Applicants' Paddington home and contents were inundated during the January 2011 Queensland floods and the FSP declined the claim as flood. AFCA found the inundation up to 0.9m above benchmark was covered flash flood, so the FSP must pay repair and replacement costs to that level with interest, while the higher inundation remains excluded.

Cover applies only to flash flood caused by rain falling within 24 hours before inundation, so inundation beyond that window is excluded as flood.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 255923 Determination Page 1 of 12 Case number: 255923 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Water Inundation - Flood 12 September 2012 Background 1. The Applicants insured their home and contents with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 26 July 2010. The policy had been in place for more than ten years. During the relevant period, the building was insured to a sum of $260,000 and the contents for $121,000. 2. On or about 11 January 2011, the Applicants sustained damage to their home in Paddington as a result of extensive water inundation following severe weather events in Queensland. A claim was lodged in the subsequent days. Summary of Applicants’ position 3. The Applicants submit the following as alternative arguments in response to the FSP’s decision:  The FSP had previously covered a claim for water inundation in November 2008 and this led them to believe that they would be covered in these circumstances, which were similar. The FSP misrepresented the policy in failing to honour this claim.  The FSP’s Product Disclosure Statement (PDS) failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act).  The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4.00am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated the Applicants’ property. Summary of FSP’s position 4. In response to the Applicants’ arguments, the FSP submits the following: Determination Case No: 255923 Determination Page 2 of 12  The acceptance of the previous claim is by no means a representation that any water inundation would be or should be accepted under the policy. Each claim is treated under its own merits and the current claim was not covered as the cause was determined to be “flooding”, which is excluded from cover.  It is not in dispute that a copy of the PDS was sent to the Applicants prior to the claim. The policy structure and layout of this document serves to “clearly inform” them of the limitations of the cover and enables the FSP to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. 5. The FSP relies on a number hydrology reports authored by SC and the following policy provisions to de ny the Applicants’ claim: Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Case No: 255923 Determination Page 3 of 12 Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind Case No: 255923 Determination Page 4 of 12 What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the pr operty address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool or spa covers or lin ers and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas... ...” Issues 6. Whether the FSP misrepresented the level of cover under the policy by failing to honour the claim as it had done in 2008. 7. Whether the Applicants were “clearly informed” about what the policy did and did not cover. 8. Whether the cause of the Applicants’ loss was covered under the policy. Reasons for decision 9. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 10. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 11. It is appropriate to consider the issues under the various headings. Case No: 255923 Determination Page 5 of 12 Consideration of ‘flood’ definition in PDS 12. The Applicants do not dispute that they received copies of the PDS from the FSP during the period of insurance, nor do they allege that they were not in possession of the current policy at the time of the loss. The Panel is therefore satisfied that this document may be relied upon. 13. It is also not in dispute that the Applicants received an annual COI from the FSP, including at the renewal immediately prior to the loss. 14. The Applicants contend that the definition of flood is too broad, too difficult to comprehend and that the FSP has not met its obligations under Section 35 of the Act to “clearly inform” them of what is and is not covered under the policy. 15. The PDS has an index on the inside cover which highlights the areas of the policy to which the policyholder might find information. Included in this is “Words/terms with special meanings” on page 10, for which definitions of relevant terms in the policy are provided. Flood is included in this, together with the qualification that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 16. In addition to this, page 53 directs the reader to “Flood and storm surge”, which is explained under the broader definition of “Optional covers for extra peace of mind”. This section explains that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance.” 17. The Certificate of Insurance (COI) notes that flood and storm surge is not included in the cover offered to the Applicant. 18. There is no suggestion that the Applicant had sought flood and storm surge cover. 19. A fair reading of Section 35(2) of the Act requires the relevant exclusion and limitations to be in clear and unambiguous language and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. The Panel having considered the policy and noting the indexation of the policy and cross referencing in the policy is satisfied that on reading the policy, the reader would be informed that coverage for flood is excluded and that there is a limitation on the extent of cover for flash flood. The Panel is satisfied that by providing the policy to the Applicant, the FSP has in this case met its obligation to clearly inform in accordance with Section 35 of the Act. Case No: 255923 Determination Page 6 of 12 Misrepresentation of cover 20. The Applicants suggest that the FSP misrepresented the level of cover provided under the policy, by virtue of a payment of a similar claim for water inundation in November 2008. 21. No details of the other claim were provided. Notwithstanding this, the Panel is satisfied that a payout of one claim for water inundation does not in any way imply that a subsequent claim must be honoured, noting the flood exclusion in the policy. 22. The Panel is satisfied that each claim must be considered on its merits and that this should be the case in this instance. Water inundation The evidence 23. The Panel accepts that the FSP’s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It extends cover to damage from sudden flood events “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. 24. The Applicants noted that water entered the property at about 10 .00pm on 11 January 2011. The home was situated about one kilometre from the Brisbane River. 25. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicants’ property. The report estimated that there was about $150,000 worth of building damage and $30,000 of contents damage. Amongst the factual information, MY suggested that water first entered the property in the afternoon of 12 January 2011. This is at odds with the Applicants’ recollections. 26. MY considered that the cause of the loss was the “overflow of external drains” and that this related to “rainwater”. She noted that the property would need a hydrologist’s report “before liability can be considered”. 27. The Applicants claim that MY said that she was “80% sure” that they would be covered. Whether this was done or not (it is not refuted by MY), the Panel is satisfied that the Applicants were not prejudiced by the alleged representation as they took no action to their detriment as a result. 28. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the damage. 29. SC provided a statutory declaration dated 6 October 2011 to evaluate the cause of the loss in the region surrounding and specifically affecting the Applicants’ home. He found that: Case No: 255923 Determination Page 7 of 12  a substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days, which caused significant inflows into the Wivenhoe Dam, which peaked on the evening of 11 January 2011;  rain also fell in the area of the Bremer River from 6.00am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed about 15-25% of its peak flow;  a “small proportion” of the overall depth of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days.  the terrain data for the Applicants’ home suggested that it was unlikely that the Applicants would have experienced significant stormwater or run- off problems during the period;  inundation from stormwater run- off requires “intense levels of rain” which is sufficient to overcome the stormwater drainage system. Any such run- off generally occurs during or very shortly after such an intense period of rainfall;  a review of the rainwater gauge at Toowong, approximately 2.9km from the Applicants’ property and representative of its rainfall in the expert’s opinion, revealed that 122mm of rain fell over 9 and 10 January 2011, with a further 74mm falling on 11 January 2011. The most intense rainfall on 11 January 2011 fell between 10.00am and 11.00am;  the overall intensity of the rainfall was low and unlikely to result in run-off or stormwater inundation to the property;  the water levels of the Brisbane River were not of a sufficient height to rise and inundate the local streets, however it was sufficient to infiltrate the stormwater drainage system and this led to water exiting the drains and entering some homes, including the Applicants’ home;  the Applicants’ property was inundat ed by backflow from the Brisbane River and not stormwater run-off or flash flooding (as defined in the policy). 30. The central issue for Determination in this dispute is whether the inundation of the Applicants’ home on 11 January 2011 was due to flash flood as defined within the terms of the policy, that is whether rain that fell no more than 24 hours prior to the inundation of the Applicants’ property was the proximate cause of the inundation. 31. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between Case No: 255923 Determination Page 8 of 12 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 32. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 33. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute, including general submissions in a reference document, which is broadly applicable to all its matters and additional hydrological evidence and submissions in relation to the classification of this event. 34. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 35. The FSP’s hydrologist has referred to data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8 .00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 36. The Queensland Flood Commission of Inquiry report confirms that prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 37. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 38. There is no dispute that following the second spike the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel’s view, the Queensland Flood Commission of In quiry final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 Case No: 255923 Determination Page 9 of 12 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 39. The ICA hydrology and the information provided by the FSP’s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 40. The Panel agrees wit h the FSP’s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 41. The Panel accepts there had been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier. However, having regard to the information that has been exchanged and the relevant legal principles, the Panel is satisfied that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 release strategy. The W4 release developed a flood wave which combined with the heavy rainfall over the Brisbane River commencing about 4.00am on 11 January 2011 and the heavy rain over the Brisbane River commencing around 6.00am that same day caused the inundation of the Applicants’ property. In other words, the Panel is satisfied that the proximate cause of the inundation of the Applicants’ property was th e rain that commenced falling at approximately 4.00am on 11 January 2011. The inundation of the Applicants’ property 42. Both the Applicants and the FSP have provided contemporaneous photographs from the area surrounding the Applicants’ property in an attempt to explain the time of inundation. 43. The FSP’s photographs are taken from a social networking internet site for a neighbouring property, which were allegedly taken at 8 .00am and 10.00am on 12 January 2011. Both photos show clear views of the front of the Ap plicants’ property and appear to indicate that it had not been inundated at those respective times. 44. The Applicants also supplied photographs of a local park and the streets near their home to attest to the presence of stormwater run-off prior to inundation from river water. These photos, allegedly taken between 3.40pm and 3.50pm on 11 January 2011 do not attest to any actual inundation of the subject home. Case No: 255923 Determination Page 10 of 12 45. Statutory declarations were signed by each of the Applicants to attest to the presence of water that w as “knee deep” in the downstairs part of the home at 10.00pm on 11 January 2011. This was when the Applicants left. 46. SC’s statement in the further submissions from the FSP, specifically his Key Conclusions Attachment accompanying his 7 J une 2012 site specific report indicates the effect of the W4 releases first reached the vicinity of the Applicants ’ property at 3.14pm on 11 January 2011. This is much earlier than he first predicted (being no earlier than 11.30pm that night). The approximate peak contribution of the W4 releases prior to 4.00am on Wednesday 12 January 2011 was approximately 0.9m above the relevant benchmark level. 47. The Panel notes that the ultimate inundation of the property was 2.6m above the benchmark level. SC identified this peak inundation occurred at approximately 2.57am on 13 January 2011. 48. Although the Panel accepts the assessme nts may not be entirely accurate as to timing or level of inundation, the information provided by SC in the key conclusion statement is largely consistent with the information provided by the Applicants. SC has based his further measurements in a more detailed study and in the circumstances the Panel accepts the assessment of SC as provided in the key conclusion statement as the most reliable assessment as to the timing of the inundation of the Applicants’ property. 49. The Panel is satisfied that the inundatio n of the Applicants’ property as at 4.00am on 12 January 2011 was approximately 0.9m above the relevant benchmark level and was caused by the heavy rainfall that had commenced within 24 hours of that time that is from 4.00am 11 January 2011 and is therefore covered under the flash flood provisions of the policy. 50. Any inundation of the Applicants’ property after 4.00am on 12 January 2011 falls outside the terms of the policy as it is inundation outside of the relevant 24 hour period and is therefore excluded as flood. 51. The Panel notes from the FSP’s assessor’s report that at the time of inundation the water was contaminated by sewerage. It is likely in these circumstances that any items contacted by the water would have been lost. This is particularly so with respect to the contents that were damaged. 52. The Panel further notes that the Applicants’ property was ultimately inundated to a level of 2.6m above the benchmark level. 53. Insofar as liability under the policy extends, the Panel accepts that the FSP would only be liable for that damage that was sustained as a result of the inundation up to the level of 0.9m above the relevant benchmark. Any inundation and damage caused beyond that level would be excluded under the policy provisions. 54. The Panel further notes that the property is described as being built on a slab and stumps. The ground level of the property varies from 3.4m AHD to Case No: 255923 Determination Page 11 of 12 6.3m AHD. The key conclusion statement identifies the benchmark level of the property at 3.4m AHD. According to the hydrology, water e xceeded this level that the level of 3.4m AHD by 0.9m by 4.00am on 12 January 2011. That is the water would have reached a height of 4.3m AHD which is substantially lower than the upper levels of the property. 55. The Panel is satisfied however that inundation to a level of 0.9m above benchmark is likely to cause total loss of contents stored on the lower level of the Applicants’ property and insofar as the building is concerned, is likely to cause the majority of damage to the building at the lower level. Quantum 56. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $260,000 for the home with contents of $121,000. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of up to $130,000 for the damage to the building and up to $60,500 for the contents. 57. The Panel has not been provided a breakdown as to the loss sustained by the Applicants or a statement of works. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the loss sustained or a breakdown of those costs. 58. In the circumstances, the parties are asked to work cooperatively together to establish the extent of the loss sustained to the downstairs level (as described in the Applicants’ statutory declarations of 14 and 15 December 2011) and to reach agreement as to the cost of repairs and replacements of the various contents lost consistent with the limitations provided under the terms of the policies. 59. In the events that the parties are unable to reach agreement within 30 days of acceptance of this determination, then the parties may make further submissions to FOS as to the quantum in dispute and the matter will be determined by the Panel. 60. Insofar as the FSP made a payment of $12,500 from its compassionate fund to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms under which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Determination 61. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of approximately 0.9m inundation above the relevant benchmark level of the property. Any payment is subject to the limitations of the policy as expressed in this Determination. Case No: 255923 Determination Page 12 of 12 62. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 14 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.