Text of the determination
Case No: 254805 Determination Page 1 of 7
Case number: 254805
General Insurance - Small Business - Commercial Property – Storm Damage
Extent of the FSP’s Liability.
19 April 2012
Background
1. The Applicant holds a business pack insurance policy issued by the
Financial Services Provider (FSP). The policy provides cover for general
property up to a sum of $420,000, subject to a $250 excess.
2. On 7 February 2011, the Applicant lodged a claim for storm damage to her
property. Following assessment of the claim, the FSP accepted liability and
sourced quotes for reinstatement of the claimed loss.
3. At the Applicant’s request, the FSP agreed to cash settle the claim and
offered a total amount of $43,066.07 (less GST and $100 excess).
4. The Applicant rejected the offer and requested payment of $55,865.00 (net
of GST), plus allowance for removal and reinstatement of her contents from
the premises, and after hours works.
5. The FSP maintains that its settlement offer of $43,066.07 is correct.
Otherwise, it is prepared to organise a panel builder to undertake the repairs.
6. The amount in dispute is estimated to be approximately $15,000.
Summary of Applicant’s position
7. She preferred a cash settlement as she was unhappy with the conduct of the
FSP’s builders and chose not to use them for the repairs.
8. The FSP’s offer of settlement of $43,066.07 (less GST and $100 excess) is
unacceptable.
9. The Applicant maintains that the appropriate settlement amount should be
$55,865.00 (net of GST).
10. In order for repairs to be carried out, the contents would need to be removed
from the property. Therefore, allowance should be made for the cost of
removal and reinstatement of the contents.
Determination
Case No: 254805 Determination Page 2 of 7
11. Building repairs should be conducted outside business operating hours to
minimise disruption to her tenants and the cost of after hour works should be
met by the FSP.
Summary of FSP’s position
12. It is entitled to settle a partial loss by paying out the cost to repair the
Applicant’s premises to a condition equal to but not better or more extens ive
than its condition when new. Alternatively, if a cash settlement is preferred
the amount should not exceed the cost to repair the items.
13. The FSP maintains that its offer of settlement in the amount of $43,066.07 is
correct. Alternatively, it is prepared to organise a panel builder to undertake
the repairs.
14. The FSP relies on the following policy provisions:
“ 2. Cover
We will indemnify you to the limit specified in the Policy Schedule in respect of
physical loss or damage to:
(i) Building
(ii) Contents
(iii) Other interests as defined in the Policy Schedule, directly caused by
an insured event.
3. Insured Events
3.3 Wind and Water
Wind and water including water and any other liquid discharged from
mains, pipes, gutters, drains, tanks or a fixed apparatus used to hold or
carry liquids, but not loss or damage:
(i) By sea, tidal wave, high water, flood, erosion, subsidence, landslide,
mudslide or settling
(ii) By steam or condensation
(iii) By water seeping from outside the premises
(iv) To gates, fences, retaining walls, signs, shade cloth, plastic or textile
awnings, plastic or textile blinds
(v) To property in the open air unless such property comprises part of a
permanent structure designed to function without protection of walls or
roofs.
...
5 Basis of Settlement
Unless otherwise specified in the schedule, claims will be settled on the basis
of reinstatement and replacement and extra costs, as follows:
5.1 Reinstatement and replacement shall mean:
(a) where property (excluding stock, customers’ good and buildings
awaiting or undergoing demolition) is damaged, the repair of the
Case No: 254805 Determination Page 3 of 7
damage and the restoration of the damaged portion of the property to
a condition substantially the same as but not better or more expensive
than its condition when new.
(b) where property (excluding stock, customers’ goods and buildi ngs
awaiting or undergoing demolition) is damaged, the repair of the
damage and the restoration of the damaged portion of the property to
a condition substantially the same as but not better or more extensive
than its conditions when new.
The basis of settlement of any claim shall be the cost of reinstatement
of property destroyed or damaged at the time of such destruction or
damage as follows:
(i) The work of rebuilding, or replacement, or repairing as the case may
be (which may be carried out upon another site and in any manner
suitable to your requirements but subject to our liability not being
thereby increased), must be commenced and carried out within a
reasonable despatch, failing which we shall effect settlement on an
indemnity basis.
(ii) When any property to which this clause applies is damaged or
destroyed in part only, our liability shall not exceed the sum specified
in the schedule.
(iii) No payment beyond the amount which would have been payable
under this section shall be made until a sum equal to the cost of
reinstatement shall have been actually incurred.
...
General Property Section
...
3 Basis of Settlement
We will pay up to the sum insured for each insured item, less the
excess:
...
3.1 For a total loss:
...
(c) where the item can be replaced but you prefer a cash settlement, the
cost to replace the item with the same or similar item equal to but no
better or more extensive than its condition when new less an equitable
amount of age, wear, tear, depreciation and the general condition and
remaining useful life of the item.
3.2 For a partial loss:
(a) the cost to repair the insured item to a condition equal to but no better
or more extensive than its conditions when new, or
(b) where the item can be repaired but you prefer a cash settlement, the
cost to repair the item as above less an equitable amount for age,
wear, tear, depreciation and the general condition and remaining
useful life of the item.
4. Exclusions
Case No: 254805 Determination Page 4 of 7
4.1 We will not cover any loss or damage directly or indirectly
caused by:
(a) mechanical, electronic or electrical breakdown or derangement
unless as a consequence of an insured loss.
...
4.3 We will not cover a ny consequential loss or damage”
Issue
15. The extent of t he FSP’s liability under the terms of the policy .
Reasons for Decision
16. Having reviewed the matter, FOS has considered it appropriate to expedite
the dispute in accordance with clause 8.6 of the FOS Terms of Reference.
This is due to the circumstances, quantum and complexity of the dispute.
This dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
17. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity to respond to the issues raised.
18. Initially, there was a dispute regarding allowance for further electrical repairs.
However, this issue had been resolved and therefore will not be addressed
in this determination.
19. The central issue in dispute relat es to the extent of the FSP’s liability under
the terms of the insurance contract.
20. The Applicant has raised a number of issues in this dispute. For the purpose
of clarity I will address each of the issues separately hereunder.
Reinstatement of the Building Damage
21. The parties have submitted three quotes for repair of the building damage:
The FSP’s b uilder 1 (BB) provided a quote for $54,833.00 (including
the cost of replacing the blinds).
The FSP builder 2 (JL) issued a quote for $33,269.67.
The Applicant sourced an alternate quote from her own builder for
$42,500.
22. The Applicant submits that she preferred a cash settlement as she was
unhappy with the conduct of the FSP’s builders and chose not to use them
for the repairs.
23. The FSP accepted the Applicant’s request for a cash settlement and offered
to pay her $33,269.67 based on the lower quote. This offer was rejected as
Case No: 254805 Determination Page 5 of 7
the Applicant considers she is entitled to a cash settlement based on her
own builder’s quote of $42, 500.
24. The Applicant, apart from stating that she was unhappy with the FSP’s
builders ’ conduct, has not provided any substantive evidence to show that
the FSP’s offer based on JL’s quote was inadequate for the work required .
Further there is no evidence to show that JL is not appropriately qualified to
rectify the damage. In fact, the evidence clearly shows that all three builders
have based their quotation on similar scope of works.
25. It is common insurance practice that an insurer is entitled to select the most
comprehensive and competitive quotation to rectify the damage, subject to
the repairer being appropriately qualified.
26. Taking into account the available evidence, I am satisfied that the FSP’s
offer of $33,269.67 is fair and reasonable.
Carpet Replacement
27. The FSP offered to settle the carpet claim for $11,108.00 based on a quote
provided by the Applicant’s supplier (C1). The Applicant rejected the offer
and sourced an alternate quote from another supplier (C2) for $14,800.
28. The FSP sourced a quote from its own supplier (C3) for $9,600. However, in
good faith it was prepared to offer the original sum of $11,108.
29. During a conversation with the Service’s Case Manager o n 13 March 2011,
the Applicant conceded that her suppliers did not inspect the carpet.
However, she maintains that C2 has provided the most accurate quote
based on the details she provided.
30. The Applicant ’s contention is that she has two different types of carpet in the
four offices and as C3 did not inspect all four offices, the quote provided by
this company is unreliable and inaccurate.
31. The evidence before me clearly shows that all suppliers were provided with
the same information regarding the type and quality of the carpet in each of
the four offices, together with a floor plan outlining the measurement of the
carpeted areas. Therefore, even if C3 did not inspect all four offices, it would
not be unreasonable to assume that he would have relied on the information
provided by the Applicant for his quote.
32. I acknowledge the Applicant’s concern about C3 ’s quote being relatively
cheaper compared to her suppliers’ quotes . However, I am aware that this is
an industry practice whereby the FSP’s greater buying power makes it the
beneficiary of retail discounts. The provision of such discounts are beneficial
to the industry and to its consumers insofar as it makes replacing insured
items less expensive than would otherwise be the case.
33. Overall, the Applicant has not established to my satisfaction that she is
entitled to the higher amount quoted by C2. Therefore, I accept the FSP’s
Case No: 254805 Determination Page 6 of 7
offer of $11,018.00 was more than fair and reasonable having regard to the
report by C3.
Carpet Damage Report
34. The Applicant submits that on 03 June 2011the FSP’s ass essor instructed
her to obtain a carpet damage report. Therefore, the FSP is required to
reimburse her for the cost of this report.
35. I have examined the carpet company ’s report and note that t heir property
inspection occurred on 17 May 2011, which was about two weeks prior to
the date the Applicant said she received the instruction from the FSP’s
assessor.
36. In view of the Applicant’s contradicting evidence, I am unable to accept the
Applicant’s assertion . Therefore, I am satisfied that the FSP is not required
to indemnify the Applicant for this cost.
Removal and Reinstatement of Contents
37. In considering the nature and extent of the work required for reinstatement of
the building damage, I accept that contents would need to be removed in
order for repairs to be carried out safely.
38. Had the FSP authorised for repairs to be carried out, it would have no doubt
incurred the cost of removing and reinstating the contents from the insured
premises. Hence, it would be fair and reasonable that the FSP includes this
cost as part of the claim.
39. I note however that the Applicant has yet incurred any cost as repairs have
not commenced. Accordingly, the FSP is not required to make any
allowance and/or payment until such time that the Applicant provide the FSP
with adequate evidence to substantiate the cost of removal and
reinstatement of her contents. I note that this does not include removal and
reinstatement of the tenants’ contents.
After Hour Works
40. Whilst I accept the Applicant’s desire to have repairs completed after hours
to minimise disruption to her tenants’ business operation, there is no
provision under the terms of the policy that would provide cover for this loss.
Determination
41. On the basis of the available information, I determine that:
the FSP is not required to pay the Applicant any more than its original
offer of $33,269.67 for reinstatement of the building damage.
the FSP is not required to pay the Applicant any more than its original
offer of $11,108 for replacement of the carpet.
Case No: 254805 Determination Page 7 of 7
the FSP is entitled to deny liability for the costs of the carpet damage
report and after hours works.
the FSP pay the Applicant the cost of removal and reinstatement of her
contents from the insured premises, subject to the Applicant providing
the FSP with proof of costing for this work.