Text of the determination
Case No: 255468 Determination Page 1 of 11
Case number: 255468
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Partial Denial of claim-Exclusion/ condition – Flood – Insurance Contracts Act
1984 Sections 35 & 71
17 May 2012
Background
1. The Applicants held a Country Building and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP) providing indemnity for
loss arising from “Accidental Damage” and subject to limitations/exclusions
listed within the policy.
2. The insured property sustained extensive damage arising from the
significant weather events experienced in Queensland (Qld) in January
2011.
3. A claim was lodged against the policy seeking indemnity for the resultant
loss which was partially accepted by the FSP.
4. The Applicants remain dissatisfied with the FSP‟s partial acceptance of the
claim and are seeking complete indemnity for their loss.
Summary of Applicants’ position
5. The Applicants in disputing the FSP‟s position in respect to the settlement of
their claim have sought the assistance of legal representatives “L”. In the
interests of the easy understanding of the parties and brevity, both the
Applicants and L will be referred to as “the Applicants”, for the purpose of
this determination.
6. The Applicants do not recall whether or not they received a Product
Disclosure Statement (PDS) providing the terms and conditions of the policy.
Accordingly, the FSP has failed in its obligations set out in section 35 of the
Insurance Contracts Act 1984 (the Act) to clearly inform them of the relevant
provisions of the policy.
7. The FSP has failed to satisfy the requirements set out by the Service to
establish it had provided the Applicants with the relevant policy wording.
Therefore, the FSP is not entitled to rely upon the exclusion provision relied
upon and the Applicants are left with the “Standard Cover”, which includes
indemnity for loss or damage arising from the event “Flood”.
Determination
Case No: 255468 Determination Page 2 of 11
8. The Applicants maintain that the policy is not clear and it is not possible for a
reasonable consumer to work out what they are covered for and/or what is
excluded from cover under the policy. There is no index in the PDS and
nowhere in the policy does it make reference to flood, stormwater, rain water
wind or water.
9. The Applicants acknowledge the FSP has partially accepted their claim for
the damage it accepts to be due to storm/rainwater run-off inundation of the
first floor of the property up to 100mm. However, they dispute the FSP‟s
reliance on the hydrology report submitted by “W” which provides that the
peak inundation was caused by floodwater backing up from the Brisbane
River, as this is at odds with what they actually witnessed.
10. After the initial stormwater run-off inundation from the South, the property
was further inundated by a second wall of water, which contrary to W‟s
report did not come from the east; rather the water came from the west
(direction of Marburg) at 9.00am.
11. The Applicants maintain as witnesses to the event their evidence holds
greater weight and the second inundation was caused by storm and
rainwater arriving from the west and (the water level) rose a few metres
within seconds.
12. Such was the magnitude of the wall of water that it displaced a Rural Fire
Shed complete with vehicle and concrete slab; it all ended up in a paddock
across the road.
13. The Applicants maintain that if the matter was to proceed to trial they would
be prepared to summon a witness (neighbour). This witness will attest to
being home on 11 January 2011 and having observed a torrential downpour
(18-20 inches of rainfall within 5 hours) and violent storm on the morning of
11 January 2011.
14. The Applicants submit that there is no Insurance Council of Australia (ICA)
Hydrology Report that deals with the particular circumstances in Fernvale
over the relevant period.
Summary of FSP’s position
15. The Applicants‟ policy provides cover for Accidental Damage to buildings
and contents caused by storm, rain water and liquid escaping from a fixed
pipe and drains, but specifically excludes damage caused by “Flood”.
16. The FSP maintains the PDS is clear and unambiguous in its meaning and
provides a table of contents referring a reader to the different sections of the
policy.
17. The onus is on the Applicants to establish that the loss claimed was due to a
peril insured against. There has been no evidence made available by the
Case No: 255468 Determination Page 3 of 11
Applicants to establish the loss is due to any other factor other than the
inundation by floodwaters.
18. The Applicants reference/allegation to not having been provided with the
policy terms is of no consequence in this instance. The po licy was incepted
and managed by the Applicants ‟ brokers “AS”, who were well aware of the
provisions of the policy. The FSP has complied with all its requirements and
obligations in line with Section 71 of the Act.
19. The FSP maintains that the report submitted by W is a correct and accurate
reconstruction of events and clearly explains the behaviour and source of the
water resulting in the loss.
20. The FSP, in line with the Wayne Tank principle, is not obliged to provide
indemnity in the instance that two perils contemporaneously operate to
produce a loss and one of such perils is excluded from cover (Flood). It has,
however, given the Applicants the benefit of the doubt and in good faith
accepted and offered to pay the Applicants $41,819.74 for stormwater
damage up to 100mm within the home.
21. In the absence of any hydrological or independent observer evidence to
contradict W‟s findings, the FSP maintains the proximate cause for the loss
(above 100mm) within the insured home, was damage by floodwater.
22. In respect to the management of the claim, the FSP acknowledges the
assessor initially erroneously advised the Applicants that the claim would be
accepted, however, this was quickly corrected with no prejudice to the
Applicants.
23. The FSP has provided the Applicants and/or their representatives with all the
reports and information available on the file and accordingly has been
transparent in its management of the claim.
24. The FSP relies on the following policy provisions:
“Page 11 Words that have a special meaning in this policy
Flood
is when water from a river, creek, lake, swamp, watercourse, reservoir, dam
or navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land. Water that escaped from an
irrigation canal is not flood.
We also regard any rainwater on your property
that cannot run off into a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original
state or have been modified) because it is overflowing in flood, and/or
that mixes with the floodwater coming from the river, creek, lake,
swamp, watercourse, reservoir, dam, or navigable canal (whether they
are in their original state or have been modified)
As water coming from a flood.
…
Case No: 255468 Determination Page 4 of 11
What all sections of this policy do NOT cover
Any cover we provide is subject to the following exclusions.
We will NOT pay claims arising from the following:
Flood, storm surge, the action of the sea, tidal wave or high water.
This exclusion is not applicable to Sections 7, 9, and 10 of this policy.
…
Page 18-19 Cover 2 – Accidental Damage
…
We will not cover your domestic farm buildings and domestic contents for
accidental damage or accidental loss caused by or arising from the following:
Flood.”
Issue
25. Whether the FSP has correctly declined indemnity to the Applicants for their
loss under the policy.
Reasons for decision
26. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
27. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
28. The Panel Chair Ombudsman attended on site where he met with the
Applicants and a representative of the FSP.
29. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
30. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
31. The Panel notes the parties do not dispute the following:
The Applicants‟ policy was arranged and managed by their
agent/broker AS.
Case No: 255468 Determination Page 5 of 11
The insured property suffered significant damage arising from water
inundation during the extreme weather events experienced in the area
on 11January 2011.
The property is located in close proximity to Black Snake Creek (BSC),
Fairnie Brook (FB) and is reasonably close to the Brisbane River.
The FSP has partially accepted the claim and issued payment for
damage to the home and contents up to a height of 100mm in line with
its opinion that this was the extent of the initial stormwater run-off
inundation of the home.
Insurance Contracts Act 1984 and “Clearly Inform”
32. The Applicants in referring to Section 35 of the Act maintain that:
The FSP failed in its obligations under the Act to provide them with the
PDS.
The PDS itself is not clear and would prove difficult for a reasonable
consumer to understand the extent of cover and/or limitations of the
policy.
33. The Panel notes it is not in dispute that the Applicants utilised the services of
broker/agents AS to incept and manage the policy and as such finds section
71 in essence it provides:
…
Section 71(1) of the Act states that where an insurance broker, not on a
binder, acts on behalf of the insured, the insurer is exculpated from the
requirement to provide the insured with any statutory notices et al, pursuant to
the requirements of the Insurance Contracts Act 1984 (with the sole exception
of 58(2))”
34. In line with the relevant legislation, an FSP is obliged under Section 35 to
first establish it has clearly informed a policyholder in writing of any provision
of the contract which seeks to derogate from the statutory terms of „standard
cover‟. In the instance that the policyholder utilises the services of a broker,
as is the case on this occasion, section 71 establishes the FSP is not
required to so clearly inform the insured. The statutory underpinning here is
that the broker will provide such expert commentary as necessary to the
insured, in a timely fashion.
35. Accordingly, the Panel determines the Applicants have not established an
entitlement to indemnity ari sing from the FSP‟s alleged failure to fulfil its
obligations under section 35 of the Act.
Probable cause of the Inundation
36. The FSP has acknowledged the possibility that the insured property may
have experienced a limited extent of stormwater run-off inundation, prior to
the arrival of the more substantial floods, due to the significant amount of
rainfall experienced in the area on 11 January 2011. On the basis of this
opinion, the FSP partially accepted the Applicants‟ claim and issued
Case No: 255468 Determination Page 6 of 11
payment in the amount of $41,819.74, for loss/damage caused by inundation
up to a level of 100mm.
37. The Applicants refute the FSP‟s position in this respect and maintain that the
full extent of their loss is due to stormwater run-off and accordingly are
seeking complete indemnity for the loss under the policy.
38. The Applicants have provided a Statutory Declaration and a hand written
letter, both dated 12 April 2012 and both from their neighbour GB.
39. The Panel Chair Ombudsman has also spoken on the telephone to the
Applicants‟ son PR.
40. The Panel notes that GB‟s property is to the north of the Applicants‟
property, but that PR was at the Applicants‟ property when the inundation
occurred.
41. The Panel, as a preliminary matter, also notes this is an Accidental Damage
policy; accordingly, the FSP bears the onus of proof of demonstrating the
damage above 100mm is excluded from indemnification by virtue of it being
comprised of flood.
42. In maintaining its position that the damage claimed was in fact, the result of
flood as defined within the policy, the FSP relies on evidence made available
by the ICA and a site specific hydrology report submitted by W (hydrologist
commissioned by the FSP).
43. The hydrological report commissioned by the ICA titled „ Flooding in the
Brisbane River Catchment January 2011 Volume 5 Flooding in Somerset
Regional Council LGA ” dated 20 February 2011, provides a detailed analysis
for the flooding experienced in that region.
Three distinct flooding episodes occurred over Somerset RC LGA on
different days over the period 9 January to 13 January.
At Fernvale and Lowood flooding occurred over the morning, afternoon
and evening of 11 January and 12 January. The morning flooding was
due to flash flood events in local creeks. The major event on 11
January was from the river, Lockyer Creek and local tributaries of the
river due to the dam release.
Releases from the dam caused a flood wave to move down the river.
As this flood wave moved downstream, backwater flooding occurred
along the lower reaches of Lockyer Creek, Ferny Gully and through
Fernvale.
Fernvale is drained by Ferny Gully and its tributaries which discharge
into the river at Savages Crossing to the northeast of the town.
Fernvale experienced light to moderate rainfall between 4.00am to
6.00am, moderate to heavy rainfall between 11.00am to 5.00pm, with
rainfall effectively ceasing at 7.00pm on 11 January. The severity of
rainfall across Fernvale area was relatively consistent.
Case No: 255468 Determination Page 7 of 11
The principle cause of flooding along the river downstream of the dam,
including Fernvale and Lowood, was releases from the dam.
Releases from the dam caused water flow flooding in Fernvale from the
river and backwater flooding via Ferny Gully. River flooding in Fernvale
commenced around 4.00 to 5.00pm on 11 January and continued well
into 12 January. Prior to flooding from the river, parts of Fernvale also
experienced flash flooding from local creeks in the morning between
7.30am to 11.00am on 11 January.
Figure 8.7 shows the pattern and direction of flooding in Fernvale and
more specifically in the area of the insured property on 11 January.
Rainfall of consequence ceased in the Fernvale area by 2.00pm on 11
January, any inundation after this would be due to backwater flows.
The major rainfall event was ongoing in Fernvale on 11 January when
(5.00am – 1.00pm) the major flood wave in the river was passing
through Savages Crossing. Thus overland flow inundation caused by
over loaded stormwater drainage systems could have occurred in the
Fernvale area before and during the Ferny Gully flash flood event o f
Tuesday morning.
At Fernvale the severity of short duration rainfall was more significant
(Savages Crossing where 1 hour duration rainfall had an ARI greater
than 100 years). Overland flow flooding is generally associated with
intense rainfalls of short duration. Therefore, it is expected that at some
locations in Fernvale, overland flow inundation would have occurred,
either before water flow flooding occurred or during waterway flooding
(if rains were still occurring).
Uncertainties exist as to whether properties inundated by water flow
flooding in Fernvale on 11 January and 12 January also suffered initial
inundation from overland flooding.
Resolution of this issue requires investigation of “local” factors (such as
local topography and characteristics of the area of overland flow) and,
preferably, hydrologic/hydraulic modelling of the storm event and loca l
stormwater drainage systems.
44. The site specific hydrological report commissioned by the FSP and
submitted by W with the title “HYDROLOGY REPORT RELATIN G TO THE
JANUARY 2011 STORM” dated 30 March 2011 provided the following
relevant information:
The Applicants‟ property is considered to be located on the southern
flood plain of a watercourse named “FB”, which flows in an easterly
direction and discharges into the Brisbane River approximately 2kms
east of the property.
BSC discharges into FB about 3kms upstream from the property. The
combined catchment of both watercourses extends about 15kms to the
southwest, beyond the town of Marburg.
Case No: 255468 Determination Page 8 of 11
The property is located on the north side of a hill with the catchment
area directly above the site estimated to be less than 0.1km 2 . The
elevation of the insured property is approximately 35m AHD.
The rainfall record obtained from a gauge near Lowood and considered
representative of rainfall in Fernvale and across Fairnie Brook,
indicates up to 340mm of rainfall within the nine hours starting 5.00am
on 11 January 2011. It is estimated that this storm was in order of a
100 year ARI event.
The Applicants‟ son present at the pr operty up to initial inundation
advised:
He witnessed water running downhill from the south and which
entered the ground floor of the property at 7.00am on 11
January.
A boat and trailer was taken from a storage shed at 8.00am and
driven off the property. At this stage water was rising rapidly
across the property.
By about 9.00am the water level had reached half way up the
door of a four wheel drive owned and driven by the son.
The rising waters reached the property soon thereafter and
peaked at approximately 1.5m-1.7m above first floor level at
about 9.00pm on 11 January 2011. It is understood nobody was
present at the property by this time.
There was no obvious entry point from where stormwater run-off
entered the ground floor at the rear of the property. The bunding at the
rear of the dwelling and additional grading and concrete surfacing was
no higher than 200-300mm. Considering the intense rainfall, it is
possible that some run-off overtopped the bund and entered the
property up to the likely depth of 100mm.
The locally generated stormwater run-off from the hill to the south of the
property would not have been sufficient to cause any inundation higher
than about 100mm across the ground floor of the home and sheds.
Accordingly, any further inundation would have been the result of
overflow from FB.
The response time of BSC and FB would have been relatively rapid,
primarily due to the steepness of the catchment, which is bounded by
high areas such as Mount Marburg and Mount Stradbroke.
A wooden pallet had been displaced from the roof of the western most
shed confirms there was a significant depth of inundation across the
property.
Interpolation of gauge levels indicates that the peak level of Brisbane
River in the vicinity of the property would have been about 38.5m AHD.
This corresponds well with the reported peak depth of inundation at the
property, considering that the natural surface level of the property is
about 35m AHD.
Case No: 255468 Determination Page 9 of 11
In accordance with the reported timing of when water receded from the
property (5.30pm 12 January), the Brisbane River level had dropped by
about four meters by this time.
The hydrologists conclude that:
inundation was initially the result of stormwater overflow from the
confines of FB and subsequently overflow from the normal
confines of the Brisbane River backing up FB.
It is possible that the intense rainfall caused stormwater run-off
to enter the main home and farm sheds (prior to overflow from
FB) up to a depth no greater than 100mm.
Based on the available evidence at the time of the FSP‟s
inspection it appeared that floodwater is the principle cause of
the loss.
45. The Panel has considered the Applicants‟ position in respect to their loss
and circumstances leading up to the inundation of the home. The Applicants‟
son (PR) was on site at the time of inundation. PR confirms that there was
run-off from the rise to the south of the property but that the major inundation
was the wave of water from Black Snake Creek to the west of the property.
46. PR also confirmed that the water from Black Snake Creek was subsequently
followed by and joined with water from the Brisbane River to the east of the
property.
47. The Panel is satisfied that the evidence of PR confirms that beyond the initial
100mm, the water that inundated the Applicants‟ property was flood water as
defined by the policy.
48. Accordingly, on the basis of the available information and in the absence of
any information to the contrary, the Panel is satisfied that the FSP has, on
the balance of probabilities, established that:
The extent of stormwater run-off inundation was limited to a depth of
100mm.
The proximate cause for the inundation of the property above 100mm is
floodwater.
49. Damage or loss arising from the event flood is clearly excluded under the
terms of the policy and therefore the FSP is entitled to decline indemnity to
the Applicants for that portion of the loss which is the result of floodwaters.
50. The Panel notes the FSP acknowledges having initially in error advised the
Applicants that the claim would be accepted. In the absence of any evidence
to substantiate any prejudice suffered by the Applicants arising from this
error on the FSP‟s behalf, the Panel is not satisfied any further remedial
action is required.
Case No: 255468 Determination Page 10 of 11
Compensation
51. The Panel notes the Applicants‟ claim for compensation and con siders the
following FOS Terms of Reference relevant to this dispute:
“9.3 Other compensation
…
Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial loss
but only where:
an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred; or
in the case of a Dispute pertaining to an individual‟s privacy ri ghts – injury has
occurred to the Applicant‟s feelings or humiliation has been suffered by the
Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
consequential financial loss; or
non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability”
52. Under 9.3(b) of the Terms of Reference (TOR) there must be an unusual
degree or extent of physical inconvenience, time taken to resolve the
situation or interference with the Applicants‟ expectation of enjoyment or
peace of mind occur before compensation for non-financial loss may be
determined.
53. The evidence before the Panel does not establish to its satisfaction that the
Applicants had been prejudiced due to the FSP‟s error (initial advice by
assessor that claim would be accepted) nor have the Applicants established
an unusual degree or extent of physical inconvenience, time taken or
interference with their expectation of enjoyment or peace of mind due to the
actions of the FSP.
54. Accordingly, the Panel is not satisfied there is reasonable cause for it to
award compensation in this instance.
Case No: 255468 Determination Page 11 of 11
Determination
55. On the basis of the available information the Panel determines that the FSP
was entitled to decline further indemnity to the Applicants for the loss
claimed.