Home / Financial Firm (Unknown - Insurer) / Determination 254173
Determination 254173
Denial of strata unit inundation claim under flood exclusion
Summary
The applicant, a beneficiary under a body corporate strata policy, claimed about $69,300 for unit damage from sewerage and flood inundation in Emerald in late 2010. AFCA held the FSP liable for the earlier sewerage damage but not for the later flood damage, with quantum left to the parties.
The FSP bears the onus of proving an exclusion applies, and it did not establish that the initial sewerage inundation was caused by flood, while flood damage on 31 December 2010 was excluded.
Issues
- Claim denial primary · upheld
“the Panel is not satisfied that the FSP has provided evidence sufficient to establish ... that the damage due to the inundation by sewerage on 29 December 2010 was due to flood.”
- Inadequate claim investigation secondary · upheld
“The Panel is concerned neither the FSP, CL, or WR has directly addressed the Applicant's assertion that on 29 December 2010 sewerage entered her laundry.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 254173 Determination Page 1 of 6
Case number: 254173
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of Claim - Inundation - Flood
20 March 2012
Background
1. The Applicant is a beneficiary under a strata insurance policy with the
Financial Services Provider (FSP), for which the relevant last renewal was 3
November 2010. The cover, as issued to the „body corporate‟ was under the
name of BCOR and included the 32 units within the body corporate
structure. As is usual with blocks of strata titled units, the body corporate had
retained the services of a strata management company, one „STM‟, to attend
on an annual basis to the issues pertinent to the management of the
common property of BCOR.
2. The Applicant states that her property, being unit 31, was inundated with
sewerage on 29 December 2010 and subsequently by water on 31
December 2010 after a series of heavy storms in and around Emerald,
Queensland. STM lodged a claim with the FSP on behalf of the body
corporate.
3. The FSP rejected the claim on the basis that it considered the cause of the
loss to be inundation by floodwater, which is excluded from cover.
4. The Applicant disputes the decision on the basis that her claim has not been
properly assessed or considered fairly. She seeks indemnity for her loss
estimated at $69,300.
Summary of Applicant’s position
5. The Applicant states that on 29 December 2010, “ raw sewerage came up
through the drain/pipes in the laundry of my units (sic) ” and on that day the
property was evacuated. On 30 December 2010 water entered the rear of
the property from the drain that runs behind her unit into the back door. On
31 December 2010, water entered the front of her unit when water across
the road from „M‟ Street, rose and inundated the unit block.
6. Her unit was never individually assessed; to her knowledge the only unit to
be so inspected by the FSP in relation to this event was unit [number]. This
unit is situated at the front of the block while hers is on the back line, some
distance away.
Determination
Case No: 254173 Determination Page 2 of 6
Summary of FSP’s po sition
7. The FSP says that the cause of the Applicant‟s loss was flooding of the
Nogoa River. The policy does not extend cover to beneficiaries in such
circumstances.
8. The FSP relies on the following policy provisions:
Page 5 of the Product Disclosure Statement (PDS)
“ Exclusions
...
Under some circumstances, this policy will not provide any insurance cover to
you. For example, we do not pay for loss or damage caused by:
...
Flood.”
Pages 18-19 of the PDS
“ What is insured
We will cover your buildings, your common contents and your common
property for any accidental damage or accidental loss...
...
What is not insured under Section 1
We will not cover... accidental damage or accidental loss caused by:
...
Flood.
We do not provide cover for damage by flood. Flood is when water
from a river, a creek, lake, swamp, watercourse, reservoir, dam or
navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land. Water that escapes from
an irrigation canal is not flood. We also regard any rainwater on your
property;
that cannot run off into a river, creek, lake, swamp,
watercourse, reservoir, dam or navigable canal (whether they
are in their original state or have been modified), because it is
overflowing in flood, and/or
that mixes with the floodwater coming from the river, creek,
lake, swamp, watercourse, reservoir, dam or navigable canal
(whether they are in their original state or have been modified);
as water coming from a flood.”
Issue
9. Whether the Applicant‟s l oss was attributable to a flood and therefore
excluded from cover under the policy.
Case No: 254173 Determination Page 3 of 6
Reasons for decision
10. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
11. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
12. The Panel accepts in relation to this matter that:
the Applicant is an eligible beneficiary under the policy but not a
policyholder;
there is no suggestion that the PDS was not provided to the
policyholder by the FSP and there is no obligation to provide same to
the Applicant; and that
as a result, the FSP is entitled to rely upon the conditions within the
policy in order to consider any claim.
13. The FSP‟s policy is for accidental damage or accidental loss. The inundation
of the property on 29 December 2010 and subsequently on 31 December
2010 would qualify as accidental damage or loss within the terms of the
policy. It is therefore the responsibility of the FSP to establish the application
of any exclusion on which it relies to deny the Applicant‟s claim.
14. The FSP claims that the loss was caused by a flood and the Panel accepts
that the policy excludes cover for such events. It is therefore incumbent upon
the FSP to establish that the loss was attributable to a flood (within the
definition afforded to it in the PDS) in order to avoid the claim.
15. A hydrologist, WR, was retained to prepare a report on the possible cause of
the loss. A site inspection was not conducted and BS, the chairman of the
executive committee on behalf of the BCOR, was interviewed over the
telephone for factual material about the inundation.
16. The ensuing report dated 22 February 2011 to the FSP noted: the date and
time of initial inundation above floor level was „about 01 00 hours on 31
December 2010‟ (from newspaper clippings provided by the insured which
the Panel notes has not been provided to it by the FSP).
17. The report then notes the following from BS:
BS was not at the subject property at the time of inundation; his
daughter was there and advised him;
she evacuated the subject property at about 1800 hours on 30
December 2010, when water was coming in from the east;
the buildings had not been inundated above floor level at this stage;
another tenant said water may have initially come out of the toilets;
Case No: 254173 Determination Page 4 of 6
the next morning (31 December), she returned to the property. Water
was coming into the subject property from the west through the front
gates from the racecourse. It was not coming in from the river side.
18. The report then makes the following findings:
the “unit complex” was inundated to a depth of about 150mm above
floor level; the pool was inundated.
as very little rainfall was recorded after 0900 hours on 28 December
2010, any inundation after this time could only have been from the
Nogoa River and could not have been inundation by stormwater run-off.
The timing of the initial inundation is consistent with the estimated
timing of arrival of Nogoa River floodwaters.
The Nogoa River overflowed and drained in a northerly direction along
the western (upstream) side of town along a major constructed open
channel, which in turn overflowed towards the subject property.
The initial inundation of the street (from the east of the subject property)
would have been from Nogoa River water backing up the stormwater
and sewer pipes. It could not have been stormwater run-off.
19. The report then concluded: Inundation of unit complex and pool above floor
level by Nogoa River floodwaters.
20. A loss adjuster, CL, visited the site on 11 January 2011, wherein it is
asserted „we inspected 4 properties which had all experienced similar
damage‟. Unfortunately this first report of CL‟s, dated 28 January 2011,
neglected to advise precisely which numbered units, within the strata block,
the assessor visited and so its value to the Panel is limited. In any event, the
report advised that as flood (an excluded policy event) was likely involved, a
hydrologist (WR) would also need to provide a report.
21. The FSP, in response to the Applicant‟s claim that her unit ha d not received
an individual assessment, required CL to attend again; this visit occurred on
16 September 2011 with an ensuing second report dated 28 September
2011. Units 31, 32, 27, 8 and 9 were re-assessed. The Panel notes that in
the second report CL made reference to the flooding that occurred in the
area on 21 December 2011. The Panel accepts that reference to 2011
should read 2010. The Panel notes that in CL‟s earlier report, he recorded
the date of loss as 21 December 2010. Clearly the date of loss recorded by
CL is incorrect.
22. In the body of his report, he referred to the torrential rain that commenced in
the area on 26 December 2010 and continued till 29 December 2010.
23. There is no reference in the original report or supplementary report that CL
had spoken to any of the property owners nor had CL made any reference to
sewerage inundation on 29 December 2010.
Case No: 254173 Determination Page 5 of 6
24. The FSP relies upon the overview report dated 27 January 2011 prepared by
WR for the Emerald area. This report was general and considered the
causes of the inundation of the local area. It revealed that stormwater
inundation during the period was “highly unlikely” due to the moderate
rainfall intensity. Further it concluded that:
“... very little rainfall was recorded in Emerald after 2100 hours on the 27 th
December 2010. At this time the Nogoa River water levels were about 5m
below its peak and well within the river bank at Emerald. Therefore, any
inundation after this time could have only been from the Nogoa River and
could not have been stormwater inundation.”
25. The Panel notes however, that in WR‟s report of 22 February 2011,
consequent upon its telephone discussion with BS, the following is recorded
beside the question „Prior Inundation by Stormwater Run-off ‟:
„No. Very little rainfall was recorded after 0900 hours on 28 December 2010.
Therefore any inundation after this time could have only been from the Nogoa
River and could not have been inundated by stormwater run-off ‟. (Panel
emphasis added).
26. The Panel notes the discrepancies in the reports by WR with respect to the
rainfall. The Panel further notes that whilst WR‟s initial report was allegedly
based on an area inspection that the subsequent report indicates that there
was no site inspection conducted.
27. In the initial report, WR concluded that site specific inspections and
interviews with the residents were required to determine definitively whether
properties were inundated above floor level by stormwater run-off during the
period of interest. That does not appear to have occurred.
28. The Panel is concerned neither the FSP, CL, or WR has directly addressed
the Applicant‟s assertion that on 29 December 2010 sewerage entered her
laundry. The closest WR comes to responding to this contention is:
„ Some properties may have been initially inundated by Nogoa River
floodwater draining along or backing up the stormwater drainage channels
and underground stormwater p ipes‟.
29. The evidence therefore before the Panel that is uncontested is that the
property was initially inundated by sewerage on 29 December 2010 prior to
the inundation by flood water that would most likely have occurred on or
about 0100 on 31 December 2010.
30. The Panel has already noted that this is an Accidental Damage policy,
limited only by the specified exclusions of which flood is the relevant one.
The FSP bears the onus of establishing on the balance of probabilities that
the damage suffered by the Applicant is attributable to flood. Whilst the
Panel is satisfied that the damage sustained on 31 December 2010 was
damage due to flood, the Panel is not satisfied that the FSP has provided
evidence sufficient to establish on the balance of probabilities that the
damage due to the inundation by sewerage on 29 December 2010 was due
to flood. The FSP has provided no evidence to dispute the Applicant‟s claim
with respect to this.
Case No: 254173 Determination Page 6 of 6
31. Accordingly, the Panel is satisfied that the FSP is liable with respect to the
damage sustained as a result of the sewerage inundation of the property on
29 December 2010.
32. The Panel accepts the FSP is not liable with respect to the damage
sustained on or about 31 December 2010 as the Panel accepts the FSP has
established on the balance of probabilities that the subsequent damage was
due to flood an event excluded under the terms of the policy.
Determination
33. Accordingly the Panel determines the FSP is liable to meet the Applicant‟s
loss with respect to the damage sustained as a result of sewerage
inundation on or about 29 December 2010.
34. The parties will need to agree as to the assessment of the damage
sustained by the initial inundation by sewerage on 29 December 2010 as
against the subsequent damage sustained as a result of the floods that
occurred on 31 December 2010.
35. In the event the parties are unable to agree as to the damage covered under
the policy, then the parties may return to this Service and a Supplementary
Determination will be issued.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.