Carpet replacement cost and fee for builder's inspection report after water entry
Text of the determination
Case No: 253338 Determination Page 1 of 8
Case number: 253338
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Claim Amount - Carpet Replacement - Expert Report
28 August 2012
Background
1. The Applicant holds a home contents insurance policy with the Financial
Services Provider (FSP). The policy covered the Applicant’s residential
home.
2. On 21 March 2011, the Applicant lodged a claim with the FSP who recorded
the following claim description:
“Insd advd that during heavy rain water has come through ceili ng and
damaged carpet in 2 x bedrooms”. (sic)
3. On 22 March 2011, the FSP’s representative, N, attended the insured
property. N determined that the “(c)arpet is not restorable” because of
“contaminated water”. N removed the carpet and recommended the
replacement of the carpet to the FSP. The determination by N that the carpet
was not restorable, was contested by the Applicant.
4. On 23 March 2011, the Applicant informed the FSP that his relatives were
arriving in two days and therefore the carpet needed to be replaced as soon
as possible.
5. On 24 March 2011, the Applicant contacted the FSP who recorded the
following claim notes:
“RCVD call from [Applicant] ACTION: - insd wanting to know when we will be
replacing carpet on this claim… - on this claim we have r ecieved [N’s] report
which states carpet does need to be replaced – advd insrd that we actually
need to get a builder to confirm the water entry point – he advd me that it has
come through the balcony … advd insrd that i still need a builder to attend and
give us report before we can confirm if covered – insrd not happy with this as
he states that he is a builder and he knows where it has come from… - advd
without a report we cant do anything as we need to determine coverage – he
advd because he is a builde r he’l submit a report – advd insrd it can’t come
from himself and needs to be another builder he doen’st no – insrd advd that
he is going ahead and replce carpet anyway because … he has guests
coming … - advd if that what he wants to do then that’s fine b ut we can’t
guarentee we can reimburse the full cost if any until COD confirmed – insrd
will still submit builders report though – insrd did also say he wasn’t happy [N]
Determination
Case No: 253338 Determination Page 2 of 8
cut out his carpet – he advd it was fairly new and he didn’t ask for it to be
taken ou t”. (sic)
6. The Applicant organised the replacement of the carpet by P. He also
obtained a “Building Inspection Report” from B Consulting Engineers which
concluded as follows:
“From my investigation of the property, perusal of the documentation and
experience I have formed the following opinions:
The damaged were caused by:
In my opinion due to severe and unexpected very heavy storm, sudden built
up of storm water and penetrated to the bedrooms. The water went through
the frame of the sliding glass panel door to the room.” (sic)
7. The Applicant then sought payment of the following from the FSP:
$1,950 - cost of replacing the carpet; and
$1,485 - cost o f obtaining a builder’s report .
8. The FSP responded that it is liable only for the following amounts:
$967.03 – which is the amount it would have cost the FSP to replace
the carpet; and
$176 – which is the amount it would have cost the FSP to obtain a
builder’s report. The FSP noted that the report submitted by the
Applicant was prepared by a structural engineer and not a builder.
9. When the matter was referred to this Service, it was the subject of a
Recommendation. After carefully considering all of the material on the file,
the Case Manager recommended that the FSP was not obliged to reimburse
the Applicant $1950 for the replacement carpet, but was entitled to settle the
carpet damage in the amount of $967.03. The Case Manager also
recommended that the FSP was not obliged to reimburse the Applicant in
the sum of $1485 for the Building Inspection Report. She recommended that
it was fair and reasonable that the FSP reimburse the Applicant in the sum of
$371.25 being 25% of the cost of the Report.
10. The Applicant has not accepted this Recommendation. When rejecting the
Recommendation, he has been assisted by a submission drafted by a lawyer
and I am grateful for the assistance provided by that submission.
11. The submission responded, in part, to the statement in paragraph 23 of the
Recommendation relating to the Applicant’s decision to try to provide expert
evidence in support of his allegation that the carpet was not polluted. The
Recommendation listed the times by which the Applicant was to provide
such additional evidence.
12. The submission suggested that it was unreasonable for the Applicant to
have to spend more money in obtaining such a report, and also suggested
that, well after the event, it was unlikely that such a report would be of much
assistance.
Case No: 253338 Determination Page 3 of 8
13. The submission further reinforced the principal argument by the Applicant
that he disputed the need for the carpet to be cut up and replaced at all, and
considered that it should have been dried and re-laid.
14. The FSP has chosen not to respond to this submission.
Summary of Applicant’s p osition
15. With regard to the removal of the carpet, the Applicant says:
the FSP’s representative “wanted to cut the carpet” and he “strongly
opposed” the cutting of the carpet;
he informed the FSP’s representative that “rain water from the first floor
balcony has made the carpet wet, just dry them and I am happy with
that”; a nd
he was told “water is contaminated and carpet is damaged, and this is
our policy we have to cut it”.
16. With regard to the replacement of the carpet, he says:
the FSP informed him it will take two to three weeks to install the new
carpet;
that was not acceptable to him because his son and his wife were
arriving in three days from the United States of America;
he asked the FSP to install the carpet within three to four days, but this
was rejected by the FSP; and
he had no other choice but to organise the replacement of the carpet.
17. With regard to the cost of obtaining the report, the Applicant says the FSP
wanted him to get a builder to make a report and so he did, but the FSP now
refuses to pay in full the builder ’s fee for the report.
Summary of FSP’ s position
18. With regard to the replacement of the carpet, the FSP says that it obtained a
carpet replacement quote from C in the amount of only $967.03. It contends
that its liability “is the amount it would incur in the replacement of any item
lost or damage as a result of an insurable event”. The Applicant was
advised on 24 March 2011 that if he replaced the carpet he may not be
reimbursed in full. It notes that the invoices submitted by the Applicant
shows that the carpet was replaced on or around 23 March 2011. Thus, the
FSP “was never provided with the option of organising the replacement of
carpet”.
19. With regard to the cost of obtaining the report, the FSP says that the
Applicant did not supply a builder’s report as requested. Instead, he
submitted an eng ineer’s report. It asserts that a builder’s report would have
Case No: 253338 Determination Page 4 of 8
been sufficient and it is fair and reasonable that it incur a cost of what a
builder would have charged to inspect and report on the property.
20. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ Making a claim
…
What you must not do
…
do not carry out or authorise repairs without our consent unless you
contact us and need to make emergency repairs to protect your home
or contents
...
do not negotiate, pay or settle a claim with anyone else unless we
agree.
…
How to establish your loss
…
Things you must do
…
provide us with a quote for repair or replacement if we ask for this. If
you choose to use our recommended repairers (when available), there
is no need to obtain your own quotes
consult an expert if we ask for this.
…
How we settle your claim
We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to your home or contents,
we will decide if we will:
repair damage new for old or
replace home or contents new for old or
pay you what it would cost us to repair or replace your home or
contents new for old.
…
Contents claims
How contents claims are settled
If we agree to pay a claim for loss, theft or damage to your contents, we will
decide if we will:
repair damage new for old or
replace home or contents new for old or
Case No: 253338 Determination Page 5 of 8
pay you what it would cost us to repair or replace your contents new
for old.”
Issues
21. Whether the carpet was restorable and did not have to be removed.
22. Whether the FSP must reimburse the Applicant $1,950 for the amount he
paid to replace the carpet.
23. Whether the FSP must pay the Applicant $1,485 for the cost of obtaining the
“Building Inspection Report” from B.
Reasons for Decision
24. I am satisfied that in this matter there has been an adequate exchange of
material between the parties and that each has had the opportunity to
address the submissions raised by the other.
25. I am in substantial agreement with the Recommendation in this matter, a nd
many of the paragraphs above and below are reproduced from the
Recommendation.
26. N’s email report to the FSP dated 22 March 2011 reads:
“22/3/11: Attended to water damaged carpet in two bedrooms as a result of
drain overflow causing contaminated water to affect carpet. Carpet is not
restorable and removed. Equipment installed to commence drying.
Carpet Replacement Required : Yes
Reason: contaminated water
…
Estimated Completion Date: 22/03/2011”.
27. N sent another email to the FSP on 24 March 2011 stating:
“Addendum to report: cause of damage not drain overflow rather, ingress from
heavy rain entering room from outdoor balcony”.
28. The Applicant argues that the FSP wrongly assumed that the carpet was
contaminated by polluted water. He says he has kept the carpet removed by
N. The carpet is now dry and “like brand new”. He says he is “ready to put
the carpet to test to show there [are] no p[ol]luted materials inside [the]
carpet”.
$1,485 for the “Building Inspection Report”
29. I have examined the “Building Inspection Report” from B and note that the
report states that the “inspection was carried out by [name] consulting
engineer”.
Case No: 253338 Determination Page 6 of 8
30. The Tax Invoice states “(o)ur fees for the following engineering inspection
and services at [insured address]”.
31. Having read the file carefully, I do agree that in its discussions with the
Applicant, the FSP requested that the Applicant supply a report from a
builder. Nevertheless, I am unable to agree that $352 for two reports
represents a reasonable estimate of the costs likely to have been incurred
had the reports been prepared by a builder. Both parts of the property had to
be inspected, the damage within the properties had to be assessed and, in
all the circumstances, I think a reasonable allowance for two reports (bearing
in mind that only one inspection of the property was required), would be
$900 or $450 per report.
32. I appreciate that this will leave the Applicant considerably out of pocket.
However I consider that he should take up the matter with the provider of the
building inspection report, for in my opinion the sum which was charged,
appears to be vastly out of proportion to what might have been anticipated.
Replacement of the carpets
33. This is by far the most contentious matter. There is good sense in the FSP’s
proposition that it should only be obliged to pay the sum that it would have
expended, had it authorised and paid for the carpets from one of its
suppliers.
34. But this presupposes that the FSP was entitled to rely upon its assessor
“NR” who attended the property on 22 March 2011 and who, within two days,
commenced the removal of the carpet after it was cut.
35. It is plain that this was occurring despite the objection of the Applicant, who
maintains that there was no need for the carpet to be replaced. It was new,
and in his view (and he has experience as a builder, including in the outfitting
and refurbishing of domestic premises within the Public Service) once the
carpet had been dried, it could have been adequately restored and
continued to be used.
36. I must say that it is an unusual state of affairs when an Applicant is
challenging a decision to replace carpets!
37. Nevertheless, in the particular circumstances of the Applicant which, no
doubt were adequately expressed both to “NR” and to the FSP, his request
that the carpets be dried and re-laid was one which I consider should have
been very seriously considered.
38. Apparently “NR” advised the FSP that in their view the carpets would be
“contaminated”. Having regard to the method by which the water entered the
property, the Applicant strongly disputes this.
39. I must say that I have struggled to find any evidence of “contamination” and I
have also struggled to understand why a decision had to be made so quickly
that the carpets needed to be replaced.
Case No: 253338 Determination Page 7 of 8
40. No doubt, the matters troubling the Applicant, notably the imminent arrival of
relatives from overseas, who were expected to occupy the rooms in which
the carpet had been dampened, was a very major concern for him.
41. From the absence of any evidence that the carpets were actually
contaminated, I am of the view that the option of drying the carpets and
restoring them to their place in the properties should have been considered
and put to the Applicant.
42. As it stands at present, the Applicant is heavily out of pocket by reason of
the FSP’s decis ion to offer some $967.03 per property, as opposed to the
sum of $1,950 for one property, and $2,000 for the other property, which are
the sums actually paid by the Applicant.
43. There is one further comment which I should make in relation to the carpets.
I consider that if the possibility of drying and restoring the carpets to their
previous positions was not one which found favour with the FSP, the
Applicant should have been given the opportunity of considering his position,
and deciding whether he wished to proceed with the claim in respect to the
carpets.
44. Having said all of this, I am concerned by the fact that it is plain that indeed
the Applicant had ordered replacement carpets as early as 23 March 2011.
Whilst recognising that English is not apparently his first language, I should
have thought that it would be possible for him to have the quotations for the
new carpets submitted by email or fax to the FSP, so that it could give some
indication as to the acceptability of the quotes, or the differential between the
sum which the Applicant was contemplating paying, and the sum which the
FSP was likely to reimburse.
45. No doubt the Applicant was under considerable pressure at the time, but I do
think that he has proceeded in a high handed manner, and I cannot overlook
the fact that the invoice which he eventually provided for the carpets which
he had purchased was dated 23 March 2011. He did not immediately reveal
this to the FSP. Had the Applicant followed normal and accepted
procedures, he would have been aware that if he proceeded with the carpet
purchase at the prices quoted to him, he would be considerably out of
pocket.
Other Compensation
46. Paragraph 9.3b) of the Terms of Reference for this Service is in the following
form:
“9.3 Other compensation
...
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss
but only where:
Case No: 253338 Determination Page 8 of 8
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situatio n or interference with the Applicant’s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy rights - injury
has occurred to the Applicant’s feelings or humiliation has been suffered by
the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
...
“
47. I am concerned that the FSP has (through its agents) acted in a manner
which caused considerable inconvenience a nd upset to the Applicant. His
requests that his (almost new) carpet be dried and re-laid appear to have
been summarily rejected. His particular circumstances, with overseas guests
arriving, are not so unusual as to lead to a conclusion that the FSP could not
give sympathetic consideration to his requests. These matters, including the
question of proof of contamination in the carpet, have been put to the FSP
which has not provided any substantive reply. I consider that in the
circumstances a modest award under paragraph 9.3b)(i) is required.
Determination
48. On the basis of the available information and for the above reasons, I
determine that:
the FSP is not obliged to reimburse the Applicant $1,950 for the
replacement carpet. The FSP is entitled to settle the carpet damage
claim in the sum of $967.03;
the FSP is to pay to the Applicant the additional sum of $250 pursuant
to paragraph 9.3b)(i) of the Terms of Reference having regard to its
summary rejection of the possibility that the soaked carpet co uld have
been dried and re-laid; and
the FSP is not obliged to reimburse the Applicant $1,485 for the
Building Inspection Report. It is fair and reasonable that the FSP
reimburse the Applicant $450 of the fee paid for that report, together
with interest at the statutory rate from the date upon which the
Applicant has paid for the report until the date of settlement.