Summary

The applicant's pool, paving and fence were damaged, and the FSP denied the claim as subsidence. AFCA found the loss was caused by a leaking storm water pipe, an insured event, and ordered payment of the pool and paving, 75% of the fence repair, exploratory costs and interest.

Subsidence caused by a leaking pipe is covered, and the FSP failed to prove the exclusion applied; the fence payment was reduced because it was already leaning before the loss.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 252239 Determination Page 1 of 8 Case number: 252239 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 16 January 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) from 15 October 1997 and the policy was current at the time of the loss. 2. On 21 February 2011, the Applicant lodged a claim with the FSP for damage sustained to the perimeter brick fence, paving and pool as a result of a disconnected storm water pipe. 3. The FSP denied the Applicant’s claim on the grounds that the damage was caused by subsidence and not by an insured event listed in the policy. 4. The Applicant believes her claim falls within policy cover and expects the FSP to honour the claim. Summary of Applicant’s position 5. The Applicant noticed damage to the rear fence, paving and pool and appointed an engineer (D) to identify the cause of the loss in 2007/2008. 6. Based on D’s opinion that the loss resulted from the poor construction of the Council’s pipe culvert including inadequate backfilling, the Applicant took the matter to the local council. 7. The Council appointed its own engineers (G and A) to investigate the circumstances surrounding the loss and subsequently denied liability. This resulted in the Applicant lodging a claim with the FSP in February 2011. 8. The Applicant says the rain water runoff from the house no longer runs into the drain designed for this purpose but has become disconnected and is washing away the fill around the pool and alongside the wall. Further, a cavity under the paving could be clearly seen from the yard drain. 9. The Applicant says she was unaware of any defects at the property and that it was subject to a building inspection prior to acquisition. The construction of the property including the pool was approved by the Council. Determination Case No: 252239 Determination Page 2 of 8 10. The Applicant refers to the policy wording and states that even though the policy excludes cover for subsidence, it covers damage caused by a burst pipe. Ongoing damage to the property has been caused by the disconnected storm water pipe and the washaway along the side of the pool and along the wall has caused them to sag and crack. 11. Therefore, the Applicant expects the FSP to accept her claim in full. Summary of FSP’s position 12. Subsequent to the lodgement of the claim, the FSP appointed Builder (C) to investigate the circumstances surrounding the claim and to assess the cause of the loss. 13. The FSP believes the damage was caused by subsidence and not as a result of the leaking pipe. The policy also excludes cover for faults that existed before the loss or damage occurred. 14. The FSP says qualified experts did not find the damage linked to the disconnected storm water pipe as below:  D found the subsidence above and adjacent to the storm water pipe affecting the stability of nearby structures due to poor and inadequate backfilling of the pipeline.  A identified the rear fence, pavement and pool constructed without adequate foundation to be the cause of the loss. 15. The FSP relies on the following policy provisions: “ 2. Burst pipes, leaks and overflows We cover Damage from leaking, overflowing or bursting pipes and water containers at the home including: ... - roof gutters and rainwater downpipes, drainage and sewerage systems ... Exploratory costs We will cover the reasonable cost of searching for the unknown cause of leaking pipes and restoring the damage we do to your home, but only if the leaking liquid is causing permanent damage to your home or contents. If we pay for damage or exploratory costs we will also pay up to $750 extra to replace undamaged wall tiles in the same room, stairs, hallway or passageway so they match or complement new tiles used for repairs. ... Case No: 252239 Determination Page 3 of 8 We do not cover - repair or replacement of the tank, pipe or container that water or liquid escaped from (e.g. we will not pay for replacing a hot water system that leaks) ... We do not cover loss or damage: Erosion or subsidence Caused by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover subsidence damage to your home if it is caused by: - insured event 2 (burst pipes, leaks and overflows) ... How we settle your claim We will not: ... - fix a fault that existed before the loss or damage occurred.” 16. The FSP concludes that subsidence caused by the storm water line to be the cause of the damage and maintains denial of the claim. Issue 17. Whether the FSP is entitled to deny the Applicant’s claim. Reasons for decision 18. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 20. The onus of proof rests on the Applicant to establish that, on the balance of probabilities, she has suffered a loss caused by an i nsured risk. Once the Applicant has established that the loss was caused by a risk insured under her policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. Case No: 252239 Determination Page 4 of 8 21. The Applicant’s pool, rear fence and paving sustained damage. This dispute relates to identifying the cause of this damage and whether the resultant damage is afforded cover under the terms of the policy. History 22. I note the Council removed large trees soon after the Applicant purchased the property. Subsequent to the removal of the trees, the Applicant identified a leaning wall around the area. She was requested by a Council Member to support this wall by constructing a pergola structure next to it. 23. Further, a file note from the FSP’s system reveals that the Applicant’s son contacted the FSP in December 2006 regarding a leaning wall suspecting it to be caused by dirt dug by the Council and rain water runoff from concrete. The FSP has not presented any further information on this matter. Investigation to identify the cause of the loss 24. I note that G recommended that only an exploratory excavation and geotechnical evaluation of the area would enable him to identify the cause of loss. However, the Council at the time decided to discontinue his services and appointed A, who assessed the damage based on observation. 25. Builder (C) appointed by the FSP suggested the loss may have occurred due to the removal of the tree by the Council but suggested further investigation. He confides he is not an engineer to assess the cause of the loss but believed the issues related to the Council. 26. He suggested the ground sinking in the Council Reserve would have dislodged the storm water pipes and the water would add to the sinkhole created on the other side of the fence where a large tree was removed. 27. I am concerned the FSP did not attempt to seek an independent expert opinion to ascertain the cause of the loss when it was presented with reports from engineers identifying different reasons as below:  Report from D “The subsidence that has occurred in the rear yard of [Applicant’s address], the neighbouring rear property fronting Road (F), and the adjoining public open space, is the result of the poor construction of the pipe culvert including the inadequate compaction of the backfilling.”  Report from G “ From our observations of others it is clear that settlement in and around the easement has occurred and that this settlement is causing damage and distress to surrounding structures. At the time of our visual inspection and appraisal we were unable to conclude the cause of the settlement and suggest that exploratory excavation and geotechnical evaluation be initiated to determine the source of the problem. ” Case No: 252239 Determination Page 5 of 8  Report from A “ We observed structural damage to rear perimeter fences, rear pavement slab and rotation of the in-ground pool. These elements were above and/or adjacent to the easement contained within the site. We consider that the failure and displacement of these elements was directly related to them having been constructed without adequate foundation to below the zone of influence of the stormwater easement. We consider that the significant displacement of the affected elements, without substantial damage to the storm water line, evidenced the lack of adequate foundation to the elements. ” 28. Based on the above comments, I am unsure whether A’s findings were arrived at on the assumption that there was no broken storm water pipes underground. 29. I also note that A’s report appea rs to be addressed to limit the C ouncil’s risk rather than identifying the actual cause of loss. 30. I have formed this view on the basis that A finds that even if there was a failure of the storm water line, it would be the Applicant’s responsibility to remove and replace the structure over and adjacent to the easement. 31. Further, leakage from the pool was ruled out by A and it suggested that seepage into the storm water line was due to inherent site waters. It also ruled out the possibility that the trees caused the subsidence. 32. A rejects D’s findings on the following grounds:  The subsidence is affecting less than three premises and D does not present qualitative evidence of his findings.  Storm water trench backfill was not tested for composition or compaction  D failed to observe that the upper 300mm (at least) was the Applicant’s or previous own er’s back fill material  D did not recognise the retention loading on the boundary walls by the Applicant’s property  D did not recognise the need for appropriate construction above and adjacent to the easement in accordance with the Council guidelines. 33. Subsequent to lodging the dispute with the Service, the Applicant’s brother - in-law (S), a former Chief Engineer to a large manufacturing company, conducted detailed exploratory work underground as below: “ Last Monday,19 September, myself and another brother in law cut an access hole through the paving so we could expose the rainwater drainage pipe work. We exposed the washed out cavity and with some excavation exposed all the house drain pipe work. I have attached this photo for your information. The paving area drain pipe work was broken off and loose. The rainwater run off pipe work from the northern and southern roofing gutters was originally joined by a "Y" piece and connected to drain through and into the side of the pit Case No: 252239 Determination Page 6 of 8 which forms part of the main drainage system within the easement. This "Y" piece was dislodged and disconnected from both drains from the house and also the connection into the pit. The vertical paving area drain was also broken off at its base. ... The pipe work also had mud in each of them but it was hard to determine the extent of blockage in them. This sort of inspection should have been carried out by the prior inspectors rather than the previous superficial ones from which a variety of "conclusions" have been made. (sic) ” 34. I find that the FSP acknowledges the leaking storm water pipe found by the exploratory work performed by S can cause soil erosion and large underground cavities as a result of ongoing erosion. This is compounded during heavy rain periods. 35. However, the FSP believes the settlement of soil on the Council reserve had a knock on effect due to its close proximity to the Applicant’s property. Further, the soil around the easement has settled or subsided causing the nearest object, the rear fence, to sink into ground. This has worsened over the years affecting pool, paving and underground pipes. 36. The Appl icant’s and S’s opinion is : “ These rain water drain pipes were burst and leaking in two (2) locations I will call Area 1 and Area 2 that have damaged three (3) areas – the in ground pool, the property brick fence and the stamped concrete paving. Area 1 is alongside the pool and when opened up was a wash out pit about a one (1) cubic metre in volume. The burst pipes where found in the bottom of the pit and the whole area was a slushy mess of slimy soft clay. The pool has subsided alongside this area only. If the cause was general easement subsidence then the whole length of the pool closest to the easement would be lower! There is no significant lowering of the pool side other than in the quadrant nearest Area 1. Area 2 is between the stormwater drain access pit and the rear brick fence and is about 2500mm long by 500mm wide and exposed the concrete fence foundations. It had a 400mm diameter extension burrowing out under the corner of the wall below the foundation. At the opposite end there is about a 1 cubic metre pit area washed out at the base of which is another ruptured rain water connection into the stormwater access pit. The corner of the brick wall has dropped substantially and three (3) panels of the northern wall and four (4) panels of the eastern wall slope downwards into the corner by about 150mm with vertical cracks caused by this sloping. There has been general paving cracking over these washouts as the paving sat on the stormwater drain access pit and that has not subsided at all and would indicate the main stormwater drain has not moved! Case No: 252239 Determination Page 7 of 8 If the major cause was general easement settlement that caused the wall to crack and sink then why is it at its worst only in the section next to Area 2? There is small damage to my neighbour’s brick fence adjacent to this area but there is no damage to my other brick fence on the opposite boundary or any of the neighbouring properties who are built along this easement! Why has the pool only subsided in the area next to Area 1 wash out?(sic) ” 37. There is no dispute the water leaking from a broken storm water pipe could cause erosion, subsidence and cracking to the surroundings. I am satisfied that the FSP has failed to seek expert opinion on the cause of loss even after S’s detailed findings. 38. The FSP believes that the loss occurred as a result the of a knock on effect of the settlement of soil in the Council reserve. However, its sequence of events is not substantiated by an expert opinion. 39. Damage caused by subsidence or erosion as a result of a leaking pipe is covered under the policy. Thereby, the Applicant has established the loss was caused by an insured event. The onus then rests on the FSP to establish the damage was caused by an exclusion under the policy. 40. In my view, the FSP has not established that the loss was caused by subsidence (not related to the broken storm water pipe). 41. The Applicant has produced visible evidence of the cause of the loss and the FSP’s denial is based purely on observations by engineers who had differing opinions as to the cause of loss. 42. Therefore, in the absence of any other expert evidence and on the balance of probabilities, I am satisfied that the damage was caused by the broken storm water pipes and the FSP is prevented from relying on its exclusion. 43. Nevertheless, since part of the wall was leaning prior to the loss, as evidenced by the need to prop up the wall with the pergola, I am of the opinion that the FSP is liable to pay only 75% of the cost relating to the repair of the rear wall/fence. Determination 44. On the basis of the available information, I determine the FSP is not entitled to deny the Applicant’s claim. It is required to indemnify the Applicant for the damaged pool and paving. The FSP is to pay 75% of the repair cost of the rear fence. 45. The FSP is also to pay the exploratory costs incurred in identifying the cause of loss on submission of invoices in accordance with the terms and condition of the policy. The FSP is not required to pay the cost of repairing the broken storm water pipes. Case No: 252239 Determination Page 8 of 8 46. In regard to all aspects of this matter which are cash settled by the FSP, the FSP is to pay interest at the statutory rate from denial of the claim until payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.