Home / Financial Firm (Unknown - Insurer) / Determination 254880

Determination 254880

Flood damage claim under body corporate strata policy denied

FirmFinancial Firm (Unknown - Insurer)
Decided2012-01-27
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A unit owner under a body corporate strata policy claimed for flood damage from the January 2011 Brisbane floods, and the FSP declined as flood was excluded. AFCA found the water was river flood backflow rather than stormwater run-off, the policy wording clearly excluded flood, and nothing was ordered.

Backflow from a river into the drains is floodwater under the policy definitions and is excluded, and the PDS clearly referred to the flood exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 254880 Determination Page 1 of 10 Case number: 254880 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood – Clearly Inform - Denial of claim 27 January 2012 Background 1. The Applicant‟s property was insured under a Residential Strata Insurance policy (the policy) issued to the Body Corporate Management (body corporate) of the unit complex. 2. The Applicant lodged a claim seeking indemnity for extensive damage arising from the significant weather events experienced in Queensland (Qld) during January 2011. 3. The FSP declined the claim on the basis that the policy does not provide indemnity for loss or damage a rising from the event “Flood”. 4. The Applicant remains dissatisfied with the FSP‟s decision to decline the claim and in disputing the FSP‟s decisio n has sought a review by the Service. Summary of Applicant’s position 5. The Applicant maintains that prior to January 2011; the FSP had never provided him with a copy of the Product Disclosure Statement (PDS), the policy or the Certificate of Insurance (COI). 6. In order to understand the nature of the policy, the Applicant submits that he would have to read it cover to cover and have a memory of sufficient quality, as there is no referencing from page to page. 7. The FSP has an obligation to ensure the policy wording is expressed clearly and any ambiguity is to be constructed in a manner most favourable to the Applicant. 8. The FSP has an obligation to obtain all necessary information prior to coming to a decision on a claim, which the Applicant maintains the FSP failed to do on this occasion. 9. The FSP has sought to decline the Applicant‟s claim based on the opinion of the appointed loss adjuster “M” and the Insurance Council of Australia (ICA) Hydrology report that does not deal specifically with the insured address. Determination Case No: 254880 Determination Page 2 of 10 10. The ICA hydrology Report Volume 3 clearly states that data in the report has not been formally quality checked by the ICA Panel and “ it is not intended to be used and should not be used to ascertain flooding behaviour at the individual property level.” 11. In failing to obtain a site specific report after the loss and subsequent lodgement of the claim, the FSP has failed its obligations to act with utmost good faith. 12. The Applicant attempted to mitigate his loss and as much as possible was removed from the property prior to be evacuated. The Applicant was not present at the time of inundation and accordingly an eyewitness account is not available. 13. The unit complex is situated in a small valley between a series of hills. In the past it has suffered from drain blockage e.g. in 2007 after an overnight storm the water had come up over the gutters and peaked above the electric motor and security gate (above door handles of the vehicles parked there). 14. A neighbour claims to have witnessed water bubbling up from the stormwater drain outside his property. Also, the body corporate secretary advised that the water never entered the property from the riverside of the property rather entered from the street side. 15. The Applicant disputes the FSP‟s contention that the water entered the property on the morning of 12 January 2011. A neighbour was evacuated from the property by boat on 12 January 2011 which is inconsistent with the water not inundating the property until 12 January 2011. 16. The Applicant is adamant that the insured property was initially inundated by stormwater run-off, and then later further inundated by the flood water from the Brisbane River (the river). 17. The Applicant acknowledges that the property was subsequently inundated by floodwater, however without specific conclusive hydrology evidence, it would be impossible to determine whether and at what point in time the home was inundated. 18. As the first event (stormwater run-off) is caught by the policy and the extent of damage of this aspect of the loss cannot be acc urately determined, the complete extent of his loss (building and contents) should be covered under the claim. Summary of FSP’s position 19. In declining the Applicant‟s claim the FSP maintains:  The insured property was inundated up to a height of 2.2m on 12 January 2011. Case No: 254880 Determination Page 3 of 10  The property is located within close proximity to the Brisbane River (the river).  The policy in providing indemnity for accidental damage clearly excludes cover for loss or damage arising from “Flood”.  The hydrologist W commissioned by the FSP to undertake a site specific assessment of the insured property concluded that the damage is the result of floodwater from the river.  W‟s findings must be accepted over the Applicant‟s submission.  The ICA reports conclude that the damage was caused principally by the Wivenhoe Dam (the dam) releases into the river.  The inundation of the property is consistent with the time the river peaked and after heavy rain in the Brisbane LGA had effectively stopped.  The hydrology evidence establishes that the heavy rainfall that fell in the Brisbane LGA was “inconsequential” and therefore, inadequate to cause a flash flood.  As opposed to the Applicant‟s contention that water coming up through the stormwater drainage system is not flood, the FSP maintains that the water came up through the drains from the river and therefore is still considered flood damage under the circumstances.  The damage claimed falls within the definition of river flood provided within the policy and as such is specifically excluded. 20. The Applicant is a beneficiary and not an insured under the policy. The insured is the “Body Corporate of [Applicant‟s street] on the River” (the insured). The disclosure requirements under the Insurance Contracts Act 1984 (the Act) only apply to an insured. Accordingly, the FSP was under no obligation to prove the Applicant with the PDS and this obligation was limited to providing it to the insured, which it claims to have done. 21. The FSP relies on the policy provisions which have been noted and discussed in the below “Reason for decision” section of this determination. Issues 22. Whether the FSP is entitled to decline indemnity to the Applicant for the claimed loss in line with the policy. 23. Whether the FSP has failed in its obligations to clearly inform the Applicant of the exclusion of loss or damage arising from flood under the policy. Case No: 254880 Determination Page 4 of 10 Reasons for decision 24. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 25. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 26. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 27. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 28. The Panel notes the parties do not dispute the following:  The policy has been issued in the name of the “Body Corporate for [Applicant‟s street] on the River.  The Applicant as the owner of a unit within the complex is a member of the body corporate responsible for taking out the policy with the FSP.  The insured property is in very close proximity to the river.  The property may have been inundated by a mixture of backflow water coming up the stormwater drain system and subsequent river flooding.  The Applicant had been evacuated from the property and as such is not in a position to provide a witness account in respect to the inundation.  The inundation of the property has resulted in significant loss and / or damage to the insured property.  The property had not yet been inundated during the later hours of 11 January 2011.  A neighbour of the Applicant was evacuated by boat from her property in the early hours of 12 January 2011at which point the insured property was already inundated above floor level.  The FSP arranged for a site specific assessment by hydrologists W. 29. The Panel notes the Applicant has raised multiple concerns in relation to his dissatisfaction with the FSP‟s decisions to decline the claim. For the sake of brevity and the easy understanding of the parties, the Panel will consider these concerns under the below sub-headings. Case No: 254880 Determination Page 5 of 10 Provision of the policy documentation 30. The Applicant maintains that the FSP has failed in its obligations under the Act to provide him with the relevant policy wording, policy and COI. 31. The FSP in responding to the Applicant‟s allegation in this respect maintains that the Applicant is not the insured for the purpose of the policy and as such it was not obliged to provide the relevant policy documentation to him. Rather the insured on the policy is the body corporate and to which it had made available the required policy documentation. 32. The Panel is satisfied that, the body corporate in arranging the insurance cover in line with the approval of its members (Applicant included) does so on behalf and in essence as a representative of its members. Therefore, the obligations of the FSP to make available the relevant policy documentation are deemed satisfied if and when such documentation is provided to the insured (body corporate). 33. Further, the Panel notes there is no allegation and or evidence made available to establish that the FSP had not provided the relevant policy wording and documentation to the body corporate. Accordingly, in absence of any evidence to the contrary, the Panel is satisfied that the FSP on the balance of probabilities has fulfilled its obligations under the Act to provide the relevant policy documentation to the insured. 34. The policy terms and conditions and relevant documentation would in all probability be easily available to the Applicant on approaching the body corporate management. Clearly Inform 35. Having established that the FSP had fulfilled its obligations to provide the insured with the relevant policy documentation, the next issue for consideration is whether the policy wording is sufficiently clear to inform an insured of the exclusion of flood cover. 36. The Panel notes that the Applicant has alleged that he was not in receipt of the policy wording and as such an allegation that he may have been prejudiced by what he contends to be unclear/confusing policy wording would not be regarded as a reasonable argument. However, for the sake of completeness the Panel has carefully considered the policy wording. The Panel notes:  The opening pages of the PDS provide a detailed index for the contents of the document with headings and sub-headings referring the reader to the page numbers relating to different sections of the policy. Within the index are the following headings and information: “ Important Information and Notices … What you are covered for 2 Case No: 254880 Determination Page 6 of 10 What you are not covered for 5 … Residential Strata Insurance Plan … General Definitions – the meanings of some words 13 General conditions – which apply to all policies unless otherwise stated 19 General exclusions – what we do not insure under the policy 20 … Policy 1 – Insured Property … Exclusions – what we do not insure 31” 37. Having reviewed these pages the Panel notes the policy wording provides: “Page 5 – What you are not covered for There are certain times when this insurance may not provide cover. Some events we may not provide cover include: Policy 1 – Insured Property … Damage caused by flood, or by sea, high water or tidal wave other than caused by tsunami (see Exclusions 1a and 1f of Policy 1 ) … Page 13-19 General Definitions - the meaning of some words Flood means when water that is normally contained in a Water Catchment System increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water. … Water Catchment System means: a a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain; b a dam, reservoir, storm water channel or canal. … Page 31 – Exclusions – What we do not insure 1 We will not pay for loss or damage a caused by Flood.” Case No: 254880 Determination Page 7 of 10 38. In light of the above noted policy provisions and the reference to them in the opening pages of the PDS, the Panel is satisfied that the PDS provides a clear reference to the relevant sections of the policy and the wording is reasonably clear and unambiguous in respect to the exclusion of flood cover under the policy. 39. Accordingly, the Panel is satisfied that the FSP has fulfilled its obligations to make available clear and unambiguous policy wording in respect to the cover available and/or excluded by the contract regarding flood cover. Cause of the damage 40. The Applicant maintains that the property was inundated by stormwater run- off which bubbled up from the stormwater drainage system in front of the property. Also, that this occurred prior to the arrival of the river floodwater and therefore as damage due to stormwater run-off is covered under the policy the FSP is obliged to cover him for his loss. 41. Further, that although he acknowledges that the property was subsequently further inundated by floodwater from the river, it is impossible to determine the extent of damage caused by each event of flooding (as in policy included and policy excluded) and therefore the FSP should provide indemnity for the full extent of his loss. 42. The FSP notes that the Applicant was not present at the property at the time of inundation and as such cannot provide a witness account of the time and/or cause of inundation. It has referred to hydrological evidence made available by the ICA and also W (hydrologist commissioned by the FSP) and submits this evidence must be accepted over the Applicant‟s position. 43. In considering the positions of the parties in respect to the cause of the inundation the Panel has reviewed the hydrology reports and notes these reports provide the following information: ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane River Catchment January 2011, Volume 2”. Of particular relevance contained in the report is the following:  Floodwaters moving down the Brisbane River over the period 9 to 14 January were made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)  Water level response to these „normal‟ flood events in the lower Brisbane River was dwarfed by the subsequent water level rise associated with the releases from Wivenhoe Dam over the period 0600 hours on 11 January and 0300 hours on 12 January. (page 1 para 3)  Based on the recorded water level behaviour it was concluded that releases from Wivenhoe Dam was the principal immediate cause for flooding along the reach of the Brisbane River downstream of the Dam. (page i para 4) Case No: 254880 Determination Page 8 of 10  Rain ceased over the Brisbane City area around 1800 hours on 11 January being about 24 -30 hours before flood levels in the Brisbane River peaked. (page ii para 3)  Given the rainfall across Brisbane City LGA ceased by 1800 hours on 11 January any flooding after this time will have been caused by water flow inundation from the Brisbane River and its tributary creeks it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River which in turn was principally caused by the dam release flood from Wivenhoe Dam. (page ii para 6)  The following factors affected and exacerbated the nature of flooding in the Brisbane City LGA over the period 10-14 January. – Intense rainfalls that occurred over the catchment areas upstream of Wivenhoe and Somerset Dams. – A „wet‟ catchment that maximised the rate of delivery and volume of surface runoff resulting in large volumes of floodwater flowing into the Wivenhoe and Somerset Dams. – Significant releases from the Wivenhoe Dam made over the period 11-12 January together with significant out flows from Lockyer Creek and the Brisbane River. – In a number of instances high tail water levels in the Brisbane River and its creeks resulted in backflow, up piped drainage systems. The backflow led to inundation with waterway floodwaters of low-lying areas normally drained by the piped drainage system (pipe backflow inundation.)  Section 10 of the ICA report discussed factors affecting flooding in Brisbane City LGA Flood behaviour and included the following: “… However it is clear that the dam release flood from Wivenhoe Dam was the immediate cause of flooding in Brisbane City LGA.” (para 4) And; „ W’ Report da ted 3 October 2011 in respect to a site inspection undertaken on 27 September 2011.  The insured property has an approximate floor level of 0.8m above surrounding ground level and was inundated to a depth of about 1.6m above floor level.  The property is located 70 metres from the river with Oxley Creek mouth gauge 8kms upstream and Brisbane City gauge 7.9kms downstream of the property.  The Applicant was not at the property at the time of inundation. A neighbour of the Applicant was evacuated by boat in the early hours of 12 January 2011 at which time she noted the insured property was inundated above floor level. Case No: 254880 Determination Page 9 of 10  The recorded rainfall levels at the Toowong Alert Rainfall station located 3.4kms North West of the insured property shows a peak one hour rainfall intensity of 18.5 mm/hr at 10.30am on 11 January 2011.  Peak stormwater run-off from the surrounding catchment area would have occurred within 30 mins after the peak rainfall.  No rainfall was recorded at the Toowong Alert Rainfall station after 11.30pm on 11 January 2011.  The recorded rainfalls were not particularly severe for short durations, higher peak rainfalls are regularly experienced in Brisbane.  The Brisbane City Council Floodwise report states ground levels at the property are between 4.7mAHD and 9.0mAHD, while the 100 year average re-occurrence internal (ARI) flood level is 6.2mAHD. The peak level of river during the January event at the property was 7.1mAHD.  Based on the observed depth of inundation, ground level water would have reached the property at approximately 1.30am on 12 January 2011.  Due to the property being 0.8m above ground level the floor level would have been inundated at approximately 6.30am on 12 January 2011.  Water observed discharging from the stormwater drain inlet at the front of the property late on 11 January 2011 was floodwater backflow from the river.  The report concludes that the property was inundated well after rainfall in the area had ceased and therefore it would be inconsistent with stormwater run-off inundation. Rather, W concludes that the property was inundated by floodwaters from the river. 44. The timing of the inundation is crucial to the consideration of whether the loss was flood or whether it might have been attributable to stormwater run- off and considered an insured event. 45. The consultants are consistent in the view that inundation from surface run- off rainwater is generally associated with intense rainfalls of short duration. 46. It was reported that the inundation of water into the Applicant‟s home occurred on 12 and 13 January 2011. Water had not entered the property on 11 January 2011. 47. According to the hydrological evidence three rainfall periods were experienced across the area of the Applicant‟s property between 9 and13 January 2011. The third event being between 0600 and 1600 hours on 11 January 2011. 48. There was no rainfall in the western suburbs around Highgate Hill after about 1800 hours on Tuesday 11 January 2011. Any inundation in the area after this time would have been due to backwater flooding from the Brisbane River. Case No: 254880 Determination Page 10 of 10 49. Based on the available information, it is reasonable to conclude the water inundation to the Applicant‟s home occurred at a significant period after the last peak rainfall or distinct rainfall event. 50. As there were three significant rainfall events in the area between 9 January 2011 and 13 January 2011, it is also reasonable to conclude that had surface run-off rainwater entered the home, it would have done so contemporaneously to the distinct rainfall periods experienced over the previous days. There is no evidence to support this happening. 51. While the intense rainfall may be regarded as the initial cause for the rivers and creek flooding and release of water from the dam, such water although it may not have come directly from within the banks of the river, is still classed as flood water when it would have otherwise drained into the river but is not able to because the river is full. 52. Further, when a mixture of river water and rainwater causes damage to property, the FSP is entitled to rely on the clause which excludes loss or damage caused by flood water, this being consistent with the “Wayne Tank” principle. 53. Although the property may have been inundated by a mixture of backflow water coming up the stormwater drain system and subsequent river flooding, it is established law that river backflow is properly categorised as floodwater, and as such is excluded from cover. 54. In considering the evidence as a whole, the Panel is of the opinion that the water which gave rise to the claim was flood water. 55. The policy does not cover loss or damage caused by flood. For these reasons the Panel is of the opinion that the evidence does not support a finding that surface run- off rainwater alone entered the Applicant‟s properties; nor is the Panel in a position to co nclude the risk address may first have been partially inundated by rainwater run-off and then subsequently by water properly classified as flood. Determination 56. On the basis of the available information the Panel determines that the FSP was entitled to deny liability for the damage claimed under the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.