Home / Financial Firm (Unknown - Insurer) / Determination 254175
Determination 254175
Flood exclusion used to deny strata unit inundation claim
Summary
The applicant's strata unit was damaged by sewerage on 29 December 2010 and then by floodwater on 31 December 2010, and the FSP denied the claim under the flood exclusion. AFCA found the FSP liable for the sewerage damage only and left the quantum for the parties to agree.
The FSP bore the onus of establishing the flood exclusion, and it did not prove on the balance of probabilities that the earlier sewerage damage was caused by flood.
Issues
- Claim denial primary · upheld
“The Panel is not satisfied the FSP provided evidence sufficient to establish that the sewerage damage on 29 December 2010 was due to flood.”
- Inadequate claim investigation secondary · upheld
“Neither the FSP, CL nor WR directly addressed the Applicant's assertion that sewerage entered her laundry on 29 December 2010.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 254175 Determination Page 1 of 7
Case number: 254175
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of Claim - Inundation - Flood
26 March 2012
Background
1. The Applicant is a beneficiary on a strata insurance policy with the Financial
Services Provider (FSP), for which the relevant last renewal was on 3
November 2010. The cover, under the name BCOR, was for 32 units within
a body corporate structure.
2. The Applicant claims her unit was inundated by sewerage on 29 December
2010 and subsequently inundated by water on 31 December 2010 after a
series of heavy storms in and around Emerald Queensland. BCOR lodged a
claim with the FSP on behalf of the Body Corporate and on behalf of the
Applicant.
3. The FSP rejected the claim on the basis that it considered the cause of the
loss to be inundation by floodwater, which is excluded from cover.
4. The Applicant disputes the decision on the basis that her claim has not been
properly assessed or considered fairly. She seeks indemnity for her loss
estimated at $69,300.
Summary of Applicant’s position
5. The Applicant maintains the Strata Title Management was responsible for
arranging insurance with the FSP. The Applicant advised that they were not
aware of the policy details but had been informed they were only covered for
stormwater and not for flood.
6. According to the Applicant on or about 29 December 2010 sewerage was
coming up through a drain in the laundry in her unit. At that stage there was
no stormwater in the yard. Whilst water entered the yard from the stormwater
drains on 30 December 2010, the water did not enter the house until the
early hours of 31 December 2010.
7. Whilst the Applicant acknowledges the FSP has denied the claim on the
basis of no flood damage, the Applicant‟s complaint is the fa ct that sewerage
entered the house before stormwater.
Determination
Case No: 254175 Determination Page 2 of 7
8. The Applicant maintains that a hydrologist or assessor did not attend the
property or inspect her unit.
Summary of FSP’s position
9. The FSP maintains, following investigation of the claim, the relevant data
and findings by experts that the Applicant‟s property was damaged by flood
and as flood is excluded from cover under the Strata Insurance Policy, the
Applicant‟s claim is not covered.
10. The FSP relies on the following policy provisions:
Page 5 of the Product Disclosure Statement (PDS)
“ Exclusions
...
Under some circumstances, this policy will not provide any insurance cover to
you. For example, we do not pay for loss or damage caused by:
...
Flood. ”
Pages 18-19 of the PDS
“ What is insured
We will cover your buildings, your common contents and your common
property for any accidental damage or accidental loss...
...
What is not insured under Section 1
We will not cover... accidental damage or accidental loss caused by:
...
Flood.
We do not provide cover for damage by flood. Flood is when water
from a river, a creek, lake, swamp, watercourse, reservoir, dam or
navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land. Water escapes from an
irrigation canal is not flood. We also regard any rainwater on your
property;
that cannot run off into a river, creek, lake, swamp,
watercourse, reservoir, dam or navigable canal (whether they
are in their original state or have been modified), because it is
overflowing in flood, and/or
that mixes with the floodwater coming from the river, creek,
lake, swamp, watercourse, reservoir, dam or navigable canal
(whether they are in their original state or have been modified);
as water coming from a flood.”
11. The FSP maintains that the hydrologist appointed to look at the inundation of
the Strata complex found as follows:
Case No: 254175 Determination Page 3 of 7
“Very little rainfall was recorded after 0900 hours on 28 December 2010.
Therefore any inundation after this time could only have been from the Nogoa
River and could not have been inundated by stormwater runoff.”
12. The FSP maintains that the site specific hydrology reports and the WRM
area reports demonstrate that the peak flood had occurred more than three
days after the peak rainfall and therefore the flood was not the result of
storm water inundation.
13. The FSP further states that the hydrologist found that the initial inundation of
the street (from the east of the subject property) would have been from the
Nogoa River.
14. In the Notice of Response the FSP maintains that the sewerage overflow
was caused by backup by the floodwater and therefore the cause of the loss
was flood.
Issue
15. Whether the Applicant‟s loss was attributable to a flood and therefore
excluded from cover under the policy.
Reasons for decision
16. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
17. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
18. The Panel accepts in relation to this matter that:
the Applicant is an eligible beneficiary under the policy but not a
policyholder;
there is no suggestion that the PDS was not provided to the
policyholder by the FSP and there is no obligation to provide same to
the Applicant; and that
as a result, the FSP is entitled to rely upon the conditions within the
policy in order to consider any claim.
19. The FSP‟s policy is an accidental damage or accidental loss policy.
Accidental damage or accidental loss is not defined within the terms of the
policy. The general definition of „accidental loss or damage‟ is loss arising
from a fortuitous or unintended event.
Case No: 254175 Determination Page 4 of 7
20. There is no doubt that the inundation of the property by sewerage on 29
December 2010 would be considered an accidental loss or damage within
the ordinary meaning of accidental loss or damage. The subsequent
inundation of the property on 31 December 2010 would also qualify as
accidental damage or loss within the terms of the policy.
21. The onus is therefore upon the FSP to establish the application of the
exclusion clause which it relies upon to deny the Applicant‟s claim.
22. The FSP maintains that the accidental loss or damage was caused by a
flood. The Panel accepts the policy excludes flood cover and therefore in
order to rely upon the exclusion in accordance with the definition afforded to
it within the PDS, the FSP must establish on the balance of probabilities that
the loss was attributable to flood.
23. CL, Loss Adjustors were retained to prepare a property report on behalf of
the FSP. The report dated 28 January 2011 refers to the date of loss as 21
December 2010 and notes amongst other things the following:
“Torrential rain fell within the catchment area of the Nogoa River which
passes through the town of Emerald commencing on 26 December 2010 and
continuing through to the 29 December 2010.”
24. The complex was evacuated at approximately 2pm on 29 December 2010
and therefore CL was unable to advise exactly where and when the water
first entered the property.
25. In response to a number of questions CL indicated the property was first
inundated on 30 December 2010 although the time was unknown. At its
peak, the water within the yard of the property was 200mm. He was unable
to comment on the direction of the water flow but believed a hydrologist
should be appointed to clarify the exact cause of inundation.
26. CL inspected four properties, however there is no indication whether CL
inspected the Applicant‟s property.
27. An Overview report was prepared by WR for the Emerald area. This report is
general and considered the causes of the inundation of the local area. It
revealed that stormwater inundation during the period was “highly unlikely”
due to the moderate rainfall intensity. Further it concluded that:
“... very little rainfall was recorded in Emerald after 2100 hours on the 27 th
December 2010. At this time the Nogoa River water levels were about 5m
below its peak and well within the river bank at Emerald. Therefore, any
inundation after this time could have only been from the Nogoa River and
could not have been stormwater inundation.”
28. The Panel notes the report also includes the following comments at page 11
of the report:
“During the afternoon and evening of the 29 th December 2010, the
Nogoa River overflowed into low-lying areas and properties adjacent
to the riverbank to the south and north of the Capricorn Highway.
Case No: 254175 Determination Page 5 of 7
The Nogoa River continued to rise throughout the night of 29 th
December eventually backing up a number of stormwater drains to
inundate low-lying roads and properties. These stormwater drains
carried Nogoa River floodwater at this time and not stormwater runoff
as no rainfall had occurred in the preceding period.
At or before daybreak on the 30 th December, Nogoa River floodwaters
began draining northward along the stormwater drain to the west of
Hospital Road/Gregory Highway to the north of Clermont St/Capricorn
Highway.
By midday on the 30 th December, the Nogoa River overflowed its
banks to the south-west (upstream) of Emerald township (see Figure
1.1) and began to inundate numerous roads and properties throughout
Emerald to the north of the Nogoa River.”
29. Significantly the report noted as follows:
“Site specific inspections and interviews with the residents are required to
determine definitively whether properties were inundated above floor level by
stormwater runoff during the period of interest.”
30. The rainfall data, given in section 3.2 shows that stormwater inundation is
highly unlikely to have occurred on 30 or 31 December 2010 because rainfall
intensities in Emerald were insignificant over the period of interest. The
report records that very little rainfall was recorded in Emerald after 21.00
hours on 27 December 2010.
31. A hydrologist, WR, was retained to prepare a site specific report on the
possible cause of the loss. A site inspection was not conducted. BS, the
chairman of the executive committee on behalf of the BCOR, was
interviewed over the telephone for factual material about the inundation.
32. The ensuing report dated 22 February 2011 to the FSP noted: the date and
time of initial inundation above floor level was „about 0100 hours on 31
December 2010‟ (from newspaper clippings provided by the insured which
the Panel notes have not been provided to it by the FSP).
33. The report then notes the following from BS:
BS was not at the subject property at the time of inundation; his
daughter was there and advised him;
she evacuated the subject property at about 1800 hours on 30
December 2010, when water was coming in from the east;
the buildings had not been i nundated above floor level at this stage;
another tenant said water may have initially come out of the toilets;
the next morning (31 December), she returned to the property. Water
was coming into the subject property from the west through the front
gates from the racecourse. It was not coming in from the river side.
34. The report then makes the following findings:
Case No: 254175 Determination Page 6 of 7
the “unit complex” was inundated to a depth of about 150mm above
floor level; the pool was inundated.
as very little rainfall was recorded after 0900 hours on 28 December
2010, any inundation after this time could only have been from the
Nogoa River and could not have been inundation by stormwater run-off.
The timing of the initial inundation is consistent with the estimated
timing of arrival of Nogoa River floodwaters.
The Nogoa River overflowed and drained in a northerly direction along
the western (upstream) side of town along a major constructed open
channel, which in turn overflowed towards the subject property.
The initial inundation of the street (from the east of the subject property)
would have been from Nogoa River water backing up the stormwater
and sewer pipes. It could not have been stormwater run-off.
35. The loss adjustor CL was subsequently retained to conduct a further
assessment of the properties. It is unclear from the information exchanged
whether CL inspected the Applicant‟s property on the second attendance
namely 16 September 2011. I note that units 31, 32, 27, 8 and 9 were
reassessed.
36. According to the supplementary report dated 28 September 2011 CL found
that the damage to these properties is consistent with the flooding that
occurred in the area on 21 December 2011.
37. The Panel accepts that the reference to 2011 should read 2010. The Panel
notes however that in both reports, CL has recorded the date of loss as 21
December. The Panel notes however that CL in the body of his first report
referred to the torrential rain that commenced in the area on 26 December
2010 and continued to 29 December 2010. It is not unreasonable to
presume that CL‟s reference to 21 December should in these circumstances
read 31 December 2010.
38. There is no reference in either the original report or supplementary report
that CL spoke to any of the property owners nor had CL made any reference
to sewerage inundation of the properties on 29 December 2010
39. The Panel also notes discrepancies in the reports by WR with respect to
rainfall. WR has recorded it being very little rainfall in Emerald after 2100
hours on 27 December 2010 and separately recorded there has been very
little rainfall after 0900 hours on 28 December 2010.
40. The Panel notes from the area report that site specific inspections and
interviews with the residents were required to determine definitively whether
properties were inundated at the floor level by stormwater run-off during the
period of interest. That does not appear to have occurred.
41. The Panel is concerned that neither the FSP, CL or WR has directly
addressed the Applicant‟s assertion that on 29 Decemb er 2010 sewerage
entered her laundry. The Applicant has specifically claimed that sewerage
Case No: 254175 Determination Page 7 of 7
entered the laundry on 29 December 2010 coming up through a drain in the
laundry. The Panel notes in its Notice of Response the FSP claimed that the
sewerage was caused by back up by the flood water. It is not explained how
it has reached this conclusion given that it did not appear to have
investigated this aspect of the Applicant‟s claim.
42. The evidence before the Panel is that the property was initially inundated by
sewerage on 29 December 2010 prior to subsequent inundation by
floodwater that would most likely have occurred on or about 0100 hours on
31 December 2010. This is consistent with findings made in a determination
for a separate unit within the complex, Determination number 254173.
43. As the Panel has already noted this is an accidental damage policy and the
Panel is satisfied that the Applicant has established accidental loss or
damage to the property has occurred as a result of the sewerage inundation
on 29 December 2010.
44. Whilst the Panel is satisfied the damage sustained on 31 December 2010
was damage due to flood, the Panel is not satisfied the FSP has provided
evidence sufficient to establish on the balance of probabilities that the
damage due to the inundation by sewerage on 29 December 2010 was due
to flood. The Panel is not satisfied the evidence as presented by the FSP is
sufficient to meet the onus on it with respect to this.
45. The Panel accepts the FSP is not liable with respect to the balance of the
damage sustained on or about 31 December 2010 as the Panel accepts the
FSP has established on the balance of probabilities that the subsequent
damage was due to a flood event which is excluded under the terms of the
policy.
Determination
46. Accordingly the P anel determines the FSP is liable to meet the Applicant‟s
loss with respect to the damage sustained as a result of the sewerage
inundation on or about 29 December 2010.
47. The Parties will need to agree as to the assessment of the damage
sustained by the initial inundation by sewerage on 29 December 2010 as
against the subsequent damage sustained as a result of the floods that
occurred on 31 December 2010. In the event that the parties are unable to
agree as to the damage covered under the policy, then the parties may
return to the Service and a Supplementary Determination will be issued.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.