Determination 253897

Refusal to repair south-west brick wall damage under earth movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$22,645
SourceAFCA PDF

Summary

After a burst water main, the FSP paid for accepted damage but refused to cover cracking to the south-west brick wall on earth movement grounds. AFCA found the FSP was not entitled to deny that repair, ordered quantification of the claim, excluded the middle-wall damage and report costs, and awarded $1,000 for delay and inconvenience.

Two engineers' reports supporting the applicant outweighed the FSP's single engineer, so the FSP could not prove the earth movement exclusion applied on the balance of probabilities.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 253897 Determination Page 1 of 10 Case number: 253897 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 13 March 2012 Background 1. The Applicant is insured under a home building insurance policy with the Financial Services Provider (FSP). The relevant period of insurance is 2 December 2006 to 2 December 2007. 2. On 2 December 2007, the Applicant contacted the FSP to report damage had occurred to the property that day as a result of a burst water main. 3. The FSP appointed a loss adjuster to attend the property and report on the damage. During the claims process the FSP obtained quotes for the repair of damage associated with the event as well as obtaining an engineer’s report. It was agreed that repair of damage should not be attended to for 12 months to allow for ground stabilisation. 4. However the Applicant would not allow repairs to take place after 12 months as he contended damage had also occurred to the south western brick wall of the building. The Applicant believed this was related to the December 2007 event and requested the repair of the wall be included in the scope of works. 5. The FSP advised the Applicant these repairs were not to be included as the cause of its damage resulted from events excluded by the policy. This position was based on the advice of its appointed consulting engineer. 6. The Applicant provided his own engineers’ reports to support his claim and was dissatisfied the FSP maintained its decision not to indemnify him for the repair of the south western wall. 7. The FSP has since cash settled the Applicant the amount of $14,645 for the repair of accepted damage caused by the water inundation event. Summary of Applicant’s position 8. The Applicant lodged a claim in December 2007 as result of a burst water main which caused substantial internal damage. Determination Case No: 253897 Determination Page 2 of 10 9. He says approximately 12 months after the inundation it was noticed that the exterior brick wall at the south western rear corner was tipping away from the house. 10. The Applicant says he engaged two engineers who both confirmed the damage is the result of differential movement of the footing, which is attributed to the water inundation, which occurred at the property. 11. The Applicant says a further $22,644.50 is required to cover the cost of repairs for:  Underpinning the wall;  Engineer’s underpinning report;  Engineer’s inspection reports;  Floor levelling; and  Repair of fascia, gutter and eaves. 12. The Applicant advised he is also seeking unspecified extra expenses for:  Any additional underpinning work;  Concrete replacement following underpinning;  Repair of broken brickwork;  Repair of additional damage following floor levelling;  Medical expenses incurred for assessment of personal health, diagnosed as stress related;  Psychological pain and suffering endured by family living in an unrepaired house Summary of FSP’s position 13. The FSP asserts its liability for the claim is limited to $14,655 for the following reasons:  The Applicant has not proven that the burst pipe has caused damage to the south western external brick wall;  The reports indicate pre-existing damage/cracking was evident and known to the Applicant;  The policy has general exclusions, which apply i.e. wear and tear, lack of maintenance, erosion and earth movement. 14. The FSP relies on the following policy provisions: “ Section 2: Important: General policy conditions … 2.10 Reasonable care Case No: 253897 Determination Page 3 of 10 At all time, and at your expense, you must  Take all reasonable precautions to maintain and protect the property insured to minimise or avoid damage, or destruction or theft; … Part 4: what you are insured for … 1.8 Bursting, Leaking, Discharging or Overflowing You are covered for damage or destruction caused by the sudden bursting, leaking, discharging or overflowing of a  water main or water pipe … Part 10: W hat the policy doesn’t cove r … 1.4 Erosion and earth movement Including subsidence, landslide (unless the subsidence or landslide arises immediately from an earthquake or explosion), mudslide, shrinkage, expansions or any other earth movement. … 1.9 Structural defects In the home, or faulty workmanship, or a lack of maintenance to the home or contents … 1.13 Wear and tear, and lack of maintenance Including rust, corrosion and other signs of failure to keep the property in good repair, and normal wear and tear. … Section 3 – How we will settle your Prime Home cover claim 3.1: Basis of claims settlement – “New for Old” replacement cover … Upon acceptance of your claim, we will at our option either:  Repair or rebuild …; or  Pay you the reasonable cost of repairing the damaged part of you r home … Where we decide to pay to you the reasonable cost of repairing or rebuilding your home, payment will be based on the amount we would have expected to pay …” Issues 15. Whether the FSP is entitled to refuse to indemnify the Applicant for damage to the south western brick wall under the terms and conditions of the policy. Case No: 253897 Determination Page 4 of 10 16. Whether the Applicant is entitled to medical expenses and damages for pain and suffering. Reasons for decision 17. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the issues in dispute and quantum. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 18. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 19. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed carefully all the material submitted by the parties in order to reach my decision. I will only refer to the relevant submissions and materials raised. 20. It is not disputed that an event covered by the policy occurred at the property on 2 December 2007. The FSP has accepted some damage has occurred as a result of this event. The FSP has cash settled the Applicant for this accepted damage. The FSP says it is entitled to cash settle the Applicant as allowed for under the terms and conditions of the policy. This appears not to be in dispute. 21. The issue in dispute is the FSP ’s liability to pay for damage caused to the south western brick wall for which the FSP has denied liability. The FSP relies upon the opinion of its appointed consulting engineer that damage to the wall did not result from the claimed event. 22. The Applicant claims this damage occurred as a result of the burst water main and relies on his two expert engineers’ reports to support his position. 23. The onus of proof is on the Applicant to establish, on the balance of probabilities, that the loss claimed for, resulted from an event covered by the policy. Only then does the onus shift to the FSP to show, on the balance of probabilities, that the claim falls within an exclusion in the contract of insurance. 24. The relevant policy covers damage or destruction as a result o f a sudden bursting, leaking discharging or overflowing from a water main or water pipe. The policy excludes loss caused by erosion and earth movement including subsidence, shrinkage, expansion or any other earth movement. 25. The Applicant had a similar event occur at the property in 2003. Although the Applicant was cash settled for the damage, he did not undertake any repairs. 26. In this claim, the FSP accepted a claim for internal damage to walls and wall tiles, some floor tiles and concrete paving on the western side of the home. Case No: 253897 Determination Page 5 of 10 Repairs were delayed to allow for stabilisation of foundations. The FSP has paid the Applicant$14,655 to affect these repairs. 27. The Applicant says he noticed cracking to the south west brick wall in December 2008. This is 12 months after the claimed event. 28. I have considered the reports relied upon by the parties. The FSP appointed a consulting engineer [HC] (who had previously attended the property in 2003) to report on the cause of the damage to the brick wall. HC concluded: “…, in ou r opinion, the cracking and movement that has occurred to the south west corner of the residence is a result of differential settlement of the footing due to seasonal changes in the moisture of the foundation material which may have been accentuated by tre e root drying.” 29. HC noted the soil in the area is moderately reactive clay and that “seasonal changes (such of the relevant drought conditions) in moisture content of the foundation material can cause up to 50mm movement at the surface of the soil.” 30. HC also reported there were previous repairs to the west wall brickwork. This was apparently done prior to the Applicant owning the property. HC says: “It also appears in this case, that the residence may be susceptible to cracking, with brickwork cracking observed at multiple locations and brickwork cracking repairs that were carried out prior to the current owners purchase of the property observed.” 31. The Applicant disagrees that the foundation movement is the result differential settlement (dropping). He says it is the result of differential movement (rotation) which has been caused by the wetting up on the inside of the footing by the inundation combined with drying out of the outside of the footing. The Applicant relies upon his own two experts’ evidence in thi s regard. 32. The Applicant obtained a report dated 31 May 2010 from a consulting geotechnical engineer [CEL] who reported: “The internal distress is most likely caused by heave of the dry clay soil beneath the floor of the building. This heave has resulted from water flowing under the house during the flood event. The levels tend to suggest the rotation of the side wall at the rear, although trees exist over the fence on the west side, has been caused by differential movement of the footing resulting from wetting up on the inside of the footing combined with drying out on the outside. This assumption is further advanced by the fact that the trees are away from the rear corner and the levels suggest a possible heave having occurred in this area. The external distress to the middle section of the west wall is associated with tree drying settlement. The root system of the trees and large shrubs can dry clay soils over a horizontal distance of up to the mature height of the tree or shrub. Thus the tree shown crossed on the site features plan is causing the significant drying settlements that have occurred to this section of the wall.” The levels taken over the floor of the building and the observed distress pattern support the conclusions made.…” Case No: 253897 Determination Page 6 of 10 33. It is noted in CEL’s report that the owners had indicated to him internal damage was still changing and was likely to do so for another year, and so they were asked to regularly monitor the distress. 34. The FSP asked HC to respond to CEL’s report. HC noted in his report dated 28/9/10 the following:  Levels were not taken as they can be assessed by observation.  it was well documented movement had been occurring at the property prior to the claimed event.  effects of the burst water main can affect a property between six to twelve months and effects from the event would have dissipated “well before this time.”  due to the weight of the brickwork and timber framed walls, heaving does not normally occur of strip footings unless the water flow has been occurring for some time.  no problems were evident with the movement of brickwork when he inspected the site on 7 May 2008, some 5 months after the burst water main.  if the burst water main was to affect strip footings it would have occurred in the first two to three months.  no problems were evident until 12 months after the event. 35. HC disagreed with CEL’s comment relating to heaving on one side of the footing and settlement occurring on the other side due to drying out of the foundation material. HC noted the burst in the water main was of short duration and the CEL report does not note a timeframe: “… the water from the burst water main can affect the pad footings to the concrete stumps which support the interior walls. The concrete stumps have a lighter load and are therefore more susceptible to changes in the moisture content in the foundation material. Our office carries out numerous inspections of distressed buildings and generally strip footings are only affected by changes in the moisture content of the foundation material if long periods, such as weeks or months, occur for a water leak. 36. CEL provided no further report. 37. However, the Applicant obtained a report from a consulting engineer [DPG] dated 26 November 2010. DPG essentiality agreed with CEL and advised: “.. it is our opinion tha t movements in the walls, are due to changes in moisture content in the underlying foundations clays. … Observations … Case No: 253897 Determination Page 7 of 10 The rear South west corner of the house had dropped and cracked. We were advised that no one noticed the wall movement until February 200 9… … Cause of Cracking … The movement of the rear South west corner of the house is due to the saturation of the inside face of the footing due to the flood event and drying out of the outside face of the footing…..” Clays in this area are known to be highly reactive, and clays of this type will expand and soften when wet, particularly in winter, and will shrink and powder when dry, such as in summer. Generally, such changes tend to be uniform and therefore are not crucial, ie all footings in the building move by similar amount. When there are leaking pipes or ponding in the area and the water is allowed to penetrate near the building then the foundations become excessively wet locally, and likewise when there are trees or shrubs close to the foundations the roots draw large quantities of water from the clay, causing excessive drying and hence shrinkage in local areas. Either (or both) problems can cause excessive and non- uniform movement in the footings.” 38. A copy of this report was provided to HC but he maintained and reiterated his position as set out in a letter of 12 April 2011: “… the cracking and movement that has occurred to the south west corner of the residence is a result of differential settlement of the footing due to seasonal changes in the moisture of the foundation material which may have been accentuated by tree root drying.” 39. The onus is on the Applicant to establish damage to the south west corner of the house was caused by the burst water main on 2 December 2007 and which the Applicant said inundated the property for several hours. 40. The photographs show an extreme inundation. The FSP’s expert HC supports his opinion by saying that the flooding would have been short term, which does not affect the clay. Rather, he says it is a water leak that lies on the ground for weeks and months that affects the clay adversely. However, even though the Applicant describes the inundation itself as “for several hours”, I am of the view that HC cannot necessarily assume that the water did not then lie for some weeks under the house and affect the clay adversely. 41. Two experts from the Applicant say that the heave of the dry clay soil has resulted from the water flowing under the house during the flood event. They both say the result is the inside face of the footing is saturated compared with the drying outside face of the footing. They posit the side wall of the house at the rear has rotated caused by this differential movement of the footing. 42. At first blush, there is some attraction to the idea that this damage to the south west wall was not caused by the flood event of 2 December 2007 as the damage was not seen in the inspection by HC on 7 May 2008. However, Case No: 253897 Determination Page 8 of 10 both experts for the Applicant know this fact and yet still contend the flood event nonetheless caused the claimed damage. 43. When faced with two opinions supporting the Applicant and rebutting the single opinion of HC, I find on the balance of probabilities, that the Applicant has established to my satisfaction the burst water main on 2 December 2007 caused the damage to the south west corner of the house. 44. Or, to put it another way, I am not satisfied that FSP has proved on the balance of probabilities that HC is correct and so it cannot rely on the exclusion that it was earth movement that caused the damage. 45. The Applicant has claimed for repairs as set out in his letter to FOS dated 17 August 2011. 46. The quotations are valid for 30 days and that time has long past. I suggest the Applicant obtained further quotes for the cost of repairs to the south west corner of the building within 14 days after acceptance of this Determination and submit them to the FSP. 47. The FSP should then, if it wishes, also obtain quotations within 14 days after receipt of t he Applicant’s quotations and assess and adjust the claim pursuant to the terms and conditions of the policy. 48. I should clarify that the evidence to hand is that damage to the middle section of the western wall opposite the tree marked with an X in the report of CEL dated 31 May 2010 is not payable by the FSP in this claim as the evidence is that the tree dried the settlements and caused damage to the wall in that area. Cost of professional advice and reports 49. The Applicant has sought the cost of reports obtained for underpinning and inspections by a geotechnical engineer consultant and an engineering consultant in the amounts of $434.50 and $440. 50. Under clause 9.4 of the Services ’ Terms of Reference I can determine the FSP contribute to legal or other professional costs incurred by the Applicant in the course of the dispute but this is limited to $3,000 unless special circumstances apply. 51. I would only consider these costs payable by the FSP if it were established that the advice or reports obtained by the Applicant assisted or presented a case that overwhelmingly established the FSP was incorrect with its decision and handling of the case. 52. In my view, this has not occurred, and so I am unable to grant the relief the Applicant has sought for the costs incurred for professional advice and reports. I say this as the reports obtained from HC were acceptable and maintained a credible argument. The HC opinion just did not persuade me as much as the other two reports and the preponderance of opinion was against HC. Case No: 253897 Determination Page 9 of 10 Other compensation 53. The Applicant also claimed compensation for medical expenses and for psychological pain and suffering. 54. The Applicant has not provided any receipts or material from a doctor to say he was diagnosed with stress as a result of this claim. In the absence of that evidence, I can make no determination for this part of the claim. 55. The Applicant also claims for “psychological pain and suffering endured by the family living in a house which appears about to fall down”. C lause 9.3 of the Terms of Reference sets out as to when “Other compensation” can be considered. 56. The section reads: 9.3 Other compensation a) ... b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non- financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual’s privacy rights – injury has occurred to the Applicant’s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. 57. This event occurred in December 2007. The Applicant says he first noticed damage had occurred to the brickwork at the south west corner of the house in December 2008. And yet, more than two and half years later, the matter was still not resolved and in August 2011, the Applicant brought the dispute to FOS. The issues are not simple and an expert opinion has had to be obtained from three experts. Nonetheless, in my view the length of time taken to resolve the situation or deal with the claim is longer than good industry practice dictates. In the meantime, the south west wall remains unrepaired and this would cause physical inconvenience and interfere with the Applicant’s enjoyment and peace of mind. 58. Before making a determination on this part of the claim, the FSP was asked to comment but has declined. 59. In all the circumstances, I propose to award $1,000 under Clause 9.3 b) of the Terms of Reference. Case No: 253897 Determination Page 10 of 10 Determination 60. On the basis of the available information I determine the FSP was not entitled to deny the repair of the south western corner of the brick wall and I grant the relief the Applicant has sought from the Service. 61. I determine the parties now quantify and adjust the quantum of the claim as set out in paragraphs 46 - 48 above. 62. I also determine the FSP pay to the Applicant $1 , 000 under Clause 9.3 b) of the Terms of Reference.