Determination 253107

Bushfire claim settlement: scope of works, pool liner exclusion and outstanding items

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,000
Non-financial loss—
Amount claimed$229,950
SourceAFCA PDF

Summary

After a bushfire, the insured claimed $229,949.92 for building and contents damage, while the insurer had offered $101,650.92. The panel upheld the insurer's refusal of the pool liner, required further quotes and offers on several items, and ordered the $1,000 plants limit to be included, but declined interest.

The policy excludes damage from the moving or dislodging of pool liners unless caused by an insured event, and the onus lies on the insured to substantiate the remaining items with evidence.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 253107 Determination Page 1 of 11 Case number: 253107 General Insurance - Domestic Insurance - Home Building - FSP Decision – claim amount 26 June 2012 Background 1. The Applicant and her husband incepted a home building and contents insurance policy with the Financial Services Provider (FSP) on 9 November 2010. 2. On 8 February 2011 the Applicant lodged a claim under the policy. It was reported the property sustained damage from a bushfire that occurred on 6 February 2011. 3. The FSP arranged for the damage to be assessed and obtained a scope of works and quotes. 4. The Applicant contacted the Service on 16 August 2011 at which time she advised her dispute related to the FSP not providing her with a complete scope of works, copies of reports or quotes. The Applicant also advised no work had commenced to repair the property. This matter was referred onto the FSP to deal with. 5. On 6 September 2011, the FSP issued a letter following a review through its internal dispute resolution procedures (IDR). The letter advised the FSP was not accepting a claim for damage to a swimming pool liner on the ground the damage was not caused by the fire. It was noted the pool liner was coming away from the pool shell. 6. The Applicant is dissatisfied the FSP has not accepted the claim for the pool liner. 7. Since lodging the dispute with the Service the Applicant has raised other repair issues with the FSP but she does not accept the FSP has addressed her concerns. Summary of Applicant’s position 8. The Applicant initially said the FSP would not provide her with a complete scope of works, copies of reports or quotes and those repairs had not commenced. Determination Case No: 253107 Determination Page 2 of 11 9. She says the outcome sought is for the FSP to either commence repairs or cash settle to cover repairs and replacement of damaged items. 10. In response to the FSP’ s letter dated 6 September 2011 the Applicant says the FSP:  did not address her concerns;  did not give a clear timeframe when claim would be settled;  did not advise what was to be repaired or cash settled. 11. The Applicant says she is also concerned with the competency of the FSP’s builder because they seemed incapable of completing quotes. 12. In regard to the pool liner, the Applicant says it was damaged by the fire. She provided a photograph of this and a second photograph taken five months later showing the subsequent dislodgement of the liner. 13. After receiving the FSP’s submission dated 16 November 2011 the Applicant says she is still dissatisfied as the FSP did not address her concerns for the:  swimming pool;  fence;  scope of works. 14. The Applicant says to resolve her dispute she would like to be cash settled and this would be for the amount of $101,650.92, already offered by the FSP, plus an additional amount of $116,747 to cover the cost of those items which are incomplete. Summary of FSP’s position 15. Following a further exchange of information on 14 December 2011 as to the Applicant’s concerns, the FSP responded on 21 March 2012. The FSP apologised for the delay caused. 16. In its reply, the FSP noted there were numerous issues and has responded to these individually. Swimming pool 17. The FSP says its position has not changed on this matter. Fence 18. It says it has settled the western boundary fence for half of the repair quote of $16,850 as it is a boundary fence. It has already made payment of $8,425 to the Applicant for this fence. Case No: 253107 Determination Page 3 of 11 The remaining fences on the property are yet to be settled but it will accept the quote provided by CD&F. It says it will pay the Applicant a further $14,162. Scope of works 19. The FSP says it approached the builder for clarification. It responds as follows: Small chicken shed This was damaged but was not included in the scope of works based on the Applicant’s husband’s advice. It is prepared to settle on the amount of $769. Pool backwash pipe This was damaged by fire but was mistakenly not included in the scope of works. The builder is to obtain a quote as the amount of $542 quoted by the Applicant seems excessive. Damaged brick paving near carport Only 1m ² of paving was allowed for in the scope of works as this was all that was damaged. Right hand wall of carport This was included in the scope of works but the Applicant says the carport was underquoted and seeks settlement of $12,000. However, it says the Applicant has not provided any evidence to show the amount quoted by the builder is insufficient. Garden wall melted plastic The builder advised this item was not seen and cannot confirm if it was damaged in the fire. It requests further evidence from the Applicant. Pool brick paving This was not damaged in the fire event. Pool pump house painting The scope of works only allowed for the repair of one wall as that was all that was damaged. Pool downpipe This was included in the scope of works. Case No: 253107 Determination Page 4 of 11 Garage wall and door The builder believes this is the shared right hand wall of the carport. It has already been included in the scope of works. Brick paving and driveway cleaning The builder confirmed the pavers claimed are the same pavers as those claimed to be damaged and near the carport. The builder says the remaining pavers may need to have a high pressure clean. The builder confirms the driveway cleaning was included in the scope of works. Reticulation This was included in the scope of works. Air conditioner Further assessment was required. The Applicant provided a quote for $3,979. It will accept this quote and cash settle the Applicant for this amount. Bore pump and controls Further assessment is required for this item. The Applicant claims $1,200 but no report or quote is available. It asks the Applicant to submit a report and quote for this item for consideration. Water tank The builder confirms the water tank did not require replacement as it was not damaged by the fire event. 20. The FSP relies on the following policy provisions: “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: … wear and tear, rust, deterioration or corrosion, … the moving, shifting or dislodging of any swimming pool or spa and their covers and liners, or any septic tank or other inground structure unless caused by the insured events of earthquake or impact,” Case No: 253107 Determination Page 5 of 11 Issue 21. Whether the FSP’s settlement fulfils its obligations under the terms and conditions of the policy. Reasons for decision 22. Due to the nature of the dispute, this matter has been referred to the Panel for a Determination in line with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 23. The Panel consists of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 24. The Panel will consider the material submitted by the parties but will not recite the information in detail unless it is considered relevant to do so. 25. The Panel notes t he FSP’s initial response to the Service following the Applicant’s lodgement of her dispute only addressed the issue in regard to the pool liner. Since then other issues of concerns have been raised with little resolution achieved. 26. The Panel notes the Appl icant replied to the FSP’s correspondence dated 21 March 2012. The Applicant says the FSP has again failed to understand what she is querying and is not fully aware of the damage to the property. 27. The Applicant responded on 30 March 2012 by addressing the items that were at issue. A copy of which was exchanged with the FSP. 28. The Applicant also advised that on reviewing her previous correspondence she had not included in her calculations an additional amount of $10,552 for the gazebo as it was underquoted or the $1,000 being the policy limit for garden plants. The Applicant says her total claim is now $229,949.92. 29. The Applicant also requests that if the FSP is found to be at fault with the delay of her claim that consideration is given to awarding interest. 30. In response to the matters raised in the Applicant’s email of 30 March 2012 the FSP advised that due to the deteriorating relationship between the Applicant and its builder it wished to send a building consultant to attend the property and go through the issues with the Applicant with the intention of providing an updated scope of works. 31. However, the Applicant says she is not prepared to undertake this course of action as she believes she had provided the FSP with all the available information and does not wish to delay the matter further. Case No: 253107 Determination Page 6 of 11 32. In an email dated 10 May 2012, the FSP advised the Service most of the issues the Applicant raised were raised after the matter was referred to the Service. 33. It nevertheless summarises its position on the issues as:  Pool not covered as previously advised;  It accepts the northern boundary fence is not a shared fence and will increase its settlement of this to 100%;  The cost for the pool backwash pipe is $80;  Brick paving was included in scope of works as previously advised;  The Applicant claims the right hand wall of the carport is different to the garage wall. The builder believed an inspection of this is required which the Applicant has not agreed to;  The photographs provided by the Applicant for the garden wall plastic do not establish what this claim is for;  The scope of works covered painting of one wall for the pool pump house and the photographs provided by the Applicant are unclear as to what further damage she is claiming;  The builder requests further information for the garage wall and door to establish what the Applicant is claiming. The builder believes an inspection of this is required;  The reticulation has been accepted;  In regard to the bore pump and controls it is unclear from the Applicant’s correspondence as to what report and quote she is referring to. It asks the Applicant to clearly identify the report and quote she is referring to, in order to enable consideration;  It accepts the water tank does appear to have exterior damage as indentified in the photographs. However, it is not established whether the tank can be repaired or requires replacement. It would like the opportunity to establish this;  The gazebo’s quote was based on the estimated size after on -site discussions. 34. The Panel has been asked to make a determination but notes the parties have provided very little in the way of substantiation as to the current outstanding issues. 35. Nevertheless, the Panel will endeavour to address the outstanding issues based on the presented materials. 36. The onus is on the Applicant to establish her loss under the policy. This will include damage to property for which she believes the FSP is liable. Case No: 253107 Determination Page 7 of 11 Pool liner 37. The Applicant is claiming for damage caused to the pool liner. She says the dislodgement of the pool liner was the result of the fire and subsequent loss of water through evaporation. The dislodgement of the liner occurred several months after the initial damage was caused. The Applicant says had the FSP assessed the policy at an earlier time it would have acknowledged that the liner had suffered fire damage. 38. The FSP does not accept the pool liner has sustained fire damage. The FSP says the damage was caused by events excluded by the policy. 39. The FSP says based on the findings of its assessor the damage was due to incorrect use of non-stainless steel anchor points causing the anchor points to rust, thus allowing the liner to come away from the shell. 40. The Applicant obtained a report 18 July 2011 in regard to the pool liner. According to this report the damage to the liner was caused by the loss of water through evaporation causing shrinkage of the liner and subsequent pressure on the retaining strip, resulting in the strip pulling away from shell. It was reported the loss of water can be attributed to fire, excessive heat and failure to top up the water level. The Panel accepts excessive heat can also include hot weather conditions. 41. However there is no evidence to establish the liner actually sustained fire damage nor is there evidence to show as to what extent, if any, wate r evaporation was caused by the fire. 42. The FSP’s expert “C” by email dated 25 July 2011 to the FSP stated: “In reply to your email regarding Mrs Kingsley’s pool in Kelmscott. In my opinion as stated in my report I do not believe the fire or heat from it was a factor in the liner fixture movement. I also find it very hard to believe that heat from the fire as stated caused such evaporation of the pool water, as the fire never got close to the pool due to the surrounding paving. If this had been the case the fire being so close would have made significant marking to the pool surface and paving for the length of time it would take to evaporate the water to an unsafe level. Therefore in my opinion the fire was not the primary cause of the fixture movement.” 43. On the balance of probabilities, the Panel is satisfied damage to the pool liner has been caused by an event excluded by the policy. Fencing 44. Based on the available information the Panel concludes the issue with the fencing has been resolved as the FSP has accepted the north boundary fence is not a shared fence. Case No: 253107 Determination Page 8 of 11 Pool backwash pipe 45. It is not disputed this is claim related. Neither party has provided a quote for the pipe. The Applicant seeks $542 whereas the FSP has now indicated the builder believes the cost would be $80 for this. 46. The Panel does not accept the amount of $80 sufficiently establishes the FSP’s obligations to pay the cost of repairing the item. The Panel asks that it obtain an appropriate quote on which its offer should be based. Brick paving 47. The FSP says the replacement of brick paving has been included in the scope of works. Whereas the Applicant now says she is claiming for the high pressure cleaning of soot off the remaining brick paving. 48. In its correspondence dated 21 March 2012 the FSP indicated the brick paving may need a low pressure clean and that the driveway was included in the scope of works. The scope of works makes no specific mention of cleaning. 49. The Panel believes the FSP should make a reasonable offer towards pressure cleaning of the brick paving and driveway. Pool pump house painting 50. The FSP says one wall was included in the scope of works. However the Applicant is claiming for two walls. The FSP says the photographs provided by the Applicant are unclear. 51. The photographs available to the Panel are of little value. An inspection by the building consultant as sought by the FSP may have resolved this issue. 52. The Applicant will need to provide better information as to why the FSP is obliged to paint two walls. Carport wall, garage wall and door 53. According to the Applicant the carport wall and garage wall are two different walls. The FSP’s builder believes the two walls are the same shared wall and have been included in the scope of works. 54. The FSP says an inspection by the building consultant may have resolved this issue. The FSP has asked the Applicant for further evidence to support her cause. 55. The Panel does not have the benefit of any report as to whether the issue relates to two walls or a shared wall. The Panel accepts the Applicant will need to provide better evidence in support of this part of her claim. Case No: 253107 Determination Page 9 of 11 Garden wall plastic 56. The Applicant is claiming $245 for melted garden wall plastic. The FSP has asked for further information as to what this is about as the photograph is unclear. The Panel does not have the benefit of a photograph. 57. The Panel notes the bui lder’s report with the FSP’s correspondence of 21 March 2012 in which it is indicated that a garden plastic wall was seen. It was not included in the scope of works and this would need to be-inspected. 58. Due to conflicting information the Panel is not satisfied the Applicant has substantiated this part of her claim. Reticulation 59. The FSP says the reticulation has been accepted. The Applicant says the builder has only allowed for 500 metres of poly pipe reticulation of the driveway. The Applicant says a quote was provided. The Panel does not have the benefit of having this quote. 60. The Panel has sighted the scope of works. It includes reticulation for the driveway in addition to the 500 metres of poly pipe reticulation. Bore pump and controls 61. The FSP says the Applicant has referred to a quote. It asks the Applicant to clarify what report and quote she is referring to. 62. The Panel does not have the benefit of the quote the Applicant is referring to. The Panel is not satisfied the Applicant has substantiated what she is claiming for in this regard. Water tank 63. The Panel notes the scope of works indicated that the tank liner required replacement. 64. The FSP now accepts the exterior of the water tank has been damaged. However it says it is unclear if the tank can be repaired or if it requires replacement. This has not been quoted for. 65. The FSP says it will need to establish whether the tank requires replacement. The Panel determines the FSP be given the opportunity to establish whether the tank requires repair or replacement. Gazebo 66. The Applicant did not raise this as an issue until her correspondence dated 30 March 2012. She says the gazebo has been underquoted. She says the builder did not ask what the gazebo was like or its size. The FSP says the builder advised the quote was based on the estimated size following an on- site discussion. Case No: 253107 Determination Page 10 of 11 67. The Panel does not have the benefit of what transpired between the Applicant and the builder. Nevertheless the FSP has an obligation to settle property in accordance with the terms and conditions of the policy which is to pay the cost of rebuilding to the same size and standard. 68. The Scope of Works and quote already allow for the sourcing, supply and installation of a 36 square metre “new timber framed gazebo with colorbond roof, attempting to match existing”. 69. Accordingly the Panel requires the Applicant to provide the FSP with reasonable proof that the size and standard of the gazebo described fails to meet the size and/or standard of the original gazebo. 70. Upon receipt of any such proof the FSP is to review its gazebo allowance to take into consideration the variations to ensure it fulfils its obligations under the policy. Plants 71. The Applicant has asked for payment of the policy limit of $1,000 for plants. There is no indication the FSP has addressed this. The FSP is to include this amount in the settlement if has not already done so. Interest 72. The Applicant has asked for interest to be considered if it is found the FSP is at fault for delaying her claim. 73. The FSP has not specifically addressed the issue regarding delay or interest. The FSP did acknowledge there was a delay with it responding to the Applicant’s comments of 14 December 2011. The FSP responded on 21 March 2012. 74. However the Panel notes the FSP has indicated that many of the concerns raised by the Applicant were not done so until after her contact with the Service on 16 August 2011. 75. The Panel has considered the material that has been made available. The Panel is of the opinion both parties have attributed to the prolonged process of this claim. Hence, the Panel does not believe interest should be awarded. Determination 76. On the basis of the available information the Panel determines:  The FSP was entitled to deny the claim for the swimming pool;  The FSP is to obtain an appropriate quote for the pool backwash pipe;  The FSP to make a reasonable offer towards cleaning of the brick paving and driveway; Case No: 253107 Determination Page 11 of 11  The FSP be given the opportunity to establish whether the tank requires replacement to enable consideration for settlement;  The FSP is to include the policy limit of $1,000 for plants in the settlement if has not already done so. 77. In regard to the other items raised by the Applicant, the Applicant is to substantiate her loss to enable further consideration by the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.