Home / Financial Firm (Unknown - Insurer) / Determination 253941
Determination 253941
Claim declined under flood exclusion
Summary
The applicant's storage unit contents were damaged when Bundamba Creek overflowed in January 2011, and the FSP denied the claim as flood damage. AFCA found the water was floodwater from the creek and that the FSP was entitled to deny the claim.
Water overflowing a watercourse onto normally dry land falls within the ordinary and policy meaning of flood, which is excluded, and the evidence showed stormwater runoff alone did not cause the inundation.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 253941 Determination Page 1 of 7
Case number: 253941
General Insurance - Commercial Insurance – Storage Facility - FSP Decision -
Denial of claim (Flood)
29 June 2012
Background
1. The Financial Services Provider (FSP) entered into a contract of insurance
with a company (PP) which trades as a provider of storage facilities.
Pursuant to the relevant policy (“the Master Policy”), the insurable interests
of parties who have entered into a lease agreement with PP for the use of
storage units are automatically covered subject to a signed application being
completed.
2. On 18 October 2010, the Applicant signed an application form that enabled
him to access the benefits under the Master Policy for the duration of his
lease agreement. Included in the Applicant’s application was a summary of
the benefits contained in the Master Policy (“PP’s Summary”). This cover
was operable for the relevant period in this dispute.
3. Following severe events in Queensland in January 2011 the storage facility
was damaged by water which inundated the premises.
4. A claim was lodged on behalf of the Applicant regarding damage to his
contents stored in his storage space (storage unit A17). The FSP, upon
investigating the source of water inundation, denied the claim on the basis it
was due to “flood”.
5. The Applicant has disputed this decision.
Summary of Applicant ’s position
6. The Applicant disputes the FSP’s decision as the water could have come
from:
a stormwater pit/drain located at the front of the storage unit, or
the downpipe running down the side of it,
together with a number of concrete bunkers (bumpers) nearby contributing to
the inundation.
Determination
Case No: 253941 Determination Page 2 of 7
7. Given these issues and the fact there were no eyewitnesses to the initial
inundation, the FSP is unable to state with sufficient degree of certainty that
the damage was due to “flood”. Accordingly, the claim should be honoured.
Summary of FSP’s position
8. The FSP has relied upon the following evidence to substantiate its position
that the damage was due to “flood”:
A number of hydrology reports.
Statutory declarations from MM, the manager of the storage facility,
dated 13 October 2011 and 15 February 2012.
Statutory declarations from PF, an employee of the storage facility,
dated 13 October 2011 and 15 February 2012.
9. The FSP therefore relies on the following policy provisions contained in both
the Master Policy and PP’s Summary to deny the claim:
PP’s Summar y
“What the Storer’s Risk Insurance Benefits Covers
The following cover is provided under the Master Policy in relation to any
person who is entitled to access the benefits under the Master Policy.
You are covered for any property owned by you that is stored with us against
loss or damage directly caused by the perils specified below occurring during
the currency of the Master Policy and after your access to the benefits starts,
up to a maximum $20,000 in the aggregate and subject to the terms,
exclusions and conditions below.
Because you are only accessing the benefit of our Master Policy, you are
unable to vary the terms of this cover. This means that you need to determine
whether the insurance benefit we offer adequately covers your property. If you
believe it does not, you should seek to be independently insured.
The Perils
… Storm and Tempest and/or Water and/or Rainwater being rain falling
naturally from the sky including rainwater run-off over the surface of the land
…
Exclusions
The following is not covered:
…
13. Water from or action by the sea, tidal wave, flood or high water.”
Master Policy
“Flood shall mean -
The inundation of normally dry land by water escaping or released from the
normal confines of any natural watercourse or lake whether or not altered or
modified or of any reservoir, canal or dam.”
Case No: 253941 Determination Page 3 of 7
Issues
10. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
11. Due to the nature of the dispute, the matter has been referred to the Panel
for Determination in line with the Operational Guidelines to the Service’s
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
12. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
13. The Panel Chair Ombudsman attended on site where he met with
representatives of the FSP. Due to work commitments the Applicant was
unable to attend on this occasion.
14. In order to succeed in his claim the onus rests with the Applicant to establish
on the balance of probabilities that the damage suffered was caused by an
insured event for which the policy provides cover. Should the Applicant
succeed in establishing a prima facie claim, the onus reverts to the FSP to
show that on the balance of probabilities an exclusion upon which it relies
applies to defeat the claim. This standard of proof generally requires a party
to establish the disputed fact is more probable than not.
The Evidence
15. The FSP has provided a number of hydrology reports regarding this claim.
The report dated 17 October 2011 is particularly relevant and took into
account the statutory declarations of MM and PF dated 13 October 2011.
16. MM’s declaration dated 13 October 2011 contained the following remarks:
In a previous discussion she had with the hydrologist, she informed him
that not all the water inundating the property was dirty. The higher units
were “wet” rather than “dirty”.
Howe ver, she confirmed that when she referred to “wet” rather than
“dirty” in this regard, she was referring to the floor of the storage units
and the appearance of the belongings. She was not referring to the
water that inundated the storage units.
She attended the premises between 7am and 8am on 12 January
2011. During that time, water was still rising and had inundated the
office and storage units A3-A9.
17. PF’s declaration was limited to the fact that at about noon on 11 January
2011, she left the premises and noticed water was at the end of M Street. No
Case No: 253941 Determination Page 4 of 7
units had been inundated at that time. She did not return to the premises
until three to four days later at which point, the waters had receded.
18. Upon reviewing these statutory declarations, the hydrologist compiled a
report dated 17 October 2011 that contained the following:
The office, which is located at the lowest point, was inundated to a
maximum depth of 1.8m above floor level. All storage units, with the
exception of A18, had about 6 inches (0.15m) of water above floor
level.
The property is situated immediately to the south-east of a railway
station at the high (north) end of M Street. Ground levels in the vicinity
of the property slope down to the south. The railway is located on a
raised embankment with an underpass at the end of M Street adjacent
to the north-west corner of the property.
Ground levels of the storage units vary across the site. The highest
levels are in the northern corner of the property and lowest in the
southern corner (at the office ). A17’s floor level was 1.55mm higher
than the office. The estimated floor level of the office relative to the
gauge datum is 17.2m.
A grated stormwater drain runs along the north side of Blocks B, C and
D and stormwater inlet pits are located in front of Block A on the
internal access road. A municipal stormwater inlet pit is located on M
Street adjacent to the bus shelter.
Bundamba Creek flows in a generally north-west direction in the vicinity
of the property, approximately 200m to the south. Bundamba Creek
joins the Bremer River approximately 2.9km north-west of the property.
Rainfall totals for the 24 hours to 9am of 56mm (10 January), 20mm
(11 January) and 47mm (12 January) were recorded at the Bundamba
(Hanlon St) alert, which is located approximately 2km north-west of the
property. No significant rainfall was recorded after 1700 hours on 11
January 2011.
On 11 January 2011, 42mm rainfall was recorded between 1000 hours
and 1400 hours, with a maximum 1-hour rainfall intensity of 16.3mm/hr
occurring in the 60 minutes to 1400 hours. A maximum rainfall depth of
10.2mm over a 10 minute period (an intensity of 61.0mm/hr) occurred
at approximately 1330 hours on Tuesday.
As there is very little upstream catchment area that drains to the
property, maximum stormwater runoff depth to the property would have
occurred within 5 to 10 minutes of the maximum rainfall intensity.
Recorded rainfall intensities were not particularly severe. Average
recurrence intervals (ARI) of recorded rainfall depths for durations
between 5 minutes and 24 hours were less than 1 year.
Gauge readings of the levels of Bundamba Creek were obtained from
Bundamba School alert, which is approximately 380m south of the
property. Based on these readings, overbank flooding from Bundamba
Case No: 253941 Determination Page 5 of 7
Creek would have backed up along M Street and inundated the
property after 0400 hours on 12 January 2011. The maximum water
level in the vicinity of the property was at approximately 1500 hours on
12 January 2011.
Rainfall had ceased approximately 5 hours prior to the inundation. The
estimated peak inundation depth of A17 was approximately 0.25m.
(The Panel notes that the report refers to rainfall having ceased
approximately 5 hours prior to the inundation. Within the supplementary
report, the reference is to 15 hours. The Panel is satisfied that the
reference to 5 hours is a typographical error as the rainfall having
ceased approximately 15 hours prior to inundation is consistent with the
other details provided.)
19. Based on the above, the hydrologist concluded as follows:
“The office and individual storage units at the subject property were inundated
above floor level by floodwaters overflowing from Bundamba Creek.
Rainfall intensities in the area were not particularly severe. Based on available
information, stormwater runoff would not have caused inundation above floor
level in any of the individual storage units.”
20. With respect to the Applicants’ submissions, the hydrologist responded in the
following in a letter dated 14 February 2012:
The slope of the access road at the front of the Applicant’s storage unit
and the configuration of the roof downpipe spout direct rainwater from
the roof away from the unit.
The elevation of the storage unit relative to the access road and the
slope of the access road minimises the risk of surface runoff or water
surcharging from the stormwater inlet pit.
The watermark observed on the wall of the storage unit is consistent
with the estimated maximum depth of inundation resulting from
floodwaters from Bundamba Creek.
21. In PF’s statutory declaration dated 15 February 2012, she added the
following to her previous declaration:
When she left the premises on 11 January, there was no water coming
out of the drain in front of the Applicant’s storage unit.
If there were any abnormal flows out of the downpipe, she would have
noticed.
During her employment at the storage facility, A17 has not had any
water flowing into it from the downpipes or drain.
22. In MM’s statutory declaration dated 15 February 2012, she added that the
concrete garden edgings have been located outside storage sheds since
2009. These facilitated access to some sheds by vehicles. On no occasions
has water been pushed by the garden edging into the Applicant’s unit.
Further, water which comes from the downpipe drains down the roadways.
Case No: 253941 Determination Page 6 of 7
23. The Applicant was not in the vicinity of the area at the time of loss.
Analysis
24. In light of the above, the Panel does not accept there is any evidence to
establish that stormwater runoff alone inundated the Applicant’s storage unit.
Although there was no witness at the time of the initial inundation, there is no
evidence to suggest stormwater runoff alone inundated the property given
the following:
The hydrologist’s comments that the rainfall intensities recorded were
not severe enough to cause this.
MM’s evidence that when she attended the storage facility between 7
and 8am on 12 January 2011, there was no evidence that A17 was
inundated. This was approximately 15 hours after the last significant
rainfall recorded.
25. Instead, given the level of Bundamba Creek and the depth of inundation of
the storage unit, the Panel accepts is it more probable than not that the
water which inundated the Applicant’s storage unit came from the Bundamba
Creek overflowing its banks.
26. The Applicant, as explained previously, is a third party beneficiary to the
Master Policy that was arranged by PP. In this Master Policy, “flood” is
defined as inundation of normally dry land escaping the normal confines of a
watercourse. Bundamba Creek is considered a watercourse and
accordingly, water which overflowed its banks and damaged property would
fall within the definition of “flood”.
27. Further and in the alternative, the FSP has also relied upon the Court’s
interpretation of the word “flood” when it was used in a similar context to that
contained in PP’s summary. This was set out in the cases of Spika Trading
Pty Ltd v Royal Insurance Australia (1985) NSWSC and Harper v Zurich
Australian Insurance (1987) NSWSC.
28. In particular, the judge in the latter case consulted the Macquarie Dictionary
definition of “flood” which included “a great flowing or over flowing of water
especial ly over land not submerged”. In the judge’s opinion, overflowing of
water from a creek over land which is not usually submerged would fall
within the ordinary and natural meaning of “flood”.
29. The Panel considers this interpretation is reasonable and consistent with the
common understanding of the term “flood”. Accordingly, as the Panel has
accepted that the water which inundated the Applicant’s storage unit came
from the Bundamba Creek breaking its banks and travelling over normally
dry land, this falls with in the ordinary meaning of “flood”.
30. It therefore follows the Panel is satisfied the FSP was entitled to deny the
Applicant’s claim on the basis it was due to flood.
Case No: 253941 Determination Page 7 of 7
Determination
31. The Panel determines the FSP was entitled to deny the Applicant’s claim on
the basis it was due to “flood”.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.