Determination 253493

Denial of water damage claim relying on structural defect and faulty workmanship exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$39,683
Non-financial loss—
Amount claimed$39,683
SourceAFCA PDF

Summary

The insurer denied a home contents water damage claim under exclusions for structural defects, faulty design and faulty workmanship, after offering $10,000 without admission of liability. AFCA found the insurer had not met its onus to prove the exclusions applied and ordered payment of the $39,682.50 claimed, plus statutory interest.

The insurer bears the onus of proving an exclusion applies, and its engineer's visual opinions lacked substantive evidence of structural defect or faulty workmanship, so the exclusions were not established.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 253493 Determination Page 1 of 12 Case Number: 253494 General Insurance - Home Contents – Stormwater runoff – Policy exclusions – structural defects, faulty design or faulty workmanship – Disposal of water damaged contents – Insurance Contracts Act 1984 S57 29 February 2012 Background 1. The Applicant insured her 30 year old home building for $300,000 and contents for $125,000, with a $250 policy excess, under an Elite Care Home and Contents Insurance Policy against accidental loss or damage. 2. On 26 November 2010, water entered the downstairs bedroom of the Applicant’s house causing damage to the room and contents. 3. The Applicant has estimated the replacement cost of the damaged contents to be $39,682.50. 4. The Financial Services Provider (FSP) arranged for all of the water damaged contents to be removed and cleaned wherever possible. The removal of the contents from the bedroom was arranged by the cleaning contractor. 5. However, because of the condition of the contents affected by water and mould, the cleaning contractor deemed them to be unsalvageable and they were disposed of. 6. During the course of its investigations into the cause of the entry of water into the Applicant’s home, the FSP engaged a building/engineering consulting company, ’M’, to investigate the cause of the water entry. 7. M initially arranged for a building consultant to report on the cause of the water entry. In his report dated 12 January 2011, the building consultant stated that the Applicant, and the local council engineer, had witnessed water coming from the neighbour’s property onto the Applicant’s property from a damaged stormwater drainage system. 8. The building consultant recommended a geotechnical engineer undertake two bore holes in the sub- floor area of the Applicant’s house to determine the moisture contents of the soil and the presence of any water. 9. In response to the building consultant’s report, M appointed one of its engineering and building consultants (engineer) to inspect and report on the Applicant’s property, in particular, water infiltration from the neighbour’s property and into the basement bedroom. Determination Case No: 253493 Determination Page 2 of 12 10. The engineer was of the opinion that it appeared rainwater was able to enter the subfloor area under the house through one of the external walls. He also reported the bedroom was susceptible to occasional flooding because water appears to be infiltrating the subfloor earth behind it. 11. The engineer also believed that the bedroom wall which holds back the subfloor earth is not adequately designed for the task and water seems to be capable of penetrating it and passing into the bedroom. 12. In view of these reports, the FSP denied liability on the grounds that the water entry into the Applicant’s property was caused by defects in the building, faulty workmanship, structural defects or faulty design. 13. The Applicant disputes the FSP’s decision. The Applicant also contends that the FSP’s cleaning contractor disposed of her contents without her permission and has submitted a claim for the amount of $39,682.50 for the destroyed contents 14. The FSP has rejec ted the Applicant’s claim because it states the contents were disposed of because of their condition and the Applicant would have been in the same position. 15. However, it has offered a cash settlement of $10,000 on a ‘no prejudice’ ‘no liability’ basis. The Applicant has rejected the offer. Summary of Applicant’s Position 16. During October and November 2010, Melbourne experienced heavy rains. On or about 26 November 2010, stormwater flowed onto her property from blocked street drains and from a next door neighbour’s property where a stormwater pipe was broken and their downpipes and gutters were blocked. 17. As a result a deluge of water flowed onto the Applicant’s property and the bottom room flooded. This was the third time in 30 years of owning the property flooding of the bottom room occurred. 18. The Applicant submitted a claim on the FSP on 28 November 2010 and it has taken nine months for the FSP to deny her claim. In January 2011, she was advised by the FSP that her claim had been approved and it had authorised removal of all contents from the bedroom to be cleaned of mould or mildew or to be replaced. She was asked to provide quotations for the replacement of items. 19. The FSP appointed M to inspect her property and provide a report. Due to errors in the report M inspected the property for a second time and submitted a second report. 20. In July 2011, the FSP informed her that her claim had not been accepted by the Internal Dispute Resolution process stating that although her policy covered accidental loss or damage, the policy specifically excludes water entering the Case No: 253493 Determination Page 3 of 12 building through an opening made for any building renovation or repair work, structural defects, faulty design or faulty workmanship when the home was constructed. 21. The Applicant does not believe that water entered her house due to:  any structural defect, faulty design or faulty workmanship when the buildings were constructed; or  any opening made for building, renovation or repair work. 22. Registered building practitioners were engaged to:  build the house in 1981;  build an extension in 1988, and  complete maintenance work. 23. The Applicant questions the accuracy of statements based on visual findings contained in both M reports. No water moisture measurements were taken, no digging or probes carried out, assumptions were drawn which she believes have led to inaccurate results. Background 24. When her house was built in 1981 it included a basement room. She has been the sole owner since 1981. During this time the basement room has flooded on three occasions. 25. The first entry of water was between 1981, when the house was built, and 1983. In 1985 when the extension was added the excavator used for digging the footings was also used to install agricultural (AGI) drainage along the property north (upper) boundary to prevent water infiltration. 26. The second entry was in October 2009 and was caused by a broken storm water pipe on her property. A claim was made, and approved, by the current FSP. The pipe was repaired by a licensed plumber and further drainage installed to prevent further flooding damage. 27. The current existing drainage along the north (upper) boundary includes:  flexi pipe AGI drain along north boundary of house and carport;  slotted pipe AGI drain above footing along the north side of house;  spoon drain at the front of carport;  flexi pipe AGI drain along the basement room wall and orange tanking, confirmed by the Applicant in July 2011 by organising for the digging of the basement room foundation wall under the house; Case No: 253493 Determination Page 4 of 12  flexi pipe AGI drain at the front of the house; and  paving re-laid on the north side of the house to slope away from the footings to be caught in the AGI drain along the north boundary. 28. The third flooding event occurred in November 2010 and is the subject of her claim. 29. The Applicant appointed an engineer to inspect her property. In a letter dated 7 March 2011, the engineer stated:  there was evidence of moisture in the subfloor basement room where carpet has been removed and there is staining in the slab; there is no evidence of moisture in the subfloor on the ground;  from a visual inspection, the engineer believes that the water is both travelling over the surface around the perimeter of the residence and travelling underground and pooling behind the basement room retaining wall and seeping through the cracks in the joint of the retaining wall to the slab and also under the slab and causing flooding;  to ascertain the level of moisture in the ground it is necessary to obtain a soils report in a number of locations;  a sleeper retaining wall on the north side of the property has collapsed and erosion is occurring to the soil which was retained by the wall. The collapse and erosion has occurred due to the excessive amount of runoff from the upstream neighbouring property. 30. Local council engineers attended her property during another storm and witnessed the flooding water entering the property from blocked street drains and the neighbour’s property. As a result the street drains were cleared and a letter from the council sent to the neighbour’s house advisin g the owner to repair blocked gutter, downpipes and broken stormwater pipe. A copy of the council’s letter is enclosed with her submission. 31. The FSP external loss adjuster stated in its report dated 10 December 2010: ‘EXTENT OF LOSS From our visual inspection we have sighted resultant damage to the downstairs bedroom as follows:  ...  Carpet to downstairs area will require replacement.  Various contents will require replacement – we currently await list from [cleaning contractor]. POLICY LIABILITY Case No: 253493 Determination Page 5 of 12 It appears your Insured has suffered a fortuitous loss for storm damage. We believe the policy should respond accordingly for resultant damage. ... We have requested a Schedule of Loss from [cleaning contractor] for the items that have been contaminated by the dirty water. We note your Insured had the carpet replaced under the claim on 6 March 2010 via [carpet supplier], we have requested a quotation to replace the carpet to the same room via [supplier] accordingly. With your concurrence we shall appoint an engineer a s outlined above.’ 32. The Applicant contends that the water damage or damage by mould and mildew infestation to the contents was exacerbated by the lengthy delays by both the cleaning contractor and loss adjuster. The damage could have been reduced if steps had been taken in a timely manner. 33. Anti-bacterial treatment did not occur when the dryers were installed; thus did not take place until the end of January when requested by the Applicant. 34. The Applicant stresses the importance of the acceptance of the damaged property by the loss adjuster in December 2010 and the authorised removal, replacement, or repair by the loss adjuster. 35. The Applicant is of the opinion that no faulty workmanship, structural defect or faulty design exist for the basement room and the reports submitted by the FSP consultant, M, are open to question for accurate visual inspection. Summary of FSP’s Position Water entry into the building 36. The FSP appointed building/engineering company, ‘M’, to report on the cause of the water entry into the basement bedroom. 37. The first inspection was carried out by a building consultant who stated in his report dated 12 January 2011 that he was of the opinion that the room had no moisture barrier or damp proofing and appeared to have been constructed as a storeroom initially and converted into a bedroom later. 38. Due to the building consultant’s report not clearly identifying the cause and extent of the damage, and also raised concerns as to whether the damage had occurred as a result of the one event or over time, M was requested to have an engineer reinspect. 39. The engineer observed that neither the Applicant’s nor the upper neighbour’s properties has adequate stormwater structures or systems installed to prevent water flowing into other neighbouring properties. Case No: 253493 Determination Page 6 of 12 40. In his report dated 14 May 2011, the engineer stated:  water from the upper neighbouring property was able to flow down an embankment onto the Applicant’s carport floor, as there was nothing at the base to prevent this;  the water flowed from the carport unimpeded onto the gravel driveway and scoured out the surface;  there was no worthwhile water diversion or gathering structure at ground level to handle even a minor storm and any damage was almost certainly due to a lack of planning, prevention and maintena nce. 41. The engineer’s comments on the basement bedroom were:  it was an ‘infill’ space to make use of the natural slope of the land; it has two external walls, one internal wall that separated it from a storage shed behind and one internal wall acting as a retaining wall, holding back the earth under the house;  the retaining wall did not appear to have any waterproofing ‘tanking’ material on the rear and showed some damage, either due to flooding or to water infiltration from the rear;  the external wall opposite the retaining wall appeared to be standing on a concrete footing and the lower six or seven courses of bricks were quite damp and showing evidence of a substantial water flow down or through this wall, with leaves and sticks next to the wall indicating a surface flow into the subfloor area.  as the level of the path appeared higher than the earth level in the subfloor area, this wall was also acting as a form of retaining wall and this would explain why the bottom six or seven courses were damp;  there is also a hole in this wall with a cable passing through it (a point of possible access for water);  it appeared there had been a flow of water through this external wall, which was not designed as a waterproof wall, either across the subsoil or through it to the rear of the bedroom wall. 42. The engineer concluded:  stormwater is entering the Applicant’s property from the upper neighbouring property as neither of the properties have adequate drainage structures in lace to handle, divert and remove unwanted rainfall runoff;  rainwater appears to be able to enter the subfloor area of the house through one of the external walls either by travelling around the external wall itself or through the subsoil; Case No: 253493 Determination Page 7 of 12  water appears to be infiltrating the subfloor earth behind the bedroom and the wall holding back the subfloor earth does not appear to be adequately designed for the task. 43. The Applicant’s policy of insurance excludes loss or damage caused by:  water entering the buildings through an opening made for any building, renovation or repair work; (the engineer referred to the hole in a wall for the provision of a water pipe);  water entering the buildings because of a structural defect, faulty design or faulty workmanship when the buildings were constructed ( this exclusion applies both at the initial construction of the property and at the time the downstairs bedroom was created;  a defect in an item, faulty workmanship, structural defects or faulty design (inadequate drainage structures, a wall holding back subfloor earth that is not a waterproof wall and was not adequately designed for the task). 44. In view of the engineer’s findings and the fact that the Applicant knew of the drainage problems and the bedroom’s susceptibility to water ingress (the Applicant stated that it had occurred twice before), the FSP maintains that it is entitled to deny the claim. Removal and disposal of non-salvageable contents 45. The Applicant’s contents were deemed non -salvageable by a professional company (cleaning company) dealing in specialised cleaning techniques and disaster restoration cleaning. 46. Mitigation works were initially carried out on the date of the incident and the affected carpet was immediately disposed of. 47. Drying equipment was installed and an anti-bacterial treatment applied. 48. The Applicant telephoned the cleaning company on 7 January 2011 as she was waiting for a crew to re-attend to inventory, photograph and dump all non- salvageable contents and this was carried out on 11 January 2011. 49. Further, anti-bacterial treatment was carried out on 11 January 2011. 50. All non-salvageable contents were disposed of on 12 February 2011. Had the cleaning company not removed and disposed of these items at the FSP’s expense, the Applicant would have had to bear this cost herself. 51. The cleaning contractor’s file notes indicate that the Applicant knew the items were not salvageable and made enquiries as to their removal. Nevertheless, the FSP made an offer to the Applicant of $10,000 without prejudice and without admission of liability. This was based on approximately 30% of the Case No: 253493 Determination Page 8 of 12 values claimed at that time on the document entitled ‘Insured Claim Schedule’ and indicated research on the internet. 52. The Applicant’s amount of her claim is $39,682.60. 53. In relation to the Applicant’s claim f or replacement of non-salvageable items disposed of at the FSP’s expense, the FSP submits that the Applicant knew the items were not salvageable and made enquiries as to their removal and that the removal and disposal of these non-salvageable items has not prejudiced the Applicant in any way. 54. The FSP relies on the following policy/contract provisions: ‘Section 1 Buildings and Contents ... What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:  ...  Water entering your buildings - through an opening made for any building, renovation or repair work - because of a structural defect, faulty design or faulty workmanship when your buildings were constructed  ...  A defect in an item, faulty workmanship, structural defects or faulty design  ...’ Issues 55. Whether the FSP is entitled to rely on the policy exclusions to deny indemnity to the Applicant. Reasons for Decision 56. The onus of proof is on the Applicant to establish, on the balance of probabilities, that she has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 57. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. The Ombudsman has had regard to the material exchanged and the detailed submissions made on behalf of the parties. Case No: 253493 Determination Page 9 of 12 Water entry into the building 58. Notwithstanding the opinions of the FSP’s engineer in respect to drainage problems at the Applicant’s property I note:  In the report dated 10 December 2010, by the FSP’s external loss adjuster, she stated: ‘The premise (sic) was built in circa 1980 and is in excellent condition. Housekeeping is immaculate.’  Building consultant from company M reported: ‘The property is in very good condition with no obvious sig ns of water related problem.’ 59. However, the FSP’s engineer completed a more thorough visual inspection of the property to arrive at his opinion. 60. In his report dated 14 May 2011, the engineer stated:  ‘There are essentially three problems affecting this prop erty, with one appearing to give rise to the other two. They are:  Water runs freely into the property from the neighbour’s property uphill. Some of this concentrated in particular places at the boundary line.  Some of this infiltration is flowing down the front driveway, causing gravel surface to scour out.  A bedroom located at lower ground floor at this house has flooded on at least one occasion. It is possible that the water flow from the neighbour’s property may contribute to this.’ 61. The Applicant ’ s house was built in 1981 and there have been three water infiltrations since that time. The first was between 1981 and 1983, no details have been provided; the second was in October 2009 and was caused by a broken stormwater pipe at the Applicant’s property; the third incident was in November 2010 and is the subject of this claim dispute. 62. The engineer suggests that water escaping from the neighbour’s property has been a cause of the water infiltration. However, no evidence has been submitted to establish that there have been other occasions when water has caused a problem to the Applicant’s building from that source. 63. The engineer records the driveway as being a problem affecting the Applicant’s property. However, the driveway was constructed in December 2012 after the claimed event. Its construction was approved by the local council. 64. With respect to the bedroom, which was the room subject to the water damage, the engineer has submitted various theories that he considers to be structural defects, faulty design or faulty workmanship. 65. The reasons as to why the engineer has arrived at his decision are: Case No: 253493 Determination Page 10 of 12  Lower 6 or 7 courses of bricks are quite damp and there is evidence that there has been a substantial water flow down through this wall. 66. The Applicant has shown that the bricks in question are footing bricks and the colour of the mortar is darker due to the application of waterproofing material to the mortar mix. 67. The colour change does not necessarily establish that a substantial water flow down or through these bricks has occurred and according to the Applicant’s engineer, the foundation bricks are different bricks to the house bricks. 68. Further, I note that the engineer did not use a water measurement meter to confirm his opinion.  There are leaves and small sticks next to the wall indicating that there has been a surface flow into the subfloor. 69. The Applicant contends that the entry point for the leaves to cross the threshold to the subfloor section of the house was the entry door to the laundry.  There has been a hole cut into the wall which allows a cable to pass through and is a possible source of water entry. 70. The Applicant explained that a hole was cut into the wall to allow a water pipe from a water tank to a pump. The hole was filled with approved plumbing silicone and piping and does not allow water ingress to the subfloor area.  There does not appear to be any waterproofing ‘tanking’ material on the rear wall of the bedroom wall.  It looks as though there has been a flow of water through the external wall; this is not unexpected as the wall has not been designed as a waterproof wall. 71. The Applicant has confirmed by way of a photograph that waterproofing material has been applied to the wall to ensure it is waterproof. 72. However, the engineer does concede that that there is a problem with his theory due to the subsoil under the house being very dry. He considers that if there was a flow large enough to flood the bedroom that the subfloor area would have been quite damp. 73. The Applicant prepared a comprehensive response to the e ngineer’s report. The engineer responded to many of the issues raised and some of the relevant issues are:  Visual Observation – The engineer contends that when inspecting the Applicant’s property, visual observations were all that was required to draw accurate conclusions. The engineer is aware that the observations it makes can be used as legal evidence and as such he endeavours to disturb sites as little as possible. This includes digging holes or probing delicate infrastructure or engaging in destructive testing. 74. In the Ombudsman’s experience, it is usual for engineers to support their observations with solid evidence in support of their opinions by the use of Case No: 253493 Determination Page 11 of 12 moisture measuring devices and the sinking of bore holes. Leaving a site ‘untouched’ pending leg al challenges would be counter-productive as the site could be completely compromised between the time of the incident and the legal action. 75. Altered driveway – The engineer states that the Applicant installed a subsoil drain along one side of the house between the time of the flooding and the dates of his inspections. He contends that since it is possible that floodwater flowing in from the neighbour’s property, across the original driveway and round either side of the house caused flooding in the lower bedroom, he believes the Applicant’s actions compromised his observations. 76. AGI pipe and waterproofing of bedroom wall – The engineer states that a photograph submitted with his first report showed signs of water damage to the basement bedroom. The lower part of the wall acts as a retaining wall and the water damage appears to be derived from earth behind the wall. 77. However, the engineer submitted another photograph confirming that the earth in the subfloor behind the wall was dry. 78. The engineer stated that this requires verification about the effectiveness of the membrane and the height of the AGI drain relative to the base of the wall. 79. I consider that this should have been investigated and properly determined by the engineer before submitting his report. 80. Previous incidents of water infiltration to the building – The engineer is of the opinion ‘...that flooding seems to have occurred on three occasions in 2010.’ 81. The Applicant has stated that flooding occurred between 1981 and 1983, October 2009 and November 2010. The engineer has not provided any evidence in support of his premise. 82. The onus is on the FSP to establish that, on the balance of probabilities, it has established that it can rely of the policy exclusions to deny liability. 83. The engineer responded to many of the Applicant’s issues but he did not provide substantive evidence in support of the FSP being able to rely on the policy exclusions. 84. Therefore, I find that the FSP has not met the onus on it to establish that, on the balance of probabilities, the cause of the water damage to the Applicant’s house was the result of a structural defect, faulty design or faulty workmanship whether at the time of construction or otherwise. Removal and disposal of non-salvageable contents 85. The FSP contends that had the cleaning company not removed and disposed of the water damaged items, the Applicant would have had to bear this cost herself. Case No: 253493 Determination Page 12 of 12 86. I note that it appears the Applicant was not given any choice as to whether any items may have been salvageable. 87. However, in view of the finding that the FSP is not entitled to deny indemnity to the Applicant for her loss, I shall also consider the quantum of her claim. 88. Although the FSP denied indemnity to the Applicant, it offered a cash settlement of $10,000 without prejudice a nd without an admission of liability. It arrived at the amount of $10,000 by applying a factor of approximately 30% to the Applicant’s claimed amount of $39,682.50. 89. Due to the FSP accepting the sum of $39,682.50 as being the Applicant’s loss, I find that the FSP is liable to pay that amount to the Applicant. Determination 90. Accordingly, I determine that:  the FSP is not entitled to rely upon the policy exclusions to deny indemnity to the Applicant, and  the FSP is to pay the Applicant $39,682 50 in settlement of her claim. 91. Further, I determine the FSP is liable to pay interest under section 57 of the Insurance Contracts Act 1984 at the rate prescribed in the Insurance Contracts Regulations 1985 for the period 13 September 2011, the date of the FSP’s IDR decision letter, to the date of settlement of this determination. 92. For the assistance of the parties, the prescribed interest rate appropriate to this determination is 7.50%.