends on the Service deciding
whether or not the FSP sent and the Applicant received, a specific document
(e.g. COI, PDS, SPDS, Renewal certificate etc), there are steps the FSP will
need to take to satisfy the Service about the dispatch and receipt of the
document.
Case No: 256079 Determination Page 8 of 11
47. The Panel has reviewed the evidence made available by the FSP in terms of
establ ishing “Proof of dispatch” of the PDS; a document which goes to the
heart of the FSP’s contention of its successfully informing the Applicant of
the flood exclusion. The Panel, having carefully reviewed the FSP’s
documentation in this regard is satisfied, on the balance of probabilities, the
FSP has established compliance with section 35 of the Act.
48. Accordingly, the Panel is satisfied that the Applicant, on the balance of
probabilities, would have received the PDS outlining the extent of cover
available to her.
Drafting of the policy
49. The Applicant, although, submitting that she does not recall having received
the PDS, has also alleged that due to the inadequate drafting of the PDS, it
does not clearly inform one of the exclusions contained within the policy
pertaining to flood.
50. The FSP refutes the above allegation and maintains that the wording in
respect to the definition and exclusion of flood cover used in the PDS is
similar to that which is widely used in the insurance industry and the Courts.
Further, that the policy clearly informs an insured of the scope of the policy
and the fact that loss or damage arising from flood is not covered.
51. The Panel notes that in arguing that she never received the PDS, an
inherent incongruity arises when the Applicant also seeks indemnity due to
alleged opaqueness of the PDS’s definitions – a document she claims not to
have received.
52. However, for the sake of completeness the Panel has considered the
wording of the policy relevant to this dispute. The policy covers loss from
rain, storm and flash flood but specifically excludes loss from river flood. The
Panel is satisfied the definitions and exclusions are clear and meet the
requirements to clearly inform, as per section 35 of the Act.
Cause of the Loss
53. The parties to the dispute differ in their opinion as to the proximate cause of
the loss subject to this dispute. The Applicant maintains that the water
inundation of the property was due to flash flooding as defined within the
policy. Whilst it is the FSP’s contention that the loss/damage claimed by the
Applicant is due to river flood as defined within the policy and accordingly is
specifically excluded from cover.
54. In maintaining its position that the cause for the loss is river flood, an event
excluded from cover, the FSP relies upon the ICA hydrology report and a
hydrology report commissioned by the FSP and submitted by W. The
relevant information provided in these reports has been summarised below.
55. ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA” provides:
Case No: 256079 Determination Page 9 of 11
There were four distinct rainfall periods across Ipswich City LGA during
the period from 9 January to 13 January (p1) . These occurred at:
– around 1000 hours and 1200 hours on 9 January
– around 1500 hours to 2100 hours on 9 January
– around 0700 to 1100 hours on 10 January
– around 0600 hours to 1500 hours on 11 January.
Over the 5 days from 9-13 January moderate to heavy rains fell over
Ipswich City LGA (7.2.2).
Rainfall in the 24 hours to 0900 on 9 January was not significant (less
than 25mm).
Over the next 24 hours to 0900 on 10 January was moderate (40 -
80mm).
Rainfall in the 24 hours to 0900 on 11 January was significant (25-
200mm) Rainfall was heaviest in the north-western area of the LGA.
Large releases were made from Wivenhoe Dam over the period from
0600 hours and possibly as early as 0300 hours on 11 January until
around 0300 hours on 12 January 2011. (9.3)
It was concluded that the dam release flood was the immediate cause
of flooding along the reach of the Brisbane River downstream of the
dam, and along tributaries through the Ipswich City LGA. (9.3)
At about 0900 hours on 11 January water levels at One Mile Bridge
Alert and Ipswich Alert begin to rise rapidly due to Brisbane River water
flowing back up along the Bremer River. The peak water level at these
stations occurred on 12 January 2011 and was caused by backwater
from the Brisbane River and Bremer River flood attempting to flow
downstream.
Uncertainties exist as to whether properties flooded by water flows
also suffered initial inundation from overland flow flooding. Initial
inundation from overland flow may have occurred, especially in
properties further away from waterways.
56. The site specific report submitted by the project engineer “ RA ” on behalf of
W and titled “Water Damage Assessment” provides :
The date of inspection was 27 June 2011.
The exact time of inundation is unknown as the Applicant evacuated
the property between 1.30-2.00pm on 11 January 2011.
The property has a floor level of 0.7m above ground level.
Rainfall totals for 24hr to 9.00am, of 10 January was 56mm, of 11
January was 20mm and of 12 January 2011 was 47mm; these were
recorded at the Bundamba (Hanlon Street) Alert rainfall station, located
1.6km north east of the property.
Case No: 256079 Determination Page 10 of 11
On 11 January 2011, 42mm of rainfall recorded between 1100hrs and
1500hrs, with peak one hour intensity rainfall of 16.3mm/hr occurred at
approximately 1300hrs.
Recorded rainfall intensities were not particularly severe for short
durations, with higher rainfall intensities being regularly experienced in
the area.
The maximum stormwater run-off depths would have been experienced
within 30 minutes of peak rainfall intensity.
No significant rainfall recorded at Bundamba station after about
1700hrs on 11 January 2011.
The property is located about 100m from the River to the north.
Rainfall in the area ceased more than 12hrs prior to the initial
inundation of the subject property.
Based on the maximum depth of inundation above floor level of 1.4m,
the estimated floor level of the house relative to the gauge datum is
18.0m.
Concludes that the property was inundated above floor level by
floodwaters overflowing from the Bremer River.
57. In a further email responding to a request for further clarification of the above
summarised report, “DN” (Principle Engineer at W) states that “ There is no
possibility that storm water would have reached the floor level of the property
which is elevated about 0.7m above ground level. ”
58. The Panel has also considered the loss adjuster’s report, however,
acknowledges the Applicant’s position that it contains numerous
inaccuracies.
59. In the absence of any evidence to the contrary, the Panel is not satisfied that
the Applicant has been successful in establishing that the water damage to
her property was the result of stormwater (flash flood) inundation on 12
January 2011. Inundation due to flash flood/stormwater run-off occurs within
a short period of time of the peak rainfall intensity experienced in the area.
However, on this occasion the inundation of the property did not occur until
approximately 12 hours after such peak intensity rainfall negating the
possibility of the inundation arising from flash flood.
60. Further, the evidence establishes that the amount of local rainfall in the area
of itself was not sufficient to result in the inundation of the insured property
which sits at 0.7m above ground level. The available evidence establishes
that, on the balance of probabilities, the insured property was inundated by
water escaping the normal confines of the River on 12 January 2011. This
occurred due to the large releases of water from the Wivenhoe Dam making
its way down the Brisbane River and backflowing up the River and its
tributaries resulting in the rise in the level of the River (as noted by the
Applicant) and subsequent inundation of properties in the area.
Case No: 256079 Determination Page 11 of 11
61. The policy does not cover loss or damage caused by river flood. It follows
that the Applicant’s claim does not succeed on the basis of the Applicant’s
contention that the damage was the result of flash flood.
Breach of utmost good faith
62. The Applicant has claimed that the FSP in failing to inform her of the
unsuitability of her cover, has failed in its duty of utmost good faith and
accordingly it should be obliged to cover/contribute towards her loss.
63. The Panel has also considered the Applic ant’s utmost good faith argument in
relation to the FSP’s alleged failure to draw her attention to the policy
limitations and the fact that the policy did not suit her needs, especially when
noting its close proximity to the River. The Applicant argues that being a long
standing client of the FSP it would be good insurance practice for the FSP to
have notified her of the additional cover needed.
64. Whilst the Panel can understand the Applicant’s concern with respect to this,
it is well established law that the onus is on the Applicant to identify the
cover sought and to identify to an FSP the type of cover requested. In these
circumstances, the Panel is satisfied there has been no breach of the duty of
utmost good faith on behalf of the FSP.
Determination
65. On the basis of the available information, the Panel determines that the FSP
is entitled to deny liability to pay the claim in accordance with the terms of
the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.