Home / Financial Firm (Unknown - Insurer) / Determination 253338

Determination 253338

Carpet replacement cost and fee for builder's inspection report after water entry

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$450
Non-financial loss$250
Amount claimed$3,435
SourceAFCA PDF

Summary

Rainwater entered and damaged two bedroom carpets. The insurer's assessor declared them contaminated and had them replaced, and the insured bought new carpets at higher cost. The ombudsman limited the carpet claim to the insurer's $967.03 settlement, ordered $450 of an inspection report fee with interest, and awarded $250 for the summary rejection of drying.

The insurer is only obliged to pay what it would have cost to replace the carpet, but its decision to replace without proven contamination or considering drying was unreasonable and warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 253338 Determination Page 1 of 8 Case number: 253338 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Claim Amount - Carpet Replacement - Expert Report 28 August 2012 Background 1. The Applicant holds a home contents insurance policy with the Financial Services Provider (FSP). The policy covered the Applicant’s residential home. 2. On 21 March 2011, the Applicant lodged a claim with the FSP who recorded the following claim description: “Insd advd that during heavy rain water has come through ceili ng and damaged carpet in 2 x bedrooms”. (sic) 3. On 22 March 2011, the FSP’s representative, N, attended the insured property. N determined that the “(c)arpet is not restorable” because of “contaminated water”. N removed the carpet and recommended the replacement of the carpet to the FSP. The determination by N that the carpet was not restorable, was contested by the Applicant. 4. On 23 March 2011, the Applicant informed the FSP that his relatives were arriving in two days and therefore the carpet needed to be replaced as soon as possible. 5. On 24 March 2011, the Applicant contacted the FSP who recorded the following claim notes: “RCVD call from [Applicant] ACTION: - insd wanting to know when we will be replacing carpet on this claim… - on this claim we have r ecieved [N’s] report which states carpet does need to be replaced – advd insrd that we actually need to get a builder to confirm the water entry point – he advd me that it has come through the balcony … advd insrd that i still need a builder to attend and give us report before we can confirm if covered – insrd not happy with this as he states that he is a builder and he knows where it has come from… - advd without a report we cant do anything as we need to determine coverage – he advd because he is a builde r he’l submit a report – advd insrd it can’t come from himself and needs to be another builder he doen’st no – insrd advd that he is going ahead and replce carpet anyway because … he has guests coming … - advd if that what he wants to do then that’s fine b ut we can’t guarentee we can reimburse the full cost if any until COD confirmed – insrd will still submit builders report though – insrd did also say he wasn’t happy [N] Determination Case No: 253338 Determination Page 2 of 8 cut out his carpet – he advd it was fairly new and he didn’t ask for it to be taken ou t”. (sic) 6. The Applicant organised the replacement of the carpet by P. He also obtained a “Building Inspection Report” from B Consulting Engineers which concluded as follows: “From my investigation of the property, perusal of the documentation and experience I have formed the following opinions: The damaged were caused by: In my opinion due to severe and unexpected very heavy storm, sudden built up of storm water and penetrated to the bedrooms. The water went through the frame of the sliding glass panel door to the room.” (sic) 7. The Applicant then sought payment of the following from the FSP:  $1,950 - cost of replacing the carpet; and  $1,485 - cost o f obtaining a builder’s report . 8. The FSP responded that it is liable only for the following amounts:  $967.03 – which is the amount it would have cost the FSP to replace the carpet; and  $176 – which is the amount it would have cost the FSP to obtain a builder’s report. The FSP noted that the report submitted by the Applicant was prepared by a structural engineer and not a builder. 9. When the matter was referred to this Service, it was the subject of a Recommendation. After carefully considering all of the material on the file, the Case Manager recommended that the FSP was not obliged to reimburse the Applicant $1950 for the replacement carpet, but was entitled to settle the carpet damage in the amount of $967.03. The Case Manager also recommended that the FSP was not obliged to reimburse the Applicant in the sum of $1485 for the Building Inspection Report. She recommended that it was fair and reasonable that the FSP reimburse the Applicant in the sum of $371.25 being 25% of the cost of the Report. 10. The Applicant has not accepted this Recommendation. When rejecting the Recommendation, he has been assisted by a submission drafted by a lawyer and I am grateful for the assistance provided by that submission. 11. The submission responded, in part, to the statement in paragraph 23 of the Recommendation relating to the Applicant’s decision to try to provide expert evidence in support of his allegation that the carpet was not polluted. The Recommendation listed the times by which the Applicant was to provide such additional evidence. 12. The submission suggested that it was unreasonable for the Applicant to have to spend more money in obtaining such a report, and also suggested that, well after the event, it was unlikely that such a report would be of much assistance. Case No: 253338 Determination Page 3 of 8 13. The submission further reinforced the principal argument by the Applicant that he disputed the need for the carpet to be cut up and replaced at all, and considered that it should have been dried and re-laid. 14. The FSP has chosen not to respond to this submission. Summary of Applicant’s p osition 15. With regard to the removal of the carpet, the Applicant says:  the FSP’s representative “wanted to cut the carpet” and he “strongly opposed” the cutting of the carpet;  he informed the FSP’s representative that “rain water from the first floor balcony has made the carpet wet, just dry them and I am happy with that”; a nd  he was told “water is contaminated and carpet is damaged, and this is our policy we have to cut it”. 16. With regard to the replacement of the carpet, he says:  the FSP informed him it will take two to three weeks to install the new carpet;  that was not acceptable to him because his son and his wife were arriving in three days from the United States of America;  he asked the FSP to install the carpet within three to four days, but this was rejected by the FSP; and  he had no other choice but to organise the replacement of the carpet. 17. With regard to the cost of obtaining the report, the Applicant says the FSP wanted him to get a builder to make a report and so he did, but the FSP now refuses to pay in full the builder ’s fee for the report. Summary of FSP’ s position 18. With regard to the replacement of the carpet, the FSP says that it obtained a carpet replacement quote from C in the amount of only $967.03. It contends that its liability “is the amount it would incur in the replacement of any item lost or damage as a result of an insurable event”. The Applicant was advised on 24 March 2011 that if he replaced the carpet he may not be reimbursed in full. It notes that the invoices submitted by the Applicant shows that the carpet was replaced on or around 23 March 2011. Thus, the FSP “was never provided with the option of organising the replacement of carpet”. 19. With regard to the cost of obtaining the report, the FSP says that the Applicant did not supply a builder’s report as requested. Instead, he submitted an eng ineer’s report. It asserts that a builder’s report would have Case No: 253338 Determination Page 4 of 8 been sufficient and it is fair and reasonable that it incur a cost of what a builder would have charged to inspect and report on the property. 20. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ Making a claim … What you must not do …  do not carry out or authorise repairs without our consent unless you contact us and need to make emergency repairs to protect your home or contents ...  do not negotiate, pay or settle a claim with anyone else unless we agree. … How to establish your loss … Things you must do …  provide us with a quote for repair or replacement if we ask for this. If you choose to use our recommended repairers (when available), there is no need to obtain your own quotes  consult an expert if we ask for this. … How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home or contents, we will decide if we will:  repair damage new for old or  replace home or contents new for old or  pay you what it would cost us to repair or replace your home or contents new for old. … Contents claims How contents claims are settled If we agree to pay a claim for loss, theft or damage to your contents, we will decide if we will:  repair damage new for old or  replace home or contents new for old or Case No: 253338 Determination Page 5 of 8  pay you what it would cost us to repair or replace your contents new for old.” Issues 21. Whether the carpet was restorable and did not have to be removed. 22. Whether the FSP must reimburse the Applicant $1,950 for the amount he paid to replace the carpet. 23. Whether the FSP must pay the Applicant $1,485 for the cost of obtaining the “Building Inspection Report” from B. Reasons for Decision 24. I am satisfied that in this matter there has been an adequate exchange of material between the parties and that each has had the opportunity to address the submissions raised by the other. 25. I am in substantial agreement with the Recommendation in this matter, a nd many of the paragraphs above and below are reproduced from the Recommendation. 26. N’s email report to the FSP dated 22 March 2011 reads: “22/3/11: Attended to water damaged carpet in two bedrooms as a result of drain overflow causing contaminated water to affect carpet. Carpet is not restorable and removed. Equipment installed to commence drying. Carpet Replacement Required : Yes Reason: contaminated water … Estimated Completion Date: 22/03/2011”. 27. N sent another email to the FSP on 24 March 2011 stating: “Addendum to report: cause of damage not drain overflow rather, ingress from heavy rain entering room from outdoor balcony”. 28. The Applicant argues that the FSP wrongly assumed that the carpet was contaminated by polluted water. He says he has kept the carpet removed by N. The carpet is now dry and “like brand new”. He says he is “ready to put the carpet to test to show there [are] no p[ol]luted materials inside [the] carpet”. $1,485 for the “Building Inspection Report” 29. I have examined the “Building Inspection Report” from B and note that the report states that the “inspection was carried out by [name] consulting engineer”. Case No: 253338 Determination Page 6 of 8 30. The Tax Invoice states “(o)ur fees for the following engineering inspection and services at [insured address]”. 31. Having read the file carefully, I do agree that in its discussions with the Applicant, the FSP requested that the Applicant supply a report from a builder. Nevertheless, I am unable to agree that $352 for two reports represents a reasonable estimate of the costs likely to have been incurred had the reports been prepared by a builder. Both parts of the property had to be inspected, the damage within the properties had to be assessed and, in all the circumstances, I think a reasonable allowance for two reports (bearing in mind that only one inspection of the property was required), would be $900 or $450 per report. 32. I appreciate that this will leave the Applicant considerably out of pocket. However I consider that he should take up the matter with the provider of the building inspection report, for in my opinion the sum which was charged, appears to be vastly out of proportion to what might have been anticipated. Replacement of the carpets 33. This is by far the most contentious matter. There is good sense in the FSP’s proposition that it should only be obliged to pay the sum that it would have expended, had it authorised and paid for the carpets from one of its suppliers. 34. But this presupposes that the FSP was entitled to rely upon its assessor “NR” who attended the property on 22 March 2011 and who, within two days, commenced the removal of the carpet after it was cut. 35. It is plain that this was occurring despite the objection of the Applicant, who maintains that there was no need for the carpet to be replaced. It was new, and in his view (and he has experience as a builder, including in the outfitting and refurbishing of domestic premises within the Public Service) once the carpet had been dried, it could have been adequately restored and continued to be used. 36. I must say that it is an unusual state of affairs when an Applicant is challenging a decision to replace carpets! 37. Nevertheless, in the particular circumstances of the Applicant which, no doubt were adequately expressed both to “NR” and to the FSP, his request that the carpets be dried and re-laid was one which I consider should have been very seriously considered. 38. Apparently “NR” advised the FSP that in their view the carpets would be “contaminated”. Having regard to the method by which the water entered the property, the Applicant strongly disputes this. 39. I must say that I have struggled to find any evidence of “contamination” and I have also struggled to understand why a decision had to be made so quickly that the carpets needed to be replaced. Case No: 253338 Determination Page 7 of 8 40. No doubt, the matters troubling the Applicant, notably the imminent arrival of relatives from overseas, who were expected to occupy the rooms in which the carpet had been dampened, was a very major concern for him. 41. From the absence of any evidence that the carpets were actually contaminated, I am of the view that the option of drying the carpets and restoring them to their place in the properties should have been considered and put to the Applicant. 42. As it stands at present, the Applicant is heavily out of pocket by reason of the FSP’s decis ion to offer some $967.03 per property, as opposed to the sum of $1,950 for one property, and $2,000 for the other property, which are the sums actually paid by the Applicant. 43. There is one further comment which I should make in relation to the carpets. I consider that if the possibility of drying and restoring the carpets to their previous positions was not one which found favour with the FSP, the Applicant should have been given the opportunity of considering his position, and deciding whether he wished to proceed with the claim in respect to the carpets. 44. Having said all of this, I am concerned by the fact that it is plain that indeed the Applicant had ordered replacement carpets as early as 23 March 2011. Whilst recognising that English is not apparently his first language, I should have thought that it would be possible for him to have the quotations for the new carpets submitted by email or fax to the FSP, so that it could give some indication as to the acceptability of the quotes, or the differential between the sum which the Applicant was contemplating paying, and the sum which the FSP was likely to reimburse. 45. No doubt the Applicant was under considerable pressure at the time, but I do think that he has proceeded in a high handed manner, and I cannot overlook the fact that the invoice which he eventually provided for the carpets which he had purchased was dated 23 March 2011. He did not immediately reveal this to the FSP. Had the Applicant followed normal and accepted procedures, he would have been aware that if he proceeded with the carpet purchase at the prices quoted to him, he would be considerably out of pocket. Other Compensation 46. Paragraph 9.3b) of the Terms of Reference for this Service is in the following form: “9.3 Other compensation ... b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: Case No: 253338 Determination Page 8 of 8 (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situatio n or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual’s privacy rights - injury has occurred to the Applicant’s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. ... “ 47. I am concerned that the FSP has (through its agents) acted in a manner which caused considerable inconvenience a nd upset to the Applicant. His requests that his (almost new) carpet be dried and re-laid appear to have been summarily rejected. His particular circumstances, with overseas guests arriving, are not so unusual as to lead to a conclusion that the FSP could not give sympathetic consideration to his requests. These matters, including the question of proof of contamination in the carpet, have been put to the FSP which has not provided any substantive reply. I consider that in the circumstances a modest award under paragraph 9.3b)(i) is required. Determination 48. On the basis of the available information and for the above reasons, I determine that:  the FSP is not obliged to reimburse the Applicant $1,950 for the replacement carpet. The FSP is entitled to settle the carpet damage claim in the sum of $967.03;  the FSP is to pay to the Applicant the additional sum of $250 pursuant to paragraph 9.3b)(i) of the Terms of Reference having regard to its summary rejection of the possibility that the soaked carpet co uld have been dried and re-laid; and  the FSP is not obliged to reimburse the Applicant $1,485 for the Building Inspection Report. It is fair and reasonable that the FSP reimburse the Applicant $450 of the fee paid for that report, together with interest at the statutory rate from the date upon which the Applicant has paid for the report until the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.