Text of the determination
Case No: 254501 Determination Page 1 of 11
Case number: 254501
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim- Flood - Exclusion/ condition – Ss 35,69 & 77 Insurance
Contracts Act 1984
18 May 2012
Background
1. The Applicant held a Home Contents Insurance Policy (the policy) with the
Financial Services Provider (FSP) with a total sum insured of $50,000 for her
contents.
2. The insured property suffered extensive damage arising from the significant
weather events experienced in Queensland (Qld) during January 2011.
3. The Applicant lodged a claim seeking indemnity for her loss. However, the
FSP declined her claim on the basis the loss was not due to an event
insured under the policy, rather was flood damage which is specifically
excluded under the policy.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline the
claim and is seeking complete indemnity for her loss.
Summary of Applicant’s position
5. In disputing the FSP‟s declinature of her claim the Applicant has sought the
assistan ce of legal representatives “L”. In the interest of easy understanding
and brevity, both the Applicant and L will be referred to as “the Applicant” for
the purpose of this Determination. The Applicant has also been assisted by
her daughter and reference to “the Applicant” will also include reference to
the Applicant‟s daughter .
6. The Applicant maintains that whilst taking out the policy using the FSP‟s on -
line application service, no indication was provided within the process to
indicate that there existed a flood exclusion or any other exclusion for that
matter. Accordingly, it was reasonable for the Applicant to form the opinion
that there were no exclusions applicable to cover available under the policy.
7. The Applicant contends that she does not recall having been provided with
the relevant policy Product Disclosure Statement (PDS) by the FSP at
inception of the policy. Accordingly, the FSP has failed to fulfil its obligations
set out under section 35 of Insurance Contracts Act 1984 (the Act).
Determination
Case No: 254501 Determination Page 2 of 11
Therefore, th e policy should be read as the “Standard Cover”, policy which
includes flood cover.
8. The Applicant did not understand that she would not be covered for water
rising from the Bremer River and/or Bundamba Creek which are in close
proximity to her home. The Applicant had every incentive to ensure that her
assets were protected.
9. Flooding from the watercourses in close proximity to her home was at all
times foreseeable and she relied upon the FSP and its representatives, as a
reputable insurer, to alert the Applicant of the complete inadequacy of the
policy.
10. The FSP‟s staff had a duty of good faith to inform her of such unsuitability of
the insurance cover. The product has been shown to be unsafe and
dangerous for her and has led to the loss of assets.
11. In order for an event to be excluded from cover under the policy, the event
must fall precisely within the language of the definition used in the contract.
The Applicant‟s property was damaged by an event which does not fall
within the policy definition of flood.
12. The Applicant maintains that the sole proximate cause for the damage to her
property was due to the significant releases of water from Wivenhoe Dam
(the dam). This case is not analogous to a case where stormwater mixes
with floodwater and the floodwater would have inundated the property on its
own.
13. The distinction is that the Bremer River and its tributaries on their own had
not inundated the Applicant‟s home and as such is not a separate proximate
cause. It can‟t be said that the Bremer River level in the absence of the
releases from the dam operated effectively to cause the loss at the property.
Accordingly, the Panel should not be satisfied that there are two proximate
causes and as such there is no application of the Wayne Tank principle on
this occasion.
14. The time of inundation of the property is evidence of the dominance and
effective nature of the dam release in causing the Applicant‟s loss. The
FSP‟s site specific hydrology report suggests the peak inundation of the
property occurred at approximately 2.00pm on 12 January 2011. The
Applicant‟s son had witnessed the house had not been inundated between
6.00pm-8.00pm on 11 January 2011; however, water was half way up the
Applicant‟s street at this time.
15. The Applicant acknowledges she was not at her home at the time of
inundation, however, on the basis of the observations of residents in the
area, she believes the initial inundation of her home occurred at around
6.00am-8.00am on 12 January 2011. This being consistent with the
estimated travel time of the water released from the dam making its way to
the area of the insured property.
Case No: 254501 Determination Page 3 of 11
16. The Insurance Council of Australia (ICA) hydrology reports confirm the
immediate cause for the flooding along the lower reaches of the river
downstream of the dam, along with the lower reaches of the Lockyer Creek
and Bremer River was release from the dam.
17. The Applicant relies upon opinions of experts in consumer communication
and contends that a person of average intelligence and education could not
understand the Product Disclosure Statement (PDS). In some cases merely
providing the consumer with the policy documents is not sufficient enough to
inform them of the relevant policy provisions.
18. Prior to any floodwater reaching the property, stormwater run-off inundated
her home and caused the damage. Accordingly, the damage falls within the
scope of cover provided by the policy.
19. The Applicant holds the opinion that the FSP should reconsider its decision
to decline the claim and provide indemnity for the full extent of her loss. Had
it been made clear to her that she was not covered for loss arising from
flood, she would have made arrangement to obtain appropriate insurance
cover including cover for loss or damage arising from flood.
Summary of FSP’s position
20. The Applicant fails to appreciate that the initial burden of proof is on her to
establish that an insured event has occurred and the FSP maintains that
such burden has not been fulfilled.
21. The FSP refutes the Applicant‟s contention that it had failed to fulfil its
obligations in li ne with section 35 of the Act. When the Applicant took out the
policy the on-line process clearly refers one to the PDS available on the
website and the fact that there are exclusions to cover available under the
policy. However, it would seem that the Applicant and/or her representative
(daughter) elected not to read the terms and conditions of the policy at the
time.
22. Further, in addition to having clearly informed the Applicant of the availability
of the PDS during the on-line inception process it also provided her with the
PDS after inception of the policy and mailed it to her on 15 October 2010.
Accordingly, it is entitled to derogate from the standard cover and decline
indemnity on the basis the policy does cover loss or damage arising from the
event of flood.
23. The consumer communications consultant reports referred to and relied
upon by the Applicant in respect to the content of the PDS being confusing
do not establish that the FSP has failed to comply with its obligations under
section 35 of the Act.
24. The FSP has at all times maintained that the Applicant‟s property was
inundated by floodwaters which escaped from the normal confines of a
Case No: 254501 Determination Page 4 of 11
watercourse i.e. Bremer River and its tributaries; flood being a general
exclusion across the policy.
25. The flood exclusion would still apply in the instance the Applicant was able to
establish that some of the relevant river water was introduced into that
watercourse via a release from the dam. The Applicant has incorrectly
focused on the origin of part of the water that entered the watercourse,
without having regard to the fact that the water that did damage her property
had escaped the normal confines of a watercourse i.e. the Bremer River
through its tributaries.
26. All evidence in this matter, both objective rainfall and river gauge data
supported by expert reports, establishes without a doubt that the insured
property was damaged by flood, as defined within the policy.
27. Although the Applicant claims the damage to her property is due to
stormwater inundation, she has not submitted any evidence to support this
contention. It is an accepted principle of insurance law, that the onus rests
with the policyholder to establish, on the balance of probabilities, that the
loss claimed is due to an event insured under the policy.
28. The FSP notes that none of the Applicant‟s observations in respect to the
storms and rainfalls in the area over the relevant period to the Service are
inconsistent with the observations of the FSP‟s commissioned hydrologists‟
(W) reports.
29. The evidence before the Service clearly establishes that the damage to the
property was in fact caused by the event “flood”, being water escaping from
any watercourse, channel, canal etc. This is also supported by the Applicant
in her own submission to the Service.
30. The Applicant in the alternative maintains that the sole proximate cause for
the damage to her property was water released from the dam, which she
maintains is not excluded from cover under the policy. It is her contention
that the flood exclusion only excludes from cover water “ escaping ” from a
dam as opposed to water “ released ”.
31. The FSP submits the Service can determine this matter without addressing
the matter of whether the flood exclusion applies to water “ released ” from the
dam. All evidence establishes it was escaping the normal confines of the
Bremer River and backing up of its tributaries that caused the inundation of
the property, circumstances that fall within the scope of the policy definition
of flood.
32. In the context of the Applicant‟s claim, the closest r elated insured event is
“Storm”. The hydrology evidence confirms there was no significant rainfall in
the Applicant‟s local area at the time of loss. Rather, the actual rainfall
recorded in the area was insufficient to be the sole cause of inundation of the
Applicant‟s home.
Case No: 254501 Determination Page 5 of 11
33. The FSP refutes the Applicant‟s allegation in respect to a failure to act in
good faith. It maintains it cannot know the individual circumstances of each
policyholder and relies on the policyholders to advise it of any specific issues
and risks that they may be concerned about.
34. The FSP in providing the Applicant with the relevant policy documentation
including the PDS has fulfilled its obligations under the relevant sections of
the Act.
35. There is an onus on the Applicant to read the pro visions of the policy and
ensure the cover is sufficient to meet their requirements. Further, the drafting
and wording of the policy is clear, effective and unambiguous.
36. The FSP relies on the following policy provisions:
“Page 15 – Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rains or snow, or
a sudden, excessive run-off of water as a direct result of a storm in your local
area
however
we will NOT cover loss or damage caused by flood
…
Page 35 – What you are not covered for – general exclusions
we will Not cover
loss, damage, injury or death that occurs as a result of
– flood
…
Page 70 – Flood
is the covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood also
includes water escaping from the confines of any reservoir, channel, canal or dam.
Flood is not covered by this Policy. ”
Issues
37. Whether damage to the Applicants‟ property was caused by flood water as
defined by the policy.
38. Whether the FSP was entitled to decline indemnity to the Applicants in line
with the policy.
Case No: 254501 Determination Page 6 of 11
Relevant Law
Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation to the
contract, an insurer may not refuse to pay an amount equal to the minimum amount
of cover set out in the regulations made pursuant to the Act unless it can prove that
before the contract was entered into, the insurer clearly informed the insured in
writing of the relevant provisions of the contract, or that the insured knew or a
reasonable person in the circumstances could be expected to have known of such
provision.
Section 69 provides that section 35 will be deemed to have been complied with if it
is not reasonably practicable to give the information in writing before the contract is
entered into but it is reasonably practical to give the information orally. If the insurer
gives the information orally, the insurer is deemed to have complied with section 35
if the information is given in writing within 14 days after the contract of insurance
(including an interim contract) has been entered into. Provided the oral information
is confirmed in writing within 14 days, compliance with section 35 will be
established.
Section 77 of the Act provides that a notice or other document that is by the Act
required or permitted to be given, may be given to a body corporate in any way in
which documents may be served on that body corporate, and to a natural person,
personally or by post to that person at his last known address.
Reasons for Decision
39. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
40. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
41. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this Determination except where considered
relevant.
42. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
43. The Panel notes the parties do not dispute the following:
The Applicant held an active Home Contents (only) Insurance policy
with the FSP at the time of the loss.
Case No: 254501 Determination Page 7 of 11
The property suffered significant damage due to the weather events
experienced in the area in January 2011.
The Applicant evacuated the property prior to when the inundation of
the property occurred.
The Applicant‟s home was inundated on 12 January 2011.
The insured property is in close proximity to the Bremer River,
Bundamba Creek and their tributaries.
44. The Applicant in disputing the FSP‟s decision to decline the claim has raised
multiple concerns. The FSP, although acknowledging the Applicant‟s
concerns, maintains its entitlement to decline indemnity. The issues raised
are considered under the below headings.
Section 35 and “Clearly Inform”
45. The Applicant holds the opinion that the FSP has failed to satisfy its onus to
clearly inform her of the relevant provisions of the policy as:
The on-line application for insurance process makes no mention of the
existence of any exclusions (including flood cover) to the cover
available under the policy.
The FSP‟s wording of the policy is confusing and beyond the
understanding of a person of reasonable intelligence and education.
On-line Application process and Provision of PDS
46. The Panel acknowledges the Applicant‟s contention that at the time of taking
out the policy using the on-line application process, there was no information
provided to inform her that the policy was subject to any policy exclusions
and/or limitation. Accordingly, it was reasonable to form the opinion that the
policy was not subject to any exclusions and/or limitations.
47. Section 35 of the Act imposes the obligation on the insurer to clearly inform
the insured in writing before the contract is entered into. However, section
69(2) of the Act provides that if it was not reasonably practicable for the
information to be so given orally or in writing, the information shall be
deemed to have been given if it is given in writing 14 days after the day on
which the contract was entered into.
48. The Panel has reviewed the evidence (on-line process screen shots) made
available by the FSP in respect to the information provided to an applicant
when utilising this system to purchase an insurance policy. The Panel,
having previously considered similar matters in this respect (FSP‟s on -line
process) and having regard to the available evidence, is satisfied that the
process makes reference to and encourages an applicant to read the
available terms and conditions made available by way of „link‟ within the
process. Further, in making reference to the PDS within the on-line process
it is clearly flagged that there is a policy document which sets out the terms
of cover.
Case No: 254501 Determination Page 8 of 11
49. The Panel has also reviewed the FSP‟s comprehensive documentary
evidence in respect to providing the Applicant with the PDS after inception of
the policy and is satisfied the FSP pursuant to FOS Circular 3 has
reasonably established the FSP had sent and the Applicant received the
relevant policy terms prior to the loss.
50. The Panel acknowledges the Applicant‟s contention that she has been
deprived of the opportunity to arrange alternative insurance, including flood
cover, arising from the FSP‟s failure to clearly inform her of the flood
exclusion within the policy.
51. Having established the FSP had fulfilled its obligations under section 35 of
the Act that it provided the Applicant with the releva nt policy wording, the
Panel is not satisfied that the Applicant‟s position that she suffered
detriment, in respect to arranging alternative insurance cover, is made out on
this occasion.
Clear and unambiguous provisions
52. It is well settled that the onus is on the insured to read and understand the
policy documents in order to determine whether the policy meets his or her
needs. Thus, the onus was on the Applicant to read and understand the
policy documents, including the PDS.
53. The Panel has carefully examined the PDS provisions relating to flood and
storm.
54. The Panel is of the opinion that on page 15 of the PDS, under the heading
“Storm”, it is clearly and unambiguously stated that loss or damage caused
by flood is not covered.
55. The Panel is also of the opin ion that “Flood” is clearly and unambiguously
defined in the “Glossary” on page 70 of the PDS as “the covering of normally
dry land by”:
“water escaping or released from the normal confines of a watercourse
or lake, whether or not it is altered or modifie d”; or
“water escaping from the confines of any reservoir, channel, canal or
dam”.
56. It is also noted in the policy definition of “Flood” that loss or damage arising
from flood is not covered by this policy.
57. Further, page 35 of the PDS, under the heading “What you are not covered
for – general exclusions”, it is again clearly and unambiguously stated that
the FSP “will NOT cover… loss or damage… that occurs as a result of …
flood”.
58. Therefore, the Panel determines that the FSP on providing the PDS did
inform the Applicant of the exclusion of flood cover. Further, that the wording
of the policy is both clear and unambiguous in its meaning and application.
Case No: 254501 Determination Page 9 of 11
59. The Panel is mindful of the Applicant ‟ s reference to and reliance upon
reports submitted by the consumer communication consultants in respect to
the wording and structure of the PDS.
60. However, an insurance policy is a legal contract between the parties
involved. An FSP is required by law to include information which provides a
summary of the covers provided by the contract in addition to the actual
terms and conditions of that cover. By its very nature an insurance
PDS/policy document is a complex and in some cases a lengthy document.
61. When assessing a consumer‟s reading habits and cognitive ability, in the
Panel‟s opinion it should not be assessed in the same way as reading a
novel, magazine or newspaper may be assessed.
62. In the Panel‟s opinion a PDS should not be adversely critiqued because of
what it actually is; that is, a legal contract providing a wide range of benefits,
subject to certain rules.
63. Accordingly, the Panel does not accept the Applicant‟s position in relation to
the structure and wording of the PDS. The Panel is satisfied that the FSP
has clearly informed the Applicant in writing of the terms of the policy on
which it relies to decline the Applicant‟s claim.
Proximate Cause and Hydrology Evidence
64. The Panel has been provided with multiple hydrology reports commissioned
by the FSP and has access to the Insurance Council of Australia (ICA)
hydrology reports. As there has been an exchange of material between the
parties, only information considered relevant from the various reports relied
on will be recited.
ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA”
There were four distinct rainfall periods across Ipswich City LGA during
the period from 9 January to 13 January (p1) . These occurred at:
around 1000 hours and 1200 hours on 9 January
around 1500 hours to 2100 hours on 9 January
around 0700 to 1100 hours on 10 January
around 0600 hours to 1500 hours on 11 January.
Over the 5 days from 9-13 moderate to heavy rain fell over Ipswich City
LGA (7.2.2).
Rainfall in the 24 hours to 0900 on 9 January was not significant (less
than 25mm).
Over the next 24 hours to 0900 on 10 January was moderate (40 -80mm).
Rainfall in the 24 hours to 0900 on 11 January was significant (25-
200mm). Rainfall was heaviest in the north-western area of the LGA
around Tallegalla.
Case No: 254501 Determination Page 10 of 11
Large releases were made from Wivenhoe Dam over the period from
0600 hours and possibly as early as 0300 hours on 11 January until
around 0300 hours on 12 January. (9.3)
It was concluded that the dam release flood was the immediate cause of
flooding along the reach of the Brisbane River downstream of the dam,
and along tributaries through the Ipswich City LGA. (9.3)
At about 0900 hours on 11 January water levels at One Mile Bridge Alert
and Ipswich Alert begin to rise rapidly due to Brisbane River water flowing
back up along the Bremer River. The peak water level at these stations
occurred on 12 January and was caused by backwater from the Brisbane
River and Bremer River flood attempting to flow downstream.
W’s Hydrology Report Relating to January 2011 Storm dated 8 July 2011 (Site
Specific)
To the east of the property is a stormwater gully which flows through MJK
Park, then directly into Bundamba Creek.
The property is situated approximately 200m south west of Bundamba
Creek with Bremer River situated approximately 250m to the west.
The elevation level of the property is approximately 17.3m AHD.
High intensity rainfall in the area began at about 7.00am on 11 January
and finished at 3.00pm the same day, delivering an additional 100mm of
rainfall. This equates to a 1 in 10 year ARI for the area.
River flood level data was obtained from the Hanlon Street gauge 1.4km
downstream and Bundamba School gauge located 3.4km upstream of the
property, both located on Bundamba Creek.
River gauge information for Bundamba Creek shows a steady rise in
levels until the evening of 10 January, from where the creek‟s level started
receding until midday 11 January. From this time, the gauges showed a
steeper rise in flood levels as a result of back water effects from Bremer
River with an eventual flood level peak of 18.9m AHD on 12 January.
The Applicant remained at the property until around 7.00pm on 11
January.
Pictures show flood lines at the property of about 2m above ground level.
According to topographic maps the elevation level at the property is
approximately 17.3m AHD, with the predicted peak level flood level in the
area being 19.3m AHD.
Due to the limited size of the local catchment draining to the site and
moderate intensity local rainfall, it is unlikely that local run-off would have
contributed to the inundation of the home.
The time interval between the peak flood level and that of the causative
rainfall was approximately 23 hours.
The evidence suggests inundation of the property would have resulted
from flooding in the Bremer River backing up into Bundamba Creek and
the stormwater gully to the east of the property.
Case No: 254501 Determination Page 11 of 11
65. On the basis of the available information, having dealt with similar ma tters in
the North Booval area and in the absence of any evidence to the contrary,
the Panel is satisfied that, on the balance of probabilities, the water which
inundated the Applicant‟s home was floodwater.
66. Having considered the relevant terms of the policy the Panel is satisfied that
loss or damage arising from the event “Flood” is specifically excluded from
cover provided by the FSP in Qld.
Breach of utmost good faith
67. The Applicant has claimed that the FSP in failing to inform her of the
unsuitability of her cover, has failed in its duty of utmost good faith and
accordingly it should be obliged to cover her loss.
68. The Panel has also considered the Applicant‟s utmost good faith argument in
relation to the FSP‟s alleged failure to draw her attention to the policy
limitations and the fact that the policy did not suit her needs, especially when
noting its close proximity to the Bremer River and its tributaries.
69. Whilst the Panel can understand the Applicant‟s concern with respect to this,
it is well established law that the onus is on the Applicant to identify the
cover required and to seek from an FSP the type of cover appropriate to
their needs. In these circumstances, the Panel is satisfied there has been no
breach of the duty of utmost good faith on behalf of the FSP.
Determination
70. On the basis of the available information and the above reasons the Panel
determines that:
the Applicant was clearly informed of the policy exclusion of flood;
the damage to the Applicant‟s property was caused by flood;
the FSP is entitled to deny the Applicant‟s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.