Home / Financial Firm (Unknown - Insurer) / Determination 254175

Determination 254175

Flood exclusion used to deny strata unit inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-16
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$69,300
SourceAFCA PDF

Summary

The applicant's strata unit was damaged by sewerage on 29 December 2010 and then by floodwater on 31 December 2010, and the FSP denied the claim under the flood exclusion. AFCA found the FSP liable for the sewerage damage only and left the quantum for the parties to agree.

The FSP bore the onus of establishing the flood exclusion, and it did not prove on the balance of probabilities that the earlier sewerage damage was caused by flood.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 254175 Determination Page 1 of 7 Case number: 254175 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of Claim - Inundation - Flood 26 March 2012 Background 1. The Applicant is a beneficiary on a strata insurance policy with the Financial Services Provider (FSP), for which the relevant last renewal was on 3 November 2010. The cover, under the name BCOR, was for 32 units within a body corporate structure. 2. The Applicant claims her unit was inundated by sewerage on 29 December 2010 and subsequently inundated by water on 31 December 2010 after a series of heavy storms in and around Emerald Queensland. BCOR lodged a claim with the FSP on behalf of the Body Corporate and on behalf of the Applicant. 3. The FSP rejected the claim on the basis that it considered the cause of the loss to be inundation by floodwater, which is excluded from cover. 4. The Applicant disputes the decision on the basis that her claim has not been properly assessed or considered fairly. She seeks indemnity for her loss estimated at $69,300. Summary of Applicant’s position 5. The Applicant maintains the Strata Title Management was responsible for arranging insurance with the FSP. The Applicant advised that they were not aware of the policy details but had been informed they were only covered for stormwater and not for flood. 6. According to the Applicant on or about 29 December 2010 sewerage was coming up through a drain in the laundry in her unit. At that stage there was no stormwater in the yard. Whilst water entered the yard from the stormwater drains on 30 December 2010, the water did not enter the house until the early hours of 31 December 2010. 7. Whilst the Applicant acknowledges the FSP has denied the claim on the basis of no flood damage, the Applicant‟s complaint is the fa ct that sewerage entered the house before stormwater. Determination Case No: 254175 Determination Page 2 of 7 8. The Applicant maintains that a hydrologist or assessor did not attend the property or inspect her unit. Summary of FSP’s position 9. The FSP maintains, following investigation of the claim, the relevant data and findings by experts that the Applicant‟s property was damaged by flood and as flood is excluded from cover under the Strata Insurance Policy, the Applicant‟s claim is not covered. 10. The FSP relies on the following policy provisions: Page 5 of the Product Disclosure Statement (PDS) “ Exclusions ... Under some circumstances, this policy will not provide any insurance cover to you. For example, we do not pay for loss or damage caused by:  ...  Flood. ” Pages 18-19 of the PDS “ What is insured We will cover your buildings, your common contents and your common property for any accidental damage or accidental loss... ... What is not insured under Section 1 We will not cover... accidental damage or accidental loss caused by:  ...  Flood. We do not provide cover for damage by flood. Flood is when water from a river, a creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified), overflows onto normally dry land. Water escapes from an irrigation canal is not flood. We also regard any rainwater on your property;  that cannot run off into a river, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified), because it is overflowing in flood, and/or  that mixes with the floodwater coming from the river, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified); as water coming from a flood.” 11. The FSP maintains that the hydrologist appointed to look at the inundation of the Strata complex found as follows: Case No: 254175 Determination Page 3 of 7 “Very little rainfall was recorded after 0900 hours on 28 December 2010. Therefore any inundation after this time could only have been from the Nogoa River and could not have been inundated by stormwater runoff.” 12. The FSP maintains that the site specific hydrology reports and the WRM area reports demonstrate that the peak flood had occurred more than three days after the peak rainfall and therefore the flood was not the result of storm water inundation. 13. The FSP further states that the hydrologist found that the initial inundation of the street (from the east of the subject property) would have been from the Nogoa River. 14. In the Notice of Response the FSP maintains that the sewerage overflow was caused by backup by the floodwater and therefore the cause of the loss was flood. Issue 15. Whether the Applicant‟s loss was attributable to a flood and therefore excluded from cover under the policy. Reasons for decision 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. 18. The Panel accepts in relation to this matter that:  the Applicant is an eligible beneficiary under the policy but not a policyholder;  there is no suggestion that the PDS was not provided to the policyholder by the FSP and there is no obligation to provide same to the Applicant; and that  as a result, the FSP is entitled to rely upon the conditions within the policy in order to consider any claim. 19. The FSP‟s policy is an accidental damage or accidental loss policy. Accidental damage or accidental loss is not defined within the terms of the policy. The general definition of „accidental loss or damage‟ is loss arising from a fortuitous or unintended event. Case No: 254175 Determination Page 4 of 7 20. There is no doubt that the inundation of the property by sewerage on 29 December 2010 would be considered an accidental loss or damage within the ordinary meaning of accidental loss or damage. The subsequent inundation of the property on 31 December 2010 would also qualify as accidental damage or loss within the terms of the policy. 21. The onus is therefore upon the FSP to establish the application of the exclusion clause which it relies upon to deny the Applicant‟s claim. 22. The FSP maintains that the accidental loss or damage was caused by a flood. The Panel accepts the policy excludes flood cover and therefore in order to rely upon the exclusion in accordance with the definition afforded to it within the PDS, the FSP must establish on the balance of probabilities that the loss was attributable to flood. 23. CL, Loss Adjustors were retained to prepare a property report on behalf of the FSP. The report dated 28 January 2011 refers to the date of loss as 21 December 2010 and notes amongst other things the following: “Torrential rain fell within the catchment area of the Nogoa River which passes through the town of Emerald commencing on 26 December 2010 and continuing through to the 29 December 2010.” 24. The complex was evacuated at approximately 2pm on 29 December 2010 and therefore CL was unable to advise exactly where and when the water first entered the property. 25. In response to a number of questions CL indicated the property was first inundated on 30 December 2010 although the time was unknown. At its peak, the water within the yard of the property was 200mm. He was unable to comment on the direction of the water flow but believed a hydrologist should be appointed to clarify the exact cause of inundation. 26. CL inspected four properties, however there is no indication whether CL inspected the Applicant‟s property. 27. An Overview report was prepared by WR for the Emerald area. This report is general and considered the causes of the inundation of the local area. It revealed that stormwater inundation during the period was “highly unlikely” due to the moderate rainfall intensity. Further it concluded that: “... very little rainfall was recorded in Emerald after 2100 hours on the 27 th December 2010. At this time the Nogoa River water levels were about 5m below its peak and well within the river bank at Emerald. Therefore, any inundation after this time could have only been from the Nogoa River and could not have been stormwater inundation.” 28. The Panel notes the report also includes the following comments at page 11 of the report:  “During the afternoon and evening of the 29 th December 2010, the Nogoa River overflowed into low-lying areas and properties adjacent to the riverbank to the south and north of the Capricorn Highway. Case No: 254175 Determination Page 5 of 7  The Nogoa River continued to rise throughout the night of 29 th December eventually backing up a number of stormwater drains to inundate low-lying roads and properties. These stormwater drains carried Nogoa River floodwater at this time and not stormwater runoff as no rainfall had occurred in the preceding period.  At or before daybreak on the 30 th December, Nogoa River floodwaters began draining northward along the stormwater drain to the west of Hospital Road/Gregory Highway to the north of Clermont St/Capricorn Highway.  By midday on the 30 th December, the Nogoa River overflowed its banks to the south-west (upstream) of Emerald township (see Figure 1.1) and began to inundate numerous roads and properties throughout Emerald to the north of the Nogoa River.” 29. Significantly the report noted as follows: “Site specific inspections and interviews with the residents are required to determine definitively whether properties were inundated above floor level by stormwater runoff during the period of interest.” 30. The rainfall data, given in section 3.2 shows that stormwater inundation is highly unlikely to have occurred on 30 or 31 December 2010 because rainfall intensities in Emerald were insignificant over the period of interest. The report records that very little rainfall was recorded in Emerald after 21.00 hours on 27 December 2010. 31. A hydrologist, WR, was retained to prepare a site specific report on the possible cause of the loss. A site inspection was not conducted. BS, the chairman of the executive committee on behalf of the BCOR, was interviewed over the telephone for factual material about the inundation. 32. The ensuing report dated 22 February 2011 to the FSP noted: the date and time of initial inundation above floor level was „about 0100 hours on 31 December 2010‟ (from newspaper clippings provided by the insured which the Panel notes have not been provided to it by the FSP). 33. The report then notes the following from BS:  BS was not at the subject property at the time of inundation; his daughter was there and advised him;  she evacuated the subject property at about 1800 hours on 30 December 2010, when water was coming in from the east;  the buildings had not been i nundated above floor level at this stage;  another tenant said water may have initially come out of the toilets;  the next morning (31 December), she returned to the property. Water was coming into the subject property from the west through the front gates from the racecourse. It was not coming in from the river side. 34. The report then makes the following findings: Case No: 254175 Determination Page 6 of 7  the “unit complex” was inundated to a depth of about 150mm above floor level; the pool was inundated.  as very little rainfall was recorded after 0900 hours on 28 December 2010, any inundation after this time could only have been from the Nogoa River and could not have been inundation by stormwater run-off.  The timing of the initial inundation is consistent with the estimated timing of arrival of Nogoa River floodwaters.  The Nogoa River overflowed and drained in a northerly direction along the western (upstream) side of town along a major constructed open channel, which in turn overflowed towards the subject property.  The initial inundation of the street (from the east of the subject property) would have been from Nogoa River water backing up the stormwater and sewer pipes. It could not have been stormwater run-off. 35. The loss adjustor CL was subsequently retained to conduct a further assessment of the properties. It is unclear from the information exchanged whether CL inspected the Applicant‟s property on the second attendance namely 16 September 2011. I note that units 31, 32, 27, 8 and 9 were reassessed. 36. According to the supplementary report dated 28 September 2011 CL found that the damage to these properties is consistent with the flooding that occurred in the area on 21 December 2011. 37. The Panel accepts that the reference to 2011 should read 2010. The Panel notes however that in both reports, CL has recorded the date of loss as 21 December. The Panel notes however that CL in the body of his first report referred to the torrential rain that commenced in the area on 26 December 2010 and continued to 29 December 2010. It is not unreasonable to presume that CL‟s reference to 21 December should in these circumstances read 31 December 2010. 38. There is no reference in either the original report or supplementary report that CL spoke to any of the property owners nor had CL made any reference to sewerage inundation of the properties on 29 December 2010 39. The Panel also notes discrepancies in the reports by WR with respect to rainfall. WR has recorded it being very little rainfall in Emerald after 2100 hours on 27 December 2010 and separately recorded there has been very little rainfall after 0900 hours on 28 December 2010. 40. The Panel notes from the area report that site specific inspections and interviews with the residents were required to determine definitively whether properties were inundated at the floor level by stormwater run-off during the period of interest. That does not appear to have occurred. 41. The Panel is concerned that neither the FSP, CL or WR has directly addressed the Applicant‟s assertion that on 29 Decemb er 2010 sewerage entered her laundry. The Applicant has specifically claimed that sewerage Case No: 254175 Determination Page 7 of 7 entered the laundry on 29 December 2010 coming up through a drain in the laundry. The Panel notes in its Notice of Response the FSP claimed that the sewerage was caused by back up by the flood water. It is not explained how it has reached this conclusion given that it did not appear to have investigated this aspect of the Applicant‟s claim. 42. The evidence before the Panel is that the property was initially inundated by sewerage on 29 December 2010 prior to subsequent inundation by floodwater that would most likely have occurred on or about 0100 hours on 31 December 2010. This is consistent with findings made in a determination for a separate unit within the complex, Determination number 254173. 43. As the Panel has already noted this is an accidental damage policy and the Panel is satisfied that the Applicant has established accidental loss or damage to the property has occurred as a result of the sewerage inundation on 29 December 2010. 44. Whilst the Panel is satisfied the damage sustained on 31 December 2010 was damage due to flood, the Panel is not satisfied the FSP has provided evidence sufficient to establish on the balance of probabilities that the damage due to the inundation by sewerage on 29 December 2010 was due to flood. The Panel is not satisfied the evidence as presented by the FSP is sufficient to meet the onus on it with respect to this. 45. The Panel accepts the FSP is not liable with respect to the balance of the damage sustained on or about 31 December 2010 as the Panel accepts the FSP has established on the balance of probabilities that the subsequent damage was due to a flood event which is excluded under the terms of the policy. Determination 46. Accordingly the P anel determines the FSP is liable to meet the Applicant‟s loss with respect to the damage sustained as a result of the sewerage inundation on or about 29 December 2010. 47. The Parties will need to agree as to the assessment of the damage sustained by the initial inundation by sewerage on 29 December 2010 as against the subsequent damage sustained as a result of the floods that occurred on 31 December 2010. In the event that the parties are unable to agree as to the damage covered under the policy, then the parties may return to the Service and a Supplementary Determination will be issued.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.