Home / Financial Firm (Unknown - Insurer) / Determination 252585
Determination 252585
Denial of claim - flood exclusion
Summary
The Applicant's home contents were damaged when water inundated her home in January 2011, and the FSP denied the claim as flood, which is excluded. AFCA found the inundation was flood from the Brisbane River and that the FSP is not required to indemnify her.
Site-specific hydrology evidence showed backwater flooding from the Brisbane River with no stormwater involvement, so the flood exclusion applied under the policy definition.
Issues
- Claim denial primary · not upheld“the Panel determines that the FSP is not required to indemnify the Applicant for loss or damage to her home contents.”
- Inadequate claim investigation secondary · not upheld“The Panel accepts the finding of 'W' with respect to the timing of inundation and that there was no involvement from stormwater”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 252585 Determination Page 1 of 8
Case number: 252585
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
10 April 2012
Background
1. The Applicant held a home contents insurance policy with the Financial
Services Provider (FSP).
2. On 13 January 2011, after her home had been inundated with water, she
lodged a claim with the FSP for the resultant damage.
3. The FSP denied liability for the damage, on the basis that it had been
caused by flood, which is excluded under the policy.
4. After revie wing the claim decision at the Applicant‟s request, the FSP
maintained its decision to deny liability for the damage.
Summary of Applicant’s position
5. The Applicant says that the water that caused the inundation did not come
from the Brisbane River, but from another direction altogether.
6. She believes that this water was in part stormwater from the surrounding
areas, which was the result of torrential rain.
7. The Applicant says that the evidence upon which the FSP relied to decide
her claim is flawed:
The Assessment Report contains inconsistencies, contradictions and
errors.
The area hydrology report is general in nature, contains a disclaimer
that there are several factors that the authors were not able to take into
account and also states that it is incomplete.
The aerial flood mapping is general in nature and misrepresents the
situation at her home address.
8. The FSP made its decision to deny the claim, without taking into
consideration the photographs she had taken of the damage to her property.
Determination
Case No: 252585 Determination Page 2 of 8
Summary of FSP’s position
9. The FSP says that the evidence it has obtained indicates that the cause of
the in undation of the Applicant‟s property was flood from the Brisbane River.
10. It acknowledges that some of the flood questionnaire answers recorded by
its assessor were clearly in error or contradictory. However, it regards the
issues to which these errors and contradictions pertain were not pivotal to
the claim decision and the Assessment Report was only one of several
pieces of evidence it used in making its decision.
11. The FSP has also obtained a site- specific report by hydrologist „W‟ which
points to flood as the cause of the inundat ion at the Applicant‟s property and
corroborates the other evidence it has used to make its decision.
12. Based on the information available, there was no stormwater involvement in
the inundation of the property.
13. The FSP relies on the following policy provisions:
“ What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to the particular
insured events
Yes
You are covered for damage or loss to your contents
while they are in your home or at the site,
occurring during the period of cover,
caused by the following events:
...
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
Storm means violent wind (including a cyclone or tornado),
thunderstorm or a heavy fall of rain, snow or hail.
...
No
You are not covered for:
...
Damage or loss by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
Case No: 252585 Determination Page 3 of 8
is prevented from entering, because other water has already escaped
or been released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
Flood does not mean stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
...
What we do not cover – general exclusions.
You are not covered under any section of the policy for damage, loss,
cost or liability caused of arising from or involving:
flood,”
Issues
14. Whether the FSP is able to rely on the evidence it has obtained regarding
the inundation.
15. Whether the Applicant‟s property was damaged by flood, or by stormwater
inundation.
16. Whether the FSP is liable for the damage to the Applicant‟s contents.
Reasons for decision
17. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
19. The Panel Chair Ombudsman attended on site where he met with the
Applicant and representatives of the FSP.
20. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
Reliability of FSP’s Evidence
21. The Applicant has questioned the reliability of the evidence used b y the FSP
in making the decision to deny her claim.
Case No: 252585 Determination Page 4 of 8
22. The Applicant has pointed out some aspects of the report produced by
assessment firm „C‟.
23. She has stated that the aerial flood mapping, obtained from the Queensland
Reconstruction Authority website, portrays an inaccurate picture of the
extent of inundation in her street. Specifically, she says that several of the
properties neighbouring hers, which are shown on the aerial maps as having
been subject to flooding, were not affected by inundation at all.
24. In addition, the Applicant has pointed out that the website from which the
aerial flood mapping has been obtained, includes a disclaimer that the maps
are an information source only and that the Queensland Government makes
no statements, representation or warranties about the accuracy,
completeness or reliability of any information contained in the publication.
25. The Applicant says that the area hydrology reports, commissioned by the
Insurance Council of Australia, contain an assessment of the Goodna area,
but do not take into consideration individual differences in water height or
water causation generated by specific property boundaries.
26. She has also highlighted that the hydrology reports include disclaimers that
they are incomplete and that the authors have stated that there are several
factors which they were not able to take into account.
27. Further, she says that the FSP did not carefully review the area hydrology
reports when it made its decision regarding her claim.
28. The FSP has conceded that the assessmen t report by „C‟ contains a number
of errors and contradictions, however, says that there are a number of other
aspects of the report that are not disputed by the Applicant.
29. The FSP has noted the caveats in the area hydrology reports to the effect
that the reports should not be used to assess flooding of individual
properties, particularly at the limits of the flooding.
30. The FSP says, however, that it did not place sole reliance on these reports
when making its decision regarding the Applicant‟s claim.
31. Regard less, it asserts that the Applicant‟s home was not at the limit of
flooding.
32. The Panel has reviewed the assessment report in question, and notes that it
states that the height of inundation at the Applicant‟s home was 1.5m.
However, one of the photographs attached to the report shows the height of
inundation as approximately 0.6m and this has been supported by additional
photographs provided by the Applicant and the revised height of inundation
has been accepted by the FSP.
33. When the Panel Chair Ombudsman attended on site, the Applicant showed
him the mark on the rear door which showed the level the water reached. It
was just above the height of a portable gas bottle. The Panel Chair
Ombudsman estimated the height to be approximately 0.4m.
Case No: 252585 Determination Page 5 of 8
34. The Panel also notes several other aspects of the report which appear to be
clearly in error.
35. The Panel accepts that the photographs attached to the assessment report
are an accurate representation of the damage at the Applicant‟s property.
36. However, given the number and magnitude of some of the obvious errors in
the report, the Panel is of the view that the report is of limited probative
value.
37. The Panel has considered the Applicant‟s concerns regarding the accuracy
of the aerial flood mapping. The Panel notes that the Applicant has stated
that several properties which the mapping shows as having been flooded
were not inundated at all.
38. While acknowledging the Applicant‟s allegations about the accuracy of the
flood mapping‟s depiction of the extent of the inundation in her a rea, she has
not provided any evidence to support her allegations. Nevertheless, the
Panel accepts that the aerial flood mapping may not be completely accurate
in all aspects.
39. The Panel regards the area hydrology reports as a useful information source
but recognises their limitations and is reluctant to decide any dispute entirely
on the basis of the reports‟ contents alone. This is particularly so where one
party has contested the accuracy of one or more aspect of the reports
information.
40. However, the Panel notes that although the Applicant has questioned the
reliability of the area hydrology reports because of their disclaimers, she has
not challenged any of the specific pieces of information which the FSP has
drawn from the reports in relation to her claim.
41. The Panel has considered the concerns about the reports and other
information used by the FSP to make its decision about her claim.
42. Given the Panel‟s finding regarding the FSP‟s assessment report as outlined
at paragraph 36 of this Determination, the Pa nel believes that the FSP‟s
decision to deny the Applicant‟s claim would have been difficult to justify in
the absence of any other site-specific report regarding the damage or its
cause.
43. However, the Panel also acknowledges that since its original decision
regarding the claim, the FSP has obtained a site-specific hydrology report
from hydrology firm „W‟, which examines the drainage and to pography in the
vicinity.
Site Specific Hydrology Report
44. The FSP says that the hydrology report by „W‟ provides expert evidence that
the inundation of the Applicant‟s home occurred solely as a result of flooding
of the Brisbane River.
Case No: 252585 Determination Page 6 of 8
45. The Panel notes that while the authors of the „W‟ hydrology report reviewed
the rainfall, water level and topographic data relevant to the inundation of the
Applicant‟s property, no inspection of the property was carried out by the
authors of the report and the Applicant was not consulted about the event.
46. The Panel has reviewed the hydrology report by „W‟ and notes the following:
The recorded Brisbane River water levels in the vicinity of the
Applicant‟s property (as interpolated from the two nearest water level
gauges upstream and downstream) show that the peak of the water
would have been 16.5mAHD.
The topographic data indicates that the gro und levels at the property
range from approximately 15.8mAHD to 16.5mAHD and this data
indicates that the entire property would have been inundated at the
peak water level of 16.5mAHD.
The area to the south- east of the Applicant‟s property is a natural
drainage path that connects it to the Brisbane River at the confluence
of the Woogaroo Creek.
The report concludes that the Applicant‟s property was inundated by
backwater flooding from the Brisbane River via direct overland flow.
Cause of Inundation
47. Based on all the evidence available, the Panel accepts that the Brisbane
River back-flooded its tributary Woogaroo Creek, and that this flood water
flowed from the point close to the Brisbane River‟s confluence with the
Woogaroo Creek tow ards the Applicant‟s pro perty.
48. Notwithstanding that the Applicant has disputed the relevance of the „W‟
hydrology report‟s reference to Woogaroo Creek, saying that the Creek is
2.5km distant from her property, the Panel accepts that there is a drainage
path from Woogaroo Creek to the Applicant‟s property.
49. The Panel Chair Ombudsman, when he attended on site was able to
observe the lower bank height of the Brisbane River to the south east of the
Applicant‟s property. The Panel Chair Ombudsman was also able to observe
the drainage path referred to above.
50. The Panel finds that on the balance of probabilities the drainage path, which
runs between Ipswich Motorway and the Brisbane River, served to carry the
flood water to the Applicant‟s property and ultimately inundate it.
Photographs Provided By Applicant
51. The Applicant has said that the FSP did not consider the photographs of the
damage to her property when making its decision regarding her claim.
Case No: 252585 Determination Page 7 of 8
52. The FSP says that it reviewed the photographs provided by the Applicant,
but says that while they provide evidence of the extent of damage, they do
not assist in terms of establishing the cause of the inundation.
53. After reviewing the Applicant‟s photographs, the Panel is of the view that the
photographs are not determinative in establishing the actual cause of the
inundation.
Involvement Storm water Run-off
54. The Applicant points to the reference to “torrential rainfall of more than
160mm” in the Assessment Report provided by the FSP, saying that this
would have created stormwater run-off from the areas surrounding her
property.
55. For the purpose of examining the Applicant‟s position with regard to storm -
water involvement, the Panel will accept the following reference made in the
FSP‟s assessment as this has been widely reported in other sources.
56. The Panel is of the view that the reference to torrential rainfall of more than
160mm (referred to by the Applicant) has been taken out of context. The
FSP‟s assessment report states that:
“Torrential rainfall of more than 160mm in the upper reaches of the Bris bane
River catchment area from 9 th of January 2011 combined with massive
releases of water from the Wivenhoe dam caused river levels to rise rapidly
over the period from 10 th to the 13 th of January 2011.”
57. It is clear from the assessment report‟s comment about „torrential rainfall‟
actually refers to rain that fell a significant distance from the Applicant‟s
location and could not be considered to be responsible for stormwater run-off
at the Applicant‟s home.
58. In order to establish any involvement of stormwater in the inundation of the
Applicant‟s property, the Panel has examined the other evidence available
and notes that the site- specific hydrology report by „W‟, provide d by the FSP,
addresses this issue.
59. The Panel notes that the report by „W‟ includes the following information:
Recorded rainfall data from two rainfall stations (located approximately
2.6km north- east and 5km south of the Applicant‟s property) show that
no significant rain fell at either station after about 1600 hours on
Tuesday 11 January 2011.
The peak hourly rainfall intensity occurred at 1100 hours on Tuesday
11 January 2011 at both gauges.
Peak stormwater run- off at the Applicant‟s property would have
occurred within 15 minutes of the peak rainfall intensity.
The initial inundation of the property would have occurred at 9.00 hours
on 12 January 2011, about 16 hours after the rainfall in the area had
ceased.
Case No: 252585 Determination Page 8 of 8
Any water that entered the property after about 1700 hours on 11
January 2011 could not have been stormwater run-off because rainfall
ceased about this time.
60. The Panel accepts the finding of „W‟ with respect to the timing of inundation
and that there was no involvement from stormwater in the inundation of the
Applicant‟s property.
Liability for Damage
61. The Panel has reviewed the Applic ant‟s policy wording and is satisfied that it
excludes coverage loss or damage caused by flood, which it defines as:
“The inundation or covering of normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped
or been released from it,
the normal confines of any watercourse or lake, including any that
may have been modified by human intervention, or reservoir, canal,
dam or stormwater channel.
62. Further, the Panel is satisfied that the inundation to the Applicant‟s home
was caused by flood, as defined under the policy.
63. Accordingly, the Panel finds that the FSP is not liable for the damage to the
Applicant‟s home contents.
Determination
64. On the basis of the available information the Panel determines that the FSP
is not required to indemnify the Applicant for loss or damage to her home
contents.