Quantum of building fire claim, total loss versus repair, and delayed claim acceptance
Text of the determination
Case No: 252449 Determination Page 1 of 15
Case number: 252449
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
General Insurance - Domestic Insurance - Home Contents - Service – Claim
amount
3 April 2012
Background
1. The Applicant held a home insurance policy insuring his building for
$272,950, and contents for $166,402 which included portable valuables
cover for two items of jewellery in the sum of $21,700.
2. On 25 July 2009 the property suffered significant damage caused by fire.
3. A claim under the policy was denied on 24 February 2010 on the ground the
Applicant had not provided a truthful or accurate version of the
circumstances of the claim in order to induce the FSP to pay the claim and
that the claim was fraudulent.
4. On 30 September 2011, the FSP rescinded its decision to deny the claim
and accepted liability for the loss. The FSP offered settlement of the building
by a cash payment to the Applicant in the sum of $226,600 plus interest of
$46,797.56 in accordance with the section 57 of the Insurance Contracts Act
1984 (the Act).
5. The contents claim was assessed in the sum of $137,812 plus $28,461.01
interest in accordance with the Act. The Applicant refused to sign a release
document and a payment of $137,812 without interest was made to the
Applicant.
6. A payment of $38,000 was made for 12 months temporary accommodation
expenses.
7. The FSP denied that part of the claim for a heart shaped diamond studded
pendant insured for $1,700 and a 24 carat gold necklace with an insured
value of $20,000.
Determination
Case No: 252449 Determination Page 2 of 15
Summary of Applicant’s position
8. The Applicant‟s case has been submitted to FOS by his lawyer. Any
reference to arguments submitted by the Applicant will also include
arguments submitted on his behalf by the lawyer.
9. The dispute involves three claims.
1. Break and enter which occurred on 13 September 2008 at Mulgoa.
2. Fire damage to the home and contents on 25 July 2009.
3. Loss of 24 carat gold necklace in the fire on 25 July 2009.
10. Contrary to the FSP‟s advice that the clai m was first denied on 24 May 2011,
the claim was actually denied from the outset dating back to 2009.
Break and enter claim
11. The FSP refused the claim as he had never pursued the claim.
12. In August 2009 he was arrested and bail was refused. He was not in a
position to pursue the matter while in custody.
13. The claim was later raised in communication with the FSP by his lawyer and
was also subject to the failure of the FSP to release information thus
providing significant difficulty in proceeding with the claim.
Gold necklace
14. The FSP relies on the evidence of the Applicant‟s partner Ms E that at the
time of the fire he was in possession of the necklace.
15. He has two gold necklaces which has caused some confusion. During an
interview on 8 December 2008 it was indicated that he was in possession of
a necklace. That necklace was not the necklace which was lost in the fire on
25 July 2009.
16. It is clear that there were two necklaces and that the necklace lost in the fire
was the necklace itemised on the policy.
Deed of release
17. Completion of the deed of release submitted by the FSP would be unfair as
the claims for gold necklace and break and enter loss have not been
resolved.
18. His claim is for substantially more than the FSP is offering.
19. He would enter into a release solely in respect of the fire damage to the
building and contents.
Case No: 252449 Determination Page 3 of 15
Duress
20. Undue influence and pressure were placed on him by the FSP to sign
documentation.
21. His claim is for substantially more than the FSP‟s offer to settle. He is in a
poor financial position as a result of additional costs incurred and interest
paid to the bank on a loan for the house which he cannot occupy.
Quantum
22. The FSP‟s initial offer to restore the building is no longer sufficient.
23. The building is insured for $272,950. The property is effectively a total loss
which is attributable to the delay in resolving the matter. The FSP‟s offer of
$226,000 was based on a revised costing provided by a cost assessor
shortly after the claim was lodged. The property incurred additional damage
due to prolonged exposure to the elements following the delay by the FSP in
settling the matter.
24. It would be unfair to base the cost to rectify the damage on revised costing
provided by a cost assessor and adding interest.
Compensation for expenses
Legal costs
25. He seeks payment for legal fees in respect of all costs incurred as a
consequence of the denial of the claim.
Rent
26. Rent payment should be extended to cover the period from 25 July 2009 up
to the date on which the final agreement is reached in relation to q uantum.
Quantum
Building – he seeks payment of $272,950 plus interest.
Contents – He will accept payment of the FSP‟s interest calculation in the
sum of $28,461.
Necklace - he seeks payment of $20,000.
Rent
27. There has been an undue and unreasonable delay in accepting the claim.
Consequently he has incurred rental costs from 25 July 2009 to date.
28. In this case cover for rent should be extended to cover the period up to the
date on which final agreement is reached in relation to quantum.
Case No: 252449 Determination Page 4 of 15
Other matters
29. He asked the loss adjuster to cover the building with a tarpaulin. The
adjuster replied;
“There is no use covering up the building because it was stuffed ... what we
are trying to save ... [FSP] would not waste money covering up the building
that was stuffed.”
30. Because the FSP refused to cover up the building there had been further
damage.
31. The scope of works (SOW) relied on by the FSP is not accurate as it does
not take into account the ongoing damage caused by a long exposure to the
elements.
32. The FSP delayed paying the rental accommodation for 2 months. This
caused him to lose the property and his partner having to move in with her
mother.
33. The deed of release which the FSP asked him to sign otherwise he would
not be paid, included details which were not relevant to the claim and would
prevent him from taking any further legal action. He considered the attempt
to have him sign was under duress.
34. He seeks a letter of apology stating the claim was not fraudulent.
35. He seeks a ruling that he has a right to file a civil claim for pain, suffering and
defamation.
Summary of FSP’s position
Jurisdiction
36. The amounts claimed by the Applicant in the sum of $347,554.71 exceed the
FOS jurisdictional limits and FOS should decline to determine the dispute in
accordance with 5.2(a) of the Terms of Reference.
37. The FSP further submits there is no provision within the FOS Terms of
Reference for FOS to order a written apology,
38. Further, the amount of compensation sought by the Applicant is outside the
jurisdictional limits which FOS may award pursuant to section 9.4 of the
Terms of Reference being $3,000.
Break and enter claim
39. The claim refers to a different event to the fire which occurred on 25 July
2009.
40. The break and enter occurred on 13 September 2008 and at a different
location to the fire event.
Case No: 252449 Determination Page 5 of 15
41. This claim has not been the subject of an internal review for a final decision.
42. The FSP submits that this claim should be dealt with separately from the fire
damage claim and that it be afforded the opportunity to address the
Applican t‟s concerns separate from the fire claim.
Deed of release, alleged duress, expenses
43. It is a regular and not unusual practice for parties to resolve complex claims
by way of a deed of release and in no way is it an indication that it (the FSP)
used any offer to apply unnecessary or undue pressure.
Total loss v repair.
44. It has obtained expert advice from experienced and qualified building
consultants.
45. A cash settlement of the building claim in the sum of $226,600 plus interest
based on the cost to complete the repairs plus interest was offered to the
Applicant.
46. The building had been assessed by the builder and loss adjuster as
repairable.
47. The Applicant‟s builder was unable to provide information why he deemed
the building a total loss and advised that he believed the cost of repairs to be
in the vicinity of $220,000 to $250,000.
Rent
48. The Applicant had been paid $38,000 for rental accommodation which
represents the total of all payments outstanding.
Legal fees
49. The Applicant has not substantiated his claim for legal costs other than a
single invoice in the sum of $30,618.
50. The Applicant has failed to prove he has suffered a direct financial loss or
damage. He has also failed to prove he suffered consequential financial loss
as a result of an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with his expectation of
enjoyment or peace of mind.
51. In any event the policy does not provide cover for this cost.
Listed items claim
52. Ms E confirmed that at the time of the fire the Applicant was in possession of
the necklace. The Applicant has not provided any information to the contrary
since making this assertion
Case No: 252449 Determination Page 6 of 15
53. The Applicant has not established that he has suffered any loss and his
claim should not succeed.
Interest
54. Any award for payment of interest on the contents claim should be
calculated from the date of final denial being 24 May 2011, given that it acted
in a manner consistent with good insurance practice to continually address
the multitude of issues raised by the Applicant in a timely manner.
Issues
55. Whether the Applicant is entitled to payment in excess of the sums offered
by the FSP in settlement of the claim.
Reasons for decision
56. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination by a Panel.
57. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
58. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
Jurisdiction
59. The FOS Terms of Reference relevant to this dispute are:
“ 3.2 Disputes lodged with FOS between 1 January 2010 and 31
December 2011
Where a Dispute is lodged with FOS between 1 January 2010 and 31
December 2011,
a) The maximum amount that may be awarded by FOS is relation to
a claim made in a Dispute will be determined in accordance with
Schedule 1;
...
5.1 Exclusions from FOS’s jurisdiction
The Service may not consider a Dispute:
...
o) where the value of the Applicant‟s claim in the Dis pute exceeds
$500,000;
...
Case No: 252449 Determination Page 7 of 15
Schedule 1
...
The table below specifies according to the type of claim the maximum total
value of the remedy that may be decided upon by FOS (excluding
compensation for costs and interest payments)
Type of Claim Amount per claim
... ...
5 Other $280,000”
60. The FSP has agreed to pay the sum of $226,512 in relation to the building
damage claim. The contents claim has been agreed and paid to the
Applicant and therefore does not form part of the dispute.
61. Interest and compensation payable or claimed by the Applicant do not fall
within the FOS jurisdictional limits.
62. The Applicant is claiming. $272,950 for the building, $20,000 for the gold
necklace and $30,618 for legal expenses being in total $323,568.
63. Th e value of the dispute in the Applicant‟s claim is therefore the difference
between the sums which the FSP has agreed to pay and the amount which
the Applicant is claiming, that is $97,056.
64. The maximum total amount of the remedy that FOS may award is $280,000
excluding compensation and interest which may be deemed payable.
65. Accordingly, compensation and interest included in the Applicant‟s referral to
FOS has not formed part of the calculations for the purpose of establishing
FOS jurisdictional limits and will be additional to the limit of $280,000 which
may otherwise be awarded.
66. The Panel is satisfied that the value of the Applicant‟s claim in this Dispute
falls within the jurisdictional limits pursuant to the FOS Terms of Reference.
Break and enter claim
67. This matter relates to a claim made by the Applicant for a loss arising from
theft of property located at Mulgoa on 13 September 2008. The loss was
assessed at about $100,000.
68. The claim was refused due to the Applicant‟s failure to cooperate and that he
did not pursue the claim. (see FSP letter dated 24 February 2010).
69. The Applicant explained that the claim was not pursued due to his
incarceration from August 2009 which resulted in significant difficulties in
proceeding with it.
70. This claim therefore is unconnected to the issues central to the dispute
referred to FOS arising from the fire which occurred on 25 July 2009.
Case No: 252449 Determination Page 8 of 15
71. Because of the sum involved, and the lack of material relevant to this matter
the Panel considers it is not appropriate for the issues to be determined as
part of this determination.
72. The Panel therefore recommends that the FSP process the claim through its
Internal Dispute Resolution committee with a view to providing a final
decision to the Applicant. Should the Applicant dispute the FSP‟s de cision,
he may formally lodge a new dispute with FOS.
Gold necklace
73. The Applicant claims that the gold necklace listed on his policy for $20,000
was lost in the fire on 25 July 2009.
74. The Applicant‟s partner Ms E was interviewed by the FSP‟s investigator o n
17 October 2009 and provided the following information in relation to the
gold necklace.
75. (Q1089) When asked to clarify if any jewellery was stolen she responded:
“No. On the night that we actually rang [FSP] we said we had our jewellery the
– the two nec klaces, we were wearing them.” (P 8)
76. She confirmed that they were the ones that were insured. One was her heart
shaped necklace and the other was a chain belonging to the Applicant. She
stated (Q1093)
“That is specified and we were wearing them on the night.”
77. When asked if they still had them she said that she had her necklace with
her but she did not know where the Applicant‟s gold necklace was. The
investigator sought clarification from Ms E following a further comment to
which she responded (Q1105)
“... I even told the lady that night that it was ... that we had them on us.” (P
212)
78. Ms E stated she was not aware of the Applicant‟s gold necklace having been
stolen at all.
79. The Applicant explained that some confusion has occurred in relation to the
necklace. He states there were two gold necklaces and refers to an interview
with the FSP‟s investigator on 8 December 2008 when at that time he
informed the investigator he was in possession of a necklace. However that
necklace was not the one that was lost in the fire on 25 July 2009. One of
the necklaces was purchased after initially listing the jewellery on the
contents policy.
80. Examination of the transcript of the 8 December 2008 interview reveals that
when going through the list of items claimed at that time, reference was
made to a men‟s 24 carat yellow gold link necklace (Q260). The Applicant
queried whether the investigator was referring to his ”big one” and went on to
say:
Case No: 252449 Determination Page 9 of 15
“I‟ve got a massive chain but it didn‟t get stolen cause I had it on me on the
night. ” (P 371)
81. The exchange of information during the interview on 8 December 2008
suggests that the Applicant had two gold necklaces, one of which was large
and had not been stolen during the break and enter in September 2008.
82. However, Ms E‟s evidence was clea r and unhesitating. Based on her
evidence, the Applicant was wearing a gold necklace on the night of the fire
and she agreed that this necklace was the necklace listed on the policy.
83. The onus rests with the Applicant to establish on the balance of probabilities
that the loss claimed is covered by the policy. After analysis of the evidence
the Panel is not satisfied the Applicant has discharged that onus in relation
to the gold necklace.
Building claim - quantum
84. The property was damaged on 25 July 2009. A Scope of Works (SOW) to
rectify the damage was prepared by a consultant and on 20 August 2009
submitted to three builders. On 3 September 2009 quotations were received
from the builders in the sums of $205,920, $126,108 and $125,000.
85. On 14 November 2011 the FSP offered a cash settlement of the building
claim in the sum of $170,000. The offer was rejected and on 16 November
2011 the FSP offered settlement in the sum of $205,920 plus 10%
contingency rounding up to $226,512.
86. The FSP argues that the building is therefore repairable and that the offer is
fair and reasonable.
87. The Applicant argues that as a result of the delay in accepting the claim, the
building deteriorated as it was exposed to the elements during that time
causing it to be a total loss. The Applicant submits that the assessor ignored
his request to have the damaged building protected by tarpaulins .
88. By letter dated 28 October 2011, a builder SOC commissioned by the
Applicant made the following comments:
In his opinion the building was a total loss.
After reviewing the SOW, he found it incomplete and not reflective of
the true damage caused by the fire.
Further damage was caused to the property due to prolonged exposure
to weather.
The only salvageable parts of the building were the slab and partial
parts of the brickwork.
89. The Applicant‟s builder was contacted by the FSP‟s home assessor. The
home assessor provided a statutory declaration detailing that
communication. She stated:
Case No: 252449 Determination Page 10 of 15
The builder advised that he had seen the property 2 weeks after the fire
and again when the SOW was available and again when the claim was
refused.
He could not remember what items were missing from the SOW as it
was over 2 years ago.
He acted as a consultant to the Applicant. Other tradesmen who were
friends of the Applicant were completing the repairs.
He had never completed a quotation for repairing the building.
He estimated the cost of repairs to be between $220,000 and
$250,000.
90. The FSP‟s home auditor involved in the initial assessment of the damage by
statutory declaration denied the substance of the comments which the
Applicant alleged he made at the time the damaged property was inspected.
He also stated that he did not indicate to the Applicant that the property
would not be repaired correctly or deny the claim.
91. The home auditor stated that at the time he believed that the property was
not a total loss and it could have been repaired. As such he organised a
number of quotations for that purpose.
92. In arriving at a decision in relation to the extent of damage and in turn
quantum, the Panel relies on the following factual information.
1. The loss occurred on 25 July 2009.
2. A SOW was prepared which encompassed repairing the building and 3
builder‟s quoted according to the SOW.
3. On 24 February 2010 the FSP issued a letter denying the claim.
4. On 21 July 2010 a final decision was made to deny the claim.
5. On 30 September 2011 the claim was accepted. (see FSP chronology)
6. On 2 November 2011 a payment of $137,120 was made in relation to the
contents damage.
7. On 14 November 2011 an offer of $170,000 was made in relation to the
building damage which was increased to $226,512 on 16 November
2011 which was based on a quotation of $205,920 plus 10%
contingency.
93. According to the evidence, a S OW was prepared to rectify the damage and
three builders submitted quotations to carry out those repairs based on the
SOW. The sum of the quotations was less than the sum insured. In addition,
the Applicant‟s consultant builder had not provided a quotation to repair the
damage but gave a broad estimate ranging from $220,000 to $250,000, both
of which are less than the sum insured.
Case No: 252449 Determination Page 11 of 15
94. It is clear from the foregoing that at the time of the loss, the cost of repairing
the damage was less than the sum insured, in which case the Panel accepts
that the FSP was entitled to consider the building was a repairable
proposition and need not be deemed a total loss.
95. A period of about 26 months elapsed from the date of the loss to acceptance
of the claim. It is reasonable to conclude that any building exposed to the
elements for this period of time without protection would suffer some further
deterioration.
96. The Panel understands that the Applicant has commenced the repairs. It is
therefore not possible to now have the building inspected for the purpose of
preparing a second SOW which would reflect its current condition and have
that SOW costed.
97. The FSP has taken the option available to it to cash settle the building claim.
As a period of over 2 years has passed since the damage occurred and
quotes obtained, it is arguable the Applicant could be placed in a position of
seeking an alternate builder and in turn increased prices reflecting current
costs. The Applicant‟s arrangements with his contractors carrying out the
rectification works is not known to the Panel.
98. Nevertheless, the Panel accepts that the cost of labour and material will
have increased since September 2009 when the initial quotations were
obtained by the FSP.
99. In this regard the FSP„s offer includes a 10% continge ncy based on the
$205,920 quotation. Thus, the quotation was increased by $20,592.
100. Given the building sustained substantial damage as a result of the fire, it is
reasonable to conclude that unforseen problems may arise which incur
additional costs. A contingency allowance is designed to offset those costs
and not necessarily to offset inflationary costs.
101. The Panel has referred to the Australian Bureau of Statistics Producer Price
Indexes, Tables 16 & 17 Materials used in house building category which for
Sydney reflect the following increases:
June 2009 quarter to June 2010 quarter change 0.9%
June 2010 quarter to June 2011 quarter change 4.9%
June 2011 quarter to December 2011 quarter change 0.5%
102. The Panel has also referred to the Australian Bureau of Statistics Labour
Price Index Table 2a Total hourly rates of pay which for New South Wales
reflects the following increases:
June 2009 quarter to June 2010 quarter change 3.2%
June 2010 quarter to June 2011 quarter change 3.8%
June 2011 quarter to December 2011 quarter Service estimate 1.7%
Case No: 252449 Determination Page 12 of 15
103. The application of the above Statistical Indexes (in the ratio of 50%
materials and 50% labour) to the contingency based $226,512 quotation
relied on by the FSP increases the cost value of the quotation to $243,858.*
104. While this formula may not be precise, it does provide an indication of the
impact of increased costs which the Applicant will most likely meet in
reinstating the building. The Panel has been advised that the Applicant is
suffering financial hardship. It follows that the Applicant would have limited
resources to effect any repairs during the period in which the claim had been
denied.
105. Given the delay in the claim being accepted and having regard to what is fair
in all the circumstances, the Panel considers the Applicant is entitled to
$243,858 for the cost of repairing the building.
Interest
106. Section 57 of the Insurance Contracts Act 1984 in part provides:
“57(1) Where an insurer is liable to pay to a person an amount under a
contract of insurance or under this Act in relation to a contract of
insurance, the insurer is also liable to pay interest on the amount to
that person in accordance with this section.
57(2) The period in respect of which interest is payable is the period
commencing on the day as from which it was unreasonable for the
insurer to have withheld payment of the amount and ending on
whichever is the earlier of the following days:
a) the day on which the payment is made:
b) the day on which payment is sent by post to the person to whom it
is payable.”
107. The Panel accepts that some delay occurred as a result of the Applicant‟s
inability to respond to the FSP‟s request for paperwork due to his
incarceration from August 2009.
108. In this case the Panel considers that interest is payable from the date the
claim was denied on 24 February 2010 until the date of this determination
less the $17,346 already allowed for cost increases as per 102 to106 above .
109. The rate of interest is 7.975%.
Rent
110. The policy provides cover for up to 12 months temporary accommodation
expenses. The FSP states that it has paid $38,400 for the Applicant‟s
temporary accommodation expenses which has exhausted the cover
provided by the policy.
111. The Applicant contends that there have been undue and unreasonable
delays by the FSP in accepting the claim and as a result the cover should be
extended to the time agreement is reached on the sum payable to him.
Case No: 252449 Determination Page 13 of 15
112. The claim was denied on 24 February 2010. The denial was overturned and
the claim was accepted on 30 September 2011. Thus a period of about 19
months passed in which the Applicant was incurring temporary
accommodation costs without the benefit of the cover provided by the policy.
113. In these circumstances the Panel considers the Applicant was placed in a
position of unreasonably incurring temporary accommodation costs for the
period of time in which the claim had been denied.
114. Clause 9.2 of the FOS Terms of Reference provide:
“ 9.2 Compensation for direct financial loss or damage
Subject to paragraph 9.7, FOS may decide that the Financial Services
provider compensate the Applicant for direct financial loss or damage.”
115. Pursuant to clause 9.2 of the Terms of Reference the Panel considers the
Applicant is entitled to be reimbursed for the reasonable temporary
accommodation costs incurred for a period equal to the period from 24
February 2010 to 30 September 2011. The Applicant is to provide evidence
of the costs incurred
Legal costs
116. The FOS Terms of Reference provide:
“9.4 Applicant’s costs in pursuing the matter
FOS may decide that the Financial Services Provider contribute to the
legal or other professional costs or travel costs incurred by the
Applicant in the course of the Dispute. Unless exceptional
circumstances apply, FOS will not require the Financial Services
Provider to cont ribute more than $3,000 to these costs.”
117. The Panel has been provided with a copy of an invoice in the sum of
$30,618 for legal costs incurred by the Applicant. The fees include the
services of junior and senior counsel for work carried out in relation to
investigation of the claim and barrister fees.
118. An allegation of fraud is a serious allegation. If established it has a major
impact on an individual‟s ability to obtain insurance and in some
circumstances finance.
119. In the Panel‟s opinion, following the FSP‟ s initial denial of the claim on the
ground the claim was fraudulent; the action taken by the Applicant in
employing professional legal advice was understandable and reasonable.
120. The invoice presented to the Panel established that the fees claimed were
incurred as a result of investigations carried out by counsel in connection
with the fire damage claim.
121. The Panel therefore considers pursuant to clause 9.4 of the Terms of
Reference that the Applicant is entitled to be compensated up to $3,000 for
these costs.
Case No: 252449 Determination Page 14 of 15
Other matters
Written apology
122. The FOS Terms of reference do not provide the Panel with the authority to
determine that the FSP provide the Applicant with a written apology.
123. Nevertheless, the Panel directs the FSP to expunge from its records and
from the records of any other organization which may have been informed of
the decision to deny the claim of any reference to fraud.
Release/duress
124. It is common practice for insurers to require a person to whom a payment is
being made to sign a form of release. The form of release may vary
according to the terms agreed and the conditions on which payment is being
made. It is not uncommon for the release to include an agreement that the
recipient will release the insurer from any further liability in respect of the
event giving rise to the payment.
125. A copy of the release referred to by the Applicant has not been presented to
the Panel.
126. The Panel understands from the Applicant that the sum of the release
included an interest payment for the contents claim, but required the
Applicant to release the FSP from all other claims. He refused to sign the
release although the contents claim was paid less the interest.
127. As the release was not signed, there is no issue for the Panel to consider in
the context of the release having been signed under duress.
128. The Panel has addressed the issue relating to interest previously in this
determination and has ordered payment of interest for the contents claim.
Civil claim
129. The Applicant is not prevented from filing a civil claim in the courts for pain,
suffering and defamation. However, the Panel draws the Applicant‟s
attention to the conditions which apply as expressed on the Acceptance form
should he accept this Determination.
Determination
130. On the basis of the available information the Panel determines:
a. The FSP is to consider the break and enter claim independently of this
matter. In the event the Applicant does not accept the FSP‟s final
decision the Applicant is entitled to have the dispute considered by FOS
as a new dispute.
b. The FSP is not liable for the gold necklace claimed by the Applicant.
Case No: 252449 Determination Page 15 of 15
c. The FSP is to pay the Applicant the sum of $243,858 in settlement of the
building damage claim.
d. The FSP is to reimburse the Applicant for temporary accommodation
costs incurred for a period equal to the period from 26 February 2010 to
30 September 2011. The Applicant is to provide the FSP with evidence of
the expenditure.
e. The FSP is to pay the Applicant $3,000 as part compensation for legal
costs incurred.
f. The FSP is to pay the Applicant interest as follows at the applicable
statutory rate
i. On the building payment of $243,858 from 24 February 2010 to
the date of this determination less the $17,346 already allowed as
per 102-106 above.
ii. On the contents payment of $137,812 from 24 February 2010 to
the date the payment was made to the Applicant.
iii. On the temporary accommodation costs paid to the Applicant
pursuant paragraph (d) above.
iv. Compensation payment of $3,000 for legal costs incurred from 24
February 2010 to date of this determination.