Home / Search / Determination 252770
Determination 252770
Stormwater damage to bitumen car park claim denied under seepage, wear and tear and workmanship exclusions
Summary
The owners' car park bitumen failed after a November 2008 storm, and they claimed $71,373.40 for repairs. AFCA found the damage was caused by stormwater seeping into the pavement, which the policy excludes, and determined the FSP is entitled to deny indemnity.
Although the FSP's original grounds of wear and tear and faulty workmanship were not proven, the policy exclusion for water seeping or penetrating the premises was established on the balance of probabilities.
Issues
- Claim denial primary · not upheld“the Panel finds that the FSP has met the onus on it to establish that ... damage to the bitumen pavement was caused by the stormwater seeping, percolating or penetrating the bitumen.”
Subjects and remedies
natural disasterno remedy
Related
Text of the determination
Case No: 252770 Determination Page 1 of 10
Case Number: 252770
General Insurance – Commercial Insurance Ltd – Building including bitumen
car park - Stormwater damage
13 March 2012
Background
1. The submission for the owners and policyholders of the insured property has
been prepared by one of the insured‟s husbands who will be referred to as the
Applicant.
2. The Applicant insured the commercial business property against loss or
damage caused by insured events. The policy commenced on 8 February 2007
and had been renewed annually to 8 February 2009.
3. In October 2009, the Applicant lodged a claim for damage to a bitumen parking
area at the insured site which he states was caused by torrential rainfall that
occurred on or about 3 November 2008.
4. The Applicant completed a claim form and described the damage as:
„During a torrential downpour, stormwater drains & pits overflowed thus
causing increased moisture penetration to the outside edges of bitumen
surface. The sub soil pavement became saturated to a large area of the
bitumened (sic) surface ultimately causing failure to bitumen.‟
5. The cost of repairs has been estimated to be $71,373.40.
6. The Financial Services Provider (FSP) denied liability on the ground that the
damage was caused by wear and tear, gradual deterioration, faulty materials
and/or faulty workmanship.
Summary of Applicant’s Position
7. The insured property‟s bitumen car park was resealed in June 2008 as part of
the regular maintenance programme. The cost of the reseal was $7,640.
8. Heavy rains were experienced in November 2008 and shortly after the bitumen
started to deteriorate.
9. The property was initially bituminised when the complex was constructed in
1998. The bitumen surface wore well for ten years and as part of the
maintenance program resurfacing was effected in June 2008. There were no
signs of cracking or stress of the bitumen until after the rain event in November
2008. Prior to the November 2008 event, ponding never occurred.
Determination
Case No: 252770 Determination Page 2 of 10
10. Following the storm event, the bitumen started to deteriorate and continues to
the point where it is now dangerous in areas.
11. The FSP contends that the cracking of bitumen is just the natural deterioration
of bitumen over time. However, natural deterioration should take over a period
of years not several months. There has been a period of months from re-seal to
penetration.
12. In May 2009, consulting engineers, „S‟, carried out a site inspection and site
testing. Upon receiving the engineer‟s final report he submitted a claim on the
FSP in October 2009.
13. The engineer‟s report dated May 2009 stated, in part:[36 -43]
“ The bitumen pavement had deteriorated in sections of the driveway and
internal trafficked areas. The deterioration had resulted in several large areas
where the pavement had sunk and the bitumen material had separated.
There was evidence of several failures in the bitumen pavement along the
western edge of the paved areas, areas adjacent to the concrete driveways
into the shed and office complex and a larger area of failure at the northern
end of the bitumen area. Other small areas were observed to have a soft
surface where vehicle traffic had started to damage the bitumen surface.
At the time of inspection, the bitumen material was soft and „sticky‟. This
„sticky‟ state was identified as containing a considerable proportion of wet
bitumen (tar) in the spray seal material.
The spray seal coating had not hardened or bound the aggregate to produce
a uniform stiff pavement across the site. The bitumen material and aggregate
lacked any cohesive strength.
Examination of the old and new mix of bitumen indicated that the newer
bitumen had appeared to have penetrated the older bitumen and softened the
entire bitumen coat in areas that have failed.
Areas that had failed had allowed moisture to penetrate the gravel base. The
soaked gravel material was observed to be above optimum moisture content
and therefore soft and unable to support the weight of normal traffic through
the site.
The site inspection and survey identified that the general slope of the bitumen
paved area would encourage rapid drainage of the surface. No ponding
occurs after rain other than a small area of the southern entrance driveway
which forms part of the table drain on G Road.
A contactor was employed to apply a one coat bitumen seal in June 2008 to
rejuvenate the surface. No testing is available to provide an analysis of the
bitumen material to determine whether the bitumen was mixed correctly or
contained the correct percentage of either cutter oil or flux oil.
The bitumen applied over the existing bitumen pavement may have softened
due to soakage of excess cutter into the original bitumen layer causing a loss
of cohesion in the original material and therefore a loss of structure and
strength.
The loss of cohesive strength across the site is not uniform as sections of the
bitumen remain intact with full strength.
Case No: 252770 Determination Page 3 of 10
Post-testing the bitumen content could not definitely determine whether too
much cutter – the solvent used in the mixing procedure - was applied during
the June 2008 application of bitumen.
Compaction of the spray seal is also an issue that may cause the break-up of
the pavement. A lack of compaction on the surface seal may result in a lack of
strength in the bitumen seal, making it more prone to failure from normal
traffic on the site.
As both the pavement (gravel) and sub-base (clay) are highly reactive
material, any significant increase in moisture content as a result of penetration
of water through the bitumen seal would greatly decrease the strength and
bearing capacity of the base and pavement material and therefore
encouraging failure of the pavement. ”
14. S recommended that the existing bitumen area be removed as it is predicted to
continue failing and potentially allow drainage to the founda tions of the
adjoining sheds as a result of moisture penetration along the edge and footings
of the buildings and drainage lines.
15. In view of the FSP continuing to deny their claim, he engaged a consulting civil
and structural engineer, „B‟, to review the d ocumentation submitted by both
parties and offer an opinion.
16. In his report dated 28 June 2011, B stated:
There is no conclusive evidence that the bitumen re-seal effected in June
2008 was faulty and a cause of the pavement failure.
All consultants‟ reports are inconclusive in their findings regarding the
cause of the pavement failure and clearly argue that a number of factors
could have been the cause but no conclusive evidence has been
provided.
The only clear evidence is the rain event for the month of No vember 2008
as documented by the Bureau of Meteorology. The total rainfall for the
month was 149.2mm with 65mm falling in one storm event on 3
November 2008.
Both consultants in their reports agree that moisture penetration could
have been the cause of the bitumen failure. There is no clear, analectic
(sic) and conclusive evidence in the consultants‟ reports to disprove his
assertions that the initial storm event on the 3 November 2008 and
following weather patterns caused the bitumen surface to fail.
The consultant stated in his conclusion:
„In our opinion the failure to the bitumen pavement was caused by the initial
Storm event on the 3 r d November 2008 and the unusual preceding (sic)
weather conditions for the remainder of the month, which broke down the
bitumen pavement re-seal effected in June 2008.
17. The FSP has stated that B prepared his report after studying documentation
presented to him and was not based on any site inspection. The Applicant
denies this assertion and confirms that B did inspect the insured property.
Case No: 252770 Determination Page 4 of 10
18. He contends that the FSP‟s engineer stated that the local council was
contacted and the situation with the car park discussed and apparently an
inspection was undertaken.
19. However, there has never been an inspection undertaken by a local council
representative. In the FSP‟s engineer‟s report dated 17 June 2010 he confirms
that he spoke with an engineer in charge of pavements for the Main Roads
Queensland. This contradicts his statement in his report dated 6 February 2010
in which he reported an inspection had been undertaken by a Council Bitumen
Overseer who gave a verbal report that it seemed the seal is an emulsion seal
and did not hold the aggregate well at all.
20. The FSP also states that the ponding of stormwater has only been affected
since the bitumen has deteriorated and the cause has been faulty workmanship
to which the Applicant disagrees.
21. The damage to the bitumen pavement was caused by the stormwater event on
3 November 2008.
Summary of FSP’s Position
22. The policy of insurance provides that any circumstances likely to lead to a claim
must be immediately notified and prompt steps taken to minimise any loss.
23. The history of the claimed event predates lodgement of the claim by some 11
months and the Applicant‟s engineer‟s report was prep ared in May 2009, some
five months prior to lodgement of the claim.
24. Having noticed, or being advised of, the overflowing stormwater system at the
site on or about 3 November 2008, and witnessed the deterioration of the
bitumen to the extent the Applicant engaged an engineer to inspect and report
in March 2009, it cannot understand why the claim was not lodged at that time.
By the time the claim was lodged the contractor who conducted the reseal
could no longer be found.
25. The Applicant‟s engineer, S, does no t mention the storm and merely refers to
the deterioration of the bitumen which resulted in several large areas where the
pavement has sunk and the bitumen material has separated and pot-holed.
26. It engaged a consulting engineer, „M‟, to inspect and report on the conditions of
the pavement.
27. In M‟s report dated 6 February 2010, he stated:
Three sheds close to G Road intercept drainage off the internal road, thus
allowing stormwater to pond against the shed walls. This ponding caused
the failure of the pavement in this area.
The ponding water gradually seeps into the gravel pavement, weakening
it and allowing it to be shoved to one side.
Case No: 252770 Determination Page 5 of 10
The turning movement of vehicles accessing individual sheds has caused
aggregate to be stripped from the bitumen.
The reseal conducted in June 2008 could have been the wrong type of
reseal. The contractor who carried out the work cannot now be traced and
therefore the type of seal used cannot be confirmed.
The ponding is from rainfall, so the duration of the damage causing event
is the ten years of rainfall since the bitumen was installed. The cracking of
the bitumen is just the natural deterioration with time.
Whilst the gravel thickness is correct for the traffic expected, the reseal
could be the wrong type and the pavement cannot drain properly because
of the location of the sheds.
28. Under the insured event of „storm‟, the policy excludes damage that occurs
gradually, that is, caused by water seeping or percolating or otherwise
penetrating the premises or that is caused by water entering the premises
because of structural defects, faulty design or faulty workmanship.
29. Further, under the „accidental damage‟ cover, the policy excludes loss or
damage caused by wear and tear, gradual deterioration or developing flaws,
error or omission in design, plan or specification or failure if design, faulty
materials or faulty workmanship.
30. With these exclusions in mind, it maintains that it is entitled to deny the claim
because:
the duration of the damage causing event is the 10 years of rainfall since
the bitumen was installed and the cracking of the bitumen is just the
natural deterioration with time;
the reseal applied could be the wrong type and the pavement cannot drain
properly because of the location of the sheds;
the newer bitumen appeared to have penetrated the older bitumen and
softened the entire coat in areas that had failed. These areas then allowed
moisture to penetrate the gravel base, which became soft and unable to
support the weight of normal traffic through the site;
ponding water, which gradually seeps into the gravel pavement and
weakens it, and the turning movement of vehicles accessing individual
sheds and C Street have caused the damage over time.
31. It relies on the following policy/contract provisions:
‘SECTION 4 - Claims Conditions
These conditions are important and must all be met before we will accept a claim
under your policy with us.
...
7 WHAT YOU MUST DO
a) You must immediately notify us of any circumstances likely to lead to a claim.
b) You must take prompt steps to minimise the loss.
Case No: 252770 Determination Page 6 of 10
...
SECTION 5 – Property
...
4 INSURED EVENTS
Loss or damage to the insured property described in the certificate caused by:
...
7 storm, hail, wind and water including rainwater or snow PROVIDED THAT this does
not include damage
...
f) that occurs gradually;
...
h) caused by water seeping or percolating or otherwise penetrating the premises or
percolating or otherwise penetrating the premises other than snow creep;
i) caused by water entering the premises because of structural defects, faulty design
of the premises or faulty workmanship
...
9 accidental damage excluding loss or damage caused by:
...
c)
d) wear and tear, fading, scratching or marring, gradual deterioration or developing
flaws, normal upkeep or making good;
e) ...
f) ...
g) error or omission in design, plan or specification or failure of design;
h) faulty materials or faulty workmanship;
i) ....‟
Issues
32. Whether the damage to the bitumen pavement was caused by the insured
event „storm‟ ; or
33. Whether the damage was caused by wear and tear, gradual deterioration or
faulty workmanship or seeping, percolating or penetration of stormwater which
are events excluded from the cover provided by the policy.
Reasons for Decision
34. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
Case No: 252770 Determination Page 7 of 10
35. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
36. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the Applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
37. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other than when
relevant.
38. Therefore, the onus shifts to the FSP to establish that, on the balance of
probabilities, the damage to the pavement was caused by an event which is
excluded under the policy.
39. The Applicant contends that the damage to the bitumen pavement occurred
during a period after the storm event in November 2008. There is some
evidence that sections of the pavement have deteriorated which could be
attributed to the stormwater. Therefore, prima facie, the applicant has a claim
that falls within the cover provided by the policy of insurance.
40. The Applicant contends that the cost of replacing the bitumen pavement at
2008 prices was $68,857.40. He has also incurred costs of $30,938.19 due to
increased costs of insurance, engineers‟ reports and employees‟ hours in
managing the claim.
41. However, he is willing to negotiate the partial repair of the surface with the FSP.
42. The FSP relies on one of three policy exclusions to deny liability. These are:
faulty materials or faulty workmanship;
wear and tear; gradual deterioration;
water seeping or percolating or otherwise penetrating the premises.
Faulty materials or faulty workmanship
43. The bitumen pavement was resealed in June 2008 and there is conjecture and
speculation as to whether the materials used by the contractor were suitable for
the purpose.
44. The Applicant‟s engineer, S, reported that the bitumen pavement ma y have
softened due to soakage of excess cutter into the original bitumen layer
causing a loss of cohesion in the original material and a loss of structure and
strength.
45. S also reported that post testing the bitumen could not definitively determined
whether too much cutter was applied during the application of the bitumen.
Case No: 252770 Determination Page 8 of 10
46. The FSP‟s engineer, M, agreed with S that the failure of the pavement could
have been linked to the reseal carried out in June 2008. M was also of the
opinion that the wrong type of bitumen was used.
47. However, due to the absence of proof, the engineers could not unequivocally
state that the stormwater damaged the pavement due to the quality of the
reseal.
48. Therefore, the Panel finds that the FSP has not established that, on the
balance of probabilities, the damage to the pavement was caused by faulty
materials or faulty workmanship. There was some speculation especially from
the loss adjuster - that the contractor that undertook the work was a cash job to
a (sic) itinerant Bitmen (sic) Layer from interstate but in the Panel‟s view without
proof this is merely gossip.
Wear tear, gradual deterioration
49. The FSP has stated that the turning movement of vehicles accessing individual
sheds on the site has caused the aggregate to be stripped from the bitumen.
50. The FSP contends that it understands that the traffic area was bitumen sealed
in 2001 and would have had a life expectancy of approximately ten years.
51. The FSP‟s engineer M stated that the type of bitumen pavement (bitumen
bound gravel pavement with 7mm aggregate) was never going to last 10 years
service because of turning vehicles. The aggregate is stripped from the bitumen
due to the turning movements of the trucks/cars into the sheds and also C
Street.
52. However, the stormwater damage to the bitumen pavement occurred after the
pavement had been resealed. This was in 2008. The notion that the
deterioration had gradually occurred over the lifetime of the paving – 10 years –
is not sustainable. The FSP, and its engineer, have not proved as to how wear
and tear prior to the resealing of the pavement could have contributed to the
stormwater damage. Therefore, the FSP cannot rely on this exclusion to deny
liability.
Water seeping or percolating or otherwise penetrating the premises
53. The Applicant has stated that during the storm event on 3 November 2008,
65mm of rain was recorded at the Applicant‟s locality by the Bureau of
Meteorology. The torrential downpour caused the stormwater drains and pits to
overflow causing increased moisture penetration to the outside edges of the
bitumen surface.
54. The pavement became saturated to a large area of the bitumen surface
ultimately causing failure to the bitumen.
55. The Applicant‟s engineer reported several failures in the bitumen pavement
along the western edge of the paved area, areas adjacent to the concrete
Case No: 252770 Determination Page 9 of 10
driveways into the sheds and office complex and a larger failure at the northern
end of the bitumen area.
56. Although the Applicant‟s site has a general slope that allows rapid drainage of
the surface, the excessive rainfall built up in certain areas and caused damage
to the pavement sometime after the storm event.
57. Based upon the evidence submitted to the Panel, on the balance of
probabilities, the stormwater has seeped through the bitumen into the gravel
base. The Applicant‟s engineer S reported in May 2009:
„Areas that had failed had allowed moisture to penetrate the gravel ba se. The
soaked gravel material was observed to be above optimum moisture content
and therefore soft and unable to support the weight of normal traffic through
the site. Moisture had also penetrated through the gravel material into the
sub-base of black clay fill. The black clay has little or no strength as a result of
the excess moisture.‟
58. Further, the Applicant‟s additional consulting engineer B reported on 28 June
2011:
“ After studying the documentation presented to this office it is our conclusion
that the main contributor to the failure of the bitumen re-seal effected in June
2008 initially was caused by the Storm events in November 2008. This storm
event started with an initial storm on the 3 rd of November resulting in 65mm of
rain in one deluge. Even with sufficient gradients on the site as documented in
the consultants (sic) reports, the amount of excess water has not dissipated
quickly enough. This has caused softening of the surface which in time has
allowed moisture to penetrate the pavement thus causing the bitumen to fail.”
59. Further, there is no evidence that the storm event caused the bitumen surface
to be washed away allowing stormwater to penetrate the sub-base and causing
the bitumen to fail.
60. The policy of insurance excludes damage caused by water seeping or
percolating or otherwise penetrating the premises.
61. Therefore, the Panel finds that the FSP has met the onus on it to establish that,
on the balance of probabilities, damage to the bitumen pavement was caused
by the stormwater seeping, percolating or penetrating the bitumen and
undermining the sub-base of the pavement causing its failure.
The delay in lodging the claim
62. The FSP has pointed out that there was a delay of eleven months in lodging a
claim. It is a condition of the policy that “ You must immediately notify us of any
circumstance likely to lead to a claim”. The delay is thus a breach of that
condition. If the FSP is to rely on that breach to deny liability, and it has not, it
must be able to demonstrate that it suffered prejudice as a result. It has not
done so.
63. Accordingly the delay in lodging the claim has no significance in the settlement
of this claim.
Case No: 252770 Determination Page 10 of 10
Determination
64. Accordingly the Panel determines that the FSP is entitled to deny indemnity to
the Applicant for the cost of repairing or replacing the bitumen pavement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.