Home / Financial Firm (Unknown - Insurer) / Determination 252949
Determination 252949
Denial of home and contents water damage claim (flood exclusion)
Summary
The applicants' home and contents were damaged when stormwater drains overflowed on 11 January 2011. AFCA found the water that initially inundated the home was flood, which is excluded, and that no temporary accommodation was payable.
On the balance of probabilities the inundating water was backflow from the Brisbane River, which is flood as defined and excluded without the optional flood cover.
Issues
- Claim denial primary · not upheld“the Panel determines that the FSP is not required to indemnify the Applicants for the damage to their home and contents.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 252949 Determination Page 1 of 10
Case number: 252949
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
30 April 2012
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP), which they arranged through their broker.
2. After their home was inundated with water on 11 January 2011, they lodged
a claim with the FSP for the resultant damage.
3. The FSP denied the damage on the basis that it was caused by flood, which
is excluded under the policy.
4. A review of the claim at the request of the Applicants resulted in the FSP
maintaining its decision to deny liability for the damage.
5. The Applicants are represented and for convenience, throughout this
Determination the Applicants and their representative will be referred to as
the Applicants.
Summary of Applicants ’ position
6. On the evening of 11 January 2011, following extensive rain, water came
gushing up through the stormwater drains that are located in front of the
house, and across the road.
7. The water kept flowing from these drains, and quickly inundated the ground
floor of their home.
8. The Applicants say that this water could only have been stormwater, as by
that stage the river had not risen to the extent that it could have been
responsible for the inundation.
9. They have provided six Statutory Declarations from eye -witnesses to the 11
January 2011, event (including one from the male Applicant) all of which
attest to the source of the water and the speed at which it rose.
10. The Applicants say that from the outset, the FSP has ignored these
eye-witness accounts of the event.
Determination
Case No: 252949 Determination Page 2 of 10
11. The FSP has the onus to prove that the water that initially inundated their
home was flood, and they have failed to do so
12. They concede, however, that the subsequent inundation of the second level
of their home was caused some time later by flood water from the river, after
considerable damage had already been caused to their home and contents
by the stormwater.
13. They say that the FSP should accept their claim for the damage to the
ground floor of their home, and for temporary accommodation costs.
Summary of FSP’s position
14. The FSP says that the evidence it has available indicates that the water
which inundated the Applicants‟ home was flood water.
15. That flood water made its way from the Brisbane River, via the Arboretum to
the north of their property, through the piped stormwater system.
16. The rain that fell around the time of the initial inundation was insufficient to
cause stormwater runoff.
17. The FSP relies on the following policy provisions:
“ Words with special meanings
Wherever the following words or terms are used in the Policy, they mean what
is set out below
Word or Term Meaning
...
Flood The inundation of normally dry land by
water escaping from any watercourse,
lake, canal, dam or reservoir.
...
Section 2: Cover for your home and contents – Insured events
What you are insured against, and what you are NOT
You are insured for loss or damage to your home, contents or both, caused
directly by any of the „insured events‟ set out in the left column of the following
table except to the extent indicated in the right column of the table...
Ther e are some limits and exclusions described under „How we will pay‟ and
„When you are not covered‟, which you must read.
You are insured against loss or
damage caused directly by the
following insured events
But not
...
Case No: 252949 Determination Page 3 of 10
(b) Storm (including cyclone or
hurricane) and/or rain, which may
be accompanied by snow, sleet
or hail.
Loss or damage caused by:
Flood (unless this optional benefit
has been selected) „flood‟ means
the inundation of normally dry land
by water escaping from any
watercourse, lake, dam, c anal or
reservoir.
...
Options you can choose for additional premium
The following options may be obtained on application, and for an additional
premium:
...
3. Flood
If you have chosen cover for this option it will be shown on your Policy
Schedule. You must have paid any applicable additional premium. We will
cover loss or damage caused by flood to your home, contents or both
depending on the cover you have chosen,
„Flood‟ means the inundation of normally dry land by water escaping from any
watercourse, lake, dam, canal or reservoir.
...
When you are not covered
...
Additional exclusions applying to the Policy
These additional exclusions apply to cover for your home, contents, additional
benefits and „Options you can choose for an additional premium‟.
The Policy does not cover:
...
(e) flood, (unless your Policy Schedule confirms that you have chosen
optional flood cover and paid any additional premium we require). ”
Issue
18. Whether the initial inundation to the Applicants‟ home was caused by flood,
or by stormwater.
Reasons for decision
19. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
Case No: 252949 Determination Page 4 of 10
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
21. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
22. The Panel notes that the following matters are not in dispute:
That water came out of the stormwater drains nearby to the Applicants‟
property on the evening of 11 January 2011
That t he Applicants‟ home and contents were damaged by water.
That flood water eventually inundated the Applicants‟ property.
That damage caused by flood is not covered under the policy, unless
the flood optional cover has been selected and applicable additional
premium paid.
That the Applicants did not select and pay for the optional flood cover
under their policy.
23. The central issue in this dispute is whether the water which gushed up
through the nearby stormwater drains was stormwater runoff, or „flood‟ as
defined under the policy.
24. It is a principle of general insurance law that an insured bears the onus to
establish that, on the face of the facts, they have suffered a loss caused by
an event to which their policy responds. Once so established, the onus
shifts to the insurer to prove that a policy exclusion applies.
Cause of Inundation
Immediate Source of Inundating Water
25. The Panel notes that the Statutory Declarations put forward by the
Applicants from eye-witnesses to the event are consistent in stating that at
between 7:30pm to 8pm on 11 January 2011, water overflowed from the
stormwater drains located on both sides the road in front of the Applicants‟
home.
26. It is also noted that these elements of the Applicants‟ position are not
disputed by the FSP; it agrees that water flowed from the stormwater drains,
and accepts the Applicants‟ advice that this commenced at approximately
8:30pm on 11 January 2011.
27. The Panel accepts that, on the face of the facts, the Applicants have
established that they have suffered a loss caused by stormwater, an event to
which their policy responds.
Case No: 252949 Determination Page 5 of 10
28. The FSP must therefore prove that an exclusion (in this case „flood‟) applies
if it seeks to deny the Applicants‟ claim.
Flood
29. The FSP has provided a copy of a report titled „Flooding in the Brisbane
River Catchment – January 2011‟ (the Area Hydrology Report),
commissioned by the Insurance Council of Australia and jointly produced by
three established hydrology firm.
30. The FSP has also submitted a report by hydrology firm „W‟, produced after a
site inspection of the Applicants‟ property on 8 November 2011, which it says
shows that the water which flowed up out of the stormwater drains, and
inundated the Applicants‟ home, was flood water from the Brisbane River.
31. The Panel notes that the repor t by „W‟ states the following:
“Figure 2 shows recorded water levels upstream and downstream of
Sherwood, as well as an interpolated water level in the vicinity of the subject
property where the Brisbane River reached a peak level of about 10.4 mAHD
(based on the Brisbane City Council Floodwise Report for the property). From
Figure 2, it is estimated that Brisbane River water levels would have reached
the ground level of J Street in front of the subject property (5.8 mAHD) at
about 1830 hours on 11 January.
Information from the residents of J Street indicates that water was observed
overflowing from drains in and adjacent to J Street at about 1930 hours on 11
January. By this time rainfall had ceased and Brisbane River water levels in
the area were higher than the level of J Street. Hence, the water observed
overflowing from the drains at this time was floodwater backflowing from the
Brisbane River.
Brisbane River water levels would have reached the floor level of the garage
at about 2100 hours. This matches very well with the observed time of initial
inundation provided by the insured. The insured also indicated that the water
level was about 1 m above the lower floor level (an estimated water level of
about 7.2 mAHD) at 2330 hours on 11 January, which is close to the Brisbane
River level at this time estimated from the interpolated Brisbane River water
level hydrograph (about 7.0 mAHD).”
32. The Applicants has challenged findings of the report by „W‟, saying that there
are no river level gauges located at Sherwood and the report is based on
assumptions and speculation.
33. They say that the placement of the interpolated water level, as shown on the
graph included in the report by „W‟, is inaccurate considering the relative
distances between the location of their property, and the two river level
gauge recordings used as reference.
34. They assert that the interpolated line‟s erroneous placement on the graph
conveniently supports the FSP‟s hypothesis that flood caused the initial
inundation.
Case No: 252949 Determination Page 6 of 10
35. The author of the „W‟ report („DN‟) has clarified that the Applicants‟ belief that
the interpolated line is inaccurately placed on the graph, is based on their
own incorrect assumption about the location of the upstream river level
gauge. „DN‟ has confirmed that the location of the g auge used is in fact 2.3
km further upstream from the location asserted by the Applicants.
36. In addition, „DN‟ has clarified that the variation in water level between
upstream and downstream water levels is not linear, as the Applicants may
have assumed, and the interpolation accounts for non-linearity of the flood
profile. „DN‟ has stated that the interpolation factor has been selected to
match the recorded peak water level in the vicinity of the Applicants‟ home,
as documented by Brisbane City Council.
37. The Panel acknowledges the Applicants‟ point with respect to the lack of
river level gauges located at their suburb, noting that this is true of most
suburbs along the course of the Brisbane River and its tributaries.
38. Nevertheless, the Panel accepts that „W‟ is an established hydrology
company, and that the report represents an „expert opinion‟ regarding the
river height at the Applicants‟ location.
39. The Panel also notes that although the Applicants have disputed certain
aspects of the „W‟ report with respe ct to the river levels at the time of the
inundation event, they have not provided any expert evidence to refute the
statements in the report.
40. After reviewing the submissions from both parties, the Panel is convinced
that the level of the Brisbane River at the location near to the Applicants‟
home was reasonably consistent with the height of the water which caused
the inundation.
41. This, in the Panel‟s view, indicates that the Applicants‟ assertion (that the
river levels at the time of the inundation were not high enough to be capable
of being responsible for the inundation) is not supported by the technical
data.
Mechanism for Delivery of Flood Water
42. The FSP has stated that water from the Brisbane River backflowed to the
stormwater drains nearby to the Appl icants‟ home through the stormwater
infrastructure.
43. The Applicants have rejected the FSP‟s position on this, saying that the
stormwater pipes that connect to the drains in front of their property actually
terminate in J Street, and are not connected to the Brisbane River, and they
have provided a copy of a plan showing the drainage system for the area to
support their view.
44. The FSP has further submitted that the Applicants ‟ interpretation of the plan
is incorrect, and that the plan clearly shows that rather than terminating in J
Case No: 252949 Determination Page 7 of 10
Street, the stormwater pipes extend 20m further north and discharge into the
Sherwood Arboretum wetland.
45. A site inspection was conducted by the Panel Chair Ombudsman on 27
March 2012. The male Applicant, their representative and the FSP‟s
representative were present.
46. The Applicants‟ property is at the low point or sag in „J‟ street and there are a
number of large stormwater drains at the front of the property. The drains
appear to drain out onto the Sherwood Arboretum wetlands. The wetlands
drain out to the Brisbane River.
47. The Applicants believe they were initially inundated late on 11 January 2011,
by water escaping the stormwater drains. The Applicant maintain at this time
there was heavy rainfall consistent with stormwater runoff. P hotographs of
the damage and original level of the house were provided.
48. Having conducted the site inspection it is difficult for the Panel to accept that
a stormwater system would be designed to terminate at J Street. The drains
appear to drain into the wetland area, and in turn the Brisbane River.
49. The Panel accepts that the stormwater pipes which run under the streets of
the Applicants‟ suburb discharge into the Sherwood Arboretum wetlands to
the north.
50. The Panel has also considered a topographic map of the area around the
Applicants‟ property, and the statement by „DN‟ regarding the behaviour of
water in the area when the river level rises.
51. Based on the evidence provided, the Panel is satisfied that once the river
reaches a height of about 5.5 mAHD, river water flows in to the wetland
nearby to the Applicants‟ home, and backs up through the stormwater pipes
(which normally serve to discharge stormwater into the wetland) to overflow
into J Street.
Rainfall and Storm water
52. The Panel notes that only one of the Statutory Declarations made any
mention of rainfall in the lead up to or during the overflow of water from the
stormwater drains.
53. The Statutory Declaration by „LHDG‟, commences with the following:
„Following the continuation of excessive rain...‟
54. The A pplicants have pointed to this comment in the declaration by „LHDG‟,
suggesting that this is a clear indication that the rainfall in the area was
sufficient to cause stormwater runoff.
55. None of the other declarations (including that made by the male Applicant)
make any specific mention of heavy rainfall.
Case No: 252949 Determination Page 8 of 10
56. With respect to the duration of the overflow of water from the drains, the
Statutory Declarations which the Applicants have provided are not
consistent:
The male Applicant said that within 2 hours the water was waist deep,
and that it continued to flow for 24 hours
Witness „RAS‟ said that within the next hour (the water) continued to
such an extent that there was a significant depth of water over the
entire road.
Witness „DVG‟ said that the water kept rising for several hours.
Witness „LHDG‟ did not mention duration.
Witness „KSG‟ did not mention any particular duration, saying that
„water continued to emerge ... to cover the road surface‟.
Witness „MB‟ also did not mention duration, saying that the water
„moved quickly‟
57. Although there may be inconsistencies the Panel accepts there will be
variation in the recollections of individuals given the traumatic nature of the
event.
58. The FSP has also submitted that the Applicants‟ position that the rainfall
caused stormwater is not supported by the recorded rainfall data.
59. The Panel notes that the report by „W‟ states that:
Recorded rainfall data at the Corinda High School ALERT gauge (540071),
located about 1.9km to the south-east of the subject property, indicates a total
rainfall of approximately 128mm from 0000 hours on 9 January to 1700 hours
on 11 January 2011. Rainfall at other locations around Brisbane indicate a
similar general pattern. A total of 43 mm of rainfall was recorded at the
Corinda High School ALERT station between 0400 hours and 1700 hours on
11 January.
The maximum rainfall intensity of 14.8 mm/hr occurred in the hour to 1100
hours on 11 January. Peak stormwater runoff would have occurred within 15
minutes of this peak rainfall intensity. This rainfall intensity is not extreme and
is less than the 1 year average recurrence interval (ARI) 1-hour rainfall
intensity for Brisbane. Much higher localised rainfall intensities are regularly
experienced in Brisbane.
No significant rainfall was recorded at the Corinda High School ALERT gauge
after 1700 hours on Tuesday 11 January 2011.
...”
60. The Applicants are critical of the findings of the „W‟ report with respect to
rainfall, saying there are no rainfall gauges located at Sherwood and the
report is based on assumptions.
61. The Applicants argue that the statement in the hydrology report by „W‟ that
„no significant rainfall was recorded‟ at Corinda is an acknowledgement that
Case No: 252949 Determination Page 9 of 10
there was rain after 5pm on 11 January 2011, and that the relevant fact is
that the levels of runoff were increased because the soil was saturated.
62. The Panel has examined the rainfall information presented in the report by
„W‟, and notes that the only rain recorded at Corinda after 5pm on 11
January 2011 was at 3pm the following day, and that rain was of low
intensity and for a short duration.
63. Furthermore, after reviewing rainfall information provided in Volume 2 of the
Area Hydrology Report, the Panel is satisfied that while rain was recorded
after 5pm on 11 January 2011 at rain gauges at Jindalee, East Brisbane and
Toowong, it was similarly low intensity and short duration.
64. While noting that these rain gauges are further away from the Applicants‟
home than the rain gauge at Corinda, the Panel accepts that the rain
recorded at these gauges shows that in general, rain after 5pm on 11
January 2011 in the wider area around the Applicants‟ property eased
considerably, and in most areas it effectively ceased.
65. After considering the submissions from both parties, the Panel is not
persuaded that the rainfall in the lead up to and during the inundation event
was sufficient, on its own, to cause the inundation of the Applicants‟
property.
66. The Panel has also considered whether the water which inundated the
Applicants‟ property was a mixture of flood water (overflowing from the
stormwater drains) and stormwater runoff.
67. The Panel accepts that some stormwater runoff may have mixed with the
flood water flowing out of the drains. It is established general insurance law
that if there are two concurrent causes of a loss where one is subject to
cover and the other is not, an insurer is not liable for the loss (refer to Wayne
Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB
57).
68. The Panel accepts that water was observed flowing from the drains on the
evening of 11 January 2011. The hydrology establishes to the Panel
satisfaction that more likely, given the height of the drains and their location
there would have been considerable backflow from the Brisbane River
through Sherwood Arboretum and through the stormwater drains. The Panel
accepts that the water escaping the stormwater drains observed by the
Applicant and witnesses was more likely backflow from the Brisbane River.
69. Accordingly the Panel finds that, on the balance of probabilities, the water
that initially inundated the Applicants‟ property and caused damage to their
home and contents, was flood as defined under the policy.
70. The Panel therefore finds that the FSP is not liable for the damage to the
Applicants‟ home and contents.
Case No: 252949 Determination Page 10 of 10
Temporary Accommodation
71. The Applicants have also indicated that they seek payment from the FSP
under the policy‟s additional benefit of temporary accommodation.
72. The Panel has reviewed the „Loss of rent or temporary accommodation‟
benefit of the policy provides the following:
“If your home is so damaged by an event for which we agree to pay a claim
that it cannot be lived in, or let to tenants we pay up to:
$20,000, or
20% of the sum insured for your home
whichever is higher,
For additional cost of reasonable temporary accommodation where the
home is your principal place of residence
...”
73. The Panel is satisfied that the temporary accommodation benefit of the
policy is dependent on the FSP agreeing to pay a claim for damage to the
home. In view of the Determination that the FSP is not liable for the loss, the
FSP is not liable to meet the temporary accommodation costs.
Determination
74. On the basis of the available information the Panel determines that the FSP
is not required to indemnify the Applicants for the damage to their home and
contents.
75. The Panel also determines that the FSP is not required to pay any temporary
accommodation benefit to the Applicants.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.