Text of the determination
Case No: 252780 Determination Page 1 of 11
Case number: 252780
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 October 2012
Background
1. The Applicants hold a Home and Contents policy underwritten by the
Financial Services Provider (FSP). The policy covers a residential address in
Charlton Victoria.
2. On or about 14 January 2011 the insured property was inundated by water.
3. The FSP assessed then declined the claim on the basis the inundation arose
from flood which was an excluded cause of loss or damage under the policy.
4. The Applicants dispute the declinature on the basis inundation occurred from
stormwater runoff.
Summary of Applicants ’ position
5. The Applicants rely on a letter from a law firm which provides the following
summary of an independent hydrology report:
Charlton‟s local drainage system is highly likely to have reached
capacity and overflowed between 12am and 4am on 14 January 2011.
Rainfall after 4.00am 14 January 2011 is likely to have contributed to
the overflow.
It is highly likely that the intensity of the rainfall and stormwater runoff
would have caused damage.
Heavy rainfall between 10 and 14 January 2011 is likely to have
caused saturation of soils in farmland surrounding Charlton and the
additional rain was likely to have caused saturation overland flow or
runoff.
Clear water indicates that the water was of a low sediment load and
therefore is likely to be from local runoff and rainwater not from the
Avoca River.
Every property owner‟s situation is different. The evide nce from each
property owner is required to determine what caused the damage to
their property. Any evidence relating to damage before 5.00pm on 14
January 2011 is in all probability a result of stormwater and local runoff.
Determination
Case No: 252780 Determination Page 2 of 11
It is noted that the Applicants were unable to obtain a copy of the
hydrologist‟s report (as quoted above) as they were not a client of the
solicitors.
6. The Applicants have provided photographs captioned with the street address
and time the photographs were taken. The Panel notes that the photographs
depict significant inundation as early as 8.12am on 14 January 2011 and a
substantial depth of water around 12.00pm-2.00pm. The Applicants have
labelled a photograph inside their property at 7.46pm and noted it was clear
water.
7. The Applicants have enclosed a letter dated 26 August 2011 from a witness
“TM”, from which the Panel notes the following:
On 14 January 2011, following heavy storms the previous day and
overnight, the Yeungroon Creek sent an unprecedented “torrent
towards Charlton”.
By midday the creek water had reached the south-east end of town and
was rising in the gutters along High Street.
The Applicants‟ residence sits lower than the centre of the road
because it is older.
After midday the creek water had begun to surround the house and
seep under it.
It was not until some hours later that the Avoca River waters joined with
the waters from Yeungroon Creek.
8. The Applicants have enclosed a letter from “GW” from which the Panel notes
the following:
GW has 22 years of local experience with soil and water, gained from
working in the catchment south of Charlton.
83mm of rain fell in an eight hour period between 13 and 14 January
2011.
The rainfall contributed to the stormwater runoff (clear water) entering
houses from the south.
Water started entering houses around 5.30pm to 5.45pm; this water
was clear.
9. The Applicants rely on an email dated 27 July 2011 from their broker, from
which the Panel notes the following:
The FSP agreed to pay for any water damage that can be proven to
have occurred prior to 2.00pm on 14th.
The latest hydrologist‟s report states that flooding east of Armstrong
Street on the morning of 14 th can be attributed to stormwater and
secondly at 2.00pm water began coming into the house.
10. The Applicants have obtained Bureau of Meteorology data from which the
Panel notes the data indicates heavy rainfall towards the evening of 13
January 2011 and particularly in the early hours of 14 January 2011.
Case No: 252780 Determination Page 3 of 11
11. The Applicants submit that the FSP‟s hydrologist provided inaccurate
information and has not taken into account local flooding or stormwater
runoff from the hills that lie to the south-east of the town. In particular the
Applicants state:
The hydrologist stated the water inundation level was 0.5m when in fact
it was 740-765mm above floor level, this being 960mm from ground
level. The Applicants also note that the cellar is 1800mm deep.
The hydrologist has not investigated the height „build up‟ of the old St
Arnaud Road, as this „build up‟ would have prevented the water from
the Yeungroon Creek from entering across the road.
The fact that 8-10 inches of clear rain water entered the property
indicates that it is stormwater and nothing else. It is incorrect to suggest
that the water from the Avoca River was filtered clear of debris when it
travelled overland.
The level of the river cannot be fully taken into account as the river
gauges failed at 8 metres.
The Applicants note that the parties interviewed by the FSP‟s
hydrologist were all on higher ground.
The Applicants note the people interviewed in their street all indicated
the approximate time of inundation was 7.00pm-8.00pm. The notations
indicate water direction as coming from the west, south, north and the
river. One interviewee stated that the backyard was flooded the day
before.
The hydrologist misreported statements by the (male) insured
regarding the timing of the inundation.
12. The cellar beneath the home became nearly full at 8.00pm on 13 February
2011. Further, there was water around the front and side verandah which
was escaping into the vents around the base of the house.
13. The rear of the insured property consists of a bathroom, kitchen and spare
room which sits lower than the rest of the house. When the female Applicant
awoke around 7.30am (14 January 2011) the rear of the property had taken
in about 3 inches of water.
14. The driveway and all the stormwater drains around the house were under
water the night before, with the garage and rear shed full of water in the
morning.
15. Family and friends of the Applicants came around to stack sandbags 2-3
metres high. The sandbags held back the water until early afternoon.
Summary of FSP’s position
16. The FSP relies on the following policy terms and conditions:
“Flood
Case No: 252780 Determination Page 4 of 11
The inundation of normally dry land by water escaping from any water course,
lake, canal, dam or reservoir.
...
Additional exclusions applying this Policy
These additional exclusions apply to cover for your home, contents, additional
benefits and „options you can choose for an additional premium‟.
This Policy does not cover:
...
(e) flood, (unless your policy Schedule confirms that you have chosen optional
flood cover and paid any additional premium we require)”
17. The FSP relies on a copy of the Home & Contents Insurance Schedule. The
Panel notes the building is covered up to $233,000 and the contents up to
$69,000. The policy is subject to an excess of $250 for building and $250 for
contents.
18. The FSP relies on a Flood Assessment Report dated 21 March 2011 from
which the Panel notes the following:
Charlton experienced heavy rainfall be tween 10 and 14 January 2011.
The rainfall data indicates that on Thursday 13 January 2011 Charlton
received 66mm in the 24 hours to 9.00am on 14 January 2011.
The peak flood level of 8.05m was reached early morning on 15
January 2011 at least two days after the most intense rainfall.
The general mechanism of flooding of Charlton properties was overflow
from the Avoca River and Yeungroon systems. The Avoca River
peaked 700mm above the prior September 2010 event.
Any flooding after lunchtime can be directly attributed to the Avoca
River and Yeungroon Creek systems.
Floor inundation that occurred east of Armstrong Street early morning
on 14 January 2011 can be attributed to stormwater flooding.
The owner of the insured property provided the following information:
i. At 9.00am on 14 January there was water in the street.
ii. At 11.00am the road adjoining the property were becoming
inundated.
iii. At 2.00pm water began coming into the house.
iv. At 4.00pm on 14 January 2011 the water was knee deep in the
house.
v. Water came from the south west along Wilson Street.
The house is almost level with the surrounding land and therefore has
little freeboard when flooding occurs.
Depth marks on the house indicates a final flood depth of
approximately 0.5m.
The property is outside the historical mapped extent of flooding within
Charlton.
Case No: 252780 Determination Page 5 of 11
The hydraulic model prepared to determine the source of various flood
waters that entered the town indicates that the water that flooded the
property at 2.00pm was from Yeungroon Creek, this was followed by
flooding from the Avoca River.
Timing and depth on inundation is in line with the information provided
by other residents throughout the town.
The clarity of the water, or otherwise, has little bearing on whether the
water is classified as stormwater related.
The hydrologist concluded that flood damage at the insured property
occurred as a result of flood flows from Yeungroon Creek followed by
flooding from Avoca River.
The report has an attachment of interviews with other residents, some
of which are in the same street as the Applicants. Most of the residents
in the same street indicate inundation around 7.00pm-8.00pm. One of
the residents indicated flooding in the backyard the day before.
19. The FSP contends that the site specific hydrology report together with the
timing of the inundation and the amount of water demonstrates the
proximate cause of water inundation was flood. Further, the hydrologist has
the appropriate expertise to determine the cause of inundation.
20. The damage falls within the definition of flood under the policy and is
specifically excluded from cover.
21. The FSP maintains that it was entitled to decline the claim as flood is
excluded under the policy.
Issue
22. Whether the FSP was entitled to decline the Applicants‟ claim for loss or
damage arising from flood inundation.
Reasons for decision
23. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination by an Ombudsman Panel.
24. The Panel is comprised of an Ombudsman, an insurance representative
appointed by the Financial Ombudsman Service Board, and a consumer
representative appointed by the Financial Ombudsman Service Board.
25. The Panel Chair Ombudsman and a Panel Member attended on site where
they met with the Applicants and a representative of the FSP.
Case No: 252780 Determination Page 6 of 11
26. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
27. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
28. There appears to be no dispute between the parties that the Applicants‟
residence was subject to heavy rainfall from the evening of 13 January 2011
to early morning on 14 January 2011.
29. The Panel notes that the Applicants have disputed the FSP‟s summary of
information allegedly provided by them to the hydrologist.
30. The Applicants have provided a timing of inundation as early as 8.00pm on
13 February 2011. This being the time that the property‟s cellar became full
of water and the driveway and storm drains were submerged. The Panel
notes this matches a description of an individual interviewed in the street
who stated water had inundated his backyard the day before.
31. The Applicants have stated that the rear of the property became inundated
up to 3 inches around 7.30am on 14 January 2011. Further, the garage and
rear shed were also full of water at this time.
32. The Applicants confirmed with the Panel Chair Ombudsman and Panel
Member that the inundation of the house occurred at approximately 2.00pm.
33. It is unclear from the hydrological evidence precisely when the river broke its
banks. However, given the evidence presented, the Panel is satisfied that
ultimately the property was impacted by flood waters which had escaped
from the Avoca River. The Panel accepts that flood is an excluded event
under the policy.
34. On the other hand, the relevant policy pro vides coverage for storm damage.
The Panel notes that the policy does not include a definition of “storm” but
does include coverage for rain and as such, the Panel accepts that coverage
will include stormwater runoff.
35. It is appropriate for the Panel to determine the potential extent of inundation
that could properly be described as having arisen from stormwater runoff as
distinct from flood water.
36. Subsequent to the attendance on site by the Panel Chair Ombudsman and
Panel Member, the further exchanges between the parties have been
voluminous. Given that there has been an exchange of all submissions
between the parties and the parties have had the opportunity to respond, the
Panel does not propose to recite the full details of the various submissions
exchanged but rather to summarise and to refer to specific submissions
where appropriate.
37. The exchanged submissions include but are not limited to the FSP‟s
hydrology report dated 16 August 2012. The Applicants have provided a
Case No: 252780 Determination Page 7 of 11
detailed response to the hydrology report and there have been further
exchanges between the parties subsequent to that time.
38. In respect to the FSP‟s hydrology report, the Panel notes that the report
refers to and responds to a report from Dr PM dated 3 November 2011.
39. It is interesting that the FSP has had their hydrologist respond to that report
when that report of Dr PM does not appear to form part of the Applicants‟
material.
40. However, the Panel recognises that the Applicants‟ claim is one of ma ny
made by residents of the Charlton area arising from the weather events of
January 2011.
41. The Panel has considered a number of the claims arising from these
weather events and is aware of the report from Dr PM, as that report forms
part of the material submitted in respect of a number of the other claims.
42. In respect to the report from the FSP‟s hydrologist, the Panel notes the
following conclusion:
“ It is our opinion that, based on the reported timing, parts of the property and
cellar of the dwelling at (A pplicants’ address) Charlton were flooded firstly by
local runoff and overflows from the rain water tanks. The property and
dwelling were then later flooded by overflows in the (C) highway tributary
caused by breakouts from Yeungroon Creek and the Avoca River farther
upstream. The property and dwelling were then flooded later again by
breakouts from the Avoca River directly.”
43. The FSP provided a copy of the supplementary report of the hydrologist
dated 12 September 2012. The FSP‟s hydrologist concluded that the initial
inundation reached a height of approximately 50-75mm above the
surrounding ground level. Further, the hydrologist was of the view that this
was sufficient for water to enter the cellar through the ventilation holes but
insufficient to cause flooding of the main part of the house.
44. Further, the hydrologist‟s supplementary report confirmed that any
subsequent inundation and any inundation above the 75mm level was
caused by river flood water.
45. As previously stated, the Panel is satisfied that ultimat ely the Applicants‟
property was inundated by waters which came from the Avoca River.
46. Given the policy provisions relevant to this claim, the Panel is also satisfied
that the water that ultimately came from the Avoca River is properly
categorised as flood water and excluded under the terms of the policy.
47. However, as stated, consideration needs to be given as to whether the
inundation of the property as described within the FSP‟s hydrologist report
as being overflows in the Calder Highway tributary caused by breakouts from
Yeungroon Creek can be described in the same way.
Case No: 252780 Determination Page 8 of 11
48. Having dealt with a number of different disputes arising from the weather
events in Charlton in January 2011, the Panel notes the undisputed
evidence that water which inundated parts of Charlton, approached Charlton
from the south and south east. The hydrology evidence is also consistent in
that this water was caused by overflows from the Charlton/St-Arnaud
tributary waterway of the Calder Highway and overland flows from the
breakouts from Yeungroon Creek and later from the Avoca River upstream.
49. The question arises as to whether the Yeungroon Creek and the landscape
over which the water flowed was a „water course, lake, canal, dam or
reservoir‟ as described by the policy provision under the definition “flood”.
50. In this regard, the Panel has been greatly assisted by its visit to the area and
the ability it has had to familiarise itself with the topography and relevant
sites.
51. Within the report submitted by the FSP‟s hydrologist, the hydrologist re fers to
descriptions of “ waterways ” contained within [a named publication] and
reaches the conclusions that Yeungroon Creek and the two Avoca River
tributaries are defined as “ waterways ” and based on stream flow and
channel definition would be considered ephemeral streams.
52. Within [the named publication], referred to above, ephemeral stream is
referred to as “those waterways with (often) poorly defined channels that
generally flow unpredictably and only after heavy rainfall”.
53. However, the Panel notes that t he policy definition of “flood” includes
reference to “water course” and not “waterway”.
54. The Panel also notes that the relevant policy does not contain a definition of
“ water course ” .
55. In these circumstances, the Panel is not satisfied it is sufficient for the
hydrologist to refer to a definition of “waterway” when the relevant wording in
the policy is water course.
56. For the sake of completeness, the Panel notes that the FSP‟s hydrologist
appears to agree with what the FSP‟s hydrologist says i s the finding of Dr
PM that “Yeungroon Creek is a named water course”.
57. As stated, although familiar with the report from Dr PM, the Panel has not,
within this dispute, been provided with a copy of that report or details of the
basis on which the FSP‟s hydro logist finds that Yeungroon Creek is a named
water course. It is also unclear to the Panel the context in which the FSP‟s
hydrologist has used the term “water course”, given that the hydrologist
appears to be addressing the concept of a waterway.
58. Having had the opportunity to review the report of Dr PM in other disputes,
the Panel is not satisfied that the phrase “named water course” is sufficient
to satisfy the definition within the policy provisions. The Panel does not
Case No: 252780 Determination Page 9 of 11
accept that simply because the Yeungroon Creek, is so named, that that of
itself, makes it a water course.
59. In this regard, the Panel considers it appropriate to consider the definition of
water course.
60. The following comments were made by the High Court in Gartner v Kidman
[1962] HCA 27: 108 CLR 12 (30 May 1962):
“This distinction between water course and depression follows the language
of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural water course. To constitute such a water
course as a matter of law, there must be a stream of water flowing in a
defined channel or between something in the nature of banks. The stream
may be very small and need not run, nor need the banks be clearly or sharply
defined. But there must be a course, marked on earth by visible signs, along
which water usually flows in order to constitute a water course such as
creates riparian rights (1899VLR at p485 (at p16).
61. Following its visit to the area, the Panel considers the area of land over
which the water flowed from the south and south east of the town cannot be
regarded as a water course.
62. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows. The landscape may
best be described as a flood plain over which water flows in a direction
determined by the rise and fall of the land.
63. This view is further supported by the description given by Dr PM who
observed Yeungroon Creek has been infilled with flood deposits over many
years. The course of the creek to the south of the town is marked by linear
depressions and vegetation.
64. In addition, the Panel has regard to the area on the Charlton/St-Arnaud
Road and the flood expanse of land in the area of that road. In respect to
their visit to the Charlton/St-Arnaud Road it was noted that the road had
been raised to allow access to the airport during floods. It was noted that the
road dissects the natural flood plain which was in the direction of the
Yeungroon Creek and Avoca River.
65. A number of pipes/culverts have been positioned under the road, but the
evidence from the locals who also attended, is that they were insufficient to
cope with the overland flow of water and thus the flow of water is diverted
initially east of Armstrong Road and eventually through the town.
66. This evidence was confirmed by observation of the section of the
Charlton/St-Arnaud Road which had to be dug up during the course of the
flooding of Charlton in order to release the water building up on the east side
of the Charlton/St-Arnaud Road. The FOS Panel representatives were able
to observe the new bitumen laid subsequent to the road being rebuilt.
Case No: 252780 Determination Page 10 of 11
67. Having considered all of these matters and with the benefit of having
attended on site in the area, the Panel has gained a greater understanding
of the local topography and its impact on the stormwater runoff in the area,
prior to arrival of the flood water from the Avoca River.
68. The Panel has also had the benefit of the evide nce presented in numerous
cases arising from the weather events in Charlton in January 2011.
69. In considering all these matters, the Panel is satisfied that the Yeungroon
Creek referred to in the various hydrology reports and evidence in the
submissions presented by the parties, is not a water course as defined under
the terms of the policy.
70. As such, the Panel is satisfied that the flow of water which entered the town
from the south and south east, prior to the water from the Avoca River
cannot be regarded as flood water as defined by the policy but rather the
overland flow of stormwater runoff.
71. The result is that the Panel is satisfied that the property was initially
inundated by stormwater during the afternoon/evening of 13 January 2011
and then inundated by stormwater runoff from the south and south east
during the course of the day on 14 January 2011 and only then ultimately
inundated by flood water from the Avoca River later in the day on 14 January
2011.
72. Unfortunately, because of the absence of eye witness evidence, it is not
possible to precisely differentiate the inundation arising from the second and
third events.
73. Having regard to clause 8.2 from the Terms of Reference, the Panel
proposes to do what is fair in all the circumstances, after being informed by
the evidence submitted and the conclusions of the various Determinations,
both in the same street and in the same area as the property, the subject of
this dispute.
74. The Panel is satisfied that an inundation to a level of 150mm above the
ground across the property is fair in all the circumstances when considering
the storm damage inundation. The FSP is not responsible for damage
arising from any inundation above 150mm from the ground.
75. The Panel enjoins the parties to work together to agree upon and forma lise a
scope of works which appropriately represents the damage which would
have been caused by an inundation to 150mm above the ground of the risk
address.
Determination
76. The Panel determines that the FSP must indemnify the Applicants for their
loss arising from an inundation to the level of 150mm above the ground at
the property.
Case No: 252780 Determination Page 11 of 11
77. In the event that the FSP is to cash settle any part of the Applicants‟ claim
the FSP is to pay interest pursuant to the Insurance Contracts Act 1984 from
the date that the claim was rejected to the date that it is settled.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.