Home / Financial Firm (Unknown - Insurer) / Determination 251776
Determination 251776
Denial of claim - inundation - flood
Summary
The Applicants claimed for home and contents water damage from the January 2011 Queensland floods, which the FSP declined as flood damage. AFCA found the denial premature, because stormwater run-off and drain backflow caused initial inundation, and directed a cash settlement of 50% of the loss with interest.
The policy excludes flood but covers stormwater run-off and water escaping from drains, and the panel accepted that initial inundation from those sources was likely, so the FSP was required to settle on that basis.
Issues
- Claim denial primary · upheld
“The Panel determines the FSP is to cash settle the Applicants' claim for 50% of the loss sustained in accordance with the terms of the policy.”
- Inadequate claim investigation secondary · upheld
“Given the observations of MP in particular, the Panel is of the opinion that this decision was premature.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 251776 Determination Page 1 of 7
Case number: 251776
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Flood
27 April 2012
Background
1. The Applicants held a home and contents policy with the Financial Services
Provider (FSP) from 13 December 2002. The policy provided for complete
building replacement and contents cover of $138,500.
2. On 15 January 2011, the Applicants lodged a claim for damage sustained on
or about 12 January 2011 as a result of water inundation at the time of the
flood events that affected significant parts of Queensland. The Applicants
state that their property was inundated by stormwater run-off or overflowing
water from the storm drains.
3. The FSP declined the claim on the basis that it considered the cause of the
loss to be the flooding of the Brisbane River.
4. The Applicants disagree with the decision and seek indemnity for their loss.
Summary of Applicants ’ position
5. The Applicants say that their home was inundated with water to a depth of at
least 210mm prior to the arrival of the floodwaters from the Brisbane River.
They rely upon evidence from an actuary and statistician, AT, who has
experience in flood claims.
Summary of FSP’s position
6. The FSP says that the inundation of the home was due to the flooding of the
Brisbane River. Losses due to flood are excluded from cover.
7. The FSP relies upon the following policy provisions:
Pages 8-13 of the Home Building Product Disclosure Statement (Home PDS)
and pages 16-21 of the Home Contents Product Disclosure Statement
(Contents PDS)
“ What we cover – insured events
This section describes under the heading:
Determination
Case No: 251776 Determination Page 2 of 7
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular
insured events.
...
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
Storm means violent wind (including a cyclone or tornado),
thunderstorm or a heavy fall of rain, snow or hail.
...
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering because other water has already escaped
or been released from it,
the normal confines of any watercourse or lake, including any that
may have been modified by human intervention, or reservoir, canal,
dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.”
Page 14 of the Home PDS and page 22 of the Contents PDS
“ What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
...
flood...”
Issue
8. Whether the damage to the Applicants’ property was first caused by
stormwater run-off, water from the drains as covered under the policy or
whether all the damage arose from the excluded event of flood.
Reasons for decision
9. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the issues to be considered. This dispute has
Case No: 251776 Determination Page 3 of 7
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
11. It is not in dispute that after incepting the policy with the FSP, the Applicants
were provided with a copy of the Home PDS and the Contents PDS.
12. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy does extend
cover in circumstances where the home is subject to stormwater run-off or
water that escapes from a drain or water main.
13. The Applicants report that their home was first inundated with water around
12pm on 12 January 2011. They evacuated a few hours earlier. The water
emanated from the western side of their property and not from the direction
of the nearby Brisbane River. There was a major stormwater drain located at
the front of the property.
14. It is not in dispute that the Applicants’ home was ultimately inundated to a
depth of about 800mm nor that this inundation was a result of the overflow
from the flooded Brisbane River, located just north of the property.
15. The Applicants concede that water from the drains or the stormwater run-off
is not responsible for the full inundation of the home but they contend that it
entered first and accounted for the majority of the damage. The FSP
contends that floodwater was responsible for the entire loss.
16. It is the FSP’s position that there was no stormwater run -off and the water
from the stormwater drains had no effect on the flooding of the home.
17. After the report of the incident, the FSP appointed a loss adjuster to
investigate and report on the damage caused to the Applicants’ property.
18. The assessor, CL, noted in his report of 1 February 2011 that:
“Based on the evidence available a t the time of our inspection, it appears
flood water is the principle cause of loss...”
19. A questionnaire was completed with the assistance of the Applicants,
although they have disputed the accuracy of the information recorded. The
Panel will not rely upon this document in its consideration of the loss.
20. A provisional reserve estimate was given for repairs required by CL. It
estimated that the damage was worth about $32,000.
21. A second, internal assessment report of the property was compiled by MP
for the FSP. This assessment was conducted on 4 April 2011. MP conducted
a second interview with the female Applicant and noted:
water came into their home from the parkland across the road;
Case No: 251776 Determination Page 4 of 7
the inundation peaked at about 2am on 13 January 2011 at a depth of
about a metre outside (but only 800mm in the home);
the colour of the water from the street was muddy;
she believed that the drains opposite the home were filled with debris
and blocked. This allowed water to backup and flow into the home;
a neighbour of the Applicants was present for the interview and
confirmed his knowledge of the information provided.
22. MP considered that the issue of the drain opposite the home and its possible
impact on the inundation. He noted:
“I HAVE WALKED [TO THE] PARK/SPORTS AREA... DIRECTLY ACROSS
THE ROAD [FROM THE APPLICANT’S] HOME AND I HAVE FOUND THAT
THERE IS A LARGE EARTH SPOON DRAIN... THAT RUNS THROUGH
THE PARK.
FROM MY OBSERVATIONS IF THE EXIT DRAINS THAT HAVE BEEN
BUILT AT THE ENDS OF THIS DRAIN BACKED UP AND/OR BECOME
BLOCKED IT COULD BE POSSIBLE THE WATER WOULD FLOW INTO
THE STREET AND [THE APPLICANT’S] PROPERTY/HOME...””
23. Based on the reports provided and the material supplied by the Insurance
Council of Australia (ICA) into the flood disaster, the FSP rejected the
Applicants’ cla im on the basis that it considered the cause of the loss to be
flood water from the Brisbane River. Given the observations of MP in
particular, the Panel is of the opinion that this decision was premature.
24. The Applicants retained an expert, who compiled a report into the cause of
the loss. AT, is an actuary and statistician with experience in flood related
events. Whilst the Panel accepts that he is not a hydrologist, his report of 22
July 2011 raised some interesting issues:
heavy rain fell in the area over the 11-12 January 2011;
the Applicants’ street was inundated by 6am on 12 January 2011 and
they evacuated between 6am-7am;
the recorded flood height (7.31m AHD – Australian Height Datum) for
Oxley Creek, being the closest water body to the Applicants’ property,
was less than what was required (8.27m AHD) to have inundated the
property at the time that water entered. As a result, the water present
must have been stormwater run-off;
the Applicants’ neighbour confirmed the inundation of the street at
about 6am and the Applicants’ home sometime between 12pm -2pm;
stormwater run-off was responsible for the initial inundation of the
Applicants’ home.
25. The FSP then engaged a hydrologist, WR, to provide a report specific for the
Applicants’ property and to address the issues raised by AT. This report of 7
November 2011 revealed:
Case No: 251776 Determination Page 5 of 7
the recorded rainfall from the Green Hill Reservoir Alert gauge (about
2.8km northwest of the Applicants’ property) showed there was
125.3mm of rain between 12am on 10 January 2011 and 12am on 12
January 2011;
no significant rainfall was recorded at this site after about 5pm on 11
January 2011;
the peak intensity of the rainfall occurred at 11pm on 11 January 2011;
the peak stormwater run-off a t the Applicants’ property would have
occurred “within about 15 minutes of the peak rainfall intensity”;
the property was within 600m of the Brisbane River and within the
extent of backwater flooding from this river;
ground levels at the property range from 8.0m AHD at the front to 8.7m
AHD at the rear, with the peak flood level in the vicinity of the property
being 9.2 AHD;
the inundation at the floor level was about midday on 12 January 2011.
Rainfall had ceased about 10-12 hours earlier;
any water enteri ng the property after about 12am on 12 January 2011
“could not have been stormwater run-off ”;
the overland flow level for stormwater discharge from the drains was
6.8m AHD, which was well short of the Applicants’ property, being 8m
AHD (and about 8.4m AHD for the building);
the Brisbane River water level was 7.3m AHD at 5.30am on 12 January
2011, in the vicinity of the Applicants’ property. This was over and
above the highest point for the overland stormwater flow (6.8m AHD)
and was likely overtaken at about 3am;
a photograph showing water west of the home around 5.30am on 12
January 2011 is consistent with a water level of 7m AHD (which
equates with the level of the Brisbane River at this time);
any water surcharging up the stormwater system would have joined
with the overland (flood) flow at the time of inundation of the property;
AT misinterpreted the height of the Applicants’ property and this
undermines the credibility of his subsequent analysis. He misread the
statistics regarding rainfall (as there was no meaningful rainfall on 12
January 2011) and did not understand the dynamics of rainfall and
water levels;
it was “not physically possible” for the property to have been inundated
by stormwater run-off.
26. AT provided a response to WT’s report to contend that there was a
difference in the water levels for the house and the river at relevant junctures
on the morning of 12 January 2011.
27. The Panel Ombudsman attended a site meeting on 22 March 2012. Present
were the Applicants, AT and two representatives of the FSP. After
Case No: 251776 Determination Page 6 of 7
examination of the site and its surrounds, AT thought that at its peak, as
either storm water or storm water backing up through the drains and from the
reserve opposite the home, initial inundation would have reached a
maximum height of 15 to 20cm above the crest of the road. Consequently,
they now agree that approximately 10cm of this inundation would have
initially come through the home as a result of water escaping the stormwater
drains backflow and/or run-off from the reserve.
28. Further material was exchanged by the parties following the site inspection.
The FSP provided a further report from its hydrologist WT. The Panel notes
the hydrologist agrees the initial inundation of the Powenyenna Reserve
opposite the Applicants’ home was due to bac kflow along the northern
drainage path that passes through culverts under nearby street. The FSP
maintains that the drainage path is a water course not a drain. The FSP
further submits that the photograph provided by the Applicants depicting
water overflowing at the intersection with Oxley Road and the explanation for
this is inaccurate. The FSP maintains the local stormwater drainage system
would not lead to stormwater inundation at the Applicants’ property. The
Applicants on the other hand have provided further information with respect
to the local run-off including information from local newspapers. The
Applicants maintain that local run-off was significant and caused the flooding
of the Powenyenna Reserve. The Applicants also question the accuracy of
the data relied upon by the FSP. The Applicants maintain that drains from
the Reserve are not natural waterways but in fact artificially constructed
drains.
29. The Applicants maintain through observation that there was back-flow
flooding occurring through the sewer system as well as the stormwater
drainage system.
30. Both the FSP and the Applicants have provided credible but conflicting
expert evidence concerning the possibility of the risk address being initially
inundated by stormwater run-off or back-flow. It is difficult based on the
information provided for the Panel to determine which expert evidence
should be afforded more weight. The Panel is assisted by the site inspection
which was conducted and by the policy definition. Unlike some policies, the
Applicants ’ policy provides cover for back -flow inundation regardless of the
source of that water. That is providing the Applicants can establish on the
balance of probability that inundation occurred through stormwater run-off
from areas surrounding the site or water escaping from any water main,
drain, pipe, street gutter, guttering or surface, then cover is offered and the
inundation would not be excluded by the flood exclusion.
31. The Applicants have provided several photographs of the local area,
including the main drain opposite their home which is clearly blocked with
debris. In the Panel’s view, it is likely in the circumstances that there would
have been inundation of the property from stormwater run-off in the area and
in particular from water escaping the wate r mains, drains, pipes, street gutter
or guttering or surface. The Panel accepts that this inundation would have
occurred prior to the ultimate inundation of the property by a combination of
water escaping the drains and flood water.
Case No: 251776 Determination Page 7 of 7
32. Whilst the photographs do not provide any guidance as to the likely height of
any damage by water escaping the drains, the Panel, having considered all
the evidence, accepts that this initial inundation is likely to have been
between 100mm and 200mm in height. In the circumstances, and in view of
discussions at the site inspection, the Panel believes it is fair to assess the
initial inundation to the height of 100mm.
33. The evidence available of the assessment of damage conducted by the
FSP’s assessor do not allow the Panel to determine the actual loss suffered.
It is clear that the property has sustained both building and contents
damage. The damage and repair assessment conducted by CL placed a
provisional reserve of $32,000 on the contents and building damage. The
Panel accepts that the FSP is not liable for all of this damage as the property
was ultimately inundated to a height of 800mm by flood water.
34. Having considered all of the information and given the length of time since
the losses occurred, the Panel believes it is fair in the circumstances that the
FSP cash settle the Applicants 50% of the amount of the loss suffered based
on the damage to the property to a height of 100mm be classified as
inundation from the water mains, drains, street gutters or guttering.
35. The Panel notes that there is an itemised list of items lost and an estimate as
to the building damage. The parties are asked to work cooperatively to
determine the total loss amount and to then agree to settle on the basis of
50% of the total loss assessed.
Determination
36. Accordingly the Panel determines the FSP is to cash settle the Applicants’
claim for 50% of the loss sustained in accordance with the terms of the
policy. Further, the FSP is to pay interest on the settlement sum at the
statutory rate from 15 April 2011 being the date of the FSP’s decision in this
claim to date of satisfaction of this Determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.