Determination 251708

Method and amount of cash settlement for storm-damaged home building claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$114,470
Non-financial loss—
Amount claimed$225,000
SourceAFCA PDF

Summary

Following a storm claim, the FSP cash settled the building repairs at $97,970 and the applicants sought $225,000. AFCA accepted the cash settlement method, rejected the roof and most disputed items, but increased the award to $113,970 plus interest and a $500 report fee.

Where the policy gives the insurer discretion to cash settle, the insurer may do so, and the amount is determined by the reasonable repair cost evidence, with interest payable from the date it was unreasonable to withhold payment.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 251708 Determination Page 1 of 15 Case number: 251708 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 26 June 2012 Background 1. The Applicants (EG & DK) entered into an insurance contract with the Financial Services Provider (FSP) to cover their residential property. The relevant period of insurance operated for twelve months beginning from 23 March 2010. During this period, the building was insured for up to a sum of $385,000 and contents for $55,000. Building claims were sub ject to an excess of $500. 2. The Applicants lodged a claim for storm damage on 5 February 2011 following severe weather events in Victoria. 3. The FSP accepted the claim but a dispute has arisen regarding the method and amount of settlement. 4. The FSP, in its latest submission, has proposed to settle the claim by way of cash settlement totalling $97,970. The Applicants have disputed this on a number of bases. 5. The parties have provided detailed and lengthy submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants’ position 6. The Applicants have disputed the FSP’s position on the following bases: a. They never sought a cash settlement. This was the FSP’s choice and it was made without their consent. Instead, their wish was for the FSP to undertake the repairs. b. The scope of works undertaken by the FSP’s builder (S) was incomplete. For instance, various issues were not included due to being inappropriately categorised. In particular, the damage to the roof should have been included. Determination Case No: 251708 Determination Page 2 of 15 c. Further, S’s quote and evidence should not be preferred because of an apparent conflict of interest. This is corroborated by the incomplete scope of works and underpriced quote. d. The FSP’s settlement is clearly inadequate because it is based on S’s incomplete scope of works; S has severely underquoted the work and failed to include other ancillary benefits, such as temporary accommodation and the removal and storage of household items. e. The FSP has inappropriately handled the claim and in the process, breached its duty of utmost good faith. 7. Although not their preferred option, the Applicants in their latest correspondence were prepared to accept a cash settlement in the sum of $225,000. This did not include any sum for the physical illness and medical costs, emotional suffering and hardship they have endured over the course of this dispute. Summary of FSP’s position 8. The FSP’s latest settleme nt offer was $97,970 and this was contained in an email dated 29 November 2011. This amount is based on the following:  S’s costing dated 2 June 2011 totalling $68,376.45. This was the most economical of the three quotes obtained for the second scope of works.  An allowance for the cork flooring totalling $10,000.  An increase of 25% of S’s quote to factor in any variation, totalling $19,594. 9. The FSP has relied on S’s reports and costing and the following policy provisions to substantiate its position: “ General exclusions - apply to the overall policy Unless included in the additional cover, we will not cover loss, damage or legal liability caused by:  wear and tear and lack of maintenance, including rust, corrosion, deterioration …;  gradual loss or damage of any kind;  structural defect and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents;” Issues 10. Whether the FSP’s method of settlement is fair and in accordance with its obligations under the policy. 11. Whe ther the FSP has inappropriately handled the Applicants’ claim. Case No: 251708 Determination Page 3 of 15 Reasons for decision 12. Due to the issues and amount in dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service’s Terms of Refe rence. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. Method and Amount of Settlement 14. The substantive issue in dispute has clearly been the method and amount of settlement offered by the FSP. The Applicants have disputed the FSP’s choice to cash settle the claim as they clearly preferred for the FSP to undertake the necessary repairs. 15. However, the policy contains the following provisions regarding settlement of accepted claims: “Settling building claims … This means that if any part of the building is damaged by an insured event, you are covered for the costs which are incurred to repair or rebuild the damaged part of the building as near as possible to the condition prior to the event using only new materials. … Once we accept your claim, we will decide whether to:  repair or rebuild the damaged portion of your building; or  pay you the amount we determine to be the reasonable cost of repairing the damaged part of your building. If we decide to pay you, the payment will be based on the amount we would have expected to pay if the work was authorised and completed by us, and after deducting any excess which applies to the claim.” 16. As the policy clearly provides the FSP with the discretion as to whether to authorise the repairs itself or to pay for those costs, the Panel is satisfied the FSP is entitled to settle the Applicants’ claim by way of cash settlement, despite their objections. 17. Accordingly, the substantive issue that remains is the amount. Scope of Works 18. S provided two scopes of works, one dated 11 April 2011 and another dated 20 May 2011. The Applicants contested the first scope of works. EG provided an email setting out, in detail, areas and works she considered the first scope of works did not account for. Case No: 251708 Determination Page 4 of 15 19. S attended the property again and provided a second scope of works which included some of the additional items being claimed by the Applicants. With respect to the majority of the balance though, S did not consider they were storm related for various reasons, such as the fact they were a pre-existing building defect, wear and tear or no damage was sighted. 20. S’s reasons and rationale were set out in a report dated 23 May 2011 which, for the sake of brevity, the Panel will not set out in detail given both parties have had an opportunity to read S’s report. 21. The Applicants have contested S’s reasons, particularly the basis for not including the repairs to the roof. Further, the Applicants have also raised a number of allegations about S, including but not limited to:  S has a conflict of interest due to its multiple roles, and  S has deliberately undercharged the work to secure the works. 22. In relation to the amount of the works being quoted and these allegations, the Panel will discuss them later. 23. As a starting point, the Panel considers it is appropriate to determine whether the scope of works set out by S dated 20 May 2011 accurately reflects the extent of repairs required for the building. Applicants’ Reliance on BC, FSP’s loss adjuster, MCS & Real estate agent to substantiate their position 24. The Applicants have disputed the items denied by S and omitted from the second scope of works. On this basis, they engaged a builder (BC) to review S’s scope of works. BC provided a report dated 14 June 2011 that contained the following preamble and instructions: “I was verbally instructed by [EG] to comment on, and inspect areas of damage not covered in the Report dated 11 April 2011 by [S]. … The report provided by [S] and dated 11 April 2011 is considered extremely comprehensive, however, inspection revealed there are several areas that have been omitted from the scope of works for the rectification.” 25. The report found the following items omit ted in S’s scope of works dated 11 April 2011:  The ceiling in bedroom 3 should be replaced.  All of the cork flooring requires replacement.  The ceiling in the bathroom should be replaced. 26. The Panel acknowledges the FSP has provided an allowance for the cork flooring in the sum of $10,000. However, it does not appear the FSP has provided any allowance for the replacement of the ceilings in bedroom 3 and Case No: 251708 Determination Page 5 of 15 the bathroom as they are not allowed for in S’s scope of works dated 20 May 2011. 27. However, of note, the Pa nel notes that BC’s report provides minimal support to the Applicants’ position with respect to the balance of items that were denied. Although BC allowed those three main items set out above, it does not appear to account for the multiple other items being sought by the Applicants, including repairs to the roof. 28. Further, there is little evidence to support the Applicants’ contention regarding these items. Instead, much of the Applicants’ submissions are centred on their observations of the damage on the day and why they maintain the scope of works were inadequate. 29. However, the Panel is not persuaded by this. In these circumstances, the Panel accepts that building consultants, such as S and BC, are appropriately qualified to examine and report on the likely cause and nature of repairs necessary. For instance, water damage to a plaster may, conceivability, be repaired by special types of paint. Whether this is possible is an issue best resolved by a builder. 30. In addition, it appears BC and S have provided consistent evidence regarding the repairs necessary except for the three additional items identified by BC. 31. The Applicants have sought to also rely on the FSP’s loss adjuster’s reports, a structural engineer’s report (MCS) and the real estate agent’s statutory declaration to support their contention. 32. In relation to the loss adjuster reports and the extent of damage identified there, the Panel does not consider this is persuasive given the comment contained therein: “This Assessment is partially complete listing all major damage items only. A detailed Scope of Works has been requested and will be forwarded to you on receipt”. 33. Further, the report clearly indicated that:  The scope of works will be determined by S,  The works listed were general in nature (for exampl e, it quoted “R&R plaster wall” but with no specific reference as to which walls required this), and  It provided minimal to no analysis about the cause of the damage identified. 34. Accordingly, the Panel accepts the report does not purport to provide a detailed analysis of the cause of the visible damage and/or the specific extent of works required for same. Clearly, the loss adjuster considered it appropriate to defer to S in this regard. Case No: 251708 Determination Page 6 of 15 35. With respect to MCS’s report, the Panel considers the scope of the repo rt did not extend to identifying the cause and extent of repairs necessary. This is evident by the introduction to the report under the sub- heading “Instructions”: “… We have been requested to attend and report to confirm if there is any structural movement of the dwelling and confirm whether the ground has dried so that reinstatement works can be arranged. We understand that other inspectors will assess damage and loss to furniture, finishes and building fabric. Our Report is to focus on the structure and any other elements of an engineering nature.” 36. The Applicants have provided written up comments on various parts of their copy of MCS’s report as evidence that it supports their contention regarding the damage to the ceilings in bedroom 3 and the bathroom. The Panel does not accept this because MCS’s comments were limited to their observations as evident by the sub- heading “Observations and Discussions” and the fact it provided no comment about the extent or nature of the necessary repairs. 37. In regards to the roof, the Panel considers similar principles apply. MCS provided a description about how water entered the ceiling cavity due to the large volume of rain. This has not been disputed. However, the description provided of the water entry provided no additional comment that the roof itself was damaged as a result of it. 38. Accordingly, the Panel does not accept MCS’s report provides any probative evidence to assist the Applicants. 39. With respect to the real estate agent’s statutory declaration, the Panel does not accept this contains any probative value. A real estate agent is not qualified to comment on whether certain building elements were installed pursuant to appropriate building standards. This is clear given parties seeking to purchase a home and determine its structural integrity before signing a contract engage a builder to report on this, not a real estate agent. 40. Accordingly, the Panel considers the Applicants’ reliance on these parties provides minimal probative value to their dispute. Roof 41. One of the substantive items the Applicants are seeking indemnity for is repairs to the roof. In this regard, the Applicants provided an invoice dated 19 September 2011 totalling $7,150 with the following works described:  Pressure clean and de-mossing  Complete re-pointing and re-bedding  Tile replacement as required  Application of silicone sealer  Replacement of three 500 x 500 lead flashings  Replacement of 4 metres of flashing (along window). Case No: 251708 Determination Page 7 of 15 42. However, the Panel considers this provides minimal probative value. For inst ance, the works include “de - mossing”. It is difficult to associate moss with damage being sustained as a result of the storm. This appears more maintenance related. 43. With respect to the re-pointing and re-bedding, replacement of tiles and other associated works, the contractor provided no comments as to the reason these works were required. 44. In contrast, S provided comments about the roof’s structure which state the following: “Some maintenance related improvement works are recommended to the roof flashings and the storm water guttering drainage to reduce the risk of reoccurring water penetration into the roof. In particular it was observed that the storm water gutter located along the outside edge of the rear pergola has no downpipe and discharges directly onto and against the pitch of the tile covered roof of the main residence. Silicone mastic was observed between the laps of the tiles where it would appear that a previous attempt has been made to prevent water prevention at this location.” 45. Further, there is no other report or evidence showing the roof sustained damage as a result of the storm. For instance, these repairs were not included in the broad scope of works in the loss adjuster’s report and there was no support provided by BC that this should be included. 46. Accordingly, the Panel is not persuaded on the evidence that the damage to the roof was caused by the storm. Section 46 of the Insurance Contracts Act 47. The Applicants have also relied on Section 46 of the Insurance Contracts Act 1984 (the Act). The operative provision is Section 46(2) of the Act which states the following: “Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer’s liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing .” (Panel emphasis) 48. There is only one case that has judicially reviewed this case ( Nelson v Hollard Insurance Co P/L (2010) NSWSC 199). The facts of that case can be summarised as follows:  The insured had purchased a yacht.  Prior to purchase, the insured had engaged a qualified marine surveyor to prepare a report on the vessel’s condition. Case No: 251708 Determination Page 8 of 15  The surveyor confirmed verbally on 7 November 2008 that the vessel was built with quality materials and was in reasonable condition. This was confirmed in a written survey report dated 10 November 2008.  The insured entered into a contract of insurance with Hollard on 7 November 2008.  On 21 November 2008, the vessel was slipped for routine maintenance and suffered a structural failure.  The insured lodged a claim for the loss suffered as a result of this. 49. The parties agreed that the circumstances of the loss fell within the following exclusion clause: “for any loss of damage caused by or resulting from, or the costs incurred from or of: inherent defects, structural faults, faulty workmanship or faulty design.” 50. The insured in that case sought to rely on Section 46(2) of the Act in stating Hollard could not rely on the above exclusion to deny the claim. Hollard presented three arguments to rebut this, one of which was: “An exclusion of a particular event without reference to when it occurs does not transgress section 46” 51. The judge accepted this argument and provided the following comment that the Panel considers is relevant to this dispute: “… the fact that on th e particular facts of this case the relevant condition appears to have been one pre-existing the entry to the policy does not assist the plaintiff. Section 46(2) requires an examination of the relevant policy terms and not the particular facts of this case .” 52. Accordingly, based on the judge’s comments, it is clear Section 46(2) of the Act only applies if the exclusion itself provides a temporal reference to when the event occurs. If it does not, then Section 46(2) of the Act cannot be relied upon by the insured. 53. In this case, the FSP’s exclusion clause (set out in “Summary of FSP’s Position”) provides no temporal reference. Accordingly, in line with the authority of Nelson the FSP is entitled to rely on same even if the relevant defects pre-existed the inception of the insurance contract inception and the Applicants were not reasonably aware of them. 54. The Panel therefore accepts Section 46 of the Act does not assist the Applicants. Conclusion 55. Based on the available evidence, the Panel accepts that S’s scope of works dated 20 May 2011 reflects the majority of the repairs necessary as a result of the insured event. Case No: 251708 Determination Page 9 of 15 56. There are only three exceptions that appeared to have been omitted and identified by BC. As stated previously, the FSP has accepted one of these omissions, namely the cork flooring. 57. With respect to the replacement of the ceiling in bedroom 3 and the bathroom, S did not accept there is evidence of damage to these parts of the home. Further, according to the FSP, enquiries were made with BC regarding their report and BC allegedly admitted that the ceilings could be repaired and his reference to replacement was only included at the Applicants’ preference. 58. The FSP provided no file note or other document corroborating this conversation though. 59. Further, S’s c omments regarding these items are fairly limited. For instance, with respect to bedroom 3, S appeared to indicate there was no evident damage to the plasterboard ceiling lining. This appears inconsistent with BC’s findings that there was a deflection in th e ceilings in both rooms that required addressing. In the Panel’s opinion, it is difficult to accept painting of the ceiling would address the deformation. 60. Further, S did not appear to rebut BC’s comments regarding the requirements to replace. Given this, the Panel is inclined to prefer BC’s comments that the ceilings in bedroom 3 and the bathroom require replacement. 61. Accordingly, the Panel accepts that the scope of works necessary to repair the home is reflected in S’s scope of works and the additional i tems identified by BC. Quantum 62. The FSP provided three quotations it claimed were based on S’s scope of works, namely:  SG for $78,804.55  AJG for $87,780.76, and  S for $68,376.47 63. One of the issues the Applicants have raised is that the quotations obtained by the FSP were based on the original scope of works provided by S. 64. In regards to S’s quotation, the Panel notes the Applicants’ submission is incorrect because S’s quote was dated 2 June 2011 and clearly made reference to the “Origin of Scope” being dated 20 May 2011. 65. However, AJG’s quotation appears to have been based o n the original scope of works. This is evident in the email it sent through because the items it was quoting on did not include the additional items allowed for in S’s scope of works dated 20 May 2011. Case No: 251708 Determination Page 10 of 15 66. The evidence is less clear regarding SG’s quote. Howev er, in an email by the FSP’s loss adjuster, it appears they consider SG’s quote was incomplete, overpriced in various aspects, and other amendments were required. 67. The Applicants have strongly disputed the amounts being relied upon by the FSP, namely S’s qu ote. The Applicants have raised a number of serious allegations, such as that the FSP is breaching its duty of utmost good faith, S has deliberately underquoted to secure the works and that the amounts being relied upon do not accurately reflect the actual cost. 68. However, the Applicants’ arguments are mainly based on speculation. That is, there is no evidence from any other builder or expert that corroborates the amounts being relied upon by the FSP are clearly undervalued. Although the Applicants have indicated they are unable to obtain a builder to do the work for the amount quoted, they have provided no evidence from any builder corroborating this. 69. Further, the Applicants have theorised that the FSP is deliberately underquoting due to economic constraints. Again, this is based on speculation as the Applicants have provided no direct evidence that S’s quote is clearly undervalued. 70. In relation to a breach of utmost good faith, this is mainly based on the FSP’s handling of the claim, which the Panel will review later. Further, even if a breach of utmost good faith is found, the Panel notes this does not entitle an insured to payment of the claim as indicated by the High Court decision of CGU Insurance Ltd v AMP Financial Planning Ltd [2007] HCA 36. 71. In the Pan el’s opinion, there is no evidence to suggest that S’s quote was so low that no builder could reasonably be able to do the works for a similar price. Although there were a number of other quotations that were higher in value, this in itself is not evidence that the works were overpriced. It is common knowledge that building quotes can vary considerably from builder to builder. 72. The FSP has decided to settle the Applicants’ building claim based on S’s quote with a 25% loading allowed for additional variations. Given the absence of any evidence from another builder to state that S’s quote for the scope of works are undervalued, the Panel considers this was fair and consistent with the policy terms. 73. The FSP has also provided an allowance of $10,000 for the replacement of the cork flooring. In the absence of any contrary evidence about this amount, the Panel accepts this allowance is reasonable. 74. The Panel has also accepted that the ceilings in bedroom 3 and the bathroom should be replaced. Unfortunately, there is no specific costing available for these works. Case No: 251708 Determination Page 11 of 15 75. In this regard, the Panel refers to S’s quote regarding plastering, which allowed for approximately $2,000 for all the plastering works required in the scope of works. Included in this quote was the supply of plasterboard, installation and relevant materials. 76. Applying its discretion under clause 8.2 of the Terms of Reference to do what is fair in all the circumstances, the Panel accepts that an additional allowance of $3,000 should be provided to reflect the replacement of the ceilings in the bathroom and bedroom 3. This is based on the fact there are two ceilings requiring replacement and the Panel considers a loading of 150% on top of the current plaster works is fair in all the circumstances. 77. Although the Panel acknowledges there is minimal building evidence to support this figure, it is reasonable to apply a figure for the sake of settling this long outstanding dispute. Ancillary Benefits 78. The Applicants have also noted that the FSP’s cash settlement omits ot her ancillary benefits, such as:  Alternative accommodation costs,  Packing and moving contents into storage, and  Costs of storing these household items. 79. The Panel cannot find any benefit in the policy regarding the packing and moving of household contents i nto storage. Accordingly, these costs do not appear to be payable. 80. The benefit in the policy regarding alternative accommodation states the following: “If we agree that an insured event has caused so much damage to your building that you cannot live in it, we will pay alternative accommodation costs. The amount we will pay is the amount it could have been rented for, and we will pay this amount for the period from the time the building is unable to be lived in as a result of the damage and while it is being repaired, rebuilt or replaced up to a maximum period of twelve months.” 81. The FSP has provided no allowance for these costs, nor any reason as to why it has omitted to do so. 82. The Panel accepts that the damage sustained was quite extensive as evident by the number of rooms requiring repairs, including the kitchen and bathroom. Accordingly, the Panel accepts it is likely that the additional benefit of the policy is triggered. 83. The costs allowed under this benefit are limited to the amount the property could have been rented for during the period of repairs. The Applicants have estimated this cost to be $1,300 per week and believe they are entitled to approximately $26,000 under this benefit. Case No: 251708 Determination Page 12 of 15 84. The Panel has no evidence to refute the weekly amount sought. In relation to the time period though, the Panel notes that the Applicants referred to an enquiry they had with a builder who estimated the home would be uninhabitable for eight to ten non continuous weeks. 85. No corroboration has been provided by the Applicants in this regard. However, no information has been provided by the FSP either regarding the period of time that the home would be uninhabitable whilst repairs are being undertaken. 86. Again applying clause 8.2 of the Terms of Reference, the Panel considers an allowance of ten weeks at the weekly rate of $1,300 is fair in all the circumstances. This results in an additional allowance of $13,000 to be included. 87. Adding this to the amount allowed for under the building repairs ($100,970), the Applicants are entitled to a cash payment of $113,970 in total for the building claim. Claims Handling and Guarantee of renewal Claims Handling 88. The Applicants have provided a number of serious allegations regarding the FSP’s conduct and handling of the claim, citing breaches of utmost good faith, dishonesty and deliberate attempts to limit their entitlements. 89. However, as indicated previously, the Applicants have not provided any substantive evidence to substantiate their allegations. For instance, the Applicants stated the FSP engaged S to deliberately underprice and underquote the cost of repairs but did not provide any evidence from other builders to corroborate this. 90. Further, the Panel was satisfied on the evidence that the scope of works provided by S were accurate bar for three items. In addition, S’s scope of works was acknowledged by BC as being comprehensive and thorough. 91. The Applicants have also attempted to attribute a number of other issues to the FSP’s conduct, such as the fact the storm occurred the day before their wedding, the stress in dealing with this matter and the substantive delays. 92. The Panel cannot accept that the stress involved in having a storm occur the day before the Applicants’ wedding ca n be attributed to the FSP in any way. Although the Panel does accept this would have been stressful, it clearly was not the fault of the FSP. 93. In relation to the balance of the claims handling, the Panel does not accept this can be substantially attributed to the FSP given the following: a. The FSP was prepared to authorise repairs and provide scope to the Applicants to seek variations during the repair process where Case No: 251708 Determination Page 13 of 15 appropriate. The Applicants refused as they considered the scope of works needed to be completely settled and agreed to before repairs begin. As the Panel has found, many of the items the Applicants sought to be included was largely disallowed. b. It is general industry practice to allow for further repairs and works when identified during the repair process. Attempting to identify every item of repair at the outset, particularly for a claim with extensive damage, is not practicable. Accordingly, the Panel considers the Applicants’ insistence in having every item identified and included prior to repairs beginning contributed substantially to the delay; particularly given the Panel has not accepted a majority of the items sought. 94. Accordingly, the Panel is not satisfied that the Applicants’ allegation that the FSP unduly mishandled the claim or breached its duty of utmost good faith is established. Guaranteed Renewal 95. In the Applicants’ recent submissions, they have sought a guarantee that the FSP will not go off risk whilst the repairs are being completed. The Panel notes that the FSP has renewed the policy which, based on the previous period, should operate for a twelve month period that expires around March 2013. 96. The Panel notes that insurers have a commercial discretion as to whether it is prepared to renew a policy and if so, on what terms. An insured is not entitled to expect policies will be guaranteed renewable unless the contract of insurance allows for this. The Panel accepts this contract is not a guaranteed renewable policy and this is consistent with almost all home building policies. Guaranteed renewable policies are normally associated with personal accident & sickness type policies. 97. Accordingly, the Panel accepts it does not have the authority to compel the FSP to guarantee renewal of the Applicants’ policy in future. 98. By way of commentary, the Panel considers it is good industry practice for an insurer to stay on risk whilst a claim dispute is outstanding. Interest 99. Although the FSP has largely been successful in substantiating its cash settlement offer dated 29 November 2011, it appears this amount was not made available to the Applicants unless they were prepared to accept the offer in full and final settlement. 100. Section 57(2) of the Act discusses interest and this states: “The period in respect of which interest is payable is the period comm encing on the day as from which it was unreasonable for the insurer to have withheld payment of the amount and ending on whichever is the earlier of the following days: Case No: 251708 Determination Page 14 of 15 (a) the day on which the payment is made; (b) the day on which the payment is sent by post to the person to whom it is payable.” 101. It is unclear at what stage the FSP attempted to cash settle the Applicants’ quote. However, the Panel notes that in its Notice of Response to the Service, it made reference to the fact that the issue in dispute was whether its settlement offer of $68,376.47 was appropriate. 102. This amount was based on S’s quote dated 2 June 2011. BC’s report, which was dated 14 June 2011, provided the additional information necessary that the Panel considers allowed the FSP to determine the extent of its liability. 103. The Panel considers an allowance of three weeks from the date of BC’s report would have allowed the FSP to determine the likely amount owing to the Applicants. That is, the Panel accepts that the FSP should have been in a position to determine the extent of its liability by 5 July 2011. 104. Accordingly, as the FSP exercised its discretion to cash settle the claim and does not dispute that it was liable for the claim; the Panel considers it was unreasonable for the FSP to have withheld payment of this amount from 5 July 2011 onwards. 105. The Panel understands that an argument available to the FSP is that it did attempt to pay this amount but the Applicants continually rejected its offer. However, it is unclear whether the FSP attemp ted to pay this amount without any condition that it was only payable if the Applicants accepted it in full and final settlement. 106. Based on the information to date, the Panel is inclined to accept this was likely the case. In particular, in its email dated 29 November 2011, the amount the FSP currently sought to rely on was set out as an “offer” rather than payment of its liability. 107. In the Panel’s opinion, the Applicants were entitled to payment of the amount found in this Determination as from 5 July 2011. From that date onwards, it was unreasonable for the FSP to have withheld payment. Further, the Applicants were deprived of the opportunity to accrue interest on this amount or applying the monies for necessary repairs. 108. Accordingly, the Panel accepts that i nterest is payable on the amount owing. BC’s fee 109. It is unclear if the FSP has made provision for the costs of this report. If it has not, the Panel considers it is appropriate that this cost be added to the final amount pursuant to clause 9.4 of the Terms of Reference which states: “ 9.4 Applicant’s costs in pursuing the matter FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course Case No: 251708 Determination Page 15 of 15 of the Dispute. Unless exceptional circumstances apply, FOS will not require the Financial Services Provider to contribute more than $3,000 to these costs.” 110. For the sake of clarification, this amount is not subject to interest. The reason being is that it is not a cost payable under the contract of insurance. Instead, the Panel has allowed this cost pursuant to a discretion available to it under clause 9.4 of the Terms of Reference. Determination 111. On the basis of the available information the Panel determines that the FSP do the following in full and final settlement of this building claim: a) Pay to the Applicants the sum of $113,970, b) Pay interest on the above amount sum in accordance with the Act from 5 July 2011 to the date when payment is affected, and c) If it has not done so, t he FSP is to reimburse the costs of BC’s report totalling $500. 112. In the event the Applicants accept this Determination, this amount should be paid within 14 days of the FSP being notified of its acceptance unless it requires a binding release to be signed first. In the event the FSP requires a binding release to be signed, it should:  Ensure a release is sent to the Applicants within 7 days of being notified of the Applicants’ acceptance of the Determination; and  Pay the above amount within 7 days after it has received an appropriately signed release.