Text of the determination
Case No: 255514 Determination Page 1 of 14
Case number: 255514
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
20 June 2012
Background
1. The Applicant holds a Building and Contents policy with the Financial
Services Provider (FSP) covering a residential property. The policy covered
contents up to $100,000 and the building up to $300,000.
2. The Applicant‟s property was inundated by flood events in January 2011 and
the FSP accepted the claim. As contents were a total loss, the FSP agreed
to pay the sum insured. The FSP has also cash settled the Applicant for
$232,680.48 for building repairs.
3. The FSP declined to make a total loss payment of the home. Further, the
FSP declined payment for repairs to the brickwork, chimney, timber frame,
roof truss and entire house concrete slab as this did not require replacement
as a result of the flood.
4. The Applicant disputes the FSP‟s decision not to provide a total loss
payment of the home. Further, the Applicant disputes the declinature of the
claim for repairs to the brickwork, chimney, timber frame, roof truss and
house concrete slab on the basis that flood caused the damage. The
Applicant is also dissatisfied with the length of time involved in the handling
of the dispute.
Summary of Applicant’s po sition
5. The house was flooded up to approximately 4 metres high from the house
floor and only the ridge cap tiles of the home were not covered by flood
waters.
6. The Applicant relies on an expert report by A from which the Panel notes the
following information:
A observed:
The primary concrete slab is suffering small (<5mm) to moderate
cracking (5mm-10mm).
There are small cracks in the brickwork
Determination
Case No: 255514 Determination Page 2 of 14
A secondary internal slab has sunk 30mm
The external slab (where the chimney is situated) has sunk and the
chimney is leaning into the wall of the house
A high number of large cracks and openings of the soil surrounding the
property
The shed slab has a very large crack
The garage slab has a small crack
The soil in the area of the site are known to be moderately to highly
reactive or even highly reactive.
The floods would certainly have had an effect on the site as the soil has
been submerged for days. This now causes movement to the soil and
consequently to the foundations.
As movement is expected for years, the current foundations are not
suitable for their intended use.
The primary ground slab has effectively broken into three large
portions, wall cracks and slab settlement of the secondary internal slab
and chimney slab are all symptoms of this major issue.
The issue could be remedied by underpinning of the foundation,
however this is not practicable given the deep underpinning required
and the use of heavy machinery on soft soils. The best solution would
be to replace it with a fully engineered foundation solution that will be
able to manage the site‟s unique nature.
7. A further report from A dated 1 May 2012 further states:
Any settlement damage caused by trees at the property would be
proximate to the trees. Contrary to the FSP‟s experts A notes the
phenomena is present throughout the entire site, the trees are distant
from the property and combined with the relatively low age of the
subject structure, the damage is unlikely to be caused b y trees.
The slab is unable to cope with the new conditions introduced by the
flood.
Repair of the slab is not viable due to its high cost and complexity.
The structures on the site are experiencing differential settlement due
to changes to the site geology and the effects will be long-term. This is
a direct result of the January 2011 flood events of South-East
Queensland.
8. The Applicant considers the chimney movement and slab cracking is directly
related to the flood. The property was purchased 6 months prior to the flood
and a pre-purchase inspection report completed indicated no construction
issues. There were no cracks to the relevant areas prior to the flood. Further,
the build date of the property is in the eighties and construction methods
may have altered since this time.
Case No: 255514 Determination Page 3 of 14
9. The expert‟s reports should be relied upon as they prov ide in depth analysis
of the repair methods to the slab and anything less than a new slab will have
further cracking issues which will damage internal tiles fixed to the floor.
10. The quotation of works originally provided to them left off rooms and major
repair items. However, the FSP later allowed for these items in a separate
quotation.
11. The FSP has failed to act expeditiously in that:
The FSP forwarded the contents settlement cheque to the flooded
address which led to a delay in receiving and clearing the funds.
The assessor advised the claim was lost in filing for three months.
The scope of works did not include items listed on the first quotation.
Time frames for inspections/receipt of reports were substantial.
12. As a result of the delays, pecuniary losses have been suffered as many local
merchants were providing discounts to flood victims during repairs but these
offers have now ceased.
13. The Applicant submits that residing in a caravan during the claims handling
process has resulted in stress and physical discomfort.
Summary of FSP’s position
14. The FSP relies on claims file notes from which the Panel notes the following:
The Applicant was informed on 18 March 2011 that the contents claim
would be settled that day.
The Applicant was asked on 21 March 2011 to provide a copy of any
rental agreement and he was informed that 4-6 weeks rental would be
paid straight away.
The Applicant raised an issue with the time frame on multiple
occasions.
An initial claims decision was made on 7 June 2011 and a discussion
was had with the Applicant regarding the opportunity to provide further
information and proceed to IDR.
On 6 September 2011 the FSP received a report from its expert
engineer which noted the cracking to the main house; garage/carport
was caused by the flood event. The house slab could be repaired as
the damage was minor but the garage/carport needs to be replaced. In
addition, the engineer noted the flood exacerbated pre-existing issues
with the shed slab. It noted any damage that has been exacerbated by
the flood should be met by the policy.
On 9 September 2011 the FSP received comments from its engineer‟s
builder advising that 50% of the shed slab damage is attributed to the
flood event. Further, the roof tiles should be covered as the water le vel
Case No: 255514 Determination Page 4 of 14
was over most of the roof and the tiles have been damaged by debris
impact.
There does not appear to be a three month gap in work based on the
information contained within the claim file notes.
15. A building expert from its engineers reported on 24 May 2011.
The residence was completely submerged with only the ridge tiles
exposed above the water line.
There is evidence of step cracking on the northern and eastern
elevations for a distance of 5 metres in both directions. The north-east
corner appears to have dropped substantially. The exposed concrete
raft at the slab edge on the east elevation did not indicate vertical
cracking as would be expected if the slab had subsided in the corner.
The chimney was constructed after the residence was constructed. The
clearance margin between it and the original brick wall residence to the
east elevation provides evidence of the chimney rotating towards the
west and was bearing against the residence‟s external skin of
brickwork. There is further visual evidence indicating the inside
brickwork skin and timber frame has severely reduced from 30mm at
floor level up to 10mm at ceiling level where the metal frame ties
presented as being crushed due to rotation of the chimney towards the
residence. The uneven gap has also been filled with expanding foam
which was present at the time of purchase.
The chimney was constructed on 90mm thick concrete which pathway
was originally provided as a carport slab to the residence. There is
evidence the slab has cracked and collapsed under the weight of the
chimney and the insured has confirmed this cracking was present prior
to the flooding event. This footing for the chimney is inadequate.
The roof truss and tile battens had been cut away directly in line with
the fire place – this suggests illegal installation in order to provide
penetration through the roof void for the circular flue kit.
Timber framework was cut away and two studs in the location of the
fireplace damaged – allowing for an extreme bow inwards caused by
the fireplace brick chimney resting against and pushing the eastern wall
of the residence inwards.
The engineer concluded that the damage to brickwork, chimney, timber
frame and roof truss at this location is not related to the flooding event.
Further, as the deviation of the top wall plate at the northeast elevation
is considered „as built‟ fault with the timber frame and is not the result of
flood.
The dining room slab shows signs of movement related to subsidence.
The rear patio had cracking to the base slab beneath the pavers which
presents at its edging timber as having dropped 30-40mm along the
rear southern elevation. This has been caused by subsidence due to
the drying out of the soil.
Case No: 255514 Determination Page 5 of 14
The carport slab shows cracking consistent with movement as a result
of reactive soil.
16. The FSP‟s engineer‟s report dated 22 August 2011 notes the following:
There is minor cracking of <1mm wide in bedroom one, master
bedroom, lounge room, laundry and area under the kitchen island. The
hairline cracks appeared in isolated areas of the slab. The majority of
the remainder of the concrete slab appears to be in good condition
without any cracks observed.
The Australian Standard for Damage to Concrete Floors is AS2870-
1996 Residential Slabs and Footings. The slab has a crack width of
<1mm which by reference to the appropriate Table falls into Category 1
which is deemed to be “minor”.
It is recommended the cracking to the main dwelling slab be sealed
with epoxy sealant which is adequate for the damage sustained.
In the garage, minor spalling of the concrete has occurred to the slab
with appalling (sic) area of up to 15mm wide. Random cracks were
observed in various directions on the slab with a maximum crack width
of 5mm.
The shed slab was constructed without reinforcement mesh. Further,
the whole section of concrete was only 50mm thick which is less than
today‟s minimum requirements. The insured indicated the cracks
widened after the floods.
The damage to the garage slab is the direct result of a long period of
inundation during the flood event.
The damage to the shed‟s slab was exacerbated by the flood event.
Repairs were quoted at $208,565.
17. Engineer‟s report dated 5 October 2011 . The Panel notes the following
additional information from this report:
Movement is expected to any structure ove r its lifespan regardless of
whether flood events occur. Movement is common when shrinkage and
expansion of the soil occurs.
Its two investigations have not revealed that the footing of dwelling
would be compromised by the flood event. The hairline cracks are
minor in nature and would not affect the performance or structural
integrity of the slab or foundation or the ability for the laying of floor
covering to be installed in the near future.
Due to the reactive nature of the site the slab should have been built to
withstand soil conditions. The reactive nature of the soil is not the result
of the flood event.
Cracking to the slab on the scale observed does not necessarily
indicate major structural problems or safety or stability issues, unless
Case No: 255514 Determination Page 6 of 14
walls tilt to a substantial degree or there is a danger of falling material
or dislodgment of lintels, floor or roof structures.
There are a number of trees on the site which would be a contributing
factor to the cracks in the area, including the cracks in the main
dwelling.
18. A quotation and scope of works dated 7 October 2011 from a builder,
indicates the total sum of works at $191,851.17. This quotation allows for the
demolishing of the paved ground slab and the slab around the patio, the
carport slab, double garage slab and garden shed slabs.
19. A further quotation dated 11 October 2011 covered the missing items raised
by the Applicant in the sum of $40,829.31.
20. The expert reports are relied on to decline the brickwork, chimney, timber
frame and roof truss of the property.
21. Its policy does not cover faulty workmanship or faulty design.
22. The house slab, brickwork, chimney, timber frame and roof truss did not
require replacement and had not been damaged as a result of the flood. In
addition, the house slab did not require replacement as it could be repaired
simply.
23. The soil movement and cracking at the property are not the result of a single
event but have occurred over the lifetime of the building. Further, an
appropriate engineering solution for the extent of the cracking of the house
slab has been provided. The Applicant has been settled for this repair.
24. The Applicant has not offered any evidence specifically as to the cause of
the cracking damage to the brickwork, chimney, the concrete slab at the
base of the chimney, timber frame or roof truss. The lack of reinforcing of the
carport slab upon which the chimney sits has led to the cracking of the slab
around the base of the chimney due to the weight of the chimney. This has
led it to rotate and lean against the house.
25. The Applicant has not provided any pre-purchase inspection report.
26. The investigation of the claim has not been unduly delayed by it or its
agents. It is the enormity of the flood event in this area which led to a
considerable strain on resources. It sought to ma nage the claim
appropriately as well as obtain expert evidence on each claim and in a timely
manner.
27. There has been no medical evidence provided indicating diagnosis of
recognised medical conditions or evidence of anxiety or stress that is
attributable in any degree to its actions or inactions.
28. The Applicant‟s claim for compensation does not fall within the scope of
cover provided by its policy and it is not obliged to compensate for anxiety,
Case No: 255514 Determination Page 7 of 14
stress, physical inconvenience or delay. The Applicant has also not
quantified this issue.
Issues
29. Whether the FSP was entitled to decline the Applicant‟s claim for the
replacement of the house slab and repairs to the brickwork, chimney,
timber frame and roof truss
30. Whether the Applicant is entitled to a claim for compensation.
Reasons for decision
31. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
32. The Panel has read each party‟s various submissions and material and w ill
only refer to relevant portions of submissions and materials raised.
33. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
34. The first issue the Panel will deal with is the house slab.
The House Slab
35. It is not in dispute that the soil on which the slab is located is reactive.
36. Nor is it disputed that the slab is set on steel re-enforced concrete piles.
37. The drawings and designs for the slab (which were available to the
Applicant‟s engineer) have not been made available to the Panel.
38. The site was inundated for some four days.
The FSP’s Expert’s Reports
39. In a report dated 24 May 2011 by a builder from the FSP‟s engineer it is
noted that although untested the clay soil in the local area was thought to be
“Moderately Reactive to Highly Reactive.
40. It went on to say “ It will be noted that the insured property can expect some
form of movement resulting from changes in the soil moisture .”
41. Following a site inspection on 26 July 2011 the FSP‟s engineer reported;
In this particular case, the concrete slab on the ground has a crack
width of <1mm . (Panel emphasis)
Case No: 255514 Determination Page 8 of 14
The Australian Standard] “ AS2870-1996 Residential Slabs and
Footings provides guidance on the classification of damage in concrete
floors The standard details the following table :
The Table is not reproduced here as it is in the possession of the parties. For
the sake of completeness it is headed,
“ CLASSIFICATION OF DAMAGE WITH REFERENCE TO CONCRETE
FLOORS”.
The report continued,
”As a result of our inspection and using the above table as reference, the damage
to the concrete slab on ground falls into Category 1 which is deemed to be
“minor”… We recommended the cra cks to be sealed with an epoxy sealant. This
type of repair would be adequate for all of the damage sustained to the concrete
slab in the main dwelling.”
The Applicant’s Engineer’s Report
42. The Applicant appointed his own expert engineer A, who inspected the
property on 20 September 2011.
43. It reported “This site is a residential property, located directly adjacent to the
Bremer River. The house is of single-story brick construction, founded on a
concrete slab and steel re-enforced concrete piles (as per supplied drawings
and designs). The house is approximately 25 years old.”
44. Its observations were:
The primary concrete slab is suffering small (<5mm) to moderate
cracking (5mm-10mm).
There are small cracks in the brickwork.
A secondary internal slab has sunk 30mm.
The external slab (where the chimney is situated) has sunk and the
chimney is leaning into the wall of the house .
A high number of large cracks and openings of the soil surrounding the
property.
The shed slab has a very large crack.
The garage slab has a small crack.
45. The report went on to record:
“… a significant amount of water is meeting reactive soils to a considerable depth
below the surface of the subject site causing movement of the soil and
consequently, the foundation. As this behaviour is expected to continue into the
long-term we cannot say that the foundations of the current structures present on
site are suitable for their intended use, particularly as there is no evidence to
guarantee that the current foundations are stable and will continue to be for a
reasonable period of time .
Case No: 255514 Determination Page 9 of 14
The extent of the cracking of the primary ground slab, which has effectively broken
into three large portions, wall cracks and slab settlement (of the secondary
internal slab and chimney slab) are all symptoms of this major issue. The
foundations present are simply unable to cope with these new conditions, as such
events are rarely foreseeable in the design stage of a project such as this …
The best solution to this problem is to replace the current foundations with a fully
engineered foundation solution. ”
The FSP’s Engineer’s Response
46. In a supplementary report dated 5 October 2011 the FSP‟s engineer
responded‟
„ We do not concur with the conclusion made by (A) ’
The following points were made,
a. Movement is expected to any structure over its lifespan regardless of
whether flood events occur. Movement is common when shrinkage and
expansion of the soil occurs.
b. Our two investigations did not reveal that the footing of the dwelling
have been compromised by the flood event. The hairline cracks are
minor in nature and would not affect the performance or structural
integrity of the slab or foundation.
c. Due to the reactive nature of the site the slab should have been built to
withstand soil conditions. The reactive nature of the soil is not the result
of the flood event.
d. Cracking to the slab on the scale observed does not necessarily
indicate major structural problems or safety or stability issues.
e. There are a number of trees on the site. In reactive soils trees
significantly alter moisture conditions of soils as do seasonal changes.
A Further Response Was Made by the Applicant’s Engineer
47. In a report dated 1 May the Applicant‟s engineer added the following points
to its earlier report;
a. Ipswich flood level peaked at approximate ly 18.0m.
b. The floods would certainly have had an effect on the site as the soil
was completely submerged for a number of days.
c. The area‟s water table will have increased in height making it closer to
the surface level and thus the foundations on the site. A significant
amount of water will travel under the house to reach the river coming
into contact with and affecting the soils supporting the house.
d. As movement is expected for years, the current foundations are not
suitable for their intended use.
e. It ref erences a document “KOH, Tiver, Wong, & Jones, 2010” from
which it quotes but fails to detail what the study is in reference to.
Case No: 255514 Determination Page 10 of 14
f. The primary ground slab has effectively broken into three large
portions, wall cracks and slab settlement of the secondary internal slab
and chimney slab are all symptoms of this major issue.
The Panel’s Slab Determination
48. The question before the Panel is to determine, on the available evidence,
whether the slab has been damaged by the flood such that it has lost its
structural integrity.
49. The FSP has acknowledged that the cracks visible in the slab have arisen
since the flood. It argues, however, that the damage is minor and refers to its
expert engineer‟s statements that “the damage is consistent with the
movement of reactive soils during the drying process after the flood event in
January 2011” and that “the cracks sustain ed to the main house slab were
all less than 1mm”.
50. To support its contention of minor crack damage it draws attention to the
photographic evidence of the cracks provided by the engineer which
includes one photo showing a measuring tool across a crack to illustrate the
measuring of the width of the cracks.
51. The engineer‟s report includes details of the relevant Australian Standard
and a copy of the Table related to the “ classification of damage with
reference to concrete floors” and points out that, using the Table, the cracks
being approximately <1mm they are “Damage Category 1” which is deemed
to be “minor”.
52. The report‟s conclusion is “ We believe that the hairline cracks are very minor
in nature and would not effect (sic) the performance or structural integrity of
the slab or foundation or the ability for the laying of floor coverings to be
installed in the near future.”
53. The Applicant‟s expert engineer reported “ The primary concrete slab is
suffering small (<5mm) to moderate cracking (5mm-10mm). ”
54. It says “The extent of the cracking of the primary ground slab … has
effectively broken it into three large portions”…
55. It goes on to refer to the site conditions (water meeting reactive soils) as
having been altered by the flood and opines:
“As this behaviour is expected to continue into the long term, we cannot say that
the foundations of the current structures present on the site are suitable for their
intended use, particularly as there is no evidence to guarantee that the current
foundations are stable and wi ll continue to be for a reasonable time.”
“The foundations present are simply unable to cope with these new conditions as
such events are rarely foreseeable in the design stage of such projects.”
Case No: 255514 Determination Page 11 of 14
56. It concludes:
“The structures on this site are experiencin g differential settlement due to
changes to site geology…the best solution to this problem is to replace the
current foundations with a fully engineered foundation solution.”
57. The Panel is faced with two opposing opinions with the FSP‟s engineer
asserting that the slab damage is minor and that the performance and
integrity of the slab has not been compromised by the flood , as compared to
the assertion by the Applicant‟s engineer that the slab has been broken into
three large portions, that the site geology has altered and that the present
foundations are simply unable to cope with these new conditions”.
58. The report from the Applicant‟s engineer describes the slab as „broken‟. This,
if proven, would cause the Panel serious concern but nowhere does the
engineer provide any evidence whatever to support the allegation.
59. The Applicant‟s engineer also asserts that the slab has cracks measuring 5 -
10mm but again fails to provide any evidence to support the allegation. And
this notwithstanding it has attached various photographs to its report
including one of “a moderate crack in ground slab” but not a single
photograph of the major issue, the house slab.
60. The Applicant‟s engineer further argues geological site change but provides
no site related evidence. The reference it supplied refers to clay, however,
there is no technical evidence that this site is clay, or if it is, what that means
in terms of the sourced reference and the site.
61. The Applicant‟s engineer states:
“Simply put, a significant amount of water is meeting reactive soils to a
considerable depth below the surface of the subject site causing movement of
the soil a nd consequently the foundation”.
62. The Panel notes this is the normal phenomenon on reactive sites and is no
doubt why the slab design included steel reinforced concrete piles.
63. What is lacking is evidence of the magnitude of any change in the site
geology. By failing to provide supporting evidence the engineer has in the
Panel‟s view, failed to substantiate its opinion. There is no evidence at all as
to the composition of the soil at the site apart from it being considered
reactive. It is not explained what a “considerable depth” is , or whether it is
above or below the existing slab piles, or at what depth the water tables are
located or indeed of the site slope stability.
64. The FSP‟s engineer has argued the slab damage is minor and supports its
opinion with photographs of the slab, the measurement process, the relevant
Australian Standard and its categorization of the damage as minor.
65. It argues “Movement is expected to any structures over their life span
regardless of whether flood events occurred to the structure ” . It quotes the
Applicant‟s engineer “As moisture levels change over time, soils expand and
Case No: 255514 Determination Page 12 of 14
contract…” and “Cracking of this nature occurs when th e soil is subject to
rapid changes in moisture or multiple cycles.” The FSP‟s engineer concurs
and states “we agree that the water table would rise after the flood event, our
two inspections still did not reveal that the footing of dwelling has been
compro mised by the flood event.” and “The hairline cracks are minor in
nature and would not affect the performance or structural integrity of the slab
or foundation.”
66. The Panel, on the evidence before it, is more persuaded by the evidence of
the FSP‟s engineer. It therefore accepts that the damage to the slab is minor
and of such a nature as to be able to be repaired by the use of epoxy
sealant.
67. Accordingly, the Panel determines the FSP is liable for the cost of repairs to
the slab by the FSP‟s recommended method.
The Chimney and Brickwork and Truss/frames
68. The Applicant states “ this house was purchased 6 months before the flood
and there was building reports carried out on the house prior to purchase.”
69. No such reports have been submitted as evidence.
Chimney
70. The Applicant states “I know there was no issues (sic) with that chimney
before the flood but after there was movement to this chimney.”
71. The Applicant‟s engineer observed “The external slab (where the chimney is
situated) has sunk, causing the chimney to lean into the wall of the house”.
“The structures on this site are experiencing differential settlement, due to
changes to site geology”.
72. The FSP‟s engineer‟s builder states the chimney was constructed after the
residence was constructed “the entire chimn ey breast has been constructed
upon the 90mm thick concrete pathway which was originally provided as a
carport slab...the slab has cracked and collapsed under the weight of the
chimney breast and the insured has confirmed this cracking was present
prior to the flooding event.”
73. The report went on to say “The chimney is “leaning” against the house as a
result of the chimney having been built on inadequate or virtually no
footings…good building practices would demand a fully engineered
footing…a reinforced footing of up to 600mm deep…the slab around the
base of the chimney has simply given way under the weight. As a result, the
chimney has pushed the brick wall into the cavity as shown in the attached
photos. ”
74. The Panel concludes the proximate cause of the damage to the chimney
arose from faulty design which is a specific exclusion under the policy.
Accordingly, the FSP is not liable for damage claimed to the chimney.
Case No: 255514 Determination Page 13 of 14
Brickwork
75. The FSP‟s engineer‟s builder refers to “step cracking to the brickwork either
side of a centrally located built- in brick fireplace and flue”. It states “The
clearance margin between it [the chimney] and the original brick wall
residence to the east elevation provides evidence of the chimney rotating
toward the west and was bearing agains t the residence‟s external skin of
brickwork. There is further visual evidence indicating the inside brickwork
skin and timber frame has severely reduced from 30mm at floor level up to
10mm at ceiling level where the metal frame ties presented as being crushed
due to rotation of the chimney towards the residence .”
76. The Panel concludes the proximate cause of the cracking in the brickwork
which is adjacent to the chimney was a result of the faulty design for the
construction of the chimney.
77. As damage the consequence of faulty design is specifically excluded by the
policy the Panel determines the FSP is not liable for the brickwork damage.
The Truss/Frames
78. In the case of the timber framework and roof truss claim the evidence before
the Panel clearly establishes that the relevant items were deliberately
severed (albeit without the Applicant‟s knowledge) to make way for the
chimney.
79. As this form of damage does not fall within the events insured under the
policy the Panel concludes the Applicant has failed to bring the claimed
damage within the scope of the policy cover.
80. Accordingly, the Panel determines the FSP is not liable for the timber frame
and roof truss repairs as claimed.
Compensation
81. The Panel acknowledges that the Applicant has been through a particularly
difficult time given the nature of the damage to the home and contents.
82. The Panel is also aware of the high volume of flood claims and the limited
resources available to deal with such matters.
83. The Panel notes the Applicant made the original claim on 14 January 2011.
84. The Applicant was informed on 18 March 2011 that the contents claim would
be settled that day. However, the cheque was sent to the flood address. It is
unclear though how long it took for the Applicant to receive and cash the
cheque.
85. The original claims decision was completed in June 2011 and communicated
to the Applicant. During this time frame there were multiple inspections by
different experts and discussions with the Applicant.
Case No: 255514 Determination Page 14 of 14
86. The Panel notes the Applicant later disputed the settlement which led to
further investigations, discussions and settlement proposal.
87. The Panel has reviewed the claim file notes and does not find evidence to
support the allegation that the file was not worked on for a period of 4
months.
88. The Panel considers the original claims decision took 6 months but does not
conclude this was unreasonable given that payments had been made during
this time (including accommodation costs). This is particularly when taking
into account the limited resources available and the volume o f claims.
Determination
89. The Panel determines the FSP is liable for the cost of repairs to the slab by
the FSP‟s recommended method. Should any aspect of this claim be settled
by a cash payment, the FSP is to pay interest on the payment amount at the
rate specified by the Insurance Contracts Act 1984, from the date of denial to
the date of payment.
90. The Panel determines the FSP should not be required to make any further
payments.