Flood inundation claim declined under flood exclusion; disclosure and good faith challenged
Text of the determination
Case No: 254601 Determination Page 1 of 11
Case number: 254601
General Insurance - Domestic Insurance - Home Building and Contents - FSP
Decision - Denial of claim – Flood – Ss 35 and 69 Insurance Contracts Act
1984.
14 March 2012
Background
1. The Applicant held a Home Buildings and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. The insured property suffered extensive damage arising from the significant
weather events experienced in Queensland in January 2011.
3. The Applicant lodged a claim under the policy seeking indemnity for his loss.
However, the FSP declined the claim on the basis the damage claimed was
due to “Flood”, an event specifically excluded under the polic y.
4. The Applicant remains dissatisfied with the FSP‟s decision to decl ine the
claim and is seeking complete indemnity for his loss.
Summary of Applicant’s position
5. The Applicant has been assisted by legal representatives in preparing the
dispute notice.
6. The Applicant acknowledges the FSP has partially accepted his claim in
respect to stormwater run-off damage up to a depth of 100mm in the
laundry. However, he maintains the damage in the laundry above 100mm
and within the main building remains in dispute.
7. The Applicant did not understand that he would not be covered for water
rising from the Bremer River (the River) very close to his home. The
Applicant had every incentive to ensure that his major investment asset was
protected.
8. Flooding from the river was at all times foreseeable and he relied upon the
FSP and its representatives, as a reputable insurer, to alert the Applicant of
the complete inadequacy of the policy given the close proximity of the
property to the River.
Determination
Case No: 254601 Determination Page 2 of 11
9. The FSP‟s staff had a duty of good faith to inform him of such unsuitability of
the insurance cover. The product has been shown to be unsafe and
dangerous for him and has led to the loss of assets.
10. Accordingly, the Applicant holds the opinion that the FSP should reconsider
its decision to decline the claim and provide indemnity for the full extent of
his loss.
11. The Applicant maintains that damage/loss arising from the event flood must
be covered under the policy, unless it can be shown that there is an
exclusion within the policy that has been “clearly” communicated. The
Applicant maintains this has not been the case in this instance.
12. In the Applicant‟s opinion when the definitions of flood, stormwater,
stormwater run-off, are read together, the definitions are likely to cause
confusion for a reasonable person. It is almost impossible for a reasonable
consumer to identify when stormwater run-off becomes water that cannot
enter a drain/watercourse because it is full or has overflowed.
13. The distinctions between the definitions that signify coverage and no
coverage under the policy are artificial and it is unreasonable to expect as a
reasonable consumer to understand them.
14. Accordingly, in the Applicant‟s view, such contradictory definitions do not
meet the requirements to “clearly inform” under Section 35 of the Insurance
Contracts Act 1984 (the Act), or the requiremen t for “clear, concise and
effective disclosure”.
15. In the alternative, the Applicant maintains that the damage claimed is not
due to flood, but rather is due to run-off from storm and/or rainwater. This
view is supported by the severe weather warnings including warnings of
heavy rainfall and flash flooding issued by the Bureau of Meteorology (BoM)
shortly before 9.00am on 11 January 2011.
16. The information from BoM including satellite imagery supports the view that
Ipswich and its surrounds experienced a storm on the morning of 11 January
2011. This resulted in heavy rain that in turn caused the damage which
accordingly falls within the insured event of storm under the policy.
17. The Applicant notes that the hydrological reports made available by the
Insurance Council of Australia (ICA) also support the fact that there was a
storm in the area with the last rainfall event occurring between 0600hrs and
1500hrs on 11 January 2011.
18. For the period 9.00am on 10 January to 9.00am 11 January just 39.4mm of
rain fell, from 9.00am on 11 January to 9.00am on 12 January rainfall was
very high at 110mm, and it was a result of the storm on 11 January that flash
flooding occurred in the area.
19. The Applicant maintains that:
He left the property in the afternoon of 11 January 2011.
Case No: 254601 Determination Page 3 of 11
It was raining heavily when he left to go to his parents.
At this point the driveway was beginning to fill up with water.
The Applicant has been told that water was overflowing from the
stormwater drains in the vicinity of the property.
The land slopes from the intersection towards the Applicant‟s home and
he has been told water was running down his driveway towards his
home.
20. It is clear from the above noted circumstances that the Applicant is covered
for his loss in line with the wording of the policy.
21. It would be dangerous to rely upon the information in the very general ICA
hydrology reports that do not take into account the specific circumstances of
the water event in the Basin Pocket area.
Summary of FSP’s position
22. The FSP confirms acceptance of the Appli cant‟s claim for inundation
damage within the laundry to the depth of 100mm. It has obtained and made
available a scope of works for the approved component of the Applicant‟s
claim in the amount of $7,330.08.
23. The acceptance of this component of the claim was on the basis of the
hydrologist‟s “W” report, and taking into account the Applicant‟s advice that
there was a history of stormwater inundation within the laundry as it is
located at ground floor level as opposed to the home which is raised.
24. The FSP in addition to the ICA Hydrology Panel reports has also obtained an
independent site specific hydrology report from “ W ” . This evidence including
a further report from loss adjusting firm “C” confirms the inundation of the
insured property was due to floodwater inundation from the river, from
around 6.00am on 12 January 2011. Such loss is specifically excluded under
all sections of the policy.
25. The policy is an insured events contract, which provides cover for loss or
damage arising from the specifically listed insured events and not for all
risks. Storm and rainwater run-off is one of the listed insured events,
however this event excludes from cover loss or damage arising from flood.
26. Further, loss or damage arising from flood is also specifically excluded by
way of the general exclusions section provided within the policy.
27. The FSP acknowledges that the ICA reports do not provide specific analysis
of the cause of inundation at the individual sites. However, the data in
respect to rainfall levels, levels of watercourses etc clearly shows that no
significant rain fell for an extended period prior to inundation. Accordingly, it
is reasonable to conclude that all storm water run-off would have also
ceased well before the actual inundation of the dwelling began.
Case No: 254601 Determination Page 4 of 11
28. The Appl icant‟s property was well within the area shown to be inundated by
floodwaters from the river.
29. The FSP refutes the Applicant‟s allegation in respect to a failure to act in
good faith. It maintains it cannot know the individual circumstances of each
policyholder and relies on the policyholders to advise it of any specific issues
and risks that they may be concerned about.
30. The FSP in providing the Applicant with the relevant policy documentation
including the PDS has fulfilled its obligations under the relevant sections of
the Act.
31. There is an onus on the Applicant to read the provisions of the policy and
ensure the cover is sufficient to meet their requirements. Further, drafting
and wording of the policy is clear, effective and unambiguous.
32. The FSP relies on the following policy provisions:
“ Home Building PDS
Page 8-13 What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for
No – the conditions and exclusions that specifically apply to particular insured events.
…
Yes
You are covered for damage or loss to your home building occurring during the period
of cover and caused by the following events:
Storm and rainwater including stormwater runoff from areas surrounding the site or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of rain, snow or hail.
NO
Damage or loss caused by flood .
Flood means the inundation or covering of normally dry land by water which:
escapes or overflows from,
cannot enter, because it is full of has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have been
modified by human intervention, or reservoir, canal, dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
...
Page 14 What we do not cover – general exclusions
Case No: 254601 Determination Page 5 of 11
You are not covered under any section of this policy for damage, loss, cost or liability
caused by or arising from or involving:
…
flood,
…
Home Contents PDS
Page 18-19
Yes
You are covered for damage or loss to your home building occurring during the period
of cover and caused by the following events:
Storm and rainwater including stormwater runoff from areas surrounding the site or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of rain, snow or hail.
NO
Damage or loss caused by flood .
Flood means the inundation or covering of normally dry land by water which:
escapes or overflows from,
cannot enter, because it is full of has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have been
modified by human intervention, or reservoir, canal, dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
…
Page 22 What we do not cover – general exclusions
You are not covered under any section of this policy for damage, loss, cost or liability
caused by or arising from or involving:
…
flood, ”
Issues
33. Whether the additional claimed damage was due to stormwater run-off, flood
or a combination of both events.
34. Whether the FSP was entitled to decline further indemnity to the Applicant in
line with the provisions of the policy.
Case No: 254601 Determination Page 6 of 11
Relevant Law
35. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Section 69 provides that section 35 will be deemed to have been complied
with if it is not reasonably practicable to give the information in writing before
the contract is entered into but it is reasonably practical to give the
information orally. If the insurer gives the information orally, the insurer is
deemed to have complied with section 35 if the information is given in writing
within 14 days after the contract of insurance (including an interim contract)
has been entered into. Provided the oral information is confirmed in writing
within 14 days, compliance with section 35 will be established.
Reasons for decision
36. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
37. This decision has been made by a Panel consisting of an Ombudsma n, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
38. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
39. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
40. The Panel is satisfied the parties do not dispute the following:
The Applicant held an active home insurance policy with the FSP at the
time of loss.
The FSP provided and the Applicant received the relevant policy
documentation prior to the loss i.e. Certificate of Insurance, PDS etc.
The insured property sustained extensive damage during the
significant weather events experienced in Queensland in January 2011.
Case No: 254601 Determination Page 7 of 11
The FSP has partially accepted the Applicant‟ s claim in relation to
stormwater inundation of the laundry up to a depth of 100mm.
The FSP in maintaining its decision to decline the remainder of the loss
has relied upon evidence obtained from consultants appointed to the
claim.
The insured property was, on the balance of probabilities, inundated on
12 January 2011.
The Applicant evacuated the property sometime in the afternoon on 11
January 2011.
The insured property is in close proximity to the river.
41. The Panel notes that the Applicant has raised multiple concerns in respect to
the FSP‟s decision to decline the claim. In the interest of brevity and the
easy understanding of the parties, these matters will be considered
independently by the Panel under the below sub-headings.
Clearly Informed – Clarity of the policy wording
42. The Applicant does not dispute that he received the policy; however he
questions whether the policy clearly informs as to its limitations.
43. The Applicant has argued:
the terms of the policy in respect to „Flood‟, „Stormwater run - off‟ and
„Water escaping from a drain‟ etc and the exclusion relating to flood is
not clear and would prove confusing for a reasonable person.
the PDS‟s are drafted in a manner which discourages consumer
engagement and comprehension.
44. The FSP refutes the Applic ant‟s contention in this regard and maintains the
wording of the policy definitions, terms, conditions and exclusions is drafted
in such a way that it clearly explains the intention and application of the
provisions.
45. Having reviewed the form and content of the FSP‟s „policy documents‟, the
Panel is of the view that by reference to the index of the policy, and the
reading of policy sections „ What do we mean by that? ‟, „ What we cover -
Insured events ‟, and „ What we do not cover – general exclusions‟ is sufficient
to meet the FSP‟s obligations to clearly inform.
46. The Panel is satisfied that the wording of the definitions is not only clear in its
intention but also clearly informs the consumer that water escaping or
overflowing from the normal confines of any watercourse including those that
have been modified by human intervention is excluded from cover.
47. The Panel is satisfied the FSP‟s policy does not provide flood cover, as
distinct from stormwater run-off and/or the inundation of the property by
water escaping from any water main, drain, pipe, street gutter, guttering or
surface.
Case No: 254601 Determination Page 8 of 11
48. Accordingly, the Panel is satisfied that the FSP, in providing the Applicant
with the relevant policy terms and conditions, has fulfilled its obligations
under Section 35 of the Act.
Cause of the loss
49. The parties to the dispute differ in their opinion as to the proximate cause of
the loss subject to this dispute. The Applicant maintains that the water
inundation of the property was due to stormwater inundation, whilst, it is the
FSP‟ s contention that the extended loss/damage claimed by the Applicant is
due to flood as defined within the policy and accordingly is specifically
excluded from cover.
50. In maintaining its position that the cause for the extended loss is flood, an
event excluded from cover, the FSP relies upon the ICA hydrology report
and a hydrology report commissioned by the FSP and submitted by W. The
relevant information provided in these reports has been summarised below.
51. The loss adjuster C‟s report provides:
The Bremer River in Ipswich rose to near record levels, peaking at
19.4m.
The Bremer River is 200m from the insured property.
Water inundated the property to a depth of 0.25m above floor level
within the dwelling. The water that inundated the home was dirty and
entered the dwelling from both front and rear.
The Applicant believes the property was inundated by stormwater run-
off and rising waters in the yard.
C considers floodwater is most likely the principal cause of the
inundation and subsequent inundation of the property.
52. ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA” provides:
There were four distinct rainfall periods across Ipswich City LGA during
the period from 9 January to 13 January (p1) . These occurred at:
– around 1000 hours and 1200 hours on 9 January
– around 1500 hours to 2100 hours on 9 January
– around 0700 to 1100 hours on 10 January
– around 0600 hours to 1500 hours on 11 January.
Over the 5 days from 9-13 moderate to heavy rains fell over Ipswich
City LGA (7.2.2).
Rainfall in the 24 hours to 0900 on 9 January was not significant (less
than 25mm).
Over the next 24 hours to 0900 on 10 January was moderate (40 -
80mm).
Case No: 254601 Determination Page 9 of 11
Rainfall in the 24 hours to 0900 on 11 January was significant (25-
200mm) Rainfall was heaviest in the north-western area of the LGA.
Large releases were made from Wivenhoe Dam over the period from
0600 hours and possibly as early as 0300 hours on 11 January until
around 0300 hours on 12 January. (9.3)
It was concluded that the dam release flood was the immediate cause
of flooding along the reach of the Brisbane River downstream of the
dam, and along tributaries through the Ipswich City LGA. (9.3)
At about 0900 hours on 11 January water levels at One Mile Bridge
Alert and Ipswich Alert begin to rise rapidly due to Brisbane River water
flowing back up along the Bremer River. The peak water level at these
stations occurred on 12 January and was caused by backwater from
the Brisbane River and Bremer River floods attempting to flow
downstream.
53. The site specific report submitted by the project engineer “ SM ” on behalf of
W and titled “Site Specific Inundation Assessment” provides:
The property was inspected by the consultant on 4 October 2011.
The property was inundated to a depth of 0.7m above floor level in the
laundry. The main house, which has a floor level of approximately 0.4m
above ground level, was inundated to a depth of approximately 0.3m,
above floor level.
The Applicant returned to the property on 13 January, to find a thin
layer of silt inside the home and a strong smell.
The rec orded rainfall data for Brassall (Hancock‟s Bridge) Alert rainfall
Station (540250), located approximately 2.9km south west of the
property showed a total of 188mm of rainfall was recorded between 9
January – 11 January.
Peak rainfall intensity of 21.2mm/hr occurred at 1400hrs on 11 January.
No rainfall was recorded in the vicinity of the property after 1800hr on
11 January.
The ARI of recorded rainfall for the storm durations up to 2hr was less
than one year. For 3-72hr, the ARI was between 1 and 5 years. This
means higher intensity rainfalls are experienced in the area regularly.
The higher rainfall intensities which caused major flooding in the
watercourses occurred further to the west of the property.
Peak stormwater run-off from the local catchment area would have
occurred within 10-30 minutes of peak rainfall.
Ground levels at the property are between 16.6m AHD and 18.4m
AHD.
An open channel flows in a north easterly direction approximately 90m
east of the property. The open channel flow directly into Bremer River
with a defined bed and banks.
Case No: 254601 Determination Page 10 of 11
River floodwater would have arrived at the subject property by backing
up the open channel.
The peak flood level at the property has been estimated at 19.1m AHD.
The property is clearly within the extent of flooding from the Bremer
River.
The dwelling would have been initially inundated by floodwater at
around 6.00am on 12 January, approximately 12hr after the rainfall
ceased in the vicinity of the property.
Due to the laundry being constructed at ground level it is likely that it
was initially inundated up to a depth of 100mm by stormwater run-off
from the local catchment.
54. According to the report from WRM, due to the way the Applicant‟s driveway
was constructed, during heavy rain, water from the street misses the
stormwater drain and flows directly down their driveway. That water drains
through the garage and because the floor of the laundry is on the ground,
water seeps through the wall and into the laundry. It is unclear whether there
was any damage sustained to any items in the garage.
55. The Panel notes the policy wording provides cover for stormwater inundation
including the stormwater run-off from areas surrounding the site, or water
escaping from any main, drain, pipe, street gutter, guttering or surface. The
information exchanged reveals a possibility of water escaping the
stormwater drains or street guttering could have contributed to the loss. This
is consistent with the FSP‟s accepted position that the laundry was
inundated to a depth of 100mm by stormwater run-off from the local
catchment.
56. The Panel has considered the possibility of a more substantial contribution to
the initial inundation as a result of stormwater run-off and stormwater drains
in close proximity to the property. The Panel has considered the A pplicant‟s
contention of water spurting out of these drains prior to evacuating the
property. However, the Panel is persuaded by the hydrologist information
that such an inundation at best will be limited to the ground level (laundry) of
the Applicant‟s pr operty up to 100mm.
57. In forming the Panel‟s view, the Panel has considered not only the hydrology
information but also the Applicant‟s information and the particulars of the
Applicant as provided by the Project Engineer. The Panel accepts that the
property with the floor level approximately 0.4 metres above ground level is
unlikely to have been inundated above floor level in the house proper as a
result of stormwater run-off. The Panel is persuaded, on the balance of
probabilities that most likely the inundation above floor level of the house
proper was due to floodwater inundation as defined within the terms of the
policy.
Case No: 254601 Determination Page 11 of 11
Breach of utmost good faith
58. The Applicant has claimed that the FSP, in failing to inform him of the
unsuitability of his cover, has failed in its duty of utmost good faith and
accordingly it should reconsider its decision to decline the claim and cover
his loss.
59. The Panel has also c onsidered the Applicant‟s contention in relation to the
FSP‟s alleged failure to draw his attention to the policy limitations and the
fact that the policy did not suit his needs, noting the close proximity of the
property to the river. The Applicant argues that it would be good insurance
practice for the FSP to have notified him of the additional cover needed.
60. Whilst the Panel can understand the Applicant‟s concern with respect to this
expectation, it is well established law that the onus is on the Applica nt to
identify the cover he seeks and to inform the FSP the type of cover
requested. The Panel is satisfied that expecting the FSP to be aware of
circumstances of each policyholder or potential insured at inception of the
policy is not reasonable.
61. Further, the FSP accepts the FSP‟s position that it is not reasonable and/or
practical for an FSP to read/inform consumers of the policy provisions or
exclusions in their entirety in the course of a telephone call. Section 69 of the
Act recognises this and permits an FSP to provide the relevant policy terms
within 14 days of the policy inception. The Panel notes that it is not in dispute
that the Applicant received and the FSP sent the PDS and relevant policy
documentation to the Applicant.
62. In these circumstances, the Panel is satisfied there has been no breach of
the duty of utmost good faith and the FSP has fulfilled its obligations set out
under Sections 35 and 69 of the Act.
Determination
63. On the basis of the available information, the Panel determines that the FSP
is entitled to deny further liability to pay the claim, beyond that already
agreed by it, in accordance with the terms of the policy.