Home / Financial Firm (Unknown - Insurer) / Determination 253107
Determination 253107
Bushfire claim settlement: scope of works, pool liner exclusion and outstanding items
Summary
After a bushfire, the insured claimed $229,949.92 for building and contents damage, while the insurer had offered $101,650.92. The panel upheld the insurer's refusal of the pool liner, required further quotes and offers on several items, and ordered the $1,000 plants limit to be included, but declined interest.
The policy excludes damage from the moving or dislodging of pool liners unless caused by an insured event, and the onus lies on the insured to substantiate the remaining items with evidence.
Issues
- Claim amount dispute primary · upheld
“The FSP is to obtain an appropriate quote for the pool backwash pipe; The FSP is to include the policy limit of $1,000 for plants in the settlement”
- Claim denial secondary · not upheld
“The FSP was entitled to deny the claim for the swimming pool”
- Delay secondary · not upheld
“the Panel does not believe interest should be awarded”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claim
Text of the determination
Case No: 253107 Determination Page 1 of 11
Case number: 253107
General Insurance - Domestic Insurance - Home Building - FSP Decision –
claim amount
26 June 2012
Background
1. The Applicant and her husband incepted a home building and contents
insurance policy with the Financial Services Provider (FSP) on 9 November
2010.
2. On 8 February 2011 the Applicant lodged a claim under the policy. It was
reported the property sustained damage from a bushfire that occurred on 6
February 2011.
3. The FSP arranged for the damage to be assessed and obtained a scope of
works and quotes.
4. The Applicant contacted the Service on 16 August 2011 at which time she
advised her dispute related to the FSP not providing her with a complete
scope of works, copies of reports or quotes. The Applicant also advised no
work had commenced to repair the property. This matter was referred onto
the FSP to deal with.
5. On 6 September 2011, the FSP issued a letter following a review through its
internal dispute resolution procedures (IDR). The letter advised the FSP was
not accepting a claim for damage to a swimming pool liner on the ground the
damage was not caused by the fire. It was noted the pool liner was coming
away from the pool shell.
6. The Applicant is dissatisfied the FSP has not accepted the claim for the pool
liner.
7. Since lodging the dispute with the Service the Applicant has raised other
repair issues with the FSP but she does not accept the FSP has addressed
her concerns.
Summary of Applicant’s position
8. The Applicant initially said the FSP would not provide her with a complete
scope of works, copies of reports or quotes and those repairs had not
commenced.
Determination
Case No: 253107 Determination Page 2 of 11
9. She says the outcome sought is for the FSP to either commence repairs or
cash settle to cover repairs and replacement of damaged items.
10. In response to the FSP’ s letter dated 6 September 2011 the Applicant says
the FSP:
did not address her concerns;
did not give a clear timeframe when claim would be settled;
did not advise what was to be repaired or cash settled.
11. The Applicant says she is also concerned with the competency of the FSP’s
builder because they seemed incapable of completing quotes.
12. In regard to the pool liner, the Applicant says it was damaged by the fire.
She provided a photograph of this and a second photograph taken five
months later showing the subsequent dislodgement of the liner.
13. After receiving the FSP’s submission dated 16 November 2011 the Applicant
says she is still dissatisfied as the FSP did not address her concerns for the:
swimming pool;
fence;
scope of works.
14. The Applicant says to resolve her dispute she would like to be cash settled
and this would be for the amount of $101,650.92, already offered by the
FSP, plus an additional amount of $116,747 to cover the cost of those items
which are incomplete.
Summary of FSP’s position
15. Following a further exchange of information on 14 December 2011 as to the
Applicant’s concerns, the FSP responded on 21 March 2012. The FSP
apologised for the delay caused.
16. In its reply, the FSP noted there were numerous issues and has responded
to these individually.
Swimming pool
17. The FSP says its position has not changed on this matter.
Fence
18. It says it has settled the western boundary fence for half of the repair quote
of $16,850 as it is a boundary fence. It has already made payment of $8,425
to the Applicant for this fence.
Case No: 253107 Determination Page 3 of 11
The remaining fences on the property are yet to be settled but it will accept
the quote provided by CD&F. It says it will pay the Applicant a further
$14,162.
Scope of works
19. The FSP says it approached the builder for clarification. It responds as
follows:
Small chicken shed
This was damaged but was not included in the scope of works based on the
Applicant’s husband’s advice. It is prepared to settle on the amount of $769.
Pool backwash pipe
This was damaged by fire but was mistakenly not included in the scope of
works. The builder is to obtain a quote as the amount of $542 quoted by the
Applicant seems excessive.
Damaged brick paving near carport
Only 1m ² of paving was allowed for in the scope of works as this was all that
was damaged.
Right hand wall of carport
This was included in the scope of works but the Applicant says the carport
was underquoted and seeks settlement of $12,000. However, it says the
Applicant has not provided any evidence to show the amount quoted by the
builder is insufficient.
Garden wall melted plastic
The builder advised this item was not seen and cannot confirm if it was
damaged in the fire. It requests further evidence from the Applicant.
Pool brick paving
This was not damaged in the fire event.
Pool pump house painting
The scope of works only allowed for the repair of one wall as that was all that
was damaged.
Pool downpipe
This was included in the scope of works.
Case No: 253107 Determination Page 4 of 11
Garage wall and door
The builder believes this is the shared right hand wall of the carport. It has
already been included in the scope of works.
Brick paving and driveway cleaning
The builder confirmed the pavers claimed are the same pavers as those
claimed to be damaged and near the carport. The builder says the remaining
pavers may need to have a high pressure clean.
The builder confirms the driveway cleaning was included in the scope of
works.
Reticulation
This was included in the scope of works.
Air conditioner
Further assessment was required. The Applicant provided a quote for
$3,979. It will accept this quote and cash settle the Applicant for this amount.
Bore pump and controls
Further assessment is required for this item. The Applicant claims $1,200 but
no report or quote is available.
It asks the Applicant to submit a report and quote for this item for
consideration.
Water tank
The builder confirms the water tank did not require replacement as it was not
damaged by the fire event.
20. The FSP relies on the following policy provisions:
“ What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
…
wear and tear, rust, deterioration or corrosion,
…
the moving, shifting or dislodging of any swimming pool or spa and their
covers and liners, or any septic tank or other inground structure unless
caused by the insured events of earthquake or impact,”
Case No: 253107 Determination Page 5 of 11
Issue
21. Whether the FSP’s settlement fulfils its obligations under the terms and
conditions of the policy.
Reasons for decision
22. Due to the nature of the dispute, this matter has been referred to the Panel
for a Determination in line with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
23. The Panel consists of an Ombudsman, a representative with extensive
experience in insurance industry matters and a representative with extensive
experience in consumer claims.
24. The Panel will consider the material submitted by the parties but will not
recite the information in detail unless it is considered relevant to do so.
25. The Panel notes t he FSP’s initial response to the Service following the
Applicant’s lodgement of her dispute only addressed the issue in regard to
the pool liner. Since then other issues of concerns have been raised with
little resolution achieved.
26. The Panel notes the Appl icant replied to the FSP’s correspondence dated 21
March 2012. The Applicant says the FSP has again failed to understand
what she is querying and is not fully aware of the damage to the property.
27. The Applicant responded on 30 March 2012 by addressing the items that
were at issue. A copy of which was exchanged with the FSP.
28. The Applicant also advised that on reviewing her previous correspondence
she had not included in her calculations an additional amount of $10,552 for
the gazebo as it was underquoted or the $1,000 being the policy limit for
garden plants. The Applicant says her total claim is now $229,949.92.
29. The Applicant also requests that if the FSP is found to be at fault with the
delay of her claim that consideration is given to awarding interest.
30. In response to the matters raised in the Applicant’s email of 30 March 2012
the FSP advised that due to the deteriorating relationship between the
Applicant and its builder it wished to send a building consultant to attend the
property and go through the issues with the Applicant with the intention of
providing an updated scope of works.
31. However, the Applicant says she is not prepared to undertake this course of
action as she believes she had provided the FSP with all the available
information and does not wish to delay the matter further.
Case No: 253107 Determination Page 6 of 11
32. In an email dated 10 May 2012, the FSP advised the Service most of the
issues the Applicant raised were raised after the matter was referred to the
Service.
33. It nevertheless summarises its position on the issues as:
Pool not covered as previously advised;
It accepts the northern boundary fence is not a shared fence and will
increase its settlement of this to 100%;
The cost for the pool backwash pipe is $80;
Brick paving was included in scope of works as previously advised;
The Applicant claims the right hand wall of the carport is different to the
garage wall. The builder believed an inspection of this is required which
the Applicant has not agreed to;
The photographs provided by the Applicant for the garden wall plastic
do not establish what this claim is for;
The scope of works covered painting of one wall for the pool pump
house and the photographs provided by the Applicant are unclear as to
what further damage she is claiming;
The builder requests further information for the garage wall and door to
establish what the Applicant is claiming. The builder believes an
inspection of this is required;
The reticulation has been accepted;
In regard to the bore pump and controls it is unclear from the
Applicant’s correspondence as to what report and quote she is referring
to. It asks the Applicant to clearly identify the report and quote she is
referring to, in order to enable consideration;
It accepts the water tank does appear to have exterior damage as
indentified in the photographs. However, it is not established whether
the tank can be repaired or requires replacement. It would like the
opportunity to establish this;
The gazebo’s quote was based on the estimated size after on -site
discussions.
34. The Panel has been asked to make a determination but notes the parties
have provided very little in the way of substantiation as to the current
outstanding issues.
35. Nevertheless, the Panel will endeavour to address the outstanding issues
based on the presented materials.
36. The onus is on the Applicant to establish her loss under the policy. This will
include damage to property for which she believes the FSP is liable.
Case No: 253107 Determination Page 7 of 11
Pool liner
37. The Applicant is claiming for damage caused to the pool liner. She says the
dislodgement of the pool liner was the result of the fire and subsequent loss
of water through evaporation. The dislodgement of the liner occurred several
months after the initial damage was caused. The Applicant says had the
FSP assessed the policy at an earlier time it would have acknowledged that
the liner had suffered fire damage.
38. The FSP does not accept the pool liner has sustained fire damage. The FSP
says the damage was caused by events excluded by the policy.
39. The FSP says based on the findings of its assessor the damage was due to
incorrect use of non-stainless steel anchor points causing the anchor points
to rust, thus allowing the liner to come away from the shell.
40. The Applicant obtained a report 18 July 2011 in regard to the pool liner.
According to this report the damage to the liner was caused by the loss of
water through evaporation causing shrinkage of the liner and subsequent
pressure on the retaining strip, resulting in the strip pulling away from shell. It
was reported the loss of water can be attributed to fire, excessive heat and
failure to top up the water level. The Panel accepts excessive heat can also
include hot weather conditions.
41. However there is no evidence to establish the liner actually sustained fire
damage nor is there evidence to show as to what extent, if any, wate r
evaporation was caused by the fire.
42. The FSP’s expert “C” by email dated 25 July 2011 to the FSP stated:
“In reply to your email regarding Mrs Kingsley’s pool in Kelmscott. In my
opinion as stated in my report I do not believe the fire or heat from it was a
factor in the liner fixture movement. I also find it very hard to believe that heat
from the fire as stated caused such evaporation of the pool water, as the fire
never got close to the pool due to the surrounding paving. If this had been the
case the fire being so close would have made significant marking to the pool
surface and paving for the length of time it would take to evaporate the water
to an unsafe level. Therefore in my opinion the fire was not the primary cause
of the fixture movement.”
43. On the balance of probabilities, the Panel is satisfied damage to the pool
liner has been caused by an event excluded by the policy.
Fencing
44. Based on the available information the Panel concludes the issue with the
fencing has been resolved as the FSP has accepted the north boundary
fence is not a shared fence.
Case No: 253107 Determination Page 8 of 11
Pool backwash pipe
45. It is not disputed this is claim related. Neither party has provided a quote for
the pipe. The Applicant seeks $542 whereas the FSP has now indicated the
builder believes the cost would be $80 for this.
46. The Panel does not accept the amount of $80 sufficiently establishes the
FSP’s obligations to pay the cost of repairing the item. The Panel asks that it
obtain an appropriate quote on which its offer should be based.
Brick paving
47. The FSP says the replacement of brick paving has been included in the
scope of works. Whereas the Applicant now says she is claiming for the high
pressure cleaning of soot off the remaining brick paving.
48. In its correspondence dated 21 March 2012 the FSP indicated the brick
paving may need a low pressure clean and that the driveway was included in
the scope of works. The scope of works makes no specific mention of
cleaning.
49. The Panel believes the FSP should make a reasonable offer towards
pressure cleaning of the brick paving and driveway.
Pool pump house painting
50. The FSP says one wall was included in the scope of works. However the
Applicant is claiming for two walls. The FSP says the photographs provided
by the Applicant are unclear.
51. The photographs available to the Panel are of little value. An inspection by
the building consultant as sought by the FSP may have resolved this issue.
52. The Applicant will need to provide better information as to why the FSP is
obliged to paint two walls.
Carport wall, garage wall and door
53. According to the Applicant the carport wall and garage wall are two different
walls. The FSP’s builder believes the two walls are the same shared wall
and have been included in the scope of works.
54. The FSP says an inspection by the building consultant may have resolved
this issue. The FSP has asked the Applicant for further evidence to support
her cause.
55. The Panel does not have the benefit of any report as to whether the issue
relates to two walls or a shared wall. The Panel accepts the Applicant will
need to provide better evidence in support of this part of her claim.
Case No: 253107 Determination Page 9 of 11
Garden wall plastic
56. The Applicant is claiming $245 for melted garden wall plastic. The FSP has
asked for further information as to what this is about as the photograph is
unclear. The Panel does not have the benefit of a photograph.
57. The Panel notes the bui lder’s report with the FSP’s correspondence of 21
March 2012 in which it is indicated that a garden plastic wall was seen. It
was not included in the scope of works and this would need to be-inspected.
58. Due to conflicting information the Panel is not satisfied the Applicant has
substantiated this part of her claim.
Reticulation
59. The FSP says the reticulation has been accepted. The Applicant says the
builder has only allowed for 500 metres of poly pipe reticulation of the
driveway. The Applicant says a quote was provided. The Panel does not
have the benefit of having this quote.
60. The Panel has sighted the scope of works. It includes reticulation for the
driveway in addition to the 500 metres of poly pipe reticulation.
Bore pump and controls
61. The FSP says the Applicant has referred to a quote. It asks the Applicant to
clarify what report and quote she is referring to.
62. The Panel does not have the benefit of the quote the Applicant is referring
to. The Panel is not satisfied the Applicant has substantiated what she is
claiming for in this regard.
Water tank
63. The Panel notes the scope of works indicated that the tank liner required
replacement.
64. The FSP now accepts the exterior of the water tank has been damaged.
However it says it is unclear if the tank can be repaired or if it requires
replacement. This has not been quoted for.
65. The FSP says it will need to establish whether the tank requires
replacement. The Panel determines the FSP be given the opportunity to
establish whether the tank requires repair or replacement.
Gazebo
66. The Applicant did not raise this as an issue until her correspondence dated
30 March 2012. She says the gazebo has been underquoted. She says the
builder did not ask what the gazebo was like or its size. The FSP says the
builder advised the quote was based on the estimated size following an on-
site discussion.
Case No: 253107 Determination Page 10 of 11
67. The Panel does not have the benefit of what transpired between the
Applicant and the builder. Nevertheless the FSP has an obligation to settle
property in accordance with the terms and conditions of the policy which is to
pay the cost of rebuilding to the same size and standard.
68. The Scope of Works and quote already allow for the sourcing, supply and
installation of a 36 square metre “new timber framed gazebo with colorbond
roof, attempting to match existing”.
69. Accordingly the Panel requires the Applicant to provide the FSP with
reasonable proof that the size and standard of the gazebo described fails to
meet the size and/or standard of the original gazebo.
70. Upon receipt of any such proof the FSP is to review its gazebo allowance to
take into consideration the variations to ensure it fulfils its obligations under
the policy.
Plants
71. The Applicant has asked for payment of the policy limit of $1,000 for plants.
There is no indication the FSP has addressed this. The FSP is to include this
amount in the settlement if has not already done so.
Interest
72. The Applicant has asked for interest to be considered if it is found the FSP is
at fault for delaying her claim.
73. The FSP has not specifically addressed the issue regarding delay or interest.
The FSP did acknowledge there was a delay with it responding to the
Applicant’s comments of 14 December 2011. The FSP responded on 21
March 2012.
74. However the Panel notes the FSP has indicated that many of the concerns
raised by the Applicant were not done so until after her contact with the
Service on 16 August 2011.
75. The Panel has considered the material that has been made available. The
Panel is of the opinion both parties have attributed to the prolonged process
of this claim. Hence, the Panel does not believe interest should be awarded.
Determination
76. On the basis of the available information the Panel determines:
The FSP was entitled to deny the claim for the swimming pool;
The FSP is to obtain an appropriate quote for the pool backwash pipe;
The FSP to make a reasonable offer towards cleaning of the brick
paving and driveway;
Case No: 253107 Determination Page 11 of 11
The FSP be given the opportunity to establish whether the tank
requires replacement to enable consideration for settlement;
The FSP is to include the policy limit of $1,000 for plants in the
settlement if has not already done so.
77. In regard to the other items raised by the Applicant, the Applicant is to
substantiate her loss to enable further consideration by the FSP.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.