Home / Financial Firm (Unknown - Insurer) / Determination 254174
Determination 254174
Denial of strata flood claim for sewerage inundation on 29 December 2010
Summary
The applicants' unit was inundated first by sewerage and later by floodwater. AFCA found the FSP liable for the sewerage damage but not the later flood damage, with the amount to be agreed by the parties.
The FSP bore the onus of proving the flood exclusion applied and did not establish on the balance of probabilities that the earlier sewerage inundation was caused by flood.
Issues
- Claim denial primary · upheld“The Panel is not satisfied that the FSP has provided evidence sufficient to establish... that the initial inundation by sewerage... was due to flood.”
- Inadequate claim investigation secondary · upheld“neither the FSP, CL nor WR directly addressed the assertion that on 29 December 2010 sewerage entered the Applicants' property.”
Subjects and remedies
natural disasterpay claimreassess claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 254174 Determination Page 1 of 6
Case number: 254174
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of Claim - Inundation - Flood
21 March 2012
Background
1. The Applicants are beneficiaries under a Strata Insurance Policy with the
Financial Services Provider (FSP), for which the relevant last renewal was
on 3 November 2010. The cover, under the name BCOR, was for 32 units
within a body corporate structure.
2. The issues in this dispute are similar to the issues raised in Determinations
number 254173 and 254175.
3. On or about 29 December 2010, the Applicants state that their property,
being unit number 9, was inundated with sewerage water after a series of
heavy storms in and around Emerald, Queensland. BCOR lodged a claim
with the FSP on behalf of the body corporate.
4. The FSP rejected the claim on the basis that it considered the cause of the
loss to be inundation by floodwater, which is excluded from cover.
5. The Applicants dispute the decision on the basis that their claim has not
been properly assessed or considered fairly. They seek indemnity for their
losses.
Summary of Applicants ’ position
6. The Applicants maintain that on 29 December 2010, the unit was inundated
by sewerage coming up through the floor waste. On 30 December 2010
floodwater was coming up into the yard and on 31 December 2010 water
entered into the unit.
7. The Applicants maintain the hydrologist report was not received by them and
that the unit was not individually assessed.
8. It is the Applicants’ argument that the sewerage entered the unit before
stormwater. Their unit is nowhere near the river and flooding was caused by
stormwater rising through the stormwater drains.
Determination
Case No: 254174 Determination Page 2 of 6
9. Further the Applicants maintain that their claim was denied without
assessment and that they provided all relevant information to the FSP to
enable a proper assessment of the claim.
Summary of FSP’s position
10. The FSP says that the cause of the Applicants ’ loss was flooding of the
Nogoa River. The policy does not extend cover to beneficiaries in such
circumstances.
11. The FSP relies on the following policy provisions:
Page 5 of the Product Disclosure Statement (PDS)
“ Exclusions
...
Under some circumstances, this policy will not provide any insurance cover to
you. For example, we do not pay for loss or damage caused by:
...
Flood. ”
Pages 18-19 of the PDS
“ What is insured
We will cover your buildings, your common contents and your common
property for any accidental damage or accidental loss...
...
What is not insured under Section 1
We will not cover... accidental damage or accidental loss caused by:
...
Flood.
We do not provide cover for damage by flood. Flood is when water
from a river, a creek, lake, swamp, watercourse, reservoir, dam or
navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land. Water escapes from an
irrigation canal is not flood. We also regard any rainwater on your
property;
that cannot run off into a river, creek, lake, swamp,
watercourse, reservoir, dam or navigable canal (whether they
are in their original state or have been modified), because it is
overflowing in flood, and/or
that mixes with the floodwater coming from the river, creek,
lake, swamp, watercourse, reservoir, dam or navigable canal
(whether they are in their original state or have been modified);
as water coming from a flood.”
12. In the Notice of Response in relation to the Applicants’ claim that sewerage
entered the unit before stormwater, the FSP maintains that sewerage was
Case No: 254174 Determination Page 3 of 6
caused to backup by the floodwater, therefore the cause of the loss was
flood. There was no stormwater as the rain fell elsewhere in the catchment
area. The FSP has not advised on the evidence that is relied upon to
determine the cause of the sewerage backup.
Issue
13. Whether the Applicants ’ loss was attributable to a flood and therefore
excluded from cover under the policy.
Reasons for decision
14. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
16. The Panel accepts in relation to this matter that:
the Applicants are eligible beneficiaries under the policy but not
policyholders;
there is no suggestion that the PDS was not provided to the
policyholder by the FSP and there is no obligation to provide same to
the Applicants; and that
as a result, the FSP is entitled to rely upon the conditions within the
policy in order to consider any claim.
17. The policy is for accidental damage or accidental loss. Inundation of the
property on 29 December 2010 and subsequently on 31 December 2010
would qualify as accidental damage or loss within the terms of the policy. It is
therefore the responsibility of the FSP to establish the application of a ny
exclusion on which it relies to deny the Applicants’ claim.
18. The FSP relies on the policy exclusion of flood and maintains that the
property was inundated as a result of flood. In support of its allegation, the
FSP has relied upon evidence from a hydrologist and loss adjustor.
19. The FSP has relied upon an overview report from WR dated 27 January
2011. The report is of the Emerald area and considered the causes of
inundation of the local area. It revealed that stormwater inundation during the
period was highly unlikely due to the moderate rainfall intensity. Further it
concluded that “very little rainfall was recorded in Emerald after 2100 hours
on 27 December 2010. At this time the Nogoa River water levels were about
5m below its peak and well within the river bank at Emerald. Therefore any
Case No: 254174 Determination Page 4 of 6
inundation after this time could have only been from Nogoa River and could
not have been stormwater inundation.
20. The hydrologist WR was retained to prepare a further report on the possible
cause of loss. A site inspection was not conducted and the hydrologist only
interviewed BS, the Chairman of the Executive Committee on behalf of the
BCOR. BS was interviewed over the telephone for factual material about the
inundation.
21. The ensuing report dated 22 February 2011 noted:
The date and time of initial inundation above floor level was about 0100
hours on 31 December 2010 (from newspaper clippings provided by
the insured which the Panel notes had not been provided to it by the
FSP);
BS was not at the subject property at the time of the inundation;
his daughter was there and advised him;
She evacuated the subject property at 1800 hours on 30 December
2010 when water was coming in from the east;
The buildings had not been inundated above floor level at this stage;
Another tenant said water may initially have come out of the toilets;
The next morning (31 December) she returned to the property. Water
was coming into the subject property from the west through the front
gates from the racecourse. It was not coming from the river side.
22. The report then makes the following findings:
The unit complex was inundated to a depth of 150mm above floor level;
As very little rainfall was recorded after 0900 hours on 28 December
2010, any inundation after this time could only have been from the
Nogoa River and could not have been inundated by stormwater run-off;
The timing of the initial inundation is consistent with the estimated
timing of arrival of Nogoa River floodwaters;
The Nogoa River overflowed and drained in a northerly direction along
the western (upstream) side of town along a major constructed open
channel which in turn overflowed towards the subject property;
The initial inundation of the street (from the east of the subject property)
would have been from the Nogoa River water backing up the
stormwater and sewer pipes. It could not have been stormwater run-off.
23. The report then concluded:
Case No: 254174 Determination Page 5 of 6
“Inundation of unit complex and pool above floor level by Nogoa River
floodwater s.”
24. A loss adjustor CL visited the site on 11 January 2011 where it is asserted:
“We inspected four properties which had all experienced similar damage”.
Unfortunately this report dated 28 January 2011 does not identify which
actual unit within the Strata Unit Block were inspected. The Panel notes the
report advised that as flood (an excluded policy event) was likely involved, a
hydrologist WR would need to provide a report.
25. In response to the Applicants’ claim that the unit had not received an
individual assessment, the FSP required CL to attend the units again. This
site visit occurred on 16 September 2011 with the second report produced
on 28 September 2011. The Applicants’ unit , unit number 9 was assessed as
part of this process. The report which is brief noted that the flooding occurred
in the area on 21 December 2011. The Pa nel accepts reference to 2011
should read 2010. The Panel further notes that in CL’s earlier report he had
recorded the date of loss as 21 December 2010. Clearly that date of loss as
recorded by CL is incorrect. The Panel notes from the body of his report, he
has referred to the torrential rain that commenced in the area from 26
December 2010 and continued until 29 December 2010.
26. In the circumstances most likely CL considers the relevant inundation
occurred on or about 31 December 2010.
27. There is no referenc e in either CL’s original report or the supplementary
report that CL spoke to any of the property owners or considered the cause
of the sewerage inundation on 29 December 2010.
28. The Panel further notes that WR concluded in the initial report dated 27
January 2011 that site specific inspections and interviews with the residents
were required to determine definitively whether the properties were
inundated above floor level by stormwater run-off during the period of
interest. That does not appear to have occurred.
29. As with Determinations 254173 and 254175 the Panel is concerned that
neither the FSP, CL nor WR directly addressed the assertion that on 29
December 2010 sewerage entered the Applicants’ property. The closest WR
comes to responding to this contention is:
“Some properties may have been initially inundated by Nogoa River
floodwater draining along or backing up the stormwater drainage channels
and underground stormwater pipes.”
30. There are a number of possible causes for the initial inundation of the
properties by sewerage. The evidence before the Panel that is uncontested
is that the property was inundated by sewerage on 29 December 2010 prior
to the subsequent inundation by floodwaters that most likely occurred on or
about 0100 hours on 31 December 2010.
Case No: 254174 Determination Page 6 of 6
31. As the Panel has noted, this is an accidental damage policy limited only by
the specific exclusions of which flood is the relevant one.
32. The FSP bears the onus of establishing on the balance of probabilities that
the damage suffered by the Applicant was attributable to flood.
33. The Panel is satisfied that the damage sustained on 31 December 2010 was
on the balance of probabilities due to flood. The Panel is not satisfied
however that the FSP has provided evidence sufficient to establish on the
balance of probabilities that the initial inundation by sewerage on 29
December 2010 was due to flood. In this regard, the FSP has provided no
evidence to dispute the Applicants’ claim and other than the brief comment
in the Notice of Response, has not addressed this issue.
34. Accordingly the Panel is satisfied that the Applicants have established and
entitled under the terms of the policy with respect to the damage sustained
as a result of the sewerage inundation of the property on 29 December
2010.
35. The Panel accepts that with respect to the subsequent damage sustained on
or about 31 December 2010 that the FSP is not liable as that damage on the
balance of probabilities was due to flood which is an excluded event under
the terms of the policy.
Determination
36. Accordingly the Panel determines the FSP is liable to meet the Applicants’
loss with respect to the damage sustained as a result of the sewerage
inundation on or about 29 December 2010.
37. The parties will need to agree to the assessment of the damage sustained
by the initial inundation by sewerage as against any subsequent damage
sustained as a result of the floods that occurred on or about 31 December
2010.
38. In the event that the parties are unable to agree as to the extent of damage
sustained as a result of the initial inundation, then the parties may need to
return to the Service and a supplementary determination will be issued.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.