Home / Financial Firm (Unknown - Insurer) / Determination 254880
Determination 254880
Flood damage claim under body corporate strata policy denied
Summary
A unit owner under a body corporate strata policy claimed for flood damage from the January 2011 Brisbane floods, and the FSP declined as flood was excluded. AFCA found the water was river flood backflow rather than stormwater run-off, the policy wording clearly excluded flood, and nothing was ordered.
Backflow from a river into the drains is floodwater under the policy definitions and is excluded, and the PDS clearly referred to the flood exclusion.
Issues
- Claim denial primary · not upheld
“the Panel determines that the FSP was entitled to deny liability for the damage claimed under the policy.”
- Failure to disclose secondary · not upheld
“the wording is reasonably clear and unambiguous in respect to the exclusion of flood cover.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 254880 Determination Page 1 of 10
Case number: 254880
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood – Clearly Inform - Denial of claim
27 January 2012
Background
1. The Applicant‟s property was insured under a Residential Strata Insurance
policy (the policy) issued to the Body Corporate Management (body
corporate) of the unit complex.
2. The Applicant lodged a claim seeking indemnity for extensive damage
arising from the significant weather events experienced in Queensland (Qld)
during January 2011.
3. The FSP declined the claim on the basis that the policy does not provide
indemnity for loss or damage a rising from the event “Flood”.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline the
claim and in disputing the FSP‟s decisio n has sought a review by the
Service.
Summary of Applicant’s position
5. The Applicant maintains that prior to January 2011; the FSP had never
provided him with a copy of the Product Disclosure Statement (PDS), the
policy or the Certificate of Insurance (COI).
6. In order to understand the nature of the policy, the Applicant submits that he
would have to read it cover to cover and have a memory of sufficient quality,
as there is no referencing from page to page.
7. The FSP has an obligation to ensure the policy wording is expressed clearly
and any ambiguity is to be constructed in a manner most favourable to the
Applicant.
8. The FSP has an obligation to obtain all necessary information prior to
coming to a decision on a claim, which the Applicant maintains the FSP
failed to do on this occasion.
9. The FSP has sought to decline the Applicant‟s claim based on the opinion of
the appointed loss adjuster “M” and the Insurance Council of Australia (ICA)
Hydrology report that does not deal specifically with the insured address.
Determination
Case No: 254880 Determination Page 2 of 10
10. The ICA hydrology Report Volume 3 clearly states that data in the report has
not been formally quality checked by the ICA Panel and “ it is not intended to
be used and should not be used to ascertain flooding behaviour at the
individual property level.”
11. In failing to obtain a site specific report after the loss and subsequent
lodgement of the claim, the FSP has failed its obligations to act with utmost
good faith.
12. The Applicant attempted to mitigate his loss and as much as possible was
removed from the property prior to be evacuated. The Applicant was not
present at the time of inundation and accordingly an eyewitness account is
not available.
13. The unit complex is situated in a small valley between a series of hills. In the
past it has suffered from drain blockage e.g. in 2007 after an overnight storm
the water had come up over the gutters and peaked above the electric motor
and security gate (above door handles of the vehicles parked there).
14. A neighbour claims to have witnessed water bubbling up from the
stormwater drain outside his property. Also, the body corporate secretary
advised that the water never entered the property from the riverside of the
property rather entered from the street side.
15. The Applicant disputes the FSP‟s contention that the water entered the
property on the morning of 12 January 2011. A neighbour was evacuated
from the property by boat on 12 January 2011 which is inconsistent with the
water not inundating the property until 12 January 2011.
16. The Applicant is adamant that the insured property was initially inundated by
stormwater run-off, and then later further inundated by the flood water from
the Brisbane River (the river).
17. The Applicant acknowledges that the property was subsequently inundated
by floodwater, however without specific conclusive hydrology evidence, it
would be impossible to determine whether and at what point in time the
home was inundated.
18. As the first event (stormwater run-off) is caught by the policy and the extent
of damage of this aspect of the loss cannot be acc urately determined, the
complete extent of his loss (building and contents) should be covered under
the claim.
Summary of FSP’s position
19. In declining the Applicant‟s claim the FSP maintains:
The insured property was inundated up to a height of 2.2m on 12
January 2011.
Case No: 254880 Determination Page 3 of 10
The property is located within close proximity to the Brisbane River (the
river).
The policy in providing indemnity for accidental damage clearly
excludes cover for loss or damage arising from “Flood”.
The hydrologist W commissioned by the FSP to undertake a site
specific assessment of the insured property concluded that the damage
is the result of floodwater from the river.
W‟s findings must be accepted over the Applicant‟s submission.
The ICA reports conclude that the damage was caused principally by
the Wivenhoe Dam (the dam) releases into the river.
The inundation of the property is consistent with the time the river
peaked and after heavy rain in the Brisbane LGA had effectively
stopped.
The hydrology evidence establishes that the heavy rainfall that fell in
the Brisbane LGA was “inconsequential” and therefore, inadequate to
cause a flash flood.
As opposed to the Applicant‟s contention that water coming up through
the stormwater drainage system is not flood, the FSP maintains that the
water came up through the drains from the river and therefore is still
considered flood damage under the circumstances.
The damage claimed falls within the definition of river flood provided
within the policy and as such is specifically excluded.
20. The Applicant is a beneficiary and not an insured under the policy. The
insured is the “Body Corporate of [Applicant‟s street] on the River” (the
insured). The disclosure requirements under the Insurance Contracts Act
1984 (the Act) only apply to an insured. Accordingly, the FSP was under no
obligation to prove the Applicant with the PDS and this obligation was limited
to providing it to the insured, which it claims to have done.
21. The FSP relies on the policy provisions which have been noted and
discussed in the below “Reason for decision” section of this determination.
Issues
22. Whether the FSP is entitled to decline indemnity to the Applicant for the
claimed loss in line with the policy.
23. Whether the FSP has failed in its obligations to clearly inform the Applicant
of the exclusion of loss or damage arising from flood under the policy.
Case No: 254880 Determination Page 4 of 10
Reasons for decision
24. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
25. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
26. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
27. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
28. The Panel notes the parties do not dispute the following:
The policy has been issued in the name of the “Body Corporate for
[Applicant‟s street] on the River.
The Applicant as the owner of a unit within the complex is a member of
the body corporate responsible for taking out the policy with the FSP.
The insured property is in very close proximity to the river.
The property may have been inundated by a mixture of backflow water
coming up the stormwater drain system and subsequent river flooding.
The Applicant had been evacuated from the property and as such is not
in a position to provide a witness account in respect to the inundation.
The inundation of the property has resulted in significant loss and / or
damage to the insured property.
The property had not yet been inundated during the later hours of 11
January 2011.
A neighbour of the Applicant was evacuated by boat from her property
in the early hours of 12 January 2011at which point the insured
property was already inundated above floor level.
The FSP arranged for a site specific assessment by hydrologists W.
29. The Panel notes the Applicant has raised multiple concerns in relation to his
dissatisfaction with the FSP‟s decisions to decline the claim. For the sake of
brevity and the easy understanding of the parties, the Panel will consider
these concerns under the below sub-headings.
Case No: 254880 Determination Page 5 of 10
Provision of the policy documentation
30. The Applicant maintains that the FSP has failed in its obligations under the
Act to provide him with the relevant policy wording, policy and COI.
31. The FSP in responding to the Applicant‟s allegation in this respect maintains
that the Applicant is not the insured for the purpose of the policy and as such
it was not obliged to provide the relevant policy documentation to him.
Rather the insured on the policy is the body corporate and to which it had
made available the required policy documentation.
32. The Panel is satisfied that, the body corporate in arranging the insurance
cover in line with the approval of its members (Applicant included) does so
on behalf and in essence as a representative of its members. Therefore, the
obligations of the FSP to make available the relevant policy documentation
are deemed satisfied if and when such documentation is provided to the
insured (body corporate).
33. Further, the Panel notes there is no allegation and or evidence made
available to establish that the FSP had not provided the relevant policy
wording and documentation to the body corporate. Accordingly, in absence
of any evidence to the contrary, the Panel is satisfied that the FSP on the
balance of probabilities has fulfilled its obligations under the Act to provide
the relevant policy documentation to the insured.
34. The policy terms and conditions and relevant documentation would in all
probability be easily available to the Applicant on approaching the body
corporate management.
Clearly Inform
35. Having established that the FSP had fulfilled its obligations to provide the
insured with the relevant policy documentation, the next issue for
consideration is whether the policy wording is sufficiently clear to inform an
insured of the exclusion of flood cover.
36. The Panel notes that the Applicant has alleged that he was not in receipt of
the policy wording and as such an allegation that he may have been
prejudiced by what he contends to be unclear/confusing policy wording
would not be regarded as a reasonable argument. However, for the sake of
completeness the Panel has carefully considered the policy wording. The
Panel notes:
The opening pages of the PDS provide a detailed index for the contents
of the document with headings and sub-headings referring the reader
to the page numbers relating to different sections of the policy. Within
the index are the following headings and information:
“ Important Information and Notices
…
What you are covered for 2
Case No: 254880 Determination Page 6 of 10
What you are not covered for 5
…
Residential Strata Insurance Plan
…
General Definitions – the meanings of some words 13
General conditions – which apply to all policies unless
otherwise stated 19
General exclusions – what we do not insure under the
policy 20
…
Policy 1 – Insured Property
…
Exclusions – what we do not insure 31”
37. Having reviewed these pages the Panel notes the policy wording provides:
“Page 5 – What you are not covered for
There are certain times when this insurance may not provide cover.
Some events we may not provide cover include:
Policy 1 – Insured Property
…
Damage caused by flood, or by sea, high water or tidal wave other than
caused by tsunami (see Exclusions 1a and 1f of Policy 1 )
…
Page 13-19 General Definitions - the meaning of some words
Flood
means when water that is normally contained in a Water Catchment System
increases because of rainfall or snow melt (whether in the immediate region
or elsewhere) or is deliberately released by an authority, and the water
overflows onto land that is not normally covered by water.
…
Water Catchment System
means:
a a river, creek, other natural watercourse or lake, whether they are in
their original state or have been modified, are named or unnamed, or
normally dry that only run during periods of rain;
b a dam, reservoir, storm water channel or canal.
…
Page 31 – Exclusions – What we do not insure
1 We will not pay for loss or damage
a caused by Flood.”
Case No: 254880 Determination Page 7 of 10
38. In light of the above noted policy provisions and the reference to them in the
opening pages of the PDS, the Panel is satisfied that the PDS provides a
clear reference to the relevant sections of the policy and the wording is
reasonably clear and unambiguous in respect to the exclusion of flood cover
under the policy.
39. Accordingly, the Panel is satisfied that the FSP has fulfilled its obligations to
make available clear and unambiguous policy wording in respect to the
cover available and/or excluded by the contract regarding flood cover.
Cause of the damage
40. The Applicant maintains that the property was inundated by stormwater run-
off which bubbled up from the stormwater drainage system in front of the
property. Also, that this occurred prior to the arrival of the river floodwater
and therefore as damage due to stormwater run-off is covered under the
policy the FSP is obliged to cover him for his loss.
41. Further, that although he acknowledges that the property was subsequently
further inundated by floodwater from the river, it is impossible to determine
the extent of damage caused by each event of flooding (as in policy included
and policy excluded) and therefore the FSP should provide indemnity for the
full extent of his loss.
42. The FSP notes that the Applicant was not present at the property at the time
of inundation and as such cannot provide a witness account of the time
and/or cause of inundation. It has referred to hydrological evidence made
available by the ICA and also W (hydrologist commissioned by the FSP) and
submits this evidence must be accepted over the Applicant‟s position.
43. In considering the positions of the parties in respect to the cause of the
inundation the Panel has reviewed the hydrology reports and notes these
reports provide the following information:
ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane
River Catchment January 2011, Volume 2”.
Of particular relevance contained in the report is the following:
Floodwaters moving down the Brisbane River over the period 9 to 14
January were made up of releases from Wivenhoe Dam and
floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)
Water level response to these „normal‟ flood events in the lower
Brisbane River was dwarfed by the subsequent water level rise
associated with the releases from Wivenhoe Dam over the period 0600
hours on 11 January and 0300 hours on 12 January. (page 1 para 3)
Based on the recorded water level behaviour it was concluded that
releases from Wivenhoe Dam was the principal immediate cause for
flooding along the reach of the Brisbane River downstream of the Dam.
(page i para 4)
Case No: 254880 Determination Page 8 of 10
Rain ceased over the Brisbane City area around 1800 hours on 11
January being about 24 -30 hours before flood levels in the Brisbane
River peaked. (page ii para 3)
Given the rainfall across Brisbane City LGA ceased by 1800 hours on
11 January any flooding after this time will have been caused by water
flow inundation from the Brisbane River and its tributary creeks it being
noted that inundation along the tributaries was associated with
backwater flooding from the Brisbane River which in turn was
principally caused by the dam release flood from Wivenhoe Dam. (page
ii para 6)
The following factors affected and exacerbated the nature of flooding in
the Brisbane City LGA over the period 10-14 January.
– Intense rainfalls that occurred over the catchment areas upstream
of Wivenhoe and Somerset Dams.
– A „wet‟ catchment that maximised the rate of delivery and volume
of surface runoff resulting in large volumes of floodwater flowing
into the Wivenhoe and Somerset Dams.
– Significant releases from the Wivenhoe Dam made over the
period 11-12 January together with significant out flows from
Lockyer Creek and the Brisbane River.
– In a number of instances high tail water levels in the Brisbane
River and its creeks resulted in backflow, up piped drainage
systems. The backflow led to inundation with waterway
floodwaters of low-lying areas normally drained by the piped
drainage system (pipe backflow inundation.)
Section 10 of the ICA report discussed factors affecting flooding in
Brisbane City LGA Flood behaviour and included the following:
“… However it is clear that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding in Brisbane City LGA.” (para 4)
And;
„ W’ Report da ted 3 October 2011 in respect to a site inspection
undertaken on 27 September 2011.
The insured property has an approximate floor level of 0.8m above
surrounding ground level and was inundated to a depth of about 1.6m
above floor level.
The property is located 70 metres from the river with Oxley Creek
mouth gauge 8kms upstream and Brisbane City gauge 7.9kms
downstream of the property.
The Applicant was not at the property at the time of inundation. A
neighbour of the Applicant was evacuated by boat in the early hours of
12 January 2011 at which time she noted the insured property was
inundated above floor level.
Case No: 254880 Determination Page 9 of 10
The recorded rainfall levels at the Toowong Alert Rainfall station
located 3.4kms North West of the insured property shows a peak one
hour rainfall intensity of 18.5 mm/hr at 10.30am on 11 January 2011.
Peak stormwater run-off from the surrounding catchment area would
have occurred within 30 mins after the peak rainfall.
No rainfall was recorded at the Toowong Alert Rainfall station after
11.30pm on 11 January 2011.
The recorded rainfalls were not particularly severe for short durations,
higher peak rainfalls are regularly experienced in Brisbane.
The Brisbane City Council Floodwise report states ground levels at the
property are between 4.7mAHD and 9.0mAHD, while the 100 year
average re-occurrence internal (ARI) flood level is 6.2mAHD. The peak
level of river during the January event at the property was 7.1mAHD.
Based on the observed depth of inundation, ground level water would
have reached the property at approximately 1.30am on 12 January
2011.
Due to the property being 0.8m above ground level the floor level would
have been inundated at approximately 6.30am on 12 January 2011.
Water observed discharging from the stormwater drain inlet at the front
of the property late on 11 January 2011 was floodwater backflow from
the river.
The report concludes that the property was inundated well after rainfall
in the area had ceased and therefore it would be inconsistent with
stormwater run-off inundation. Rather, W concludes that the property
was inundated by floodwaters from the river.
44. The timing of the inundation is crucial to the consideration of whether the
loss was flood or whether it might have been attributable to stormwater run-
off and considered an insured event.
45. The consultants are consistent in the view that inundation from surface run-
off rainwater is generally associated with intense rainfalls of short duration.
46. It was reported that the inundation of water into the Applicant‟s home
occurred on 12 and 13 January 2011. Water had not entered the property on
11 January 2011.
47. According to the hydrological evidence three rainfall periods were
experienced across the area of the Applicant‟s property between 9 and13
January 2011. The third event being between 0600 and 1600 hours on 11
January 2011.
48. There was no rainfall in the western suburbs around Highgate Hill after about
1800 hours on Tuesday 11 January 2011. Any inundation in the area after
this time would have been due to backwater flooding from the Brisbane
River.
Case No: 254880 Determination Page 10 of 10
49. Based on the available information, it is reasonable to conclude the water
inundation to the Applicant‟s home occurred at a significant period after the
last peak rainfall or distinct rainfall event.
50. As there were three significant rainfall events in the area between 9 January
2011 and 13 January 2011, it is also reasonable to conclude that had
surface run-off rainwater entered the home, it would have done so
contemporaneously to the distinct rainfall periods experienced over the
previous days. There is no evidence to support this happening.
51. While the intense rainfall may be regarded as the initial cause for the rivers
and creek flooding and release of water from the dam, such water although it
may not have come directly from within the banks of the river, is still classed
as flood water when it would have otherwise drained into the river but is not
able to because the river is full.
52. Further, when a mixture of river water and rainwater causes damage to
property, the FSP is entitled to rely on the clause which excludes loss or
damage caused by flood water, this being consistent with the “Wayne Tank”
principle.
53. Although the property may have been inundated by a mixture of backflow
water coming up the stormwater drain system and subsequent river flooding,
it is established law that river backflow is properly categorised as floodwater,
and as such is excluded from cover.
54. In considering the evidence as a whole, the Panel is of the opinion that the
water which gave rise to the claim was flood water.
55. The policy does not cover loss or damage caused by flood. For these
reasons the Panel is of the opinion that the evidence does not support a
finding that surface run- off rainwater alone entered the Applicant‟s
properties; nor is the Panel in a position to co nclude the risk address may
first have been partially inundated by rainwater run-off and then
subsequently by water properly classified as flood.
Determination
56. On the basis of the available information the Panel determines that the FSP
was entitled to deny liability for the damage claimed under the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.