Water damage claim denied under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for January 2011 water inundation that the insurer denied as flood. AFCA found the flood exclusion was clearly disclosed and that the water, which was excluded river flood backing up through drains and a channel, was not covered.

Section 35(2) of the Insurance Contracts Act is satisfied by clear policy wording, and where excluded flood combines with excepted stormwater, the exclusion prevails.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 255025 Determination Page 1 of 9 Case number: 255025 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 19 November 2012 Background 1. The Applicants (JK and MK) insured their home and contents in Riverhills with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 20 October 2010. During this period, the building was insured for complete replacement and the contents for $95,000. 2. On 15 January 2011, the Applicants lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was d ue to “flood”. The Applicants, through their solicitors, have disputed this. 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. Both the Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 6. The Applicants submit the following as alternative arguments in response to the FSP’s decision: a. The FSP’s policy failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). b. The damage was due to stormwater run-off. c. The damage was due to water discharging from the drains across the street along the front of the house. d. The FSP is unable to discharge its onus in establishing the loss was caused by “flood”. Determination Case No: 255025 Determination Page 2 of 9 7. The Applicants seek to be indemnified for their claim. Summary of FSP’s position 8. In response to the Applicants’ arguments, the FSP submits it has provided evidence from an appropriately qualified individual to corroborate that the building and contents policies were sent to the Applicants prior to the claim. Further, the policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. 9. The FSP relies on a site specific hydrology report, the hydrology reports commissioned by the Insurance Council of Australia (ICA) and the following policy provisions to deny the Applicants’ claim : “ What we cover – insured events This section described under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events … Yes Storm and rainwater including stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface … No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Issues 10. Whether the policy clearly informed the Applicants that they were covered for flood. 11. Whether the FSP is entitled to deny the claim. Case No: 255025 Determination Page 3 of 9 Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. On 13 November 2012, the Panel Chair Ombudsman attended on site where he met with the male Applicant and representatives of the FSP. 15. It is appropriate to consider the issues under the various headings. Does the FSP’s policy clearly inform the Applica nts flood is not covered? 16. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 17. There is no dispute that contracts of insurance covering a person’s home an d contents are a “prescribed contract” and damage due to flood is a “prescribed event”. 18. The onus is therefore on the FSP to establish that it has clearly informed the Applicants prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 19. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that are particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood Case No: 255025 Determination Page 4 of 9 covered" is easily ascertainable by any person of average intelligence and education.” 20. In their submissions the Applicants have not disputed receiving both policies. Instead, they state they do not recall receiving the policies prior to paying the insurance premium. 21. The Panel notes the Applicants first insured with the FSP in 1998. 22. Given the Applicants’ submi ssion contains no allegation that the PDSs were never received and the FSP’s evidence regarding dispatch of documentation is consistent with the guidelines set out in Circular 3 “Dispatch of Documents”, the Panel accepts it is more probable than not that t he Applicants did receive both policies well before the claim arose. The policy structure 23. In relation to the policy structure itself, the Applicants have provided a number of submissions to argue that the relevant terms relied upon by the FSP are ambiguous. 24. The Applicants’ insurance policies regarding the building and contents are set out in two different policy documents. However, the relevant terms and structure are essentially identical. 25. Upon reviewing the policies, the Panel accepts that a person of average intelligence and education would readily ascertain that “flood” is not covered given the following:  The policy contains an index on the front;  One of the headings contained in this index is “What we do not cover – general exclusions”, in which most people would expect to find any exclusions of cover;  Upon turning to the appropriate page, an insured would find that flood is excluded;  The definition of relevant terms is set out under the heading “What do we mean by that”, which is referred to in the i ndex and is where an insured would reasonably expect to find defined terms;  The FSP has also placed this exclusion with prominence alongside the insured event of “Storm and rainwater” given it is likely this exclusion would be most applicable under this insured event. 26. The Applicants have stated the actual definition of the term “flood” is confusing when its structure is considered: “ Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or Case No: 255025 Determination Page 5 of 9 is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. 27. In reviewing this definition the Panel notes it begins by referring to the inundation or covering of normally dry land by water. This, in itself, is clear. 28. Following this, the definition refers to three different types of situations that leads to this outcome, namely:  Water that escapes or overflows from the normal confines of any watercourse …  Water that cannot enter (because it is full or has overflowed) the normal confines of any watercourse …  Water that is prevented from entering (because other water has already escaped or been released from it) the normal confines of any watercourse. 29. For the sake of clarity, the definition has only articulated the sentence “the normal confines of any watercourse…” once, at the bottom of the three scenarios, given it is consistently applied to all of them. 30. Based on the structure of this definition, it is clear there are three types of water inundation that fall within the term “flood”. In the Panel’s opinion, these are sepa rate and distinct given the use of the conjunctive “or”. Accordingly, even if the Panel was to accept that one of these situations was unclear or ambiguous, it could be severed from the contract and the others would still apply. 31. In relation to the first situation, the Panel considers this definition is clear as it reflects the common definition used by many insurers and consistent with the definition referred to by the Act. 32. In relation to the second and third aspects, the Panel considers the definitions are relatively clear. That is, if water is unable to drain into any watercourse, lake, reservoir, canal, dam or stormwater channel because it is full, has overflowed or other water has escaped or been released from it, it is deemed “flood”. This interpretati on is consistent with the ordinary and natural meanings of the words used within their context of this definition. 33. The Panel therefore accepts the “flood” definition is clear for the purposes of Section 35 of the Act. It therefore follows the FSP is entitled to rely on same, provided it is able to establish its applicability to the circumstances of this case. Case No: 255025 Determination Page 6 of 9 Water Inundation 34. The FSP has relied substantively on a site specific hydrology report dated 14 October 2011 that contains the following of relevance:  MK provided evidence that water entered the home late on Tuesday night. By Wednesday morning, it was knee deep. He and his wife evacuated the property when the water level was approximately 2m.  The property is located approximately 480m south of the Brisbane River and immediately south to an open channel. This open channel discharges directly into the Brisbane River.  The front level of the house is at ground level. The ground levels of the property vary between 11.4m AHD and 12.1m AHD. The peak flood level was 14.4m AHD.  Recorded hourly rainfall totals from the Jindalee Station were obtained. This station is located 3.8km north-east of the property. The peak 1 hour rainfall intensity of 20.6mm/hr occurred at 11.00am on Tuesday 11 January 2011. The local rainfalls were not particularly severe as higher peak rainfall intensities were regularly experienced in Brisbane. No rainfall was recorded at the station after 7.00pm on 11 January 2011.  The property is located within a topographical depression along S Road. There is a stormwater catchment of approximately 6.6ha that drains to the depression via both overland and pipe flow. Peak stormwater runoff from the surrounding catchment would have occurred within 10 to 30 minutes after the peak rainfall.  Brisbane River levels were obtained from the Jindalee Alert station (3.8km north-east downstream of the property) and Moggill Alert (5.4km south-west upstream of the property). Based on an interpolated hydrograph between these stations, the property would have been inundated above floor level by 3.00am on 12 January 2011.  The property is located within the extent of Brisbane River flooding. Floodwater would have backed up along the open channel located north of the property and overflowed S Road to inundate the property. 35. Based on the above, the hydrologist concluded as follows: “The house at the subject property was inundated to a depth of approximately 2.6m above floor level by floodwaters from the Brisbane River that backed up along the open channel and overflowed S Road. Stormwater runoff could not have inundated the house above floor level, as the reported time of initial inundation occurred 3 to 4 hours after rainfall in the area had ceased.” 36. The Applicants initially stated that the damage was due to stormwater runoff that surcharged from the drains. However, the Panel does not consider it is probable stormwater runoff inundated the property given the following: Case No: 255025 Determination Page 7 of 9  According to the Applicants’ evidence, the property had not been inundated until either late evening on 11 January 2011 or early morning on 12 January 2011.  Stormwater runoff inundation is normally contemporaneous to peak intense rainfall, which in this case occurred almost 12 hours prior to the inundation. Further, no rainfall fell after 7.00pm on 11 January 2011.  The inundation was proximate to the rising levels of the Brisbane River. 37. The Applicants’ evidence is that the water which inundated the property came out of the stormwater drains from across the street. They provided the following description in their solicitors’ letter dated 16 June 2011: “The water was coming across the street from the storm water drain. The drain is across the road on [S] Road. Directly over the road there is a bus stop with a white railing fence bordering the road where the bus pulls over. There is a big ditch which is like a sump opening for drainage behind where the bus stop is, it borders a park area/vacant land. My husband went down to look at the drain at about 1.30am Wednesday morning. It was hard because it was very dark but they could hear the water gushing out. We started moving our stuff to the upstairs of our house. Downstairs was all our storage plus a bedroom where my brother was living. We just watched the water coming higher and higher from there. There wasn’t much we could do but just wait.” 38. The Applicants therefore maintain that even if stormwater runoff did not cause the loss, loss or damage caused by the inundation is still compensable given the following exception to the flood exclusion: “ Flood does not mean … wate r escaping from any water main, drain, pipe, street gutter, guttering or surface” 39. The Panel Chair Ombudsman attended on site and had an opportunity to review a range of images of the locality and particularly the Applicants’ house and the topographical features adjacent to their house in the street. As identified by the hydrologist, there is an open channel directly across the road behind the bus stop that is also where the Applicants state the water came from. The hydrologist theorised that the Brisbane River backed up into this stormwater channel which then overflowed onto S Road. 40. This is relatively consistent with the Applicants’ evidence, particularly given the direction the Applicants state the water came from. However, the Applicants have maintained that they observed water surcharging from the drains across the street and state it was this water that ultimately inundated the property. 41. The Applicants provided a copy of the water and stormwater network relative to their property. The Panel notes the drains located across the street from the property drain into the open channel located behind the bus stop across the street. The Panel Chair Ombudsman was able to confirm this during the onsite visit. Given this, it is therefore reasonable to presume that water backing up from the Brisbane River into the open channel would likely back up through the stormwater drains that normally discharge into it. This would Case No: 255025 Determination Page 8 of 9 result in the backing up of water in the channel surging through these drains and into the street, co nsistent with the Applicants’ evidence. 42. The issue, however, is whether the water in the channel increased to such an extent that it was able to overtop the street, travel overland and inundate the Applicants’ property. It is unclear based on the Applicants’ evidence whether the water that they saw heading towards their home did not include at any stage water from the channel overtopping the road, merging with the water surcharging from the drains and combining together to inundate the property given the following:  The Applicants’ version acknowledged that it was dark and hard to see.  They stated that MK could hear water gushing out of the drains at 1.30am but it appears water did not reach the property until sometime later.  Although the Applicants state they could observe the water getting higher, it is unclear whether they could observe where the water was coming from. This appears unlikely given it was dark and according to the written description provided, MK could only hear water coming out of the drains rather than see this phenomenon. 43. The Panel has reviewed the topography of the area included in the site specific hydrology report. The ground level where the bus stop is located is approximately 1 metre lower than the ground level of the Applica nts’ property. Accordingly, water surcharging from the drains around this area would require to pool and travel upwards gradually before it was in a position to inundate the property. 44. During this period of pooling, and consistent with the hydrological evidence it is likely that the water backing up the open channel from the Brisbane River would have continued to increase to such an extent that it was of sufficient depth to overtop the street level surrounding the bus stop location. It is also reasonable and probable to accept that this water then combined with the water that had been pooling from the surcharging drains to inundate the Applicants’ property. 45. The Panel also notes that the land falls away quite steeply from the bus stop area, where the drains are located (and directly across the street from the home) towards the channel to the north. Given the land falls away to the channel to the north, any water escaping from the drains would naturally run down towards the channel and away from the Applicants’ home. 46. In the Panel’s view water from the drains would only be able to run towards the Applicants’ home if the channel had filled with water from the Brisbane River and continued to rise to the extent where it had reached the height of the bus stop area and continued to rise further towards the home. At that point this would have been a combination of water backflowing from the drains and water backflowing from the river up the open channel and across normally dry land (S Road ) and then to the Applicants’ h ome. Case No: 255025 Determination Page 9 of 9 47. Given this scenario is consistent with the Applicants’ evidence, the hydrologist’s report and the topography of the area, the Panel accepts this is what occurred on the balance of probabilities. 48. In such circumstances, the Applicants’ loss is therefore caused by a combined effect of water that falls within the flood exclusion and water that fell within the exception to the flood exclusion. Case law has stated that when damage is caused in such a situation, the exclusion shall prevail over the exception (Petersen v Union des Assurances IARD (1995) 8 ANZ Ins Cases 61-244). 49. Given this, the Panel therefore accepts the FSP was entitled to deny liability for the claim based on the “Flood” exclusion. Determination 50. On the basis of the available information the Panel determines the FSP is entitled to deny the claim on the basis of the “Flood” exclusion.