Home / Financial Firm (Unknown - Insurer) / Determination 255315
Determination 255315
Denial of claim - flood exclusion
Summary
The applicants' home was inundated during the January 2011 Queensland floods and the insurer declined the building claim under the flood exclusion. AFCA determined the water was flood water and the insurer was entitled to deny liability.
The proximate cause was floodwater, excluded under the policy, and the policy wording clearly informed the insured of that exclusion under s 35 of the Insurance Contracts Act 1984.
Issues
- Claim denial primary · not upheld“The Panel is of the opinion that the water which gave rise to the claim was flood water, which the policy does not cover.”
- Product terms interpretation secondary · not upheld“The Panel is satisfied that the FSP fulfilled its s 35 obligation to clearly inform the Applicants of the flood exclusion.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 255315 Determination Page 1 of 12
Case number: 255315
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Clearly Inform – Accidental Damage Cover - Section
35 Insurance Contracts Act 1984.
27 March 2012
Background
1. The Applicants held a Home Building Insurance Policy (the policy) with the
Financial Services Provider (FSP).
2. The insured property suffered extensive damage arising from the significant
weather events experienced in Queensland during January 2011.
3. The FSP decl ined the Applicants‟ claim on the basis that the loss was due to
the event “Flood”, which is specifically excluded from cover under the policy.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline the
claim and are seeking complete indemnity for their loss.
Summary of Applicants’ position
5. The rainfall records upon which the FSP‟s hydrological records are based
are inaccurate as they relate to areas several suburbs away. Fig Tree
Pocket (FTP) did not have its own rainfall records. Accordingly, this creates
doubt about how much rain actually fell before floodwaters from Brisbane
River (the river) entered the property.
6. The FSP has relied on other cases to support its position however , the
Applicants had never heard of these cases before nor were they included in
the policy Product Disclosure Statement (PDS). The FSP is happy to quote
other cases to support its position, but also states it is not bound by other
insurers‟ decisions that approved stormwater claims in the area.
7. The FSP never visited the property nor noted that the drainage pipes
adjacent to the property are classed as „watercourses‟, rather than drainage
inlets and pipes.
8. The FSP has gone to extreme levels to defend its position, showing the
complexity of this situation, when neighbours have had amicable and
reasonable outcomes with their insurers.
Determination
Case No: 255315 Determination Page 2 of 12
9. The Applicants‟ family have previously held insurance with the FSP in New
South Wales (NSW), and the Applicants were not made aware of the fact
there is a difference in policy coverage available in different states of this
same country.
10. The first water that entered the property was from road gutters and curbing.
The gutters and curbing structures are linked directly to the stormwater inlet
pits in the vicinity, which carry local stormwater which has not drained away
due to the drainage system already being at capacity. The PDS covers loss
or damage arising from water leaking or escaping from “ road gutters or
curbing ”.
11. The damage resulting from water overflowing the road gutters and curbing i n
front of the Applicants‟ property resulted in the first 1.2m of water inundation
with their home. Inundation above 1.2m was due to the river breaking its
banks on 12 January 2011.
12. The river did not break its banks until 12 January 2011, well after the ho use
had been inundated by water escaping from the drainage system. The
Applicants were unaware that the Service had previously determined that a
stormwater drain is a watercourse.
13. The ability of water to escape through the stormwater drains was hindered in
its escape due to other influences at the pipe inlets.
14. If the FSP was aware of this position expressed by the Service and seeks to
rely upon this to decline the Applicants‟ claim , it should have made the
Applicants aware of this earlier and accordingly allowed them the opportunity
to seek alternative insurance elsewhere that did provide cover to them for
such an event.
15. Hydrologists spent a lot of time explaining water sources away from the
property, as this leads to the FSP‟s rejection that water from offs ite sources
inundated the home. However, there was minimal consideration of local
rainfall and no consideration of the saturated ground conditions and excess
seepage of overloaded water tables into their local „basin” landform.
16. The Applicants have made available a statutory declaration from an
individual “SW” who lives in close proximity to the Applicants‟ home and
provides his account of what occurred prior to and over the relevant period.
17. The Applicants are seeking complete indemnity for the cost to repair/replace
the damaged portions of the insured property arising from what they claim to
be stormwater run-off inundation up to a height of 1.2m.
Summary of FSP’s position
18. The expert evidence relied upon by the FSP addresses all relevant local
factors necessary in determining the proximate cause of the damage, as well
Case No: 255315 Determination Page 3 of 12
as, clearly establishing the proximate cause to be “Flood”, which is clearly
excluded from cover under the policy.
19. The FSP in providing the Applicants with the PDS at inception of the policy
(2006), which clearly informs one that loss or damage arising from flood is
not covered, has fulfilled its obligations under Section 35 of the Insurance
Contracts Act 1984 (the Act). The FSP further notes that it is not in dispute
that the FSP provided and the Applicants received the PDS and Certificate
of Insurance (COI).
20. The onus is upon the Applicants to read the policy documentation including
the PDS provided to them by the FSP to ensure the scope of cover provided
meets their requirements. The FSP notes that having received such policy
documentation in 2006, the Applicants had since then to the date of loss in
January 2011, to read their policy.
21. The Applicants have made several allegations in respect to the FSP‟s
management of the claim and the evidence it relies upon i.e. the intention
behind the consultants‟ reports. However, no evidence has been made
available by the Applicants to substantiate these allegations.
22. Decisions made by other insurers under their respective contracts subject to
their own listed provisions and for different properties do not bind the FSP
and/or the Service to applying those circumstances to this dispute.
23. Rainfall data has been obtained from the two nearest weather stations as
well as a third weather station. The data reveals much heavier rain on days
prior to the date of inundation of the property, but on the day of the actual
inundation, there was relatively little rainfall, which had stopped well before
inundation.
24. The site specific hydrology report shows the rising river level caused
discharging or surcharging of the connected drains and pipes, which means
river water escaped “ the normal confines of the river ”, not just over the banks
but also through underground pipes connected to the river.
25. The Applicants have not established , on the balance of probabilities, that the
loss claimed has occurred due to an event insured under the policy. The
Applicants have failed to explain the lack of correlation between local rainfall
and the much later inundation of the property as evidenced by the objective
rainfall and river gauge data recordings. This means local rainfall and could
not have been the sole cause of the inundation.
26. The Applicants have failed to explain why inundation from “ sudden,
excessive run-off of water ” from local rainfal l did not occur on 10 January
2011, when the heaviest rainfall in the area occurred. Rather, it somehow
allegedly occurred after a much lighter rainfall period and well after the
rainfall had ceased and any water had drained away.
27. The connected drainage systems, positive water pressure exerted by the
flooding river , connected water courses, and the discharging of those
Case No: 255315 Determination Page 4 of 12
systems by the flooding river means that the only reasonable finding is that
the proximate cause was escaping from the natural confines of the river.
28. Even if the Applicants were able to establish the existence of an insured
event, this would not overcome the fact that the loss is due to flood damage,
an event which is excluded from cover under the “General Exclusion”
provisions
29. A watercourse is defined to be something that consists of a bed, banks and
water. Both the river and drainage reserve at Biambi Yumba Park (BYP) are
watercourses, as such the damage caused by the water escaping from
either, is excluded pursuant to the flood exclusion.
30. As an alternative argument, even if the Service accepts that the damage was
due to the water leaking or escaping gutters, this would have occurred
contemporaneously with the flood. As such, in line with the „Wayne Tank‟
principle the FSP would be entitled to decline indemnity to the Applicants.
31. The photographic evidence establishes that water overflowed from the river
and inundated the areas surrounding the river, including the Applicants‟
home. It is a matter of the stormwater drains back flowing due to the rising
water level of the river and then the eventual breaking of the banks of the
river, both scenarios involving water from within the confines of the river.
32. The Applicants acknowledge that the water responsible for the inundation of
their home was water that had risen through local stormwater drains and
water from the drainage reserve located at BYP, which the Applicants‟ refer
to as „Duck Park‟.
33. BYP drainage reserve is linked to the river by virtue of a large underground
pipe (1650mm in diameter). Excess water from the river travels through this
underground pipe and is released into BYP‟s drainage reserve (pond).
Accordingly, clearly an “offsite stormwater pipe”, and therefore falls within
the relevant policy exclusion.
34. The FSP acknowledges the Applica nts‟ policy includes cover for loss or
damage arising due to “Accidental Damage”, and that water damage can be
classified as accidental damage. However, the accidental damage cover
provided under the policy is subject to the policy‟s “General Exclusions”,
which exclude from cover loss or damage arising from the event flood.
35. The FSP relies on the following policy provisions:
“Page 15 – Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rains or snow, or
a sudden, excessive run-off of water as a direct result of a storm in your local
area
however
Case No: 255315 Determination Page 5 of 12
we will NOT cover loss or damage caused by flood
…
Page 35 – What you are not covered for – general exclusions
we will Not cover
loss, damage, injury or death that occurs as a result of flood
…
Page 69 – Accidental Damage
is damage that happens to your home or contents caused unintentionally rather
than through a malicious act, and is not covered under any of the incidents
described on pages 6 to17. You can purchase this as an optional cover.
Page 70 – Flood
is the covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood also
includes water escaping from the confines of any reservoir, channel, canal or dam.
Flood is not covered by this Policy.
…
Page 71 – Storm
is a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied
by rain or snow, or a sudden, excessive run-off of water as a direct result of a storm
in your local area. It does not include persistent rain by itself.”
Issues
36. Whether damage to the Applicants‟ property was caused by flood water as
defined by the policy.
37. Whether the FSP was entitled to decline indemnity to the Applicants in line
with the policy.
Relevant Law
Section 35 of the Act provides that, where a claim is made under a prescribed contract
and the event giving rise to the claim is a prescribed event in relation to the contract,
an insurer may not refuse to pay an amount equal to the minimum amount of cover set
out in the regulations made pursuant to the Act unless it can prove that before the
contract was entered into, the insurer clearly informed the insured in writing of the
relevant provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Reasons for decision
38. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
Case No: 255315 Determination Page 6 of 12
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
39. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
40. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this Determination except where considered
relevant.
41. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
42. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active home building insurance policy with the
FSP at the time of loss.
The FSP provided the Applicants with the relevant policy
documentation including the PDS at inception of the policy.
The policy excluded loss or damage arising from the event “Flood”.
The Applicants evacuated the insured property in the later hours of 11
January 2011 prior to the inundation of the dwelling occurred.
The Applicants attended the insured property at approximately
7.00am on 12 January 2011 and remained there until about 8.00am at
which point the property had not yet been inundated.
The insured dwelling was initially inundated by water which arrived
from BYP at the front of the property prior to the river breaking its
banks and causing inundation to a higher depth within the home.
Section 35 of the Act – Clearly inform
43. The Panel is satisfied that it is not in dispute that the Applicants were
provided with the relevant policy documentation. However, in the Applicants‟
submission to the Service, there is an expression of concern in respect to
the “so called plain English” policy wording . Accordingly, this essentially
raises the question as to whether the policy terms satisfy the requirements
under Section 35 of the Act, and “clearly inform” the insured of the scope
and limitations of cover.
44. The FSP refutes the Applicants‟ position that they were not clearly informed
of the terms of the policy. The Applicants were provided with the PDS and
COI at policy inception and subsequent renewal periods including the policy
term within which the loss subject to this dispute arose. Accordingly, it is
entitled to rely upon the relevant flood exclusion to decline indemnity to the
Applicants.
Case No: 255315 Determination Page 7 of 12
45. The issue before the Panel for consideration is whether the policy wording is
reasonably clear and unambiguous to inform a policyholder that the policy
excluded from cover damage arising from the event flood.
46. The Panel is satisfied that the relative provisions have been expressed in
plain English, the policy is indexed, and includes a heading „General
Exclusions‟ which clearly states that loss or damage arising from flood is not
covered. Further, there is a clear notification provided with the definition of
flood provided within the policy, that “ Flood is not covered by this policy ”.
47. Accordingly, the Panel is satisfied that the FSP has fulfilled its obligations
under Section 35 of the Act, to clearly inform the Applicants of the policies
intention to exclude from cover loss or damage arising from flood.
Proximate Cause of the loss
48. The Applicants in disputing the FSP‟s position that the damage claimed is
due to the event flood, maintain that prior to the arrival of floodwater (river
breaking its banks), their home was initially inundated by stormwater run-off.
The stormwater came from the front of the property due to the overflowing of
stormwater drains, gutters (located on the street) and which inundated the
home up to a depth of 1.2m.
49. Although the FSP accepts that the initial inundation of the property occurred
prior to the river breaking its banks, it rejects the contention that the water
responsible for the initial inundation is stormwater run-off. It maintains that
the water that escaped the stormwater drains and gutters arrived from BYP
and was all floodwater. In maintaining its position the FSP has made
available reports submitted by its assessor and appointed h ydrologist “W”. It
also relies on the hydrology reports made available by the Insurance Council
of Australia (ICA).
50. The Panel has reviewed the hydrologists‟ reports and notes that this
information has been exchanged between the parties. Accordingly, the Panel
will only reiterate information it finds relevant in providing this determination.
The relevant information has been noted (summarised) below:
Assessor’s Report
The insured property was assessed on 22 January and estimated the
damage to be in the vicinity of $57,302.
The entry point of the water was through the front from “Duck Park
(BYP)”.
The time of entry is unknown however it was on 12 January, with the
Applicants having evacuated the property on 11 January.
The pond situated in Duck Park flooded prior to the river breaking its
banks.
W’s Site Specific inundation Assessment Report dated 25 October 2011.
The date of inspection was 24 October 2011.
Case No: 255315 Determination Page 8 of 12
The time of inundation of the dwelling is estimated to be approximately
8.00am on 12 January.
The property has a front elevation level of 50mm above the surrounding
ground level at the front entrance.
The property was inundated to a level of 2.4m above floor level.
The Applicants evacuated the property at around 9.00pm on 11 January
after receiving telephone calls from neighbours advising that they were
evacuating their homes.
The Applicants returned to the property at 7.00am on 12 January and
noticed that water had started to inundate the driveway and was rising
steadily. He left at 8.00am at which point the home had not yet been
inundated. However, on returning the property on 13 January he could not
access the property due to the floodwaters.
Recorded one hour rainfall data was obtained from Corinda High Alert
(540071) rainfall station, located 2.1km southeast of the property. The
peak one hour rainfall intensity of 14.8mm/hr occurred at 11.00am on 11
January.
Peak stormwater run-off would have occurred within 30 minutes after
peak rainfall. There were no hourly rainfall depths over 2mm recorded
after 1600hrs on 11 January.
Recorded local rainfall intensities in the vicinity of the property were not
particularly severe for short durations. For the 72 hrs, rainfall had an ARI
of less than one year.
The property is located 0.2km from the river.
A drainage reserve known as Biambi Yumba Park is located immediately
adjacent to (south west) of the property. A large underground pipe
(1650mm in diameter) links the reserve to the river.
The subject property has ground levels ranging from 7.7m AHD to 8.8m
AHD, and the 100 year flood level is 9.7m AHD. The peak water level
during the January 2011 flood at the property was estimated to be 10.8m
AHD.
As the water level in the river increased, floodwaters would have started
to surcharge back up along the underground pipe network before
discharging into the adjacent drainage reserve.
An XP-STORM hydraulic model was developed by W to estimate water
levels in the vicinity of the property.
The lowest point in the bank of the river in the vicinity of FTP is at an
approximate level of about 8.8m AHD. Based on this level the banks
would have been broken sometime around 5.00am on 12 January.
Given the low intensity rainfalls recorded in the vicinity of the property and
the fact the property had not been inundated until at least the morning of
12 January, well after peak level rainfall had occurred, the property could
not have been inundated by stormwater run-off.
Case No: 255315 Determination Page 9 of 12
The initial inundation was from floodwaters surcharging from the pipe in
the drainage reserve and stormwater inlet pits. Following this inundation
the property would have been inundated by direct overland flow at about
11.00am on 12 January by floodwaters from the river.
Additional submission from W dated 5 December 2011
Given the property slopes towards BYP, the subject property would have
initially been inundated by floodwaters that inundated BYP, the road,
then the driveway due to backflow through the underground pipe
drainage.
Prior to floodwaters entering the driveway it had inundated Kenny Street
including the road gutters and curbing. This was floodwater backflow
from the river.
As the river level increased it would have started to backflow up along
the stormwater pipe until it reached the same height as the invert of the
pipe at which point floodwater would have started to flow out of BYP.
The stormwater inlet pipes on Kenny Street are designed to convey
stormwater run-off from the road to the main large underground pipe.
During the January 2011 event, floodwater flowing back up the pipe
would have surcharged out of the inlet pits inundating Kenny Street.
The local catchment area draining to BYP is approximately 0.37km 2 in
the area and run-off generated from this relatively small catchment
would not be sufficient to inundate the property above floor level even
with completely saturated ground conditions.
ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane River
Catc hment January 2011, Volume 2”.
The Panel has considered the ICA hydrology report noted above and notes
of particular relevance contained in the report is the following:
Floodwaters moving down the Brisbane River over the period 9 to 14
January were made up of releases from Wivenhoe Dam and
floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)
Water level response to these „normal‟ flood events in the lower
Brisbane River was dwarfed by the subsequent water level rise
associated with the releases from Wivenhoe Dam over the period 0600
hours on 11 January and 0300 hours on 12 January. (page 1 para 3)
Based on the recorded water level behaviour it was concluded that
releases from Wivenhoe Dam was the principal immediate cause for
flooding along the reach of the Brisbane River downstream of the dam.
(page i para 4)
Rain ceased over the Brisbane City LGA area around 1800 hours on 11
January being about 24 -30 hours before flood levels in the Brisbane
River peaked. (page ii para 3)
Case No: 255315 Determination Page 10 of 12
Given the rainfall across Brisbane City LGA ceased by 1800 hours on
11 January any flooding after this time will have been caused by water
flow inundation from the Brisbane River and its tributary creeks it being
noted that inundation along the tributaries was associated with
backwater flooding from the Brisbane River which in turn was
principally caused by the dam release flood from Wivenhoe Dam. (page
ii para 6)
The following factors affected and exacerbated the nature of flooding in
the Brisbane City LGA over the period 10-14 January.
– Intense rainfalls that occurred over the catchment areas upstream
of Wivenhoe and Somerset Dams.
– A „wet‟ catchment that maxi mised the rate of delivery and volume
of surface run-off resulting in large volumes of floodwater flowing
into the Wivenhoe and Somerset Dams.
– Significant releases from the Wivenhoe Dam made over the
period 11-12 January together with significant out flows from
Lockyer Creek and the Brisbane River.
– In a number of instances high tail water levels in the Brisbane
River and its creeks resulted in backflow, up piped drainage
systems. The backflow led to inundation with waterway
floodwaters of low-lying areas normally drained by the piped
drainage system (pipe backflow inundation.)
Section 10 of the ICA report discussed factors affecting flooding in
Brisbane City LGA Flood behaviour and included the following:
“… However it is clear that the dam release flood fr om Wivenhoe Dam was
the immediate cause of flooding in Brisbane City LGA.” (para 4)
51. The timing of the inundation is crucial to the consideration of whether the
loss was flood or whether it might have been attributable to stormwater run-
off and considered an insured event.
52. The consultants are consistent in the view that inundation from surface run-
off rainwater is generally associated with intense rainfalls of short duration.
53. It was reported that the inundation of water into the Applicants‟ home
occurred on 12 January 2011. Water had not entered the property on 11
January 2011.
54. According to the hydrological evidence three rainfall periods were
experienced across the area of the Applicants‟ property between 9 and13
January 2011. The third event being between 0600 hours and 1600 hours on
11 January 2011.
55. There was no significant rainfall in the area after about 1800 hours on
Tuesday 11 January 2011. Any inundation in the area after this time would
have been due to backwater flooding from the Brisbane River.
Case No: 255315 Determination Page 11 of 12
56. Based on the available information, it is reasonable to conclude the water
inundation to the Applicants‟ home occurred at a significant period after the
last peak rainfall or distinct rainfall event.
57. As there were three significant rainfall events in the area between 9 January
2011 and 13 January 2011, it is also reasonable to conclude that had
surface run-off rainwater entered the home, it would have done so
contemporaneously to the distinct rainfall periods experienced over the
previous days. There is no evidence to support this happening.
58. While the intense rainfall may be regarded as the initial cause for the river
flooding combined with the release of water from the dam, such water is still
classed as flood water when it would have otherwise drained into the river
but is not able to because the river is full.
59. Further, when a mixture of river water and rainwater causes damage to
property, the FSP is entitled to rely on the clause which excludes loss or
damage caused by flood water, this being consistent wit h the “Wayne Tank”
principle.
60. Although the property may have been inundated by a mixture of backflow
water coming up the stormwater drain system and subsequent river flooding,
it is established law that river backflow is properly categorised as floodwater,
and as such is excluded from cover.
61. In considering the evidence as a whole, the Panel is of the opinion that the
water which gave rise to the claim was flood water.
62. The policy does not cover loss or damage caused by flood. For these
reasons the Panel is of the opinion that the evidence does not support a
finding that surface run- off rainwater alone entered the Applicants‟ property;
nor is the Panel persuaded that the risk address may first have been partially
inundated by rainwater run-off and then subsequently by water properly
classified as flood.
63. The Panel notes the Applicants‟ concerns in respect to the rainfall data
gathered from the rainfall stations not situated within FTP rather from
stations situated in nearby suburbs. The Panel notes that the Applicants
maintain that there is no rainfall data available specific to FTP. Under the
circumstances and in line with acceptable practice, the Panel is satisfied that
data from surrounding rainfall stations (within reasonable proximity), in the
absence of a station in FTP, can be reasonably relied upon to determine
rainfall activity in the subject area.
Accidental Damage Cover
64. The Panel notes that the Applicants‟ policy of insurance covers accidental
loss or damage to insured property, therefore considering the circumstances
of the loss, prima facie, they have a claim that falls within the cover provided
by the policy.
Case No: 255315 Determination Page 12 of 12
65. Accordingly, the onus shifts to the FSP to establish that, on the balance of
probabilities, the damage was caused by circumstances which are excluded
from cover under the policy.
66. In light of the matters discussed previously, the Panel is satisfied that the
proximat e cause for the Applicants‟ loss was floodwater inundation. The
Panel notes that the policy excludes cover for loss arising from flood within
the “General Exclusion” provisions which apply to all sections of the policy,
including accidental damage cover.
67. Accordingly, as indemnity available under the accidental damage cover is
also subject to the above noted flood exclusion, this optional cover selected
by the Applicants does not provide cover under the circumstances.
Determination
68. On the basis of the available information the Panel determines that the loss
claimed by the Applicants was the result of flood as defined in the policy and
as such the FSP was entitled to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.