Home / Financial Firm (Unknown - Insurer) / Determination 252585

Determination 252585

Denial of claim - flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's home contents were damaged when water inundated her home in January 2011, and the FSP denied the claim as flood, which is excluded. AFCA found the inundation was flood from the Brisbane River and that the FSP is not required to indemnify her.

Site-specific hydrology evidence showed backwater flooding from the Brisbane River with no stormwater involvement, so the flood exclusion applied under the policy definition.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 252585 Determination Page 1 of 8 Case number: 252585 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 10 April 2012 Background 1. The Applicant held a home contents insurance policy with the Financial Services Provider (FSP). 2. On 13 January 2011, after her home had been inundated with water, she lodged a claim with the FSP for the resultant damage. 3. The FSP denied liability for the damage, on the basis that it had been caused by flood, which is excluded under the policy. 4. After revie wing the claim decision at the Applicant‟s request, the FSP maintained its decision to deny liability for the damage. Summary of Applicant’s position 5. The Applicant says that the water that caused the inundation did not come from the Brisbane River, but from another direction altogether. 6. She believes that this water was in part stormwater from the surrounding areas, which was the result of torrential rain. 7. The Applicant says that the evidence upon which the FSP relied to decide her claim is flawed:  The Assessment Report contains inconsistencies, contradictions and errors.  The area hydrology report is general in nature, contains a disclaimer that there are several factors that the authors were not able to take into account and also states that it is incomplete.  The aerial flood mapping is general in nature and misrepresents the situation at her home address. 8. The FSP made its decision to deny the claim, without taking into consideration the photographs she had taken of the damage to her property. Determination Case No: 252585 Determination Page 2 of 8 Summary of FSP’s position 9. The FSP says that the evidence it has obtained indicates that the cause of the in undation of the Applicant‟s property was flood from the Brisbane River. 10. It acknowledges that some of the flood questionnaire answers recorded by its assessor were clearly in error or contradictory. However, it regards the issues to which these errors and contradictions pertain were not pivotal to the claim decision and the Assessment Report was only one of several pieces of evidence it used in making its decision. 11. The FSP has also obtained a site- specific report by hydrologist „W‟ which points to flood as the cause of the inundat ion at the Applicant‟s property and corroborates the other evidence it has used to make its decision. 12. Based on the information available, there was no stormwater involvement in the inundation of the property. 13. The FSP relies on the following policy provisions: “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to the particular insured events Yes You are covered for damage or loss to your contents while they are in your home or at the site, occurring during the period of cover, caused by the following events: ... Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No You are not covered for: ... Damage or loss by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or Case No: 252585 Determination Page 3 of 8 is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... What we do not cover – general exclusions. You are not covered under any section of the policy for damage, loss, cost or liability caused of arising from or involving: flood,” Issues 14. Whether the FSP is able to rely on the evidence it has obtained regarding the inundation. 15. Whether the Applicant‟s property was damaged by flood, or by stormwater inundation. 16. Whether the FSP is liable for the damage to the Applicant‟s contents. Reasons for decision 17. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 18. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 19. The Panel Chair Ombudsman attended on site where he met with the Applicant and representatives of the FSP. 20. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Reliability of FSP’s Evidence 21. The Applicant has questioned the reliability of the evidence used b y the FSP in making the decision to deny her claim. Case No: 252585 Determination Page 4 of 8 22. The Applicant has pointed out some aspects of the report produced by assessment firm „C‟. 23. She has stated that the aerial flood mapping, obtained from the Queensland Reconstruction Authority website, portrays an inaccurate picture of the extent of inundation in her street. Specifically, she says that several of the properties neighbouring hers, which are shown on the aerial maps as having been subject to flooding, were not affected by inundation at all. 24. In addition, the Applicant has pointed out that the website from which the aerial flood mapping has been obtained, includes a disclaimer that the maps are an information source only and that the Queensland Government makes no statements, representation or warranties about the accuracy, completeness or reliability of any information contained in the publication. 25. The Applicant says that the area hydrology reports, commissioned by the Insurance Council of Australia, contain an assessment of the Goodna area, but do not take into consideration individual differences in water height or water causation generated by specific property boundaries. 26. She has also highlighted that the hydrology reports include disclaimers that they are incomplete and that the authors have stated that there are several factors which they were not able to take into account. 27. Further, she says that the FSP did not carefully review the area hydrology reports when it made its decision regarding her claim. 28. The FSP has conceded that the assessmen t report by „C‟ contains a number of errors and contradictions, however, says that there are a number of other aspects of the report that are not disputed by the Applicant. 29. The FSP has noted the caveats in the area hydrology reports to the effect that the reports should not be used to assess flooding of individual properties, particularly at the limits of the flooding. 30. The FSP says, however, that it did not place sole reliance on these reports when making its decision regarding the Applicant‟s claim. 31. Regard less, it asserts that the Applicant‟s home was not at the limit of flooding. 32. The Panel has reviewed the assessment report in question, and notes that it states that the height of inundation at the Applicant‟s home was 1.5m. However, one of the photographs attached to the report shows the height of inundation as approximately 0.6m and this has been supported by additional photographs provided by the Applicant and the revised height of inundation has been accepted by the FSP. 33. When the Panel Chair Ombudsman attended on site, the Applicant showed him the mark on the rear door which showed the level the water reached. It was just above the height of a portable gas bottle. The Panel Chair Ombudsman estimated the height to be approximately 0.4m. Case No: 252585 Determination Page 5 of 8 34. The Panel also notes several other aspects of the report which appear to be clearly in error. 35. The Panel accepts that the photographs attached to the assessment report are an accurate representation of the damage at the Applicant‟s property. 36. However, given the number and magnitude of some of the obvious errors in the report, the Panel is of the view that the report is of limited probative value. 37. The Panel has considered the Applicant‟s concerns regarding the accuracy of the aerial flood mapping. The Panel notes that the Applicant has stated that several properties which the mapping shows as having been flooded were not inundated at all. 38. While acknowledging the Applicant‟s allegations about the accuracy of the flood mapping‟s depiction of the extent of the inundation in her a rea, she has not provided any evidence to support her allegations. Nevertheless, the Panel accepts that the aerial flood mapping may not be completely accurate in all aspects. 39. The Panel regards the area hydrology reports as a useful information source but recognises their limitations and is reluctant to decide any dispute entirely on the basis of the reports‟ contents alone. This is particularly so where one party has contested the accuracy of one or more aspect of the reports information. 40. However, the Panel notes that although the Applicant has questioned the reliability of the area hydrology reports because of their disclaimers, she has not challenged any of the specific pieces of information which the FSP has drawn from the reports in relation to her claim. 41. The Panel has considered the concerns about the reports and other information used by the FSP to make its decision about her claim. 42. Given the Panel‟s finding regarding the FSP‟s assessment report as outlined at paragraph 36 of this Determination, the Pa nel believes that the FSP‟s decision to deny the Applicant‟s claim would have been difficult to justify in the absence of any other site-specific report regarding the damage or its cause. 43. However, the Panel also acknowledges that since its original decision regarding the claim, the FSP has obtained a site-specific hydrology report from hydrology firm „W‟, which examines the drainage and to pography in the vicinity. Site Specific Hydrology Report 44. The FSP says that the hydrology report by „W‟ provides expert evidence that the inundation of the Applicant‟s home occurred solely as a result of flooding of the Brisbane River. Case No: 252585 Determination Page 6 of 8 45. The Panel notes that while the authors of the „W‟ hydrology report reviewed the rainfall, water level and topographic data relevant to the inundation of the Applicant‟s property, no inspection of the property was carried out by the authors of the report and the Applicant was not consulted about the event. 46. The Panel has reviewed the hydrology report by „W‟ and notes the following:  The recorded Brisbane River water levels in the vicinity of the Applicant‟s property (as interpolated from the two nearest water level gauges upstream and downstream) show that the peak of the water would have been 16.5mAHD.  The topographic data indicates that the gro und levels at the property range from approximately 15.8mAHD to 16.5mAHD and this data indicates that the entire property would have been inundated at the peak water level of 16.5mAHD.  The area to the south- east of the Applicant‟s property is a natural drainage path that connects it to the Brisbane River at the confluence of the Woogaroo Creek.  The report concludes that the Applicant‟s property was inundated by backwater flooding from the Brisbane River via direct overland flow. Cause of Inundation 47. Based on all the evidence available, the Panel accepts that the Brisbane River back-flooded its tributary Woogaroo Creek, and that this flood water flowed from the point close to the Brisbane River‟s confluence with the Woogaroo Creek tow ards the Applicant‟s pro perty. 48. Notwithstanding that the Applicant has disputed the relevance of the „W‟ hydrology report‟s reference to Woogaroo Creek, saying that the Creek is 2.5km distant from her property, the Panel accepts that there is a drainage path from Woogaroo Creek to the Applicant‟s property. 49. The Panel Chair Ombudsman, when he attended on site was able to observe the lower bank height of the Brisbane River to the south east of the Applicant‟s property. The Panel Chair Ombudsman was also able to observe the drainage path referred to above. 50. The Panel finds that on the balance of probabilities the drainage path, which runs between Ipswich Motorway and the Brisbane River, served to carry the flood water to the Applicant‟s property and ultimately inundate it. Photographs Provided By Applicant 51. The Applicant has said that the FSP did not consider the photographs of the damage to her property when making its decision regarding her claim. Case No: 252585 Determination Page 7 of 8 52. The FSP says that it reviewed the photographs provided by the Applicant, but says that while they provide evidence of the extent of damage, they do not assist in terms of establishing the cause of the inundation. 53. After reviewing the Applicant‟s photographs, the Panel is of the view that the photographs are not determinative in establishing the actual cause of the inundation. Involvement Storm water Run-off 54. The Applicant points to the reference to “torrential rainfall of more than 160mm” in the Assessment Report provided by the FSP, saying that this would have created stormwater run-off from the areas surrounding her property. 55. For the purpose of examining the Applicant‟s position with regard to storm - water involvement, the Panel will accept the following reference made in the FSP‟s assessment as this has been widely reported in other sources. 56. The Panel is of the view that the reference to torrential rainfall of more than 160mm (referred to by the Applicant) has been taken out of context. The FSP‟s assessment report states that: “Torrential rainfall of more than 160mm in the upper reaches of the Bris bane River catchment area from 9 th of January 2011 combined with massive releases of water from the Wivenhoe dam caused river levels to rise rapidly over the period from 10 th to the 13 th of January 2011.” 57. It is clear from the assessment report‟s comment about „torrential rainfall‟ actually refers to rain that fell a significant distance from the Applicant‟s location and could not be considered to be responsible for stormwater run-off at the Applicant‟s home. 58. In order to establish any involvement of stormwater in the inundation of the Applicant‟s property, the Panel has examined the other evidence available and notes that the site- specific hydrology report by „W‟, provide d by the FSP, addresses this issue. 59. The Panel notes that the report by „W‟ includes the following information:  Recorded rainfall data from two rainfall stations (located approximately 2.6km north- east and 5km south of the Applicant‟s property) show that no significant rain fell at either station after about 1600 hours on Tuesday 11 January 2011.  The peak hourly rainfall intensity occurred at 1100 hours on Tuesday 11 January 2011 at both gauges.  Peak stormwater run- off at the Applicant‟s property would have occurred within 15 minutes of the peak rainfall intensity.  The initial inundation of the property would have occurred at 9.00 hours on 12 January 2011, about 16 hours after the rainfall in the area had ceased. Case No: 252585 Determination Page 8 of 8  Any water that entered the property after about 1700 hours on 11 January 2011 could not have been stormwater run-off because rainfall ceased about this time. 60. The Panel accepts the finding of „W‟ with respect to the timing of inundation and that there was no involvement from stormwater in the inundation of the Applicant‟s property. Liability for Damage 61. The Panel has reviewed the Applic ant‟s policy wording and is satisfied that it excludes coverage loss or damage caused by flood, which it defines as: “The inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. 62. Further, the Panel is satisfied that the inundation to the Applicant‟s home was caused by flood, as defined under the policy. 63. Accordingly, the Panel finds that the FSP is not liable for the damage to the Applicant‟s home contents. Determination 64. On the basis of the available information the Panel determines that the FSP is not required to indemnify the Applicant for loss or damage to her home contents.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.