Home / Financial Firm (Unknown - Insurer) / Determination 253932

Determination 253932

Swimming pool damage claim declined as excluded hydrostatic or subsidence damage

FirmFinancial Firm (Unknown - Insurer)
Decided2012-05-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$27,455
Non-financial loss$1,500
Amount claimed$54,910
SourceAFCA PDF

Summary

The applicant claimed $54,910 to replace a swimming pool shell damaged after a February 2011 storm, which the FSP declined as excluded. AFCA found no insurable event was shown, but because of poor claim handling and an admission of liability, ordered the FSP to pay half the reinstatement cost and $1,500 for non-financial loss.

Although the pool damage was excluded, the FSP's delays and perceived admission of liability made it fair to share the cost under the Terms of Reference.

Issues

Subjects and remedies

natural disasterpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 253932 Determination Page 1 of 8 Case number: 253932 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 1 May 2012 Background 1. The Applicant’s home and contents were insured with the Financial Services Provider (FSP) under a home and contents policy that commenced on 18 April 2002. 2. On 4 February 2011, the Applicant’s home and contents were damaged in a storm. 3. The FSP partially a ccepted the Applicant’s claim. It declined the claim in respect of damage to his pool on the basis the damage is expressly excluded by the policy. 4. The Applicant maintains he is entitled to indemnity for the pool. Summary of Applicant’s position 5. He is entitled to indemnity for the swimming pool because:  The FSP poorly handled his claim. Its assessment of the loss was inaccurate, untimely and was in breach of its duty of care or customer charter.  The pool did not initially sustain “hydrostatic damage”. The FSP’s handling of the claim has led to the damage.  The pool was posing a health risk in view of the FSP’s delay in handling the claim. He informed the FSP of the risk and was advised that the pool could be emptied. The damage occurred after the pool was emptied.  Ground movement had caused the pool’s shell to crack.  The FSP assured him that the damage to his pool would be covered.  The FSP’s Product Disclosure Statement (PDS) is poorly written, ambiguous and difficult to understand.  The FSP has admitted liability by apologising for the manner in which it handled the claim. Determination Case No: 253932 Determination Page 2 of 8  The FSP’s material demonstrates that it had an intention of settling the pool claim. 6. The Applicant is seeking cash settlement in the amount of $54,910 in accordance with the quotation he has received for the replacement pool. Summary of FSP’s position 7. The Applicant is not covered for his loss because:  The policy excludes the cost of cleaning mud and debris out of swimming pools  The policy also excludes damage caused to a swimming pool by “hydrostatic water seepage” or by water leaking down, against and underneath its sides. 8. Its engineers have advised that the damage to the pool was caused by hydrostatic pressure. 9. The Applicant’s pool expert does not explain the cause of the ground movement which, in turn, caused the pool shell to separate from the concrete bond beam. 10. It denies advising the Applicant to empty the pool. 11. Its apology does not constitute an admission of liability. 12. Its policy is clear and unambiguous. 13. The FSP relies on the following policy provisions: “ What you are covered for ... 1. Storm and flood We cover Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and damage caused by flooding from rivers, streets and canals. We do not cover ...  water in a tank, swimming pools or spas or their liners or covers.  the cost of cleaning mud or debris out of tanks, swimming pools or spas  damage to swimming pools and their parts or underground tanks caused by water leaking down the sides, against the Case No: 253932 Determination Page 3 of 8 sides or getting underneath them ... What is not covered under any part of your policy ... We do not cover loss or damage: ... Seepage of water through the earth Caused by water seeping or running:  through the earth (sometimes called hydrostatic water seepage)  through or down the sides of earth or earth fill that is up against your home  down the sides or underneath swimming pools or spas causing them to move, change shape or lift or leaking through their hydrostatic valves ...” Issues 14. Whether the Applicant is entitled to indemnity for the damage to his pool, and if so, to what extent. Reasons for decision Preliminaries 15. As informed to the parties, due to the nature of the dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service’s Terms of Reference. 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 17. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 18. The Panel considers the FOS Terms of Reference relevant to this dispute are: “ 8.2 Dispute resolution criteria Case No: 253932 Determination Page 4 of 8 Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these). 9.2 Compensation for direct financial loss Subject to paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for direct financial loss or damage. 9.3 Other Compensation a) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3c) and 9.7 FOS may decide that the Financial Service Provider compensate the Applicant for non- financial loss but only where: i. an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or .... The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. ...” 19. The Applicant has raised a number of issues to support his contention that the swimming pool claim should be met. 20. The Panel has reviewed these issues and does not consider all of them relevant to the question of indemnity for the damage to the pool. Accordingly, this Determination will only deal with the issues that are relevant to that question. 21. As this dispute raises a number of issues for consideration, the Panel will deal with them separately for the sake of clarity. Storm damage 22. The evidence is unclear as to the nature of damage sustained by the pool immediately following the storm (if there was damage at all). According to the Applicant, the cracking and dislodgement of the swimming pool shell only occurred after the pool was drained. Case No: 253932 Determination Page 5 of 8 23. The Panel understands that the pool was inspected by an assessor soon after the storm however, that report never materialised. 24. Notwithstanding inadequacies in the FSP’s evidence or claims handling practices, the onus still remains with the Applicant to establish a claim covered by the policy at first instance. The Applicant has not offered any specific information as to the nature of damage the pool sustained immediately after the storm. 25. Based on the material available, it appears that the storm may have just inundated the pool with mud and debris. The Panel is not convinced these matt ers could be regarded as “damage” in the ordinary sense of the word. In any case, the cost of clearing up such debris is clearly excluded by the policy (page 19 PDS). 26. Having reviewed the material available, the Panel is not persuaded that the Applicant has established a prima facie claim with respect to the swimming pool. Subsequent damage 27. Be that as it may, it is evident that the pool had cracked and lifted off its concrete base when its water was emptied out. It is unclear when the incident occurred but it is clear that the swimming pool shell cannot be repaired and must be replaced as a result of this damage. 28. The Applicant says the FSP is responsible for this loss, contending that its delay in handling the claim had created a health risk which, in turn, necessitated the emptying of the pool. He also says that the FSP had advised him to do so, a suggestion the FSP denies. 29. Although there is information in the material that supports a view that the FSP had poorly handled the claim, it is inconclusive as to whether the FSP had advised the Applicant to empty the pool. 30. Irrespective of whether the emptying of the pool was carried out on the FSP’s advice, the fact remains that the FSP had not processed the claim with reasonable diligence. 31. The Panel does not consider it reasonable:  That it took the FSP some 2 months (from claim lodgement) to obtain an assessor’s report  That it took the FSP some 3 months (from claim lodgement) to obtain its first engineer’s report. 32. Although the delay appears to have been initiated by the inaction of the FSP’s first assessor, it would not be unreasonable to expect the FSP to take measures to expedite the matter upon being aware of the delay. On the material before the Panel, there appeared to be no urgency in the FSP’s actions. Case No: 253932 Determination Page 6 of 8 33. The fi ndings of the FSP’s engineers are also not without difficulty. It is unclear to the Panel how the first engineer “JC” was able to conclude that the swimming pool damage was due to hydrostatic pressure build up from 4 February 2011 storms when:  He only conducted a visual inspection of the property some 3 months after the event.  He has not explained how he was in a position to know the moisture condition of the soil 3 months after the event.  The lifting and cracking of the pool only occurred after the pool’s water had been emptied. 34. The Panel is also unclear how the second engineer “DC” was able to conclude that the emptying of the swimming pool caused “hydrostatic pressure” to lift its shell in the absence of evidence as to the moisture condition of the soils surrounding the pool at/about the time the damage occurred. 35. It also does not assist the enquiry that the engineers’ explanation of the cause of damage were not entirely consistent and it has not yet been ascertained when the pool’s shell actually cracked a nd became dislodged. 36. The Panel has reviewed the PDS and notes the exclusions set out in the policy, as outlined above. The Panel also notes the following exclusion, as set out in the PDS: “ We do not cover loss or damage: ... Erosion or subsidence Caused by or as a result of erosion, vibration, subsidence, landslip, mudslide, collapse, shrinkage or any other earth movement, but we will cover subsidence damage to your home if it is caused by: ...  these insured events if the damage occurs within 72 hours of the event happening: ○ insured event 1 (storm and flood) ...” 37. Accordingly, whilst the Panel has not been able to conclusively ascertain from the FSP’s engineers’ reports or the Applicant the actual cause of the cracking of the pool, it is apparent that whether it is determined to have been hydrostatic pressure – an excluded event, or subsidence damage, as nothing before the Panel indicates this occurring within 72 hours of the storm, then in either instance the FSP is entitled to deny indemnity. PDS ambiguous 38. The Applicant argues that the PDS is ambiguous because it says the swimming pool was covered at page 7 without alerting readers to the Case No: 253932 Determination Page 7 of 8 exclusions found at pages 19 and 46. He sought to contrast this to the section of the PDS that relates to the repairing or replacing of kitchen cabinets, cupboards or bench tops. 39. The Panel has reviewed the PDS and is satisfied that it is reasonably clear and unambiguous. Page 7 merely states what constitutes “home” for purposes of cover. The PDS has an index that clearly spells out that:  page 7 deals with the question of “home”;  page 19 deals with the question of coverage; and  page 45 deals with the question of general exclusions. 40. Page 19 of the PDS clearly spells out the specific exclusions that apply to a storm claim while pages 45-52 clearly spell out the exclusions that apply to the policy generally. Admission of liability 41. The Applicant sought to suggest that the FSP had admitted liability for the swimming pool damage because:  At no time during the course of the assessment of the damage to the Applicant’s property and the attend ance of various assessors was there any indication given that the policy did not respond in respect of the pool damage; and  The Applicant was advised by the FSP during the progression of the claim as to adjustment of its’ insurance reserve figures to incl ude $50,000 in respect of pool, reflecting an intention to indemnify him for that damage; and  The Internal Disputes Resolution (IDR) letter issued by it to the Applicant states: “I have completed a review of the service received throughout the claim and I would like to apologise on behalf of (FSP) ... for the service you received. The service provided does not meet the expectations of (FSP).” 42. The Panel is satisfied the materials demonstrate each of the above assertions is correct. Further, the Panel is of the view that a reasonable person in the Applicant’s position would have read the above matters together as an admission of liability for the pool damage in the absence of any direct statement to the contrary, which did not occur until some 5 months after the event. Contributory Negligence 43. Whilst the claims history data does not expressly confirm the Applicant’s position that he obtained the FSP’s consent before emptying pool it is clear that the Applicant was contacting the FSP on a regular (even daily) basis and was actively involved in the claim. Case No: 253932 Determination Page 8 of 8 44. Notwithstanding the above, it is the Panel’s view that the FSP has not acted sufficiently promptly in respect of this matter. Albeit, the initial assessor was appointed soon after the storm event, it was almost two months before a second assessment was commissioned, and five months before a decision made by the FSP in respect of denial of indemnity. 45. It is understood the Applicant has young children and given the time that had elapsed and the safety/health concerns associated with the sitting water it is the Panel’s view that it was reasonable for the Applicant to drain the pool. 46. Further, the FSP in its IDR letter states: “... I have no evidence available to suggest that the emptying of the swimming pool has caused or contributed to the damage identified by the engineer. ...” Accordingly, the Panel is of the view the FSP is estopped from relying on an argument of contributory negligence by the Applicant in respect of the cracking of the pool shell. Determination 47. On the basis of the available information the Panel determines notwithstanding the Applicant has not demonstrated an insurable event, given the perceived admission of liability and poor handling of the claim it is fair in all the circumstances pursuant to paragraph 9.2 of the Terms of Reference that the FSP should meet half the cost to reinstate the damaged pool. 48. Further, the Panel determines the sum of $1,500 should be paid by the FSP to the Applicant by way of compensation for non-financial losses pursuant to 9.3b)(i).