Home / Financial Firm (Unknown - Insurer) / Determination 254859

Determination 254859

Denial of flood damage claim as river flood

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's investment property was damaged by floodwater from the Bremer River and the FSP denied the claim under its river flood exclusion. AFCA found the exclusion was clearly communicated and the loss fell within it, so the denial stood.

Under section 35(2) of the Insurance Contracts Act the policy wording clearly excluded river flood and the insured received it before the contract operated.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 254859 Determination Page 1 of 11 Case number: 254859 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 3 October 2012 Background 1 The Applicant entered into an insurance contract with the Financial Services Provider (FSP) to cover his investment property in Moores Pocket. This policy was incepted on 24 February 2007. The relevant period of insurance subject to this dispute operated for 12 months beginning from 30 October 2010. During this period, the building was insured up to a sum of $156,000 and claims were subject to a basic excess of $100. 2 The Applicant lodged a claim under this policy due to extensive water inundation damage following extreme weather events in Queensland. 3 The FSP denied the claim on the basis the damage was due to “river flood”. The Applicant, through his solicitors, has disputed this. 4 For the sake of simplicity, reference to the Applicant will include his legal representatives. 5 Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 6 The Applicant submits the following as alternative arguments in response to the FSP’s decision: a. The FSP’s policy failed to clearly inform him that “river flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). b. The FSP breached its duty of utmost good faith as it allowed the Applicant to arrange a policy clearly unsuitable to his needs. c. The damage was solely due to stormwater run-off or flash flood. d. The damage is covered under the insured event of “Water or Other Liquid”. Determination Case No: 254859 Determination Page 2 of 11 e. The FSP is unable to discharge its onus in establishing the loss was caused by “river flood”. 7 The Applicant therefore seeks to be indemnified for his loss. Summary of FSP’s position 8 In response to the Applicant’s arguments, the FSP submits the following: a. It has provided evidence from an appropriately qualified individual to corroborate that a PDS was sent to the Applicant prior to the claim. Further, the policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “river flood” pursuant to Section 35(2) of the Act. b. The duty of utmost good faith does not extend to an obligation to ensure a policy is suitable to the Applicant’s needs. 9 The FSP therefore relies on the following policy provisions, a site specific hydrology report and the reports commissioned by the Insurance Council of Australia (ICA) to substantiate its position: “ Definitions (The Meaning Of Some Words) … “ flash flood ” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your building . but does not include when rainwater on the site :  cannot run-off into a water catchment system , because it is overflowing in flood; and  mixes with the flood water coming from the water catchment system and then flows into your building . … “ rain ” means water that has fallen from the sky on to your building and the site but not water from flash flood . “ river flood ” means when water that is n ormally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home For example water may be deliberately released by an authority from a dam or reservoir. … “ storm ” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. … Case No: 254859 Determination Page 3 of 11 “ water catchment system ” means:  a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry land that only run during periods of rain;  a dam, reservoir, storm water channel or canal. … 1.12 Storm, Rain or Flash Flood You are insured for damage to your building caused by storm , rain or flash flood . … We will not pay for damage caused by:  …  river flood ;” Issues 10 Whether the FSP breached its duty of utmost good faith in allowing the Applicant to incept this type of policy. 11 Whether the FSP has complied with the requirements under Section 35 of the Act to rely on the policy exclusion of “river flood”. 12 Whether the FSP is able to establish the Applicant’s loss was caused by “river flood”. 13 W hether the FSP is able to rely on the “river flood” exclusion. Reasons for decision 14 Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 15 This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 16 It is appropriate to consider the issues under the various headings. Clearly Inform 17 Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to Case No: 254859 Determination Page 4 of 11 pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 18 There is no dispute that a contract of insurance covering a residential building is a “prescribed contract” and damage due to flood is a “prescribed event”. 19 The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “river flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 20 Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that is particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) 21 In this regard, the Applicant has not disputed receiving the policy/PDS. Instead, he has stated that he did not receive the policy/PDS until after the policy was originally incepted. 22 The Panel notes that although Section 35 of the Act requires an insured to be clearly informed in writing before the contract is entered into, Section 69(2) of Act provides an exception to this. This provision states: “Where, by reason of a provision of this Act: (a) information in relation to a contract of insurance is to be or may be given in writing to a person before the contract is entered into; and (b) it was not reasonably practicable for the information to be so given orally or in writing; the provision shall be deemed to have been complied with, and the information shall be deemed to have been given, if the information is given in writing within 14 days after the day on which the contract was entered into.” Case No: 254859 Determination Page 5 of 11 23 The Applicant has submitted it was reasonably practicable for the “river flood” exclusion to have been brought to his attention when incepting the policy over the phone. The Panel does not accept this. 24 As evident, the policy is subject to numerous exclusions or limitations and it would be unreasonable to expect an insurer to highlight all of them or alternatively, attempt to identify which ones may be of most interest to a prospective insured. 25 In addition, the policy provides a 21 day cooling off period. This enables a prospective insured sufficient opportunity to read the policy and seek any advice from a professional adviser (such as a broker) to ensure it is suitable to his needs. 26 Accordingly, the Panel accepts that Section 69(2) of the Act applies. In this regard the FSP has provided a statutory declaration from HW, who is responsible for the administration of daily processing of notices. HW’s evidence states:  The policy was sent to the Applicant shortly after inception.  The Applicant contacted the FSP on 11 May 2007 to advise he had insured the property with another company until 16 June 2007. He therefore sought deferment of the policy’s commencement until then. The FSP issued a cover note effective from 16 June 2007 along with a copy of the policy.  There is no record of the Applicant ever advising the FSP that he did not receive the policy. 27 The Applicant has not provided any evidence to refute any of this. Accordingly, the Panel accepts the FSP sent and the Applicant received a copy of the policy before the insurance contract began to operate and well before the claim arose. 28 The Applicant has also argued the FSP failed to inform him of the changes to the policy in November 2010. The FSP has responded indicating the policy has remained unchanged since 2004. 29 Further, there is no evidence of there being an updated policy which the FSP is relying upon. Instead, the FSP is relying upon the version of the policy it has sent to him at or around inception to deny the claim. Accordingly, the Panel does not accept the Applicant’s argument in this aspect has any probative value. 30 The Panel therefore accepts the Applicant received the policy in accordance with the requirements under Sections 35(2) and/or 69(2) of the Act. Whether the policy is clear 31 The Applicant has also provided numerous submissions arguing that the terms and conditions in the policy are confusing, complex and unclear. In Case No: 254859 Determination Page 6 of 11 particular, the Applicant has referred to the defined terms of “storm”, “flash flood”, “rain” and “river flood” to argue that the distinctions are ambiguous, unclear and confusing and therefore should not be relied upon. 32 These specific issues and arguments have been raised by the Applicant’s solicitors in another dispute, case number 254731, involving a very similar policy with almost identical definitions. These arguments were reviewed at length by the Panel in that case. In particular, paragraphs 28 to 38 sets out that Panel’s rationale in finding that the definitions of “rain”, “storm”, “flash flood” and “river flood” being used in that policy was clear and unambiguous. 33 Pursuant to clause 8.2 of the Terms of Reference, the Panel intends to adopt the reasoning in that Determination for the following reasons:  It is contemporaneous,  It involves policy provisions that are essentially identical to the policy in this dispute,  It considered arguments that are substantively similar to the Applicant’s submissions,  The reasoning and analysis contained in the previous Determination has clear applicability to this dispute, in particular paragraphs 28 to 38, and  The Applicant has not introduced any new substantive arguments that would imply the Panel’s previous reasoning is incorrect either in law or fact. 34 Given this, the Panel intends to adopt the rationale contained in case number 254731 in finding that the policy clearly informed the Applicant that he was not covered for “river flood” pursuant to Section 35(2) of the Act. Utmost Good Faith 35 The Applicant has alleged the FSP breached its duty o f utmost good faith by failing to ensure the policy provided adequate coverage or was suitable to his needs. 36 The Panel considers the Applicant’s arguments regarding the duty of utmost good faith are misconceived. There is no legal principle that supports the Applicant’s argument that an insurer’s duty of utmost good faith extends to enquiring and ensuring its policy is appropriate to the insured’s needs. Such a duty is generally associated with insurance brokers or other authorised parties where case law makes it clear these professionals have a duty to ensure the policy they procure is suitable to their client’s needs. 37 Further the FSP’s policy, which the Panel has found the Applicant received before the policy commenced:  Is a standard home insurance policy that appears to be available to the general public as opposed to being tailored to the Applicant’s needs, and Case No: 254859 Determination Page 7 of 11  Had a 21 day cooling off period which provided the Applicant ample opportunity to review the contract and obtain advice on it to ensure it was suitable to his needs. 38 Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicant. Water Inundation 39 The FSP is relying on a site specific hydrology report for the property which contained the following relevant information:  The property is located approximately 230m from the Bremer River to the south-east and 400m to the north. A sewerage pump station is located at the east end of MP Road adjacent to the Ap plicant’s property.  Rainfall totals were obtained from Bundamba (Hanlon St) Alert, which is located approximately 1.6km north-east of the property. On 11 January 2011, 42mm of rainfall was recorded between 1100 hours and 1500 hours with a peak 1 hour rainfall intensity of 16.3mm/hr occurring at approximately 1300 hours. No significant rainfall was recorded after 1700 hours.  Recorded rainfall intensities for storm durations of up to 24 hours had an average recurrence interval (ARI) of less than 1 year. Maxim um stormwater runoff would have occurred within 30 minutes of the maximum rainfall intensity.  Recorded water levels of the Bundamba Creek were obtained from the Bundamba (Hanlon St) Alert. The station is located approximately 1.7km upstream of the Bremer River confluence. This confluence is approximately 3.7km downstream of the property. This provides a reasonable estimate of flood water levels in the Bremer River in the vicinity of the property. The maximum water level recorded was 19.4m GH.  Based on the maximum depth of inundation of 2.4m, the estimated upper floor level of the property is 17.0m GH. The lower level is estimated to be 14.5m GH based on a maximum depth of inundation of the lower level of 4.9m.  The loss adjuster’s report referred to the initi al inundation occurring at 5pm on 11 January. This is inconsistent with the recorded rainfall and water level information. It is possible this time refers to the yard or some other area of the property being inundated. In his (the hydrologist’s) opinion, t he initial inundation to the home would have occurred at approximately 9pm on 11 January 2011.  Where flood water is able to enter the piped sewer system, it is possible for water to back up through the sewer system and into dwellings. Given the local topography and proximity of the property to the Bremer River, any inundation resulting from water backing up Case No: 254859 Determination Page 8 of 11 through the sewer system would have occurred at approximately the same time as inundation by overland floodwaters. 40 The hydrologist therefore concluded the following: “Inundation of the subject property above the lower and upper floor levels resulted from floodwaters overflowing from the Bremer River (river flood). It is possible that water backing up through the sewer system may have contributed to inundation of the lower level of subject property. If this occurred, it would have approximately coincided with the time that overland floodwaters began to inundate the lower floor level. Initial inundation of the lower level occurred approximately 4 hours after rainfall in the area had ceased. Inundation of the upper floor level occurred more than 9 hours after rainfall in the area had ceased. Based on available information, flash flood, as per [Q’s] policy definition, did not contribute to inundation of t he subject property above the lower floor level.” 41 The ICA hydrology report relied upon by the FSP is titled “Flooding in the Brisbane River Catchment January 2011, Volume 3 – Flooding in Ipswich City LGA”. The following information is available within the sub- heading “9.3 Releases from Wivenhoe Dam”:  Large releases were made from Wivenhoe Dam over the period from 0600 hours, possibly as early as 0300 hours on 11 January 2011, until around 0300 hours on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of the Bremer River and its tributaries.  Floodwaters moving down the Brisbane River were made up of dam release floodwaters from Wivenhoe and floodwaters from Lockyer Creek and the Bremer River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam and along tributaries through the Ipswich City LGA. 42 The Applicant has not provided any hydrological evidence. The Applicant instead has raised a number of arguments stating that no weight should be given to these hydrology reports as the ICA report is general in nature and the site specific report refers to a loss adjuster’s report that has not been made available. 43 The Panel does not accept the hydrology evidence should be dismissed solely on these bases. Instead, the hydrology reports should be taken into consideration if the evidence is consistent with appropriate data and undisputed facts. 44 In this context, the site specific report makes reference to rainfall measured from a gauge only 1.7km from the Applicant’s property. The Panel accepts Case No: 254859 Determination Page 9 of 11 this data likely reflects the localised rainfall th at would affect the Applicant’s property. 45 There was reference to the property being inundated at 5.00pm on 11 January. This appeared to have been obtained from the loss adjuster’s report, which has not been made available. The Panel presumes this information was likely obtained by the loss adjuster from the tenant, given the Applicant did not occupy the property at the time of inundation. However, this is not certain on the limited information available. 46 The hydrologist, upon analysing the relevant data, considered the time of initial inundation to the home likely occurred at 9.00pm on 11 January. In his opinion, the evidence of initial inundation occurring at 5.00pm is inconsistent with his analysis of the rainfall data, the river level and the topography. The hydrologist notes the witness (presumably the tenant) may have been referring to inundation occurring to the yard. This can be particularly the case given the yard extends down to the bank of the Bremer River. 47 The Applicant has not provided any witnes s’ evidence or other corroborating evidence in this regard. Accordingly, the Panel accepts the hydrologist’s contention that the witness’s reference (as above) to inundation at 5 .00pm may have been to the yard rather than the property. 48 As a result, the Pan el is inclined to prefer the hydrologist’s time of initial inundation to the home occurring at approximately 9 .00pm on 11 January 2011, as it is consistent with the elevated levels of the Bremer River at that time. Given this finding, the Panel considers it is improbable therefore that stormwater runoff inundation would have occurred 8 hours after the most intense period of hourly rainfall and 4 hours after the last rainfall recorded. 49 Accordingly, the Panel accepts the water which inundated the property likely came from the Bremer River overflowing onto normally dry land and inundating the property. This falls within the exclusion of “river flood”. Water or Other Liquid 50 The Applicant has also argued this insured event (water and other liquid) may apply, give n sewerage may have inundated the property. The FSP’s site specific hydrology report appears to corroborate this; although he states it would have occurred at the same time as the overland inundation. 51 This insured event states the following: “You are insur ed for damage to your home caused when water or other liquid suddenly escapes from:  you or your neighbours: - plumbing system - bath, fixed basin, or sink, - … Case No: 254859 Determination Page 10 of 11  the - road gutter or curbing - water main or pipe.” 52 In assessing the Applicant’s argument, it is necessary to determine the intended extent and reach of this insured event in the context of t he policy’s commercial purpose. Construction of this insured event 53 The presence of sewerage at the property does not, of itself, infer this insured event is satisfied upon any sensible construction of the policy. The insured event requires evidence that the water or other liquid which caused the damage suddenly escaped from a plumbing type appliance or enclosure owned by the Applicant and/or his neighbour or from the road guttering/curbing or a water main/pipe. The fact sewerage entered the property is not conclusive evidence that the insured event is satisfied even though the Applicant appears to advocate this point. 54 In particular, the Applicant’s argument appe ars to advocate a construction of the insured event that could conceivably include:  liquid discharging from a pipe or drain located some distance from the Applicant’s property (such as three blocks away or even another suburb),  travelling overland for some distance, and  then inundating the home. 55 In the Panel’s opinion, such a construction would not be based on a commonsense interpretation of the policy or be consistent with the commercial intent of the provision. For instance, the insured event initially discusses damage from water or other liquid suddenly escaping from an appliance owned by the Applicant or their neighbour. Both of these areas are clearly proximate to the Applicant’s property. 56 In this context, it is a natural and reasonable extension that water escaping from a water main/pipe or road gutter/curbing would also be proximate to the Applicant’s property. This is supported by the use of the word “suddenly” and the reference to appliances either at, or proximate to the Applicant’s property in the initial part of the insured event. All of this lends support to the construction that the policy’s reference to road gutter/curbing or water main/pipe in the latter description of the insured event requires some proximity to the Applicant’s property. Applying the construction to the evidence 57 In this context, the Panel does not accept that the presence of sewerage at the property is clear evidence that the insured event of “Water or Other Case No: 254859 Determination Page 11 of 11 Liquid” is satisfied in the absence of any explanation as to w here the sewerage escaped from. 58 Although the hydrologist referred to a sewerage plant located nearby, the Panel has been provided no evidence from where, when and in what manner sewerage escaped to inundate the property. For instance, it might have escaped from the plant itself or in an enclosure that would not fall within the ordinary and natural meaning of the term pipe/gutter/curbing. Given the ambiguity in this regard, the Panel cannot be satisfied, on the evidence that the insured event has been satisfied. 59 In addition to this, there is clear evidence supported by data and an appropriately qualified expert to state water overflowed onto normally dry land to inundate the property. This water clearly does not fall within the insured event of “Water or Other Liquid”. 60 Given this the Panel is therefore not satisfied, on the balance of probabilities, the Applicant’s loss was caused by the insured event of “Water or Other Liquid”. Determination 61 On the basis of the available information the Panel determines the FSP is entitled to deny the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.