Flood inundation of rental home declined under flood exclusion; policy notice disputed
Summary
The applicant's rental home was inundated in January 2011 and he claimed up to $161,002, arguing stormwater run-off caused the first damage. AFCA found the inundation was river flood excluded under the policy and that the FSP had adequately disclosed the flood limitation.
Rainfall had ceased well before the inundation, so the loss was attributed to flood, which the policy excludes, and section 35 disclosure was satisfied by the telephone inception call and PDS dispatch.
Issues
- Claim denial primary · not upheld
“the Panel determines that the FSP is entitled to deny the Applicant's claim.”
- Failure to disclose secondary · not upheld
“the FSP has discharged its obligations under Section 35 of the Act, noting that the Applicant was informed verbally of the contract limitations for flood cover.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 254524 Determination Page 1 of 7
Case number: 254524
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Flood and/or Run-Off Rainwater
14 March 2012
Background
1. The Applicant held a home and contents policy with the Financial Services
Provider (FSP) from 5 February 2008 for his property which was rented by
tenants. The policy provided building cover for $496,080.
2. On 15 January 2011, the Applicant lodged a claim for damage caused to the
rental home on or about 11 January 2011 as a result of water inundation at
the time of the flood events that affected significant parts of Queensland.
3. The FSP arranged for an assessor to inspect the home and later for a
hydrologist to provide a report. It declined the claim on the basis that it
considered that the home was inundated by flood water, which is excluded
under the policy.
4. The Applicant disagrees with the decision and seeks reimbursement for at
least part of his losses, estimated at up to $161,002.
Summary of Applicant’s position
5. The Applicant says that his property was inundated by stormwater run-off,
prior to being overcome with floodwater. He considers that the FSP should
cover him for the initial damage attributable to the run-off.
6. He considers that the FSP should not be able to rely upon the flood
exclusion as he does not recall receiving a copy of the Product Disclosure
Statement (PDS) when he incepted the policy.
Summary of FSP’s position
7. The FSP says that the loss was caused by the flooding of the Brisbane River
after the release of water from the Wivenhoe Dam and there is no evidence
to support an inundation of rainwater run-off prior to this event.
8. It complied with its obligations under Section 35 of the Insurance Contracts
Act 1984 (the Act) by providing a copy of the PDS to the Applicant to ensure
Determination
Case No: 254524 Determination Page 2 of 7
that he was adequately informed about the limitations of the policy, which did
not cover flood. Section 35 provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
9. The FSP relies upon the following policy provisions:
Page 2 of Part A of the PDS
“ flood – is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, reservoir, canal or dam.”
Pages 7-9 of the PDS
“ COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the
conditions and exclusions that specifically apply to each insured event.
They should be read with the general exclusions on pages 27-29.
...
Insure d event We will NOT cover:
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water
pipe, drain or gutter
surface run-off rainwater from
surrounding areas that occurs within 24
hours of heavy rain
Including loss or damage caused by erosion,
subsidence, landslide, mudslide or any other
earth movement that occurs within 72 hours of
a storm or heavy rain and as a result of that
storm or heavy rain
loss or damage
caused by flood...
... ”
Page 27 of the PDS
“ GENERAL EXCLUSIONS APPLYINGTO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water:
loss or damage caused by flood...”
Case No: 254524 Determination Page 3 of 7
Issues
10. Whether the Applicant was adequately informed that the policy did not
provide cover for flooding, as required under Section 35 of the Act.
11. Whether the Applicant‟s loss was attributable to stormwater run -off or flood.
Reasons for decision
12. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
The limitations of the policy and whether the Applicant was informed
14. The Applicant did not reside in the insured property which was rented out to
tenants. Since the lodgement of the claim, material meant for the Applicant
(at his new Victorian address) was inadvertently sent by the FSP to the
insured property. Whilst the Applicant does not recall receiving the PDS from
the FSP in 2008, he queried whether this was sent to the correct address.
15. In support of its contention that the Applicant was made aware of the
limitations of the policy, the FSP relies upo n the telephone call at inception,
during which the Applicant was informed that the policy “does not provide
cover for flood.” It further relies upon the provision of the PDS documents
(written derogation notice) after the policy was incepted.
16. A recording and transcript of the telephone call to incept the policy confirms
that this information was conveyed to the Applicant on 5 February 2008. The
Panel is satisfied that the FSP made the Applicant aware and that a
reasonable person in the circumstances would conclude that the policy did
not provide flood cover.
17. Documentation has also been provided to attest to the provision of the PDS
to the Applicant on or about 12 February 2008. The Panel accepts that the
Certificate of Insurance and a PDS were mailed to the Applicant, although it
does not specify to which address.
18. The supplied copy of the PDS in the material confirms the Applicant‟s
residential address in 2008 (which was in Queensland at the time). The FSP
confirmed in later documents that this represents the mailing address to
which the documents were sent and the Applicant does not dispute that he
was living at this address at the time.
Case No: 254524 Determination Page 4 of 7
19. The standard of proof placed upon the FSP under Section 77(2) of the Act
requires evidence from the FSP that it arranged for the documents to be
“delivered in the ordinary course of [the] post”. The Panel accepts that the
provided information confirms that the information was sent. The relevant
section reverses the onus of proof back to the Applicant to establish that,
through no fault of his own, he did not receive it.
20. This is a difficult onus for the Applicant to discharge and he has not done so.
The fact that he cannot remember receiving the documents is not sufficient
to suggest that he did not receive them. The Panel accepts on the balance of
probabilities that the relevant documents were sent to the Applicant‟s then
address.
21. The PDS specifies on page 9 (under the insured event for “storm and
rainwater”) and again under the general exclusions on page 27 that it does
not provide cover for flood. A definition for flood is provided on page 2.
22. The Panel accepts that the PDS adequately demonstrates that the policy
does not provide cover for damage attributable to flood. It also distinguishes
between flood and „surface run -off rainwater‟ (which is covered).
23. Accordingly, the Panel is satisfied that the FSP has discharged its
obligations under Section 35 of the Act, noting that the Applicant was
informed verbally of the contract limitations for flood cover and proof of
dispatch for the PDS has been provided. The FSP is therefore entitled to rely
upon the limitations stipulated in the policy to restrict cover for the loss.
Cause of the Loss
24. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. Should this onus be
discharged, it is then the responsibility of the insurer to establish the
application of any exclusion on which it relies to deny the claim.
25. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that his loss fits within the scope of what is covered by
the FSP‟s policy.
26. The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of damage.
27. It is not in dispute that the Applicant‟s property was inundated with water as
a result of a significant rainfall and flood event that affected much of
Queensland in early 2011.
28. In accordance with the list of defined events under the policy, the loss might
be considered under „storm and rainwater‟, which includes losses
attributable to „surface run - off rainwater‟ which occurs within 24 hours of a
storm or heavy rain, but excludes losses attributable to flood.
Case No: 254524 Determination Page 5 of 7
29. The Applicant was not present when the home was inundated and the
tenants had evacuated the property. He has suggested that the initial
inundation was sometime between the late evening of 11 January 2011,
extending overnight until around 8am on 12 January 2011. It is the
Applicant‟s submission that thi s water was stormwater run-off as evidenced
by the damage sustained to some of the exterior fixtures in his yard. He
concedes that the property was later inundated by floodwater.
30. Insofar as the Applicant is able to differentiate the events (i.e. that there was
damage attributable to stormwater run-off prior to the inundation of the
floodwater), the Panel accepts that he would be covered for the damage
from the first event.
31. After the report of the incident, the FSP arranged for an internal assessor,
BP, to visit the site and report on the damage. The subsequent report of 2
February 2011 revealed:
that he attended the property and met with a friend of the Applicant as
he could not be present;
the home was situated about one metre above the ground level;
the water inundated the home to a depth of about half a metre, being a
total depth of about 1.5m at the property; and
the cause of the loss was: “Rising Water – Flood”.
32. The FSP subsequently denied the claim on 8 March 2011 and the Applicant
challenged the FSP‟s conclusions.
33. The FSP ultimately retained a hydrologist, WR, to inspect the Applicant‟s
property on 28 May 2011. The subsequent report of 7 September 2011
revealed that:
a mutually convenient time to meet the Applicant at the property could
not be arranged and therefore the inspection of the property was limited
to a view from the street and a review of some of the information
provided by the FSP;
the home was an “elevated two storey house”;
the Corinda High Alert (CHA) rainfall station was closest to the
A pplicant‟s property, being 3.8km south of it. The peak one hour rainfall
intensity of 14.8mm recorded occurred at 11am on 11 January 2011;
peak stormwater run-off would have occurred within 10-30 minutes
after the peak rainfall;
very little rainfall was recorded at CHA after 5pm on 11 January 2011;
the property was located about 500m from the Brisbane River;
the front of the home is approximately 7.3m AHD (Australian Height
Datum), with recorded levels of flooding “in the vicinity of the subject
property” up to 9.2m AHD;
Case No: 254524 Determination Page 6 of 7
floodwaters from the Brisbane River overtopped the banks in two
locations. Flood from both locations contributed to the inundation of the
Applicant‟s property;
floodwater would have reached the property as early as 5am on 12
January 2011;
the initial inundation of the lower floor of the home would have occurred
after 12pm on 12 January 2011. This was about 18 hours after the
cessation of any “substantial rainfall” in the area; and
stormwater run-off and water from the drains did not contrib ute to the
inundation of the home, which was caused by the flooding of the
Brisbane River.
34. The Applicant argues that his neighbour has a home of almost identical
design and obtained evidence that stormwater run-off was responsible for
part of his loss, resulting in a partial settlement from his insurer. No evidence
in support of why this claim was paid or what relevance it might have to this
situation has been provided.
35. The Panel accepts that the policy provides cover for „surface run -off
rainwater‟ within 24 hours of a storm or heavy rain; however the Applicant
has not demonstrated that this was the source of the water which entered his
home.
36. The ICA reports detail information about the rainfall and its effect on the
various areas at the time of the floods. It noted that rainfall in the Brisbane
city area was heaviest through the 6am to 4pm period on 11 January 2011.
Page 41 of Volume 2 of the report notes:
“Rain ceased over the Brisbane Cit y area around 1800 hours on Tuesday 11 January,
some 24-30 hours before flood levels in the Brisbane River peak ed. Thus, when the
Brisbane River peak ed, there is no evidence that there was any „normal‟ flow of
significance from the catchment areas of tributary creek s draining the Brisbane LGA
[Local Government Area]. As the floodwave passed downstream along the Brisbane
River, back water flooding occurred up the tributary creek s. The peak flood level and time
of peak along the tributary peak s are expected to be the same as those in the Brisbane
River at the mouth of the creek s. Flooding along the mainstream of the Brisbane River
and along the lower tributaries was principally caused by releases from Wivenhoe Dam
(dam release flooding).”
37. This report confirms that rainfall had ceased in the local area well before the
apparent inundation of the Applicant‟s home. After the rain ceased,
“backwater flooding” occurred through the Brisbane River and tributary
creeks and this overflowed into the surrounding areas. WR confirmed that
this flooding through the drains had no impact on th e Applicant‟s home.
38. Volume 2 of the ICA report notes that:
“Given that rainfall across the Brisbane City [local area] had ceased by 1800
hours on Tuesday 11 January, any flooding after this time will have been caused
by waterflow inundation from the Brisbane River and its tributary creeks, it being
noted that inundation along the tributaries was associated with backwater
Case No: 254524 Determination Page 7 of 7
flooding from the Brisbane River (which in turn was principally caused by the
dam release flood from Wivenhoe Dam).”
39. This confirms that any inundation after the completion of the heaviest rainfall
on 11 January 2011 was almost certainly due to flooding and not stormwater
run- off. Given that the inundation of the Applicant‟s home was not for several
hours after this time (and up to 14-18 hours), the Panel is satisfied on the
balance of probabilities that the cause of the inundation was flood. As losses
attributable to flood are excluded under the policy, the Panel is satisfied that
the FSP has grounds to deny the claim.
Determination
40. On the basis of the available information, the Panel determines that the FSP
is entitled to deny the Applicant‟s claim.