Home / Financial Firm (Unknown - Insurer) / Determination 252005

Determination 252005

Storm damage roof claim declined and delayed review

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-03
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$4,946
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The landlord's roof and ceilings were damaged after a November 2009 storm, and the FSP initially declined the claim and delayed its internal review. AFCA found the roof damage was storm-caused and ordered the FSP to pay the balance of 12 months loss of rent, $1,000 for non-financial loss, interest, and an independent assessment of roof repair costs.

The roof collapse was not shown to be caused by wear and tear or deterioration, so the storm damage is covered, but only reasonable repair costs apply, and the FSP's unusual delays justified non-financial loss compensation under the Terms of Reference.

Issues

Subjects and remedies

pay claimpay interestpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 252005 Determination Page 1 of 11 Case number: 252005 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling 25 June 2012 Background 1. The Applicants he ld a Landlord’s Insurance policy with the Financial Services Provider (FSP). The relevant period of coverage was 14 April 2009 to 14 April 2010. 2. On 22 November 2009, the Applicants’ property was damaged during a storm. 3. The incident was reported to the FSP on 4 January 2010, the Applicants notifying the FSP that following heavy rains the roof had substantially dropped, struts inside the roof had broken with rain coming through damaging the plaster ceiling. 4. The Applicants’ initial claim was lodged as a clai m for property damage by the FSP and a second claim for consequential loss of rent was lodged by the Applicants on 22 June 2010. 5. Following inspection of the property by BBS the FSP declined the property damage claim on 25 March 2010, and declined the loss of rent claim on 9 July 2010 as not arising from an insurable event. 6. After contacting the FSP to dispute the decision, the Applicants wrote to the FSP on 3 December 2010 seeking a review of the matter. The dispute was not referred to the FSP’s IDR departme nt but following further investigation the Applicants were verbally advised on 27 April 2011 that the claim was declined. It was not until 25 August 2011 that the dispute was referred to the FSP’s IDR department. This delay is unexplained. 7. Following IDR re view the FSP obtained an engineer’s report and determined that the FSP should pay for the damage following a storm event and that the FSP was liable for the water damaged ceilings and wall and for loss of rent associated with the property being uninhabitable during a reasonable period of repairs. 8. The FSP also offered to cover the cost of replacement of the damaged purlins but maintains it is not required to make structural rectification to the property. Determination Case No: 252005 Determination Page 2 of 11 9. The Applicants maintain that the damage sustained to the property was as a result of the storm on 22 November 2009 and maintain that the roof gave way under the pressure of the storm. The Applicants seek to be indemnified for the damage to the property and for the loss of rent in accordance with the policy provisions. Summary of Applicants ’ position 10. They are entitled to coverage for the full extent the damage which occurred on 22 November 2009 because: a. There was severe storm activity on that date with 45.8mm of rainfall, and a further 16mm the following day. b. The damage to the roof occurred after the storm when the load bearing beam within the roof structure collapsed due to storm water on the roof. c. The tiles at the property are concrete and not terracotta, and therefore absorb water and increase in weight, placing additional load on the roof. d. They spoke with the FSP’s assessor shortly after its inspection of the premises who advised the Applicants that: “...the internal section of the roof had collapsed and it was consistent with the increased weight of the tiles due to excessive water absorption .” e. The FSP should not be permitted to rely on arguments relating to wear and tear as they were aware the property was more than 50 years old when they agreed to provide insurance. f. The Applicants provided two separate expert reports in respect of the condition of the property prior to the storm, indicating the roof was structurally sound. g. Had these experts advised the Applicants the roof was in a state of disrepair they would have undertaken the appropriate repairs. h. In the course of seeking a review of the FSP’s decision and providing further evidence in support of their claim, the Applicants were led to be lieve by the FSP’s assessor that their claim would be successful. i. The ‘good will’ payments received from the FSP and its assessment of the loss of rental are grossly insufficient to cover the Applicants’ loss, particularly as the house continues to be uninhabitable. Summary of FSP’s position 11. The incident was reported to the FSP on 4 January 2010 with the date of the incident advised as 1 December 2009 although subsequently revised (3 December 2010 as the 22 November 2009). 12. The FSP appointed BBS to attend and report on the incident. BBS maintain the failure of the roof struts was not due to a storm event but due to age and Case No: 252005 Determination Page 3 of 11 maintenance related issues and accordingly the FSP declined the Applicants’ claim by letter dated 25 March 2010. 13. The Applicants did not lodge a claim for loss of rent until 22 June 2010 again advising the incident date was 1 December 2009. As the loss of rent cover was dependent upon an admissible claim under the building, the cover was also subsequently declined as per the FSP’s letter of 9 July 2010. 14. On 3 December 2010 the Applicants wrote to the FSP disagreeing with the decision. The FSP maintain that it requested copy of the Applicants’ pre - condition report on 16 December 2010 and did not receive that report until 30 March 2011. The FSP confirms that during discussions with the Applicants on 27 April 2011 it maintained that the report did not confirm the storm was the proximate cause and it believed that the damage was caused by deterioration age, wear and tear and wear and tear of the purlins. 15. The matter was eventually referred by the FSP to its IDR department on 25 August 2011 and an engineer’s report commissioned. The engineer’s report dated 22 September 2011 determined that the cracking, splitting and excessive defection evident of the under purlins is typical of a problem that can result in the failure of the roof framing. In their opinion, the failure of the roof framing as result of inadequate construction of the roof framing to resist loads applied to the roof. 16. The engineer determined that the problems were not as a result of storm damage. 17. Following consideration the disp ute by the FSP’s IDR department, the department recommended the FSP pay for the damage following the storm event caused by the defect and that the damage caused was the water damage to the walls and ceilings, the defective item being the purlins of the roof. 18. The IDR department determined liability for water damage walls and ceilings and loss of rent associated with that event and the property being uninhabitable during a reasonable period of repairs. In good faith according to the FSP, the IDR determined to allow for the replacement of the damaged purlins although the replacement of these defective parts was not covered under the terms of the policy. 19. On 4 October 2011 the FSP commissioned its scope of works for the repairs to the damaged purlins only and also obtained a detailed report and designs of how the roof should be constructed from the engineer. The FSP maintains the upgrading of the roof frame work is outside the scope of cover provided by the policy. 20. The FSP obtained quotations for the repair of the damaged purlins, from the Applicants’ preferred builder JP and from the FSP’s referred builder BBS. As the quote from BBS was the lower of the two the FSP offered to cash settle this aspect of the Applicants’ claim for the sum $5,737.60. Case No: 252005 Determination Page 4 of 11 21. In an email to the Applicants dated 9 February 2012, the FSP’s claims area advised its settlement of the loss will be arranged for the Applicants as follows:  Damage to the purlins only - $5,737.60 less $100 excess  Loss of rent - $3,574.28 plus $180 (additional week for repairs) total $3754.28. 22. With respect to the Applicants ’ claim for payment of the full cost of repairs plus the maximum loss of rent benefit, the FSP maintains it is only liable for the water damage to the walls and ceilings and considers the offer in good faith to pay for the damage to the purlins is sufficient. With respect to the loss of rent the FSP maintains that as no documents were forwarded to substantiate the loss until the IDR escalation in August 2011 the Applicants had done nothing to mitigate their loss. 23. According to the FSP it was not until 15 December 2011 that partial documents were received to support their loss of rent entitlement. 24. The FSP maintains that there are delays in this matter due to both parties awaiting various assessment reports that believe the majority of the delays were caused by the Applicants. 25. As the Applicants’ loss of rent is limited to twelve months rent to a maximum sum insured of $8,700 and given the tenant’s rental was $180 per week the FSP have advised they are prepared to offer eight months loss of rent that is a total of $6,240. As they have already paid the Applicants $3,754.28, they agree to pay the balance of $2,485.72. 26. The FSP relies on the following policy provisions: “ Exclusions to your cover We will not cover any loss or damage as a result of, or caused by ...  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear  ...  a defect in an item, structural defects, or faulty workmanship or design  ... Loss of rent With this option, if your building or sections of your building suffer loss or damage and are uninhabitable as a result, we will cover any loss of rent equal to the weekly amount as stated on your rental agreement or periodic tenancy agreement for up to 12 months. The most we will pay is up to the sum insured, as listed on your schedule. ... This cover applies when  loss or damage to your buildings or contents occurs as a result of an incident as listed in this PDS. Case No: 252005 Determination Page 5 of 11 ... We will ONLY cover loss of rent while your property is uninhabitable.” Issues 27. Whether the FSP is entitled to rely upon the exclusions in the policy to deny the claim. Reasons for Decision 28. I am satisfied that a full exchange of information has taken place between the parties and that each party has had an opportunity to address all issues raised. 29. The FSP does not dispute that there was a storm on 22 November 2009 nor does the FSP dispute th at the Applicants’ property was damaged with the roof collapsing and subsequent inundations of the walls and ceilings causing damage to the walls and ceilings. 30. The FSP initially denied the online claim based on the exclusion to cover: “we will not cover a ny loss or damage as a result of, or caused by erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear” 31. Following the IDR review the FSP accepted liability for the water damage for the walls and ceilings caused by the event and accepting liability with respect to loss of rent associated with those repairs. The FSP denied the balance of the claim as it does not believe it is required to attend structural rectification works due to defects of the purlins or the extra cost of reinstatement as a result of the failure of the purlins. 32. Therefore, in order for the FSP to deny the claim, the onus now shifts to the FSP to prove that a policy exclusion applies if it wishes to deny or limit its liability. 33. The Applicants arranged for a carpenter to inspect the property in January 2009. This expert indicated at that time: “... The house was a weatherboard house with a tiled roof and appeared to be in good condition from the outside. I inspected the inside of the house including all rooms, the subfloor and roof. The house appeared to be around 50 years old and it was in appropriate condition for a house of that age from my opinion. The internal roof section of the house appeared to be sound and there were no obvious signs of wear and tear. ... My opinion was that the house appeared to be sound and that apart from some internal/external painting and general tidying up there was no need to spend a great deal of money on it...” 34. The Applicants’ had also commissioned a pre-purchase inspection of the property from a building expert which occurred on 29 January 2009. At the Case No: 252005 Determination Page 6 of 11 time they obtained this report, the Applicants were considering selling/renovating the property. 35. This report provided the following obs ervations in respect of the property’s roof: “...  Conventional coupled roof frame with no major detachment of framing members.  No excessive unevenness/bowing/sagging in roof lines.  .... Generally the dwelling required some maintenance – painting, updating bathrooms and kitchen. From a structural perspective there were no major structural faults evident at the time of inspection.” 36. T he Applicants’ expert conducted a further inspection on 18 January 2011 (more than 12 months after the collapse). In contrast to the earlier inspection, the expert indicated at this time: “...  The under purlin on the rear face (north) had snapped/cracked in two sections. One crack is directly above a strut and the other is mid-way through the purlin. This is a major structural fault and is no longer offering any support for roof loads – tiles/batons/common rafters. This requires replacement by a qualified carpenter. I am unable to ascertain the cause of same which would require assessing by a structural engineer. It may be due to excess weight on the roof tiles as they are un-sealed concrete tiles. Unsealed concrete tiles will absorb water and thus become heavier.  There was no visible evidence of termite or borer activity/damage to this under purlin to cause same.  There was no visible evidence of timber fungal decay to the under purlin that may result in this damage. 37. The expert building report obtained by the FSP determined that the damage had occurred as a result of the roof trusses giving way due to age, and therefore it asserts the damage is a maintenance related issue. 38. The FSP’s engineers however, refer to defects in the construction of the roof being the cause of the damage. Specifically: “ In our opinion, the failure of the roof framing has resulted from inadequate construction of the roof framing to resist loads applied to the roof. For example a design check of a 90 x 70 F8 under purlin supporting rafters spanning approximately 3,500mm showed that the maximum span of the under purlin is 1,500mm for a tiled roof. In this instance, the rear under purlin has a span of approximately 2,800mm... It appears that an inadequate number of props have been installed to provide support to reduce the span of the under purlins. It is also our opinion that the additional weight due to the concrete roof tiles absorbing rainfall would not have resulted in the failure of the roof framing if the roof was adequately constructed. Case No: 252005 Determination Page 7 of 11 Roof framing supporting roof tiles is designed for terracotta roof tiles. Terracotta roof tiles are heavier than concrete roof tiles, and in our opinion, the increase in weight of the concrete roof tiles as a result of absorbing water would equate to the overall weight of concrete roof tile and water to that of a terracotta roof tile. It is our opinion that the cracking and splitting of the under purlins occurred fairly recently as new timber and not much dust is evident over the cracks and splits.” 39. Although I note the above comments, I am mindful that the roof appears to have stood without any issues for 50-60 years. Further, the FSP has not produced the relevant building standards for the period of construction of the property evidencing the ‘design check’ relied upon by the FSP’s expert. 40. I am also mindful of the terms of the exclusion referred to in the FSP’s denial letter of 23 March 2010. There is nothing in the report to suggest erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear. 41. A fter receipt of the engineer’s report the FSP has accepted that the failure of the purlins and collapse of the roof was a recent occurrence following heavy rains with the roof purlins having survived some seventy years intact. 42. The FSP argues that it is reasonable in these circumstances to deduce that the purlins had eventually failed. That is, if the collapse did not occur following this storm event, it would just be a matter of time (how long is unclear) before the roof purlins eventual demise, hence a gradual deterioration due to their age in construction. 43. That argument is not supported by the engineering report. The engineering report would support an argument if made that the failure of the roof framing resulted from an inadequate construction or structural defect. This does not appear to have been relied upon by the FSP but it is an exclusion under the provisions of the policy. 44. I have carefully pe rused the information provided by the Applicants’ experts and by the FSP. The post damage report undertaken by the Applicants’ second expert rules out possible termite, borer damage and fungus. 45. The pre-purchase inspection identifies no major structural fault evidence at that time. Comments are made by a carpenter who inspected the property in January 2009 that the house appeared to be sound apart from some internal and external painting and general tiding up with the internal roof section of the house sound and no obvious signs of wear and tear. 46. In view of this I am not satisfied that the cause of the roof collapse was anything other than damage caused by the storm. As such the damage to the roof caused by the storm is covered under the terms of the policy. This does not however mean that the Applicants are entitled to the cost of having the roof redesigned but rather that the Applicants are entitled to the reasonable cost associated with repairing the roof and any damage Case No: 252005 Determination Page 8 of 11 occasioned as a result of the collapse of the roof following the storm on 22 November 2009. 47. According to the FSP’s Notice of Response , tenders for the repairs of the damaged purlins only from both its service provider and the Applicants’ preferred builder based on the engineer’s report were requested. Initially both builders submitted a full scope of works for both all damage and undamaged related works. A further scope of works was provided by both builders relating purely to the damaged purlins. According to the FSP they have agreed to settle for that damage based on the lower of the two quotes being in the amount of $5,737.60. I note the tender response provided by the Applicants’ preferred builder came to the sum of $33,264 . 48. The disparity in the two tenders is remarkable and in view of this, in my view it is appropriate to obtain a third independent assessment as to the damage to the roof sustained as a result of the storm. That is, a tender from an independent consultant/builder should be obtained to cover a scope of works to repair the damage to the roof resulting from the collapse of the purlins. 49. Insofar as the Applicants have sought to claim loss of rent, the FSP has now offered to pay a total of eight months loss of rent. This offer is based in part on what the FSP claims are delays attributed to the Applicants. The FSP maintains the Applicants did not lodge their claim until June 2010 nor did the Applicants provided details of the loss until 15 November 2011. 50. The FSP initially declined the Applicants’ claim for damage sustained in its correspondence on 25 March 2010. As the FSP itself points out the Applicants have no claim on their loss of rent unless there is an admissible claim under building. Regardless of the delay in submitting the loss of rent claim until 22 June 2010, the FSP would have not altered its position. In fact the FSP was aware of the loss of rent claimed but appears to have made no attempt to clarify this in discussions with the Applicants subsequent to December 2010. It is only after the FSP has agreed to pay part of the building claim that it has requested the Applicants substantiate the loss the loss of rent component. 51. In my view the delay in the FSP proceeding with the Applicants’ request for a review of the decision to IDR has contributed to the loss of rent. The FSP has delayed that referral at least from 3 December 2010 until August 2011. 52. The male Applicant claims he made a number of phone calls to the FSP in attempt to have the decision reviewed and was constantly advised that the wear and tear on the premises due to the age of the property. He was eventually advised by PA that he should outline the grounds for review in a letter and address it to her. This is what he has done in December 2010. 53. The FSP did not address these comments in the Notice of Response and it is a concern given the obligation of the FSP to provide an IDR response within 45 days to an Applicant where an Applicant makes a complaint about a decision. As a result of this the Case Manager was asked to contact the Case No: 252005 Determination Page 9 of 11 FSP for an explanation as to the delay in responding to the Applicant’s request for a review of the decision. 54. The FSP initially maintained that the Applicants had withdrawn the request but that is not supported by the documents exchanged. The FSP subsequently advised that following phone calls made to the Applicant in response to the letter of 3 December 2010 the Applicant had been asked to provide further information and in view of this it was not necessary to provide a formal IDR letter. Again this is not consistent with the information exchanged as it is apparent that further documentation was supplied by the Applicant and the FSP notified the Applicant verbally of a decision to maintain its rejection of the claim on 27 April 2011. 55. To ensure that there is no confusion with respect to this, I discussed this matter with the FSP’s representative. The FSP’s representative advised that he did not believe the letter of 3 December 2010 was a request for an IDR review, but simply a request for a review by a team manager. He suggested that as at 3 December 2010 the file was still under review. He could not explain in these circumstances why, if a further decision was made on 27 April 2011, this was not communicated in writing to the Applicants or why the matter ended up with the IDR department in August 2011. 56. In my view the FSP’s conduct in this dispute, in particular its failure to respond appropriately to the Applicants ’ request for review , has significantly contributed to the loss of rent and delay in repairs. In my view in the circumstances the FSP should be responsible for payment of the loss of rent in accordance with the terms of the policy. As the property has been uninhabitable for over 12 months then the FSP should be liable for 12 months loss of rent allowed under the policy. 57. I also discussed with the FSP why, given what appear to be unusual delays, consideration should not be given to awarding compensation pursuant to clause 9.3 of the Terms of Reference. The FSP maintains that at no stage had the Applicant requested a review at IDR level and in view of this he could not see why the FSP or FOS should consider any entitlement under clause 9.3. He maintained that the claims department had continual contact with the Applicants to resolve the Applicants’ issues and the IDR involvement only commenced when the FOS notice of dispute was received. T he FSP was notified of the Applicants’ complaint by FOS on 10 August 2011. 58. In the current dispute the FSP has not explained the reasons why it did not respond to the Applicants’ request for a review of its original decisions earlier. It has not provided case notes or file notes to indicate it was in regular contact with the Applicants and that the Applicants had withdrawn such a request, nor has it provided information as to why it did not request from the Applicants prior to making a decision in this dispute, particulars of any information the Applicants might have as to the condition of the house prior to the storm event. The FSP has not explained why it did not treat the request for a review of the decision as a request for an internal dispute Case No: 252005 Determination Page 10 of 11 review and act as required or why it took over nine months from that letter for the matter to eventually be dealt with by the FSP’s IDR department. 59. Paragraph 9.3 b) of the Terms of Reference provides that FOS may decide that the FSP compensate an Applicant for non financial loss only where: a. An unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicants’ expectation or peace of mind has occurred; or b. In the case of a dispute pertaining to an individual’s privacy rights, injury has occurred to the Applica nts’ feelings. 60. In this case I am satisfied the delays experienced by the Applicants in having the FSP review the decision and act on the decision are unusual. I am satisfied that the time taken to resolve the matter with the Applicants has been exacerbated by the FSP’s failure to deal with the dispute in a timely manner. In the circumstances I am satisfied that an award of compensation for non financial loss is appropriate and consider the sum of $1,000 to be an appropriate amount. Determination 61. Accordingly I determine that the FSP is liable to meet the cost of repairs following the storm of 22 November 2009. 62. Insofar as the cost to repair the roof of the building following the damage sustained, I determine that it is appropriate that the parties agree on an independent consultant/builder to quote as to the cost of those repairs. In the event that the parties are unable to agree on an appropriate consultant/builder, the dispute can return to FOS to appoint the independent consultant/builder. 63. The FSP may determine to have the repairs conducted by its authorised repairer or determine to cash settle the claim on the basis of the independent consultant/builder’s quotation should it wish to do so. 64. Insofar as the Applicants’ claim for loss of rent is concerned I de termine that the Applicants are entitled to the sum of $8,700 being loss of rent for twelve months being the maximum amount payable for loss of rent for twelve months in accordance with the terms of the policy. As the FSP has already made part payment the FSP is to pay the balance outstanding to the Applicants within 30 days of the date of this Determination. 65. Insofar as to the internal damage to the property in particular damage to wall and ceilings, the FSP has accepted liability with respect to such damage. In the event that the FSP has not attended to payment for that damage then the FSP is to cash settle the same within 30 days from the date of this Determination. Further the FSP is to pay interest on the outstanding amount in accordance with section 57 of the Insurance Contracts Act (1984) from 25 March 2010 to date of payment of the claim. Case No: 252005 Determination Page 11 of 11 66. Pursuant to paragraph 9.3b)(i) the FSP is to compensate the Applicants the sum of $1,000 for non financial loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.