Text of the determination
Case No: 255923 Determination Page 1 of 12
Case number: 255923
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Water Inundation - Flood
12 September 2012
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 26 July 2010. The policy had been in place for more than ten
years. During the relevant period, the building was insured to a sum of
$260,000 and the contents for $121,000.
2. On or about 11 January 2011, the Applicants sustained damage to their
home in Paddington as a result of extensive water inundation following
severe weather events in Queensland. A claim was lodged in the
subsequent days.
Summary of Applicants’ position
3. The Applicants submit the following as alternative arguments in response to
the FSP’s decision:
The FSP had previously covered a claim for water inundation in
November 2008 and this led them to believe that they would be
covered in these circumstances, which were similar. The FSP
misrepresented the policy in failing to honour this claim.
The FSP’s Product Disclosure Statement (PDS) failed to clearly inform
them that “flood” was excluded as required under Section 35 of the
Insurance Contracts Act 1984 (the Act).
The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
resulted in massive discharges of water into the Brisbane River that
ultimately inundated the Applicants’ property.
Summary of FSP’s position
4. In response to the Applicants’ arguments, the FSP submits the following:
Determination
Case No: 255923 Determination Page 2 of 12
The acceptance of the previous claim is by no means a representation
that any water inundation would be or should be accepted under the
policy. Each claim is treated under its own merits and the current claim
was not covered as the cause was determined to be “flooding”, which is
excluded from cover.
It is not in dispute that a copy of the PDS was sent to the Applicants
prior to the claim. The policy structure and layout of this document
serves to “clearly inform” them of the limitations of the cover and
enables the FSP to rely on the exclusion clause of “flood” pursuant to
Section 35(2) of the Act.
5. The FSP relies on a number hydrology reports authored by SC and the
following policy provisions to de ny the Applicants’ claim:
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Case No: 255923 Determination Page 3 of 12
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
Case No: 255923 Determination Page 4 of 12
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the pr operty
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or lin ers
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas...
...”
Issues
6. Whether the FSP misrepresented the level of cover under the policy by
failing to honour the claim as it had done in 2008.
7. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
8. Whether the cause of the Applicants’ loss was covered under the policy.
Reasons for decision
9. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
11. It is appropriate to consider the issues under the various headings.
Case No: 255923 Determination Page 5 of 12
Consideration of ‘flood’ definition in PDS
12. The Applicants do not dispute that they received copies of the PDS from the
FSP during the period of insurance, nor do they allege that they were not in
possession of the current policy at the time of the loss. The Panel is
therefore satisfied that this document may be relied upon.
13. It is also not in dispute that the Applicants received an annual COI from the
FSP, including at the renewal immediately prior to the loss.
14. The Applicants contend that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under Section 35
of the Act to “clearly inform” them of what is and is not covered under the
policy.
15. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 10, for which definitions of
relevant terms in the policy are provided. Flood is included in this, together
with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
16. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance.”
17. The Certificate of Insurance (COI) notes that flood and storm surge is not
included in the cover offered to the Applicant.
18. There is no suggestion that the Applicant had sought flood and storm surge
cover.
19. A fair reading of Section 35(2) of the Act requires the relevant exclusion and
limitations to be in clear and unambiguous language and in a manner which
a person of average intelligence and education is likely to have little difficulty
in finding and understanding if that person reads the policy in question. The
Panel having considered the policy and noting the indexation of the policy
and cross referencing in the policy is satisfied that on reading the policy, the
reader would be informed that coverage for flood is excluded and that there
is a limitation on the extent of cover for flash flood. The Panel is satisfied that
by providing the policy to the Applicant, the FSP has in this case met its
obligation to clearly inform in accordance with Section 35 of the Act.
Case No: 255923 Determination Page 6 of 12
Misrepresentation of cover
20. The Applicants suggest that the FSP misrepresented the level of cover
provided under the policy, by virtue of a payment of a similar claim for water
inundation in November 2008.
21. No details of the other claim were provided. Notwithstanding this, the Panel
is satisfied that a payout of one claim for water inundation does not in any
way imply that a subsequent claim must be honoured, noting the flood
exclusion in the policy.
22. The Panel is satisfied that each claim must be considered on its merits and
that this should be the case in this instance.
Water inundation
The evidence
23. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
24. The Applicants noted that water entered the property at about 10 .00pm on
11 January 2011. The home was situated about one kilometre from the
Brisbane River.
25. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicants’ property.
The report estimated that there was about $150,000 worth of building
damage and $30,000 of contents damage. Amongst the factual information,
MY suggested that water first entered the property in the afternoon of 12
January 2011. This is at odds with the Applicants’ recollections.
26. MY considered that the cause of the loss was the “overflow of external
drains” and that this related to “rainwater”. She noted that the property would
need a hydrologist’s report “before liability can be considered”.
27. The Applicants claim that MY said that she was “80% sure” that they would
be covered. Whether this was done or not (it is not refuted by MY), the Panel
is satisfied that the Applicants were not prejudiced by the alleged
representation as they took no action to their detriment as a result.
28. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the damage.
29. SC provided a statutory declaration dated 6 October 2011 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicants’ home. He found that:
Case No: 255923 Determination Page 7 of 12
a substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011;
rain also fell in the area of the Bremer River from 6.00am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow;
a “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment on
11 January 2011”, although the “overwhelming influence” was the rain
that had fallen in the previous days.
the terrain data for the Applicants’ home suggested that it was unlikely
that the Applicants would have experienced significant stormwater or run-
off problems during the period;
inundation from stormwater run- off requires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall;
a review of the rainwater gauge at Toowong, approximately 2.9km from
the Applicants’ property and representative of its rainfall in the expert’s
opinion, revealed that 122mm of rain fell over 9 and 10 January 2011,
with a further 74mm falling on 11 January 2011. The most intense rainfall
on 11 January 2011 fell between 10.00am and 11.00am;
the overall intensity of the rainfall was low and unlikely to result in run-off
or stormwater inundation to the property;
the water levels of the Brisbane River were not of a sufficient height to
rise and inundate the local streets, however it was sufficient to infiltrate
the stormwater drainage system and this led to water exiting the drains
and entering some homes, including the Applicants’ home;
the Applicants’ property was inundat ed by backflow from the Brisbane
River and not stormwater run-off or flash flooding (as defined in the
policy).
30. The central issue for Determination in this dispute is whether the inundation
of the Applicants’ home on 11 January 2011 was due to flash flood as
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inundation of the Applicants’ property was the
proximate cause of the inundation.
31. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
Case No: 255923 Determination Page 8 of 12
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
32. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
33. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute, including general submissions in a reference
document, which is broadly applicable to all its matters and additional
hydrological evidence and submissions in relation to the classification of this
event.
34. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
35. The FSP’s hydrologist has referred to data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8 .00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
36. The Queensland Flood Commission of Inquiry report confirms that prior to
8.00am of 11 January 2011 the dam releases were being managed at the
W3 strategy. Whilst it is accepted that the W3 strategy had led to an
increase in the levels of the Brisbane River, the W3 strategy was designed to
avoid where possible inundation of the properties below the Wivenhoe Dam
by flooding from the Brisbane River.
37. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
38. There is no dispute that following the second spike the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel’s view, the Queensland Flood Commission of In quiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
Case No: 255923 Determination Page 9 of 12
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
39. The ICA hydrology and the information provided by the FSP’s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
40. The Panel agrees wit h the FSP’s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
41. The Panel accepts there had been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier. However, having regard to the information that has been
exchanged and the relevant legal principles, the Panel is satisfied that the
heavy rain that commenced falling on or about 4.00am on 11 January 2011
was a proximate or effective cause of the adoption of the W4 release
strategy. The W4 release developed a flood wave which combined with the
heavy rainfall over the Brisbane River commencing about 4.00am on 11
January 2011 and the heavy rain over the Brisbane River commencing
around 6.00am that same day caused the inundation of the Applicants’
property. In other words, the Panel is satisfied that the proximate cause of
the inundation of the Applicants’ property was th e rain that commenced
falling at approximately 4.00am on 11 January 2011.
The inundation of the Applicants’ property
42. Both the Applicants and the FSP have provided contemporaneous
photographs from the area surrounding the Applicants’ property in an
attempt to explain the time of inundation.
43. The FSP’s photographs are taken from a social networking internet site for a
neighbouring property, which were allegedly taken at 8 .00am and 10.00am
on 12 January 2011. Both photos show clear views of the front of the
Ap plicants’ property and appear to indicate that it had not been inundated at
those respective times.
44. The Applicants also supplied photographs of a local park and the streets
near their home to attest to the presence of stormwater run-off prior to
inundation from river water. These photos, allegedly taken between 3.40pm
and 3.50pm on 11 January 2011 do not attest to any actual inundation of the
subject home.
Case No: 255923 Determination Page 10 of 12
45. Statutory declarations were signed by each of the Applicants to attest to the
presence of water that w as “knee deep” in the downstairs part of the home at
10.00pm on 11 January 2011. This was when the Applicants left.
46. SC’s statement in the further submissions from the FSP, specifically his Key
Conclusions Attachment accompanying his 7 J une 2012 site specific report
indicates the effect of the W4 releases first reached the vicinity of the
Applicants ’ property at 3.14pm on 11 January 2011. This is much earlier
than he first predicted (being no earlier than 11.30pm that night). The
approximate peak contribution of the W4 releases prior to 4.00am on
Wednesday 12 January 2011 was approximately 0.9m above the relevant
benchmark level.
47. The Panel notes that the ultimate inundation of the property was 2.6m above
the benchmark level. SC identified this peak inundation occurred at
approximately 2.57am on 13 January 2011.
48. Although the Panel accepts the assessme nts may not be entirely accurate
as to timing or level of inundation, the information provided by SC in the key
conclusion statement is largely consistent with the information provided by
the Applicants. SC has based his further measurements in a more detailed
study and in the circumstances the Panel accepts the assessment of SC as
provided in the key conclusion statement as the most reliable assessment as
to the timing of the inundation of the Applicants’ property.
49. The Panel is satisfied that the inundatio n of the Applicants’ property as at
4.00am on 12 January 2011 was approximately 0.9m above the relevant
benchmark level and was caused by the heavy rainfall that had commenced
within 24 hours of that time that is from 4.00am 11 January 2011 and is
therefore covered under the flash flood provisions of the policy.
50. Any inundation of the Applicants’ property after 4.00am on 12 January 2011
falls outside the terms of the policy as it is inundation outside of the relevant
24 hour period and is therefore excluded as flood.
51. The Panel notes from the FSP’s assessor’s report that at the time of
inundation the water was contaminated by sewerage. It is likely in these
circumstances that any items contacted by the water would have been lost.
This is particularly so with respect to the contents that were damaged.
52. The Panel further notes that the Applicants’ property was ultimately
inundated to a level of 2.6m above the benchmark level.
53. Insofar as liability under the policy extends, the Panel accepts that the FSP
would only be liable for that damage that was sustained as a result of the
inundation up to the level of 0.9m above the relevant benchmark. Any
inundation and damage caused beyond that level would be excluded under
the policy provisions.
54. The Panel further notes that the property is described as being built on a
slab and stumps. The ground level of the property varies from 3.4m AHD to
Case No: 255923 Determination Page 11 of 12
6.3m AHD. The key conclusion statement identifies the benchmark level of
the property at 3.4m AHD. According to the hydrology, water e xceeded this
level that the level of 3.4m AHD by 0.9m by 4.00am on 12 January 2011.
That is the water would have reached a height of 4.3m AHD which is
substantially lower than the upper levels of the property.
55. The Panel is satisfied however that inundation to a level of 0.9m above
benchmark is likely to cause total loss of contents stored on the lower level
of the Applicants’ property and insofar as the building is concerned, is likely
to cause the majority of damage to the building at the lower level.
Quantum
56. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $260,000 for the home with contents of $121,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of up to $130,000 for the damage to the
building and up to $60,500 for the contents.
57. The Panel has not been provided a breakdown as to the loss sustained by
the Applicants or a statement of works. Given the time since the loss was
sustained, the Panel accepts that the parties may be unable to provide an
exact estimate of the loss sustained or a breakdown of those costs.
58. In the circumstances, the parties are asked to work cooperatively together to
establish the extent of the loss sustained to the downstairs level (as
described in the Applicants’ statutory declarations of 14 and 15 December
2011) and to reach agreement as to the cost of repairs and replacements of
the various contents lost consistent with the limitations provided under the
terms of the policies.
59. In the events that the parties are unable to reach agreement within 30 days
of acceptance of this determination, then the parties may make further
submissions to FOS as to the quantum in dispute and the matter will be
determined by the Panel.
60. Insofar as the FSP made a payment of $12,500 from its compassionate fund
to the Applicants, FOS does not have jurisdiction to deal with this payment
but acknowledges that the FSP, given the terms under which the
compassionate payment was made, may be entitled to deduct this payment
from any settlement sum.
Determination
61. The FSP is to meet the cost of repairs incurred by the Applicants and the
cost of the replacement of items damaged as a result of approximately 0.9m
inundation above the relevant benchmark level of the property. Any payment
is subject to the limitations of the policy as expressed in this Determination.
Case No: 255923 Determination Page 12 of 12
62. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
14 March 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.