Determination 254859
Denial of flood damage claim as river flood
Summary
The applicant's investment property was damaged by floodwater from the Bremer River and the FSP denied the claim under its river flood exclusion. AFCA found the exclusion was clearly communicated and the loss fell within it, so the denial stood.
Under section 35(2) of the Insurance Contracts Act the policy wording clearly excluded river flood and the insured received it before the contract operated.
Issues
- Claim denial primary · not upheld“the Panel determines the FSP is entitled to deny the claim”
- Failure to disclose secondary · not upheld“the Panel accepts the FSP sent and the Applicant received a copy of the policy before the insurance contract began to operate”
- Product terms interpretation secondary · not upheld“the Panel intends to adopt the rationale ... finding that the policy clearly informed the Applicant that he was not covered for river flood”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 254859 Determination Page 1 of 11
Case number: 254859
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim (Flood)
3 October 2012
Background
1 The Applicant entered into an insurance contract with the Financial Services
Provider (FSP) to cover his investment property in Moores Pocket. This
policy was incepted on 24 February 2007. The relevant period of insurance
subject to this dispute operated for 12 months beginning from 30 October
2010. During this period, the building was insured up to a sum of $156,000
and claims were subject to a basic excess of $100.
2 The Applicant lodged a claim under this policy due to extensive water
inundation damage following extreme weather events in Queensland.
3 The FSP denied the claim on the basis the damage was due to “river flood”.
The Applicant, through his solicitors, has disputed this.
4 For the sake of simplicity, reference to the Applicant will include his legal
representatives.
5 Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant’s position
6 The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP’s policy failed to clearly inform him that “river flood” was
excluded as required under Section 35 of the Insurance Contracts Act
1984 (the Act).
b. The FSP breached its duty of utmost good faith as it allowed the
Applicant to arrange a policy clearly unsuitable to his needs.
c. The damage was solely due to stormwater run-off or flash flood.
d. The damage is covered under the insured event of “Water or Other
Liquid”.
Determination
Case No: 254859 Determination Page 2 of 11
e. The FSP is unable to discharge its onus in establishing the loss was
caused by “river flood”.
7 The Applicant therefore seeks to be indemnified for his loss.
Summary of FSP’s position
8 In response to the Applicant’s arguments, the FSP submits the following:
a. It has provided evidence from an appropriately qualified individual to
corroborate that a PDS was sent to the Applicant prior to the claim.
Further, the policy structure and layout in conjunction with this evidence
enables it to rely on the exclusion clause of “river flood” pursuant to
Section 35(2) of the Act.
b. The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicant’s needs.
9 The FSP therefore relies on the following policy provisions, a site specific
hydrology report and the reports commissioned by the Insurance Council of
Australia (ICA) to substantiate its position:
“ Definitions (The Meaning Of Some Words)
…
“ flash flood ” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your building .
but does not include when rainwater on the site :
cannot run-off into a water catchment system , because it is overflowing
in flood; and
mixes with the flood water coming from the water catchment system and
then flows into your building .
…
“ rain ” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
“ river flood ” means when water that is n ormally contained in a water
catchment system increases because of rainfall or snow melt (whether in
the immediate region or elsewhere) or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
your home
For example water may be deliberately released by an authority from
a dam or reservoir.
…
“ storm ” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
…
Case No: 254859 Determination Page 3 of 11
“ water catchment system ” means:
a river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally
dry land that only run during periods of rain;
a dam, reservoir, storm water channel or canal.
…
1.12 Storm, Rain or Flash Flood
You are insured for damage to your building caused by storm , rain or flash
flood .
…
We will not pay for damage caused by:
…
river flood ;”
Issues
10 Whether the FSP breached its duty of utmost good faith in allowing the
Applicant to incept this type of policy.
11 Whether the FSP has complied with the requirements under Section 35 of
the Act to rely on the policy exclusion of “river flood”.
12 Whether the FSP is able to establish the Applicant’s loss was caused by
“river flood”.
13 W hether the FSP is able to rely on the “river flood” exclusion.
Reasons for decision
14 Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Service’s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
15 This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16 It is appropriate to consider the issues under the various headings.
Clearly Inform
17 Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
Case No: 254859 Determination Page 4 of 11
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
18 There is no dispute that a contract of insurance covering a residential
building is a “prescribed contract” and damage due to flood is a “prescribed
event”.
19 The onus is therefore on the FSP to establish that it has clearly informed the
Applicant prior to the claim that it would not cover damage caused by “river
flood”. This is generally done by an insurer providing a copy of its policy to its
insured which is meant to set out completely the rights and obligations of
both parties under the insurance contract.
20 Further, the Courts have supported this and particularly, in the case of Marsh
v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following
comments that is particularly relevant to the operation of Section 35(2) of the
Act:
“In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 -
525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts
Act 1984 (Cth) could be met if the insurer provided to the proposed insured a
document such as the proposed policy, which contained the relevant wording.
I agree. … Whether the policy wording in fact "clearly informed" the insured
that there was no cover for flood is a question of fact to be determined by an
examination of the document in question. … Furthermore, the language of s
35(2) suggests that the proposed insured can be clearly informed merely by
providing the insured with a copy of the policy which shows the exclusion in
clear and unambiguous terms. … The answer to the question "is flood
covered" is easily ascertainable by any person of average intelligence
and education. ” (Panel emphasis)
21 In this regard, the Applicant has not disputed receiving the policy/PDS.
Instead, he has stated that he did not receive the policy/PDS until after the
policy was originally incepted.
22 The Panel notes that although Section 35 of the Act requires an insured to
be clearly informed in writing before the contract is entered into, Section
69(2) of Act provides an exception to this. This provision states:
“Where, by reason of a provision of this Act:
(a) information in relation to a contract of insurance is to be or may be
given in writing to a person before the contract is entered into; and
(b) it was not reasonably practicable for the information to be so given
orally or in writing;
the provision shall be deemed to have been complied with, and the
information shall be deemed to have been given, if the information is given in
writing within 14 days after the day on which the contract was entered into.”
Case No: 254859 Determination Page 5 of 11
23 The Applicant has submitted it was reasonably practicable for the “river
flood” exclusion to have been brought to his attention when incepting the
policy over the phone. The Panel does not accept this.
24 As evident, the policy is subject to numerous exclusions or limitations and it
would be unreasonable to expect an insurer to highlight all of them or
alternatively, attempt to identify which ones may be of most interest to a
prospective insured.
25 In addition, the policy provides a 21 day cooling off period. This enables a
prospective insured sufficient opportunity to read the policy and seek any
advice from a professional adviser (such as a broker) to ensure it is suitable
to his needs.
26 Accordingly, the Panel accepts that Section 69(2) of the Act applies. In this
regard the FSP has provided a statutory declaration from HW, who is
responsible for the administration of daily processing of notices. HW’s
evidence states:
The policy was sent to the Applicant shortly after inception.
The Applicant contacted the FSP on 11 May 2007 to advise he had
insured the property with another company until 16 June 2007. He
therefore sought deferment of the policy’s commencement until then.
The FSP issued a cover note effective from 16 June 2007 along with a
copy of the policy.
There is no record of the Applicant ever advising the FSP that he did
not receive the policy.
27 The Applicant has not provided any evidence to refute any of this.
Accordingly, the Panel accepts the FSP sent and the Applicant received a
copy of the policy before the insurance contract began to operate and well
before the claim arose.
28 The Applicant has also argued the FSP failed to inform him of the changes
to the policy in November 2010. The FSP has responded indicating the
policy has remained unchanged since 2004.
29 Further, there is no evidence of there being an updated policy which the FSP
is relying upon. Instead, the FSP is relying upon the version of the policy it
has sent to him at or around inception to deny the claim. Accordingly, the
Panel does not accept the Applicant’s argument in this aspect has any
probative value.
30 The Panel therefore accepts the Applicant received the policy in accordance
with the requirements under Sections 35(2) and/or 69(2) of the Act.
Whether the policy is clear
31 The Applicant has also provided numerous submissions arguing that the
terms and conditions in the policy are confusing, complex and unclear. In
Case No: 254859 Determination Page 6 of 11
particular, the Applicant has referred to the defined terms of “storm”, “flash
flood”, “rain” and “river flood” to argue that the distinctions are ambiguous,
unclear and confusing and therefore should not be relied upon.
32 These specific issues and arguments have been raised by the Applicant’s
solicitors in another dispute, case number 254731, involving a very similar
policy with almost identical definitions. These arguments were reviewed at
length by the Panel in that case. In particular, paragraphs 28 to 38 sets out
that Panel’s rationale in finding that the definitions of “rain”, “storm”, “flash
flood” and “river flood” being used in that policy was clear and unambiguous.
33 Pursuant to clause 8.2 of the Terms of Reference, the Panel intends to adopt
the reasoning in that Determination for the following reasons:
It is contemporaneous,
It involves policy provisions that are essentially identical to the policy in
this dispute,
It considered arguments that are substantively similar to the Applicant’s
submissions,
The reasoning and analysis contained in the previous Determination
has clear applicability to this dispute, in particular paragraphs 28 to 38,
and
The Applicant has not introduced any new substantive arguments that
would imply the Panel’s previous reasoning is incorrect either in law or
fact.
34 Given this, the Panel intends to adopt the rationale contained in case
number 254731 in finding that the policy clearly informed the Applicant that
he was not covered for “river flood” pursuant to Section 35(2) of the Act.
Utmost Good Faith
35 The Applicant has alleged the FSP breached its duty o f utmost good faith by
failing to ensure the policy provided adequate coverage or was suitable to
his needs.
36 The Panel considers the Applicant’s arguments regarding the duty of utmost
good faith are misconceived. There is no legal principle that supports the
Applicant’s argument that an insurer’s duty of utmost good faith extends to
enquiring and ensuring its policy is appropriate to the insured’s needs. Such
a duty is generally associated with insurance brokers or other authorised
parties where case law makes it clear these professionals have a duty to
ensure the policy they procure is suitable to their client’s needs.
37 Further the FSP’s policy, which the Panel has found the Applicant received
before the policy commenced:
Is a standard home insurance policy that appears to be available to the
general public as opposed to being tailored to the Applicant’s needs,
and
Case No: 254859 Determination Page 7 of 11
Had a 21 day cooling off period which provided the Applicant ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable to his needs.
38 Given this, the Panel does not accept the FSP breached its duty of utmost
good faith with respect to offering its standard home insurance policy to the
Applicant.
Water Inundation
39 The FSP is relying on a site specific hydrology report for the property which
contained the following relevant information:
The property is located approximately 230m from the Bremer River to
the south-east and 400m to the north. A sewerage pump station is
located at the east end of MP Road adjacent to the Ap plicant’s
property.
Rainfall totals were obtained from Bundamba (Hanlon St) Alert, which
is located approximately 1.6km north-east of the property. On 11
January 2011, 42mm of rainfall was recorded between 1100 hours and
1500 hours with a peak 1 hour rainfall intensity of 16.3mm/hr occurring
at approximately 1300 hours. No significant rainfall was recorded after
1700 hours.
Recorded rainfall intensities for storm durations of up to 24 hours had
an average recurrence interval (ARI) of less than 1 year. Maxim um
stormwater runoff would have occurred within 30 minutes of the
maximum rainfall intensity.
Recorded water levels of the Bundamba Creek were obtained from the
Bundamba (Hanlon St) Alert. The station is located approximately
1.7km upstream of the Bremer River confluence. This confluence is
approximately 3.7km downstream of the property. This provides a
reasonable estimate of flood water levels in the Bremer River in the
vicinity of the property. The maximum water level recorded was 19.4m
GH.
Based on the maximum depth of inundation of 2.4m, the estimated
upper floor level of the property is 17.0m GH. The lower level is
estimated to be 14.5m GH based on a maximum depth of inundation of
the lower level of 4.9m.
The loss adjuster’s report referred to the initi al inundation occurring at
5pm on 11 January. This is inconsistent with the recorded rainfall and
water level information. It is possible this time refers to the yard or
some other area of the property being inundated. In his (the
hydrologist’s) opinion, t he initial inundation to the home would have
occurred at approximately 9pm on 11 January 2011.
Where flood water is able to enter the piped sewer system, it is
possible for water to back up through the sewer system and into
dwellings. Given the local topography and proximity of the property to
the Bremer River, any inundation resulting from water backing up
Case No: 254859 Determination Page 8 of 11
through the sewer system would have occurred at approximately the
same time as inundation by overland floodwaters.
40 The hydrologist therefore concluded the following:
“Inundation of the subject property above the lower and upper floor levels
resulted from floodwaters overflowing from the Bremer River (river flood).
It is possible that water backing up through the sewer system may have
contributed to inundation of the lower level of subject property. If this
occurred, it would have approximately coincided with the time that overland
floodwaters began to inundate the lower floor level.
Initial inundation of the lower level occurred approximately 4 hours after
rainfall in the area had ceased. Inundation of the upper floor level occurred
more than 9 hours after rainfall in the area had ceased. Based on available
information, flash flood, as per [Q’s] policy definition, did not contribute to
inundation of t he subject property above the lower floor level.”
41 The ICA hydrology report relied upon by the FSP is titled “Flooding in the
Brisbane River Catchment January 2011, Volume 3 – Flooding in Ipswich
City LGA”. The following information is available within the sub- heading “9.3
Releases from Wivenhoe Dam”:
Large releases were made from Wivenhoe Dam over the period from
0600 hours, possibly as early as 0300 hours on 11 January 2011, until
around 0300 hours on 12 January 2011.
Releases from Wivenhoe Dam caused a flood wave in the Brisbane
River. As the flood wave moved downstream, backwater flooding
occurred along the lower reaches of the Bremer River and its
tributaries.
Floodwaters moving down the Brisbane River were made up of dam
release floodwaters from Wivenhoe and floodwaters from Lockyer
Creek and the Bremer River.
It was concluded that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding along the reaches of the Brisbane
River downstream of the dam and along tributaries through the Ipswich
City LGA.
42 The Applicant has not provided any hydrological evidence. The Applicant
instead has raised a number of arguments stating that no weight should be
given to these hydrology reports as the ICA report is general in nature and
the site specific report refers to a loss adjuster’s report that has not been
made available.
43 The Panel does not accept the hydrology evidence should be dismissed
solely on these bases. Instead, the hydrology reports should be taken into
consideration if the evidence is consistent with appropriate data and
undisputed facts.
44 In this context, the site specific report makes reference to rainfall measured
from a gauge only 1.7km from the Applicant’s property. The Panel accepts
Case No: 254859 Determination Page 9 of 11
this data likely reflects the localised rainfall th at would affect the Applicant’s
property.
45 There was reference to the property being inundated at 5.00pm on 11
January. This appeared to have been obtained from the loss adjuster’s
report, which has not been made available. The Panel presumes this
information was likely obtained by the loss adjuster from the tenant, given
the Applicant did not occupy the property at the time of inundation. However,
this is not certain on the limited information available.
46 The hydrologist, upon analysing the relevant data, considered the time of
initial inundation to the home likely occurred at 9.00pm on 11 January. In his
opinion, the evidence of initial inundation occurring at 5.00pm is inconsistent
with his analysis of the rainfall data, the river level and the topography. The
hydrologist notes the witness (presumably the tenant) may have been
referring to inundation occurring to the yard. This can be particularly the case
given the yard extends down to the bank of the Bremer River.
47 The Applicant has not provided any witnes s’ evidence or other corroborating
evidence in this regard. Accordingly, the Panel accepts the hydrologist’s
contention that the witness’s reference (as above) to inundation at 5 .00pm
may have been to the yard rather than the property.
48 As a result, the Pan el is inclined to prefer the hydrologist’s time of initial
inundation to the home occurring at approximately 9 .00pm on 11 January
2011, as it is consistent with the elevated levels of the Bremer River at that
time. Given this finding, the Panel considers it is improbable therefore that
stormwater runoff inundation would have occurred 8 hours after the most
intense period of hourly rainfall and 4 hours after the last rainfall recorded.
49 Accordingly, the Panel accepts the water which inundated the property likely
came from the Bremer River overflowing onto normally dry land and
inundating the property. This falls within the exclusion of “river flood”.
Water or Other Liquid
50 The Applicant has also argued this insured event (water and other liquid)
may apply, give n sewerage may have inundated the property. The FSP’s
site specific hydrology report appears to corroborate this; although he states
it would have occurred at the same time as the overland inundation.
51 This insured event states the following:
“You are insur ed for damage to your home caused when water or other
liquid suddenly escapes from:
you or your neighbours:
- plumbing system
- bath, fixed basin, or sink,
- …
Case No: 254859 Determination Page 10 of 11
the
- road gutter or curbing
- water main or pipe.”
52 In assessing the Applicant’s argument, it is necessary to determine the
intended extent and reach of this insured event in the context of t he policy’s
commercial purpose.
Construction of this insured event
53 The presence of sewerage at the property does not, of itself, infer this
insured event is satisfied upon any sensible construction of the policy. The
insured event requires evidence that the water or other liquid which caused
the damage suddenly escaped from a plumbing type appliance or enclosure
owned by the Applicant and/or his neighbour or from the road
guttering/curbing or a water main/pipe. The fact sewerage entered the
property is not conclusive evidence that the insured event is satisfied even
though the Applicant appears to advocate this point.
54 In particular, the Applicant’s argument appe ars to advocate a construction of
the insured event that could conceivably include:
liquid discharging from a pipe or drain located some distance from the
Applicant’s property (such as three blocks away or even another
suburb),
travelling overland for some distance, and
then inundating the home.
55 In the Panel’s opinion, such a construction would not be based on a
commonsense interpretation of the policy or be consistent with the
commercial intent of the provision. For instance, the insured event initially
discusses damage from water or other liquid suddenly escaping from an
appliance owned by the Applicant or their neighbour. Both of these areas are
clearly proximate to the Applicant’s property.
56 In this context, it is a natural and reasonable extension that water escaping
from a water main/pipe or road gutter/curbing would also be proximate to the
Applicant’s property. This is supported by the use of the word “suddenly” and
the reference to appliances either at, or proximate to the Applicant’s property
in the initial part of the insured event. All of this lends support to the
construction that the policy’s reference to road gutter/curbing or water
main/pipe in the latter description of the insured event requires some
proximity to the Applicant’s property.
Applying the construction to the evidence
57 In this context, the Panel does not accept that the presence of sewerage at
the property is clear evidence that the insured event of “Water or Other
Case No: 254859 Determination Page 11 of 11
Liquid” is satisfied in the absence of any explanation as to w here the
sewerage escaped from.
58 Although the hydrologist referred to a sewerage plant located nearby, the
Panel has been provided no evidence from where, when and in what manner
sewerage escaped to inundate the property. For instance, it might have
escaped from the plant itself or in an enclosure that would not fall within the
ordinary and natural meaning of the term pipe/gutter/curbing. Given the
ambiguity in this regard, the Panel cannot be satisfied, on the evidence that
the insured event has been satisfied.
59 In addition to this, there is clear evidence supported by data and an
appropriately qualified expert to state water overflowed onto normally dry
land to inundate the property. This water clearly does not fall within the
insured event of “Water or Other Liquid”.
60 Given this the Panel is therefore not satisfied, on the balance of probabilities,
the Applicant’s loss was caused by the insured event of “Water or Other
Liquid”.
Determination
61 On the basis of the available information the Panel determines the FSP is
entitled to deny the claim.