Home / Financial Firm (Unknown - Insurer) / Determination 255816
Determination 255816
Settlement amount for water-damaged boat and engines
Summary
Individual boat owners claimed about $39,226 after a 2011 swamping and theft of stern legs. The FSP offered $24,804.64 cash settlement. AFCA required payment of $35,688 plus $500 compensation for distress caused by the FSP's delays, rejecting mooring fees and reducing some depreciation.
The FSP's engine quote was shown to be bare of accessories, and the policy and evidence did not support its depreciation and exclusions for most items, although mooring fees were not covered.
Issues
- Claim amount dispute primary · upheld
“I am not satisfied that the settlement offered by the FSP is fair for the reasons explained in the following paragraphs”
- Delay secondary · upheld
“the FSP has caused various delays in forwarding its submissions to the Service and as a result has delayed the finalisation of this dispute”
Subjects and remedies
pay claimpay non financial loss
Text of the determination
Case No: 255816 Determination Page 1 of 9
Case number: 255816
General Insurance - Domestic Insurance - Personal and Domestic Property -
Pleasure Craft - FSP Decision - Claim Amount
24 October 2012
Background
1. The Applicants held a boat insurance policy with the Financial Services
Provider (FSP) from 22 December 2008 and the policy was current at the
time of the loss.
2. The Applicants lodged a claim with the FSP for damage sustained to a 1992
fibre glass 30 feet bay liner with two motors, when it became tangled in its
moorings and was subsequently swamped, causing damage to the interior of
the boat and engine on 20 April 2011.
3. On 2 May 2011, the Applicants informed the FSP that the boat‟s stern legs
had been stolen whilst the boat was on the hardstand.
4. The vessel hull was insured for $35,000 and the motors for a combined sum
insured of $30,000 with a basic excess of $400 for each claim.
5. The FSP accepted the Applicants ‟ claims and it offered cash settlement of
$24,804.64.
6. The Applicants expect $39,226.50 as the final settlement.
Summary of Applicants ’ position
7. The FSP‟s surveyor N‟s fourth report dated 3 January 2012 refers to a quote
for replacement engines prepared by the Applicants ‟ repairer HM as follows:
“ HM has supplied a further quotation for the sum of $13,870.00 for the bare
engines and installation”
8. This report confirms that the engines were quoted as „bare‟ and did not
include the other parts and accessories which were part of the engine.
9. They disagree with N applying 80% depreciation on the claim for electrical
parts.
Determination
Case No: 255816 Determination Page 2 of 9
10. The Applicants expect the FSP to repair the boat to the same condition,
standard and specification as it was before the accident.
11. He says that both engines were rebuilt and the boat was always maintained
to its original condition.
Summary of FSP’s position
12. The FSP relies on N‟s assessment and says that the application of 80%
depreciation on electrical parts is fair as the vessel and the damaged parts
were 19 years old.
13. The vessel still had the original parts in it and therefore it was appropriate to
apply 4% depreciation per annum for the electrical parts.
14. The replacement cost of the engines includes accessories which are engine
lifts, carburettor, starter kits, propellers, alternators, gimbal bearings, trim
pump, wiring and harness and thereby, it is not required make a separate
payment for these items.
15. The FSP says the engines were over insured for $15,000 each.
16. The FSP will not pay extra to repair the boat to a better standard.
17. N appointed S to further investigate the condition of the boat and to
comment on the offer of settlement.
18. There is no evidence the Applicants had replaced parts of the engine and
considering the age of the vessel and relying on S‟s report, the Applicant s
should contribute to the replacement cost of the parts affected by age wear
and tear.
19. No depreciation was applied on the replacement engines as they were of
similar age.
20. The FSP ‟s offer of settlement is fair and it relies on the following policy
provisions:
“ Repairs
If we choose to repair your boat, we will repair it to the same condition,
standard and specification as it was before the incident.
...
When repairing your boat we will not:
›› pay extra to repair your boat to a be tter standard, specification or quality
than it was before the loss or damage
›› fix a fault or defect in your boat that existed before the loss or damage
occurred unless the fault or defect was from repairs we authorised
Case No: 255816 Determination Page 3 of 9
›› pay for repairing pre -existing damage that you didn‟t repair or make a claim
for in the past. If we agree, you can pay the extra cost of repairing this
damage as part of our repairs
›› pay the cost of anti -fouling protection unless it is in the area of the hull
which has been repaired because of an incident
›› pay the cost of replacing or purchasing an extended warranty on your boat.
Contribution to repairs
This typically applies to mechanical and electrical parts. You won‟t have to
contribute towards labour costs.
...
If your boat is aged 2 years or more
We can ask you to contribute towards the cost of buying new parts used for
repairing your boat if the damaged parts are affected by age, wear and tear. ”
Issue
21. Whether the FSP‟s offer of settlement is fair, reasonable and in accordance
with the terms and conditions of the policy.
Reasons for decision
22. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
23. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
24. I consider the FOS Terms of Reference relevant to this dispute are:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential financial
loss or damage up to a maximum amount of $3,000 per claim made in the
Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss but
only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights – injury has
occur red to the Applicant‟s feelings or humiliation has been suffered by the
Applicant.
Case No: 255816 Determination Page 4 of 9
The maximum amount of compensation for non-financial loss will be $3,000 per
claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way r estrict FOS‟s
ability to make an interest award under paragraph 9.5. ”
25. There is no dispute the Applicants ‟ claim falls within the general cover of the
policy and the issue remains whether the FSP‟s offer of settlement is fair,
reasonable and in accordance with the terms and conditions of the policy.
26. The Applicants have not raised any issues regarding receipt of the policy
documents and in the circumstances, I am satisfied that the FSP has fulfilled
its obligations in informing them of the terms and conditions of the policy.
27. Subsequent to the lodgement of the claim, the FSP appointed marine
surveyor N to investigate the circumstances surrounding the loss and to
assess the claims.
28. N negotiated the settlement with the Applicants on behalf of the FSP. During
the claims process, the FSP has made the following offers to the Applicants:
$13,208.63;
$20,496.00; and
$24,804.64
29. N appointed S to report on the condition of the vessel and his report states:
“As you requested we travelled to [HM] to inspect a 30ft Bayliner vessel fitted
with two V8 Mercruiser 305 cubic inch Chevrolet based engines.
This vessel appears to have experienced a partial submersion and the drive
legs have been removed.
...
There are no major external rust or corrosion problems evident on the engines
possibly due to the inhibiting done by [HM]. The engines ignition and electrical
system components appear to be all original except for one starter motor that
was replaced on the 16/02/2007 by the previous owner during an engine
rebuild. This would place the rest of the wiring and electrical system at
approximately 20 years of age.
There is a receipt for a pair of reconditioned 305 Chevrolet cylinder heads
purchased on the 5/3/2010 by [Applicant] but no other receipts for gaskets or
labour costs associated with their replacement. Two new batteries were also
purchased on the 05/09.
There is no receipted documentation to show that the vessel has ever been
slipped, antifouled or serviced whilst being owned by [Applicant].
Case No: 255816 Determination Page 5 of 9
When the vessel was removed from the water [HM] noticed that the drive legs
were in extremely poor condition possibly requiring complete replacement
upon thorough inspection.
The level of deterioration suffered by the drive legs is consistent with a vessel
that has not had the anodic protection and/or sufficient battery power for some
time to enable the anticorrosion systems to function. This is generally a clear
indicator that the boat was left unattended/unmaintained for an extended
period of time therefore resulting in possible irreparable damage to the lower
units.
Your offer of $2000.00 per drive leg in is more than reasonable considering
they possibly required complete replacement due to corrosion anyway.
Due to the time frame form when the vessel submerged we requested [HM] to
check that the engines still rotate. A large cranking bar was connected to the
engines and it was discovered that both the engines are now seized thus
requiring replacement. [HM] has supplied us with a price of replacement
Chevrolet crate engines (attached).
We then asked [HM] to put a value on the existing engines prior to
submersion. He stated that 20 year old Mercruiser engines have no resale
value. This is due to changes in technology, age of engines and the ready
availability and price of the crate imported engines.
From our research these engines if in good running order would fetch
approximately $4000.00 each in the market place subject to testing.
We have reviewed the depreciation schedule you have applied to this claim
and find it to be more than reasonable taking into consideration the age,
condition and from the documentation supplied to us a severe lack of
maintenance.”
30. The FSP has allowed the full amount of the Applicant‟s claim for the
following items:
Stern Legs
Engines
Carpet and upholstery
Genset
Fridge
Bilge pump
Float switch
Labour cost of trade and apprentice referred to as „ engine bay wiring ‟ ;
and
Hot water system (provided replacement invoice is provided).
31. I have carefully reviewed the material presented by the FSP and the
Applicants and I am not satisfied that the settlement offered by the FSP is
fair for the reasons explained in the following paragraphs.
32. The FSP has allowed for the Genset but not the cost of fixing same. I have
allowed for this expense as quoted by HM.
Case No: 255816 Determination Page 6 of 9
Engine and Installation
33. The FSP has not presented evidence to confirm that the replacement cost of
the engines quoted by HM included the cost of accessories and labour
charges for installation.
34. The Applicant has presented a letter from HM confirming that the quote for
$7,000 for each engine was „bare‟ in that it did not include the cost of the
accessories as below:
“Please note the existing quote that I emailed you in relation to [Applicant],
was $7000 for each engine without accessories, just 2 by long motors”
35. The Service‟s Case Manager has provided ample opportunity for the FSP to
investigate this matter further. However, no response has been forthcoming
in this regard.
36. Therefore, in the absence of any further evidence from the FSP to rebut the
material presented by the Applicant, I am satisfied the engines were quoted
as „bare‟ without accessories. Thereby, I have allowed the following
accessories which have been classified by N as related to or were part of the
engine and installation:
Starter Kits;
Gen Props;
Alternator;
Gimbal bearings;
Engine lifts
Trim pumps;
Carburettor; and
Labour charges
37. I am satisfied that the claim for cables and connections could be included in
the above list.
38. Since these items were in their original condition and were 19 years old
except for one started motor which was replaced in 2007, I have applied
depreciation at the rate of 3% per annum for 19 years on the above items.
39. I have also allowed an additional 10% as an adjustment for GST on all items
for which the settlement was based on the repairer‟s quote as the prices
relied upon by N were from the repairers quote and excluded GST.
40. Furthermore, the Applicants are also entitled to be reimbursed the freight
cost of $50 which again has been adjusted for GST.
Case No: 255816 Determination Page 7 of 9
Hand Tools
41. The Applicants have claimed for water damaged hand tools and N has
responded that these were not covered under the policy.
42. The FSP has not commented on this and I am of the opinion that there is
cover for tools under the policy as below:
“ Your hull also includes:
...
›› tools supplied by the manufacturer.”
43. The FSP has not disputed that the tools claimed by the Applicants were not
supplied by the manufacturer and thereby, I am satisfied the Applicants
should be reimbursed for the replacement cost of these tools.
Water Pump and Macerator Pump
44. The FSP has not provided any evidence as to the reasons why it has
adjusted its settlement for the water pump and macerator pump, when it had
allowed full reimbursement for bilge pump, float switch etc.
45. Therefore, I am of the view that the FSP should pay the full amount for these
items.
Battery & Accessories
46. The FSP has allowed 33% of the replacement cost of the battery which it
does dispute was replaced in 2009.
47. I am of the opinion that it is fair that a depreciation of 20% is applied on the
replacement cost of the battery for the two years since its purchase.
48. In regards to the battery cable and terminals, N confirms that these items
have been allowed for in his final offer of settlement. However, the
settlement did not include these items.
49. Therefore, I have allowed for the full replacement cost of these items which
again have been adjusted for GST.
50. N has indicated that the battery charger is not part of the boat contents as
defined in the policy and thereby not covered.
51. The policy covers boat contents as follows:
“What we cover as your boat contents?
When you insure your boat you automatically get limited cover for your boat
contents (see page 10 for limits).
Contents we cover:
...
Case No: 255816 Determination Page 8 of 9
›› portable household goods
›› clothing and appliances
...
Boat contents
›› the sum insured for contents shown on your certificate of
insurance or
›› for contents not listed on your certificate of insurance, we pay up
to $250 per item, but no more than 5% of the hull sum insured
for all items. This amount is not paid in addition to a total loss
settlement.
...
For boat accessories, equipment or contents claims
If we agree to pay a claim for loss, theft or damage to your boat accessories,
equipment or boat
contents, we decide if we will:
›› repair or replace to the same condition, standard and specification they
were before the incident or
›› pay you what it would cost us to repair or replace them.”
52. I am of the view that the battery charger could be considered as tool or as an
appliance.
53. I consider it an appliance and allow $250 which is the policy limit applicable
to boat contents not specified in the policy.
Mooring Fees
54. The Applicants have claimed for mooring fees of $2,337.50 for the period
from 1 July 2011 to 1 April 2012. There no provision under the policy to
cover mooring expenses.
55. Furthermore, the Applicant would have had to incur this cost even if the boat
was repaired.
56. Therefore, the FSP is not required to reimburse this part o f the claim.
Other items
57. The Applicants have also included the following items in their recent
submission and I note that they have not presented any evidence from an
expert or HM that these items were required to be replaced.
Distributers;
Trim plates pump;
Leads and spark plugs;
Case No: 255816 Determination Page 9 of 9
Coil pack; and
Power steering pump.
58. On the other hand, HM‟s quote submitted to the FSP clearly states that once
the engine and generator are removed, they may find additional equipment
that require replacement.
59. Here again, the Service‟s Case Manager has provided the FSP with an
opportunity to respond and its submission in this regard has not been
forthcoming.
60. Therefore, I allow these items and accept that these items would have been
uncovered once the engine and generator were removed as explained in
HM‟s initial quote.
Compensation
61. I note the FSP has caused various delays in forwarding its submissions to
the Service and as a result has delayed the finalisation of this dispute.
62. I am satisfied that this would have caused some distress and interfered with
the Applicants‟ expectation and peace of mind during this period.
63. Therefore, pursuant to paragraph 9.3(b) (i) of the Terms of Reference, the
FSP shall pay $500 as compensation to the Applicants.
Determination
64. On the basis of the available information, I determine the FSP is required to
pay $35,688 as explained in the attached schedule.
65. The FSP is not required to pay for the mooring fee.
66. The FSP should pay compensation of $500.
67. The amount stipulated in paragraphs 51 and 53 is to be paid to the
Applicants within 14 days of the date the Applicants or the Service notify the
FSP of acceptance of this Determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.