Text of the determination
Case No: 251708 Determination Page 1 of 15
Case number: 251708
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
26 June 2012
Background
1. The Applicants (EG & DK) entered into an insurance contract with the
Financial Services Provider (FSP) to cover their residential property. The
relevant period of insurance operated for twelve months beginning from 23
March 2010. During this period, the building was insured for up to a sum of
$385,000 and contents for $55,000. Building claims were sub ject to an
excess of $500.
2. The Applicants lodged a claim for storm damage on 5 February 2011
following severe weather events in Victoria.
3. The FSP accepted the claim but a dispute has arisen regarding the method
and amount of settlement.
4. The FSP, in its latest submission, has proposed to settle the claim by way of
cash settlement totalling $97,970. The Applicants have disputed this on a
number of bases.
5. The parties have provided detailed and lengthy submissions on the relevant
issues. For the sake of brevity, the Panel will only briefly summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants’ position
6. The Applicants have disputed the FSP’s position on the following bases:
a. They never sought a cash settlement. This was the FSP’s choice and it
was made without their consent. Instead, their wish was for the FSP to
undertake the repairs.
b. The scope of works undertaken by the FSP’s builder (S) was
incomplete. For instance, various issues were not included due to being
inappropriately categorised. In particular, the damage to the roof should
have been included.
Determination
Case No: 251708 Determination Page 2 of 15
c. Further, S’s quote and evidence should not be preferred because of an
apparent conflict of interest. This is corroborated by the incomplete
scope of works and underpriced quote.
d. The FSP’s settlement is clearly inadequate because it is based on S’s
incomplete scope of works; S has severely underquoted the work and
failed to include other ancillary benefits, such as temporary
accommodation and the removal and storage of household items.
e. The FSP has inappropriately handled the claim and in the process,
breached its duty of utmost good faith.
7. Although not their preferred option, the Applicants in their latest
correspondence were prepared to accept a cash settlement in the sum of
$225,000. This did not include any sum for the physical illness and medical
costs, emotional suffering and hardship they have endured over the course
of this dispute.
Summary of FSP’s position
8. The FSP’s latest settleme nt offer was $97,970 and this was contained in an
email dated 29 November 2011. This amount is based on the following:
S’s costing dated 2 June 2011 totalling $68,376.45. This was the most
economical of the three quotes obtained for the second scope of works.
An allowance for the cork flooring totalling $10,000.
An increase of 25% of S’s quote to factor in any variation, totalling
$19,594.
9. The FSP has relied on S’s reports and costing and the following policy
provisions to substantiate its position:
“ General exclusions - apply to the overall policy
Unless included in the additional cover, we will not cover loss, damage or
legal liability caused by:
wear and tear and lack of maintenance, including rust, corrosion,
deterioration …;
gradual loss or damage of any kind;
structural defect and faulty workmanship in the construction of the building
or lack of maintenance to the building and/or contents;”
Issues
10. Whether the FSP’s method of settlement is fair and in accordance with its
obligations under the policy.
11. Whe ther the FSP has inappropriately handled the Applicants’ claim.
Case No: 251708 Determination Page 3 of 15
Reasons for decision
12. Due to the issues and amount in dispute, the matter has been referred to the
Panel for Determination in line with the Operational Guidelines to the
Service’s Terms of Refe rence. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Method and Amount of Settlement
14. The substantive issue in dispute has clearly been the method and amount of
settlement offered by the FSP. The Applicants have disputed the FSP’s
choice to cash settle the claim as they clearly preferred for the FSP to
undertake the necessary repairs.
15. However, the policy contains the following provisions regarding settlement of
accepted claims:
“Settling building claims
… This means that if any part of the building is damaged by an insured event,
you are covered for the costs which are incurred to repair or rebuild the
damaged part of the building as near as possible to the condition prior to the
event using only new materials.
…
Once we accept your claim, we will decide whether to:
repair or rebuild the damaged portion of your building; or
pay you the amount we determine to be the reasonable cost of repairing
the damaged part of your building.
If we decide to pay you, the payment will be based on the amount we would
have expected to pay if the work was authorised and completed by us, and
after deducting any excess which applies to the claim.”
16. As the policy clearly provides the FSP with the discretion as to whether to
authorise the repairs itself or to pay for those costs, the Panel is satisfied the
FSP is entitled to settle the Applicants’ claim by way of cash settlement,
despite their objections.
17. Accordingly, the substantive issue that remains is the amount.
Scope of Works
18. S provided two scopes of works, one dated 11 April 2011 and another dated
20 May 2011. The Applicants contested the first scope of works. EG
provided an email setting out, in detail, areas and works she considered the
first scope of works did not account for.
Case No: 251708 Determination Page 4 of 15
19. S attended the property again and provided a second scope of works which
included some of the additional items being claimed by the Applicants. With
respect to the majority of the balance though, S did not consider they were
storm related for various reasons, such as the fact they were a pre-existing
building defect, wear and tear or no damage was sighted.
20. S’s reasons and rationale were set out in a report dated 23 May 2011 which,
for the sake of brevity, the Panel will not set out in detail given both parties
have had an opportunity to read S’s report.
21. The Applicants have contested S’s reasons, particularly the basis for not
including the repairs to the roof. Further, the Applicants have also raised a
number of allegations about S, including but not limited to:
S has a conflict of interest due to its multiple roles, and
S has deliberately undercharged the work to secure the works.
22. In relation to the amount of the works being quoted and these allegations,
the Panel will discuss them later.
23. As a starting point, the Panel considers it is appropriate to determine
whether the scope of works set out by S dated 20 May 2011 accurately
reflects the extent of repairs required for the building.
Applicants’ Reliance on BC, FSP’s loss adjuster, MCS & Real estate agent to
substantiate their position
24. The Applicants have disputed the items denied by S and omitted from the
second scope of works. On this basis, they engaged a builder (BC) to review
S’s scope of works. BC provided a report dated 14 June 2011 that contained
the following preamble and instructions:
“I was verbally instructed by [EG] to comment on, and inspect areas of
damage not covered in the Report dated 11 April 2011 by [S].
…
The report provided by [S] and dated 11 April 2011 is considered extremely
comprehensive, however, inspection revealed there are several areas that
have been omitted from the scope of works for the rectification.”
25. The report found the following items omit ted in S’s scope of works dated 11
April 2011:
The ceiling in bedroom 3 should be replaced.
All of the cork flooring requires replacement.
The ceiling in the bathroom should be replaced.
26. The Panel acknowledges the FSP has provided an allowance for the cork
flooring in the sum of $10,000. However, it does not appear the FSP has
provided any allowance for the replacement of the ceilings in bedroom 3 and
Case No: 251708 Determination Page 5 of 15
the bathroom as they are not allowed for in S’s scope of works dated 20 May
2011.
27. However, of note, the Pa nel notes that BC’s report provides minimal support
to the Applicants’ position with respect to the balance of items that were
denied. Although BC allowed those three main items set out above, it does
not appear to account for the multiple other items being sought by the
Applicants, including repairs to the roof.
28. Further, there is little evidence to support the Applicants’ contention
regarding these items. Instead, much of the Applicants’ submissions are
centred on their observations of the damage on the day and why they
maintain the scope of works were inadequate.
29. However, the Panel is not persuaded by this. In these circumstances, the
Panel accepts that building consultants, such as S and BC, are appropriately
qualified to examine and report on the likely cause and nature of repairs
necessary. For instance, water damage to a plaster may, conceivability, be
repaired by special types of paint. Whether this is possible is an issue best
resolved by a builder.
30. In addition, it appears BC and S have provided consistent evidence
regarding the repairs necessary except for the three additional items
identified by BC.
31. The Applicants have sought to also rely on the FSP’s loss adjuster’s reports,
a structural engineer’s report (MCS) and the real estate agent’s statutory
declaration to support their contention.
32. In relation to the loss adjuster reports and the extent of damage identified
there, the Panel does not consider this is persuasive given the comment
contained therein:
“This Assessment is partially complete listing all major damage items only. A
detailed Scope of Works has been requested and will be forwarded to you on
receipt”.
33. Further, the report clearly indicated that:
The scope of works will be determined by S,
The works listed were general in nature (for exampl e, it quoted “R&R
plaster wall” but with no specific reference as to which walls required
this), and
It provided minimal to no analysis about the cause of the damage
identified.
34. Accordingly, the Panel accepts the report does not purport to provide a
detailed analysis of the cause of the visible damage and/or the specific
extent of works required for same. Clearly, the loss adjuster considered it
appropriate to defer to S in this regard.
Case No: 251708 Determination Page 6 of 15
35. With respect to MCS’s report, the Panel considers the scope of the repo rt did
not extend to identifying the cause and extent of repairs necessary. This is
evident by the introduction to the report under the sub- heading “Instructions”:
“… We have been requested to attend and report to confirm if there is any
structural movement of the dwelling and confirm whether the ground has dried
so that reinstatement works can be arranged.
We understand that other inspectors will assess damage and loss to furniture,
finishes and building fabric. Our Report is to focus on the structure and any
other elements of an engineering nature.”
36. The Applicants have provided written up comments on various parts of their
copy of MCS’s report as evidence that it supports their contention regarding
the damage to the ceilings in bedroom 3 and the bathroom. The Panel does
not accept this because MCS’s comments were limited to their observations
as evident by the sub- heading “Observations and Discussions” and the fact it
provided no comment about the extent or nature of the necessary repairs.
37. In regards to the roof, the Panel considers similar principles apply. MCS
provided a description about how water entered the ceiling cavity due to the
large volume of rain. This has not been disputed. However, the description
provided of the water entry provided no additional comment that the roof
itself was damaged as a result of it.
38. Accordingly, the Panel does not accept MCS’s report provides any probative
evidence to assist the Applicants.
39. With respect to the real estate agent’s statutory declaration, the Panel does
not accept this contains any probative value. A real estate agent is not
qualified to comment on whether certain building elements were installed
pursuant to appropriate building standards. This is clear given parties
seeking to purchase a home and determine its structural integrity before
signing a contract engage a builder to report on this, not a real estate agent.
40. Accordingly, the Panel considers the Applicants’ reliance on these parties
provides minimal probative value to their dispute.
Roof
41. One of the substantive items the Applicants are seeking indemnity for is
repairs to the roof. In this regard, the Applicants provided an invoice dated
19 September 2011 totalling $7,150 with the following works described:
Pressure clean and de-mossing
Complete re-pointing and re-bedding
Tile replacement as required
Application of silicone sealer
Replacement of three 500 x 500 lead flashings
Replacement of 4 metres of flashing (along window).
Case No: 251708 Determination Page 7 of 15
42. However, the Panel considers this provides minimal probative value. For
inst ance, the works include “de - mossing”. It is difficult to associate moss with
damage being sustained as a result of the storm. This appears more
maintenance related.
43. With respect to the re-pointing and re-bedding, replacement of tiles and
other associated works, the contractor provided no comments as to the
reason these works were required.
44. In contrast, S provided comments about the roof’s structure which state the
following:
“Some maintenance related improvement works are recommended to the roof
flashings and the storm water guttering drainage to reduce the risk of
reoccurring water penetration into the roof.
In particular it was observed that the storm water gutter located along the
outside edge of the rear pergola has no downpipe and discharges directly
onto and against the pitch of the tile covered roof of the main residence.
Silicone mastic was observed between the laps of the tiles where it would
appear that a previous attempt has been made to prevent water prevention at
this location.”
45. Further, there is no other report or evidence showing the roof sustained
damage as a result of the storm. For instance, these repairs were not
included in the broad scope of works in the loss adjuster’s report and there
was no support provided by BC that this should be included.
46. Accordingly, the Panel is not persuaded on the evidence that the damage to
the roof was caused by the storm.
Section 46 of the Insurance Contracts Act
47. The Applicants have also relied on Section 46 of the Insurance Contracts Act
1984 (the Act). The operative provision is Section 46(2) of the Act which
states the following:
“Where, at the time when the contract was entered into, the insured was not
aware of, and a reasonable person in the circumstances could not be
expected to have been aware of, the defect or imperfection, the insurer may
not rely on a provision included in the contract that has the effect of limiting or
excluding the insurer’s liability under the contract by reference to the
condition, at a time before the contract was entered into, of the thing .”
(Panel emphasis)
48. There is only one case that has judicially reviewed this case ( Nelson v
Hollard Insurance Co P/L (2010) NSWSC 199). The facts of that case can be
summarised as follows:
The insured had purchased a yacht.
Prior to purchase, the insured had engaged a qualified marine surveyor
to prepare a report on the vessel’s condition.
Case No: 251708 Determination Page 8 of 15
The surveyor confirmed verbally on 7 November 2008 that the vessel
was built with quality materials and was in reasonable condition. This
was confirmed in a written survey report dated 10 November 2008.
The insured entered into a contract of insurance with Hollard on 7
November 2008.
On 21 November 2008, the vessel was slipped for routine maintenance
and suffered a structural failure.
The insured lodged a claim for the loss suffered as a result of this.
49. The parties agreed that the circumstances of the loss fell within the following
exclusion clause:
“for any loss of damage caused by or resulting from, or the costs incurred
from or of: inherent defects, structural faults, faulty workmanship or faulty
design.”
50. The insured in that case sought to rely on Section 46(2) of the Act in stating
Hollard could not rely on the above exclusion to deny the claim. Hollard
presented three arguments to rebut this, one of which was:
“An exclusion of a particular event without reference to when it occurs does
not transgress section 46”
51. The judge accepted this argument and provided the following comment that
the Panel considers is relevant to this dispute:
“… the fact that on th e particular facts of this case the relevant condition
appears to have been one pre-existing the entry to the policy does not assist
the plaintiff. Section 46(2) requires an examination of the relevant policy terms
and not the particular facts of this case .”
52. Accordingly, based on the judge’s comments, it is clear Section 46(2) of the
Act only applies if the exclusion itself provides a temporal reference to when
the event occurs. If it does not, then Section 46(2) of the Act cannot be relied
upon by the insured.
53. In this case, the FSP’s exclusion clause (set out in “Summary of FSP’s
Position”) provides no temporal reference. Accordingly, in line with the
authority of Nelson the FSP is entitled to rely on same even if the relevant
defects pre-existed the inception of the insurance contract inception and the
Applicants were not reasonably aware of them.
54. The Panel therefore accepts Section 46 of the Act does not assist the
Applicants.
Conclusion
55. Based on the available evidence, the Panel accepts that S’s scope of works
dated 20 May 2011 reflects the majority of the repairs necessary as a result
of the insured event.
Case No: 251708 Determination Page 9 of 15
56. There are only three exceptions that appeared to have been omitted and
identified by BC. As stated previously, the FSP has accepted one of these
omissions, namely the cork flooring.
57. With respect to the replacement of the ceiling in bedroom 3 and the
bathroom, S did not accept there is evidence of damage to these parts of the
home. Further, according to the FSP, enquiries were made with BC
regarding their report and BC allegedly admitted that the ceilings could be
repaired and his reference to replacement was only included at the
Applicants’ preference.
58. The FSP provided no file note or other document corroborating this
conversation though.
59. Further, S’s c omments regarding these items are fairly limited. For instance,
with respect to bedroom 3, S appeared to indicate there was no evident
damage to the plasterboard ceiling lining. This appears inconsistent with
BC’s findings that there was a deflection in th e ceilings in both rooms that
required addressing. In the Panel’s opinion, it is difficult to accept painting of
the ceiling would address the deformation.
60. Further, S did not appear to rebut BC’s comments regarding the
requirements to replace. Given this, the Panel is inclined to prefer BC’s
comments that the ceilings in bedroom 3 and the bathroom require
replacement.
61. Accordingly, the Panel accepts that the scope of works necessary to repair
the home is reflected in S’s scope of works and the additional i tems
identified by BC.
Quantum
62. The FSP provided three quotations it claimed were based on S’s scope of
works, namely:
SG for $78,804.55
AJG for $87,780.76, and
S for $68,376.47
63. One of the issues the Applicants have raised is that the quotations obtained
by the FSP were based on the original scope of works provided by S.
64. In regards to S’s quotation, the Panel notes the Applicants’ submission is
incorrect because S’s quote was dated 2 June 2011 and clearly made
reference to the “Origin of Scope” being dated 20 May 2011.
65. However, AJG’s quotation appears to have been based o n the original scope
of works. This is evident in the email it sent through because the items it was
quoting on did not include the additional items allowed for in S’s scope of
works dated 20 May 2011.
Case No: 251708 Determination Page 10 of 15
66. The evidence is less clear regarding SG’s quote. Howev er, in an email by
the FSP’s loss adjuster, it appears they consider SG’s quote was
incomplete, overpriced in various aspects, and other amendments were
required.
67. The Applicants have strongly disputed the amounts being relied upon by the
FSP, namely S’s qu ote. The Applicants have raised a number of serious
allegations, such as that the FSP is breaching its duty of utmost good faith, S
has deliberately underquoted to secure the works and that the amounts
being relied upon do not accurately reflect the actual cost.
68. However, the Applicants’ arguments are mainly based on speculation. That
is, there is no evidence from any other builder or expert that corroborates the
amounts being relied upon by the FSP are clearly undervalued. Although the
Applicants have indicated they are unable to obtain a builder to do the work
for the amount quoted, they have provided no evidence from any builder
corroborating this.
69. Further, the Applicants have theorised that the FSP is deliberately
underquoting due to economic constraints. Again, this is based on
speculation as the Applicants have provided no direct evidence that S’s
quote is clearly undervalued.
70. In relation to a breach of utmost good faith, this is mainly based on the FSP’s
handling of the claim, which the Panel will review later. Further, even if a
breach of utmost good faith is found, the Panel notes this does not entitle an
insured to payment of the claim as indicated by the High Court decision of
CGU Insurance Ltd v AMP Financial Planning Ltd [2007] HCA 36.
71. In the Pan el’s opinion, there is no evidence to suggest that S’s quote was so
low that no builder could reasonably be able to do the works for a similar
price. Although there were a number of other quotations that were higher in
value, this in itself is not evidence that the works were overpriced. It is
common knowledge that building quotes can vary considerably from builder
to builder.
72. The FSP has decided to settle the Applicants’ building claim based on S’s
quote with a 25% loading allowed for additional variations. Given the
absence of any evidence from another builder to state that S’s quote for the
scope of works are undervalued, the Panel considers this was fair and
consistent with the policy terms.
73. The FSP has also provided an allowance of $10,000 for the replacement of
the cork flooring. In the absence of any contrary evidence about this amount,
the Panel accepts this allowance is reasonable.
74. The Panel has also accepted that the ceilings in bedroom 3 and the
bathroom should be replaced. Unfortunately, there is no specific costing
available for these works.
Case No: 251708 Determination Page 11 of 15
75. In this regard, the Panel refers to S’s quote regarding plastering, which
allowed for approximately $2,000 for all the plastering works required in the
scope of works. Included in this quote was the supply of plasterboard,
installation and relevant materials.
76. Applying its discretion under clause 8.2 of the Terms of Reference to do
what is fair in all the circumstances, the Panel accepts that an additional
allowance of $3,000 should be provided to reflect the replacement of the
ceilings in the bathroom and bedroom 3. This is based on the fact there are
two ceilings requiring replacement and the Panel considers a loading of
150% on top of the current plaster works is fair in all the circumstances.
77. Although the Panel acknowledges there is minimal building evidence to
support this figure, it is reasonable to apply a figure for the sake of settling
this long outstanding dispute.
Ancillary Benefits
78. The Applicants have also noted that the FSP’s cash settlement omits ot her
ancillary benefits, such as:
Alternative accommodation costs,
Packing and moving contents into storage, and
Costs of storing these household items.
79. The Panel cannot find any benefit in the policy regarding the packing and
moving of household contents i nto storage. Accordingly, these costs do not
appear to be payable.
80. The benefit in the policy regarding alternative accommodation states the
following:
“If we agree that an insured event has caused so much damage to your
building that you cannot live in it, we will pay alternative accommodation
costs. The amount we will pay is the amount it could have been rented for,
and we will pay this amount for the period from the time the building is unable
to be lived in as a result of the damage and while it is being repaired, rebuilt or
replaced up to a maximum period of twelve months.”
81. The FSP has provided no allowance for these costs, nor any reason as to
why it has omitted to do so.
82. The Panel accepts that the damage sustained was quite extensive as
evident by the number of rooms requiring repairs, including the kitchen and
bathroom. Accordingly, the Panel accepts it is likely that the additional
benefit of the policy is triggered.
83. The costs allowed under this benefit are limited to the amount the property
could have been rented for during the period of repairs. The Applicants have
estimated this cost to be $1,300 per week and believe they are entitled to
approximately $26,000 under this benefit.
Case No: 251708 Determination Page 12 of 15
84. The Panel has no evidence to refute the weekly amount sought. In relation to
the time period though, the Panel notes that the Applicants referred to an
enquiry they had with a builder who estimated the home would be
uninhabitable for eight to ten non continuous weeks.
85. No corroboration has been provided by the Applicants in this regard.
However, no information has been provided by the FSP either regarding the
period of time that the home would be uninhabitable whilst repairs are being
undertaken.
86. Again applying clause 8.2 of the Terms of Reference, the Panel considers an
allowance of ten weeks at the weekly rate of $1,300 is fair in all the
circumstances. This results in an additional allowance of $13,000 to be
included.
87. Adding this to the amount allowed for under the building repairs ($100,970),
the Applicants are entitled to a cash payment of $113,970 in total for the
building claim.
Claims Handling and Guarantee of renewal
Claims Handling
88. The Applicants have provided a number of serious allegations regarding the
FSP’s conduct and handling of the claim, citing breaches of utmost good
faith, dishonesty and deliberate attempts to limit their entitlements.
89. However, as indicated previously, the Applicants have not provided any
substantive evidence to substantiate their allegations. For instance, the
Applicants stated the FSP engaged S to deliberately underprice and
underquote the cost of repairs but did not provide any evidence from other
builders to corroborate this.
90. Further, the Panel was satisfied on the evidence that the scope of works
provided by S were accurate bar for three items. In addition, S’s scope of
works was acknowledged by BC as being comprehensive and thorough.
91. The Applicants have also attempted to attribute a number of other issues to
the FSP’s conduct, such as the fact the storm occurred the day before their
wedding, the stress in dealing with this matter and the substantive delays.
92. The Panel cannot accept that the stress involved in having a storm occur the
day before the Applicants’ wedding ca n be attributed to the FSP in any way.
Although the Panel does accept this would have been stressful, it clearly
was not the fault of the FSP.
93. In relation to the balance of the claims handling, the Panel does not accept
this can be substantially attributed to the FSP given the following:
a. The FSP was prepared to authorise repairs and provide scope to the
Applicants to seek variations during the repair process where
Case No: 251708 Determination Page 13 of 15
appropriate. The Applicants refused as they considered the scope of
works needed to be completely settled and agreed to before repairs
begin. As the Panel has found, many of the items the Applicants sought
to be included was largely disallowed.
b. It is general industry practice to allow for further repairs and works
when identified during the repair process. Attempting to identify every
item of repair at the outset, particularly for a claim with extensive
damage, is not practicable. Accordingly, the Panel considers the
Applicants’ insistence in having every item identified and included prior
to repairs beginning contributed substantially to the delay; particularly
given the Panel has not accepted a majority of the items sought.
94. Accordingly, the Panel is not satisfied that the Applicants’ allegation that the
FSP unduly mishandled the claim or breached its duty of utmost good faith is
established.
Guaranteed Renewal
95. In the Applicants’ recent submissions, they have sought a guarantee that the
FSP will not go off risk whilst the repairs are being completed. The Panel
notes that the FSP has renewed the policy which, based on the previous
period, should operate for a twelve month period that expires around March
2013.
96. The Panel notes that insurers have a commercial discretion as to whether it
is prepared to renew a policy and if so, on what terms. An insured is not
entitled to expect policies will be guaranteed renewable unless the contract
of insurance allows for this. The Panel accepts this contract is not a
guaranteed renewable policy and this is consistent with almost all home
building policies. Guaranteed renewable policies are normally associated
with personal accident & sickness type policies.
97. Accordingly, the Panel accepts it does not have the authority to compel the
FSP to guarantee renewal of the Applicants’ policy in future.
98. By way of commentary, the Panel considers it is good industry practice for
an insurer to stay on risk whilst a claim dispute is outstanding.
Interest
99. Although the FSP has largely been successful in substantiating its cash
settlement offer dated 29 November 2011, it appears this amount was not
made available to the Applicants unless they were prepared to accept the
offer in full and final settlement.
100. Section 57(2) of the Act discusses interest and this states:
“The period in respect of which interest is payable is the period comm encing
on the day as from which it was unreasonable for the insurer to have withheld
payment of the amount and ending on whichever is the earlier of the following
days:
Case No: 251708 Determination Page 14 of 15
(a) the day on which the payment is made;
(b) the day on which the payment is sent by post to the person to whom it
is payable.”
101. It is unclear at what stage the FSP attempted to cash settle the Applicants’
quote. However, the Panel notes that in its Notice of Response to the
Service, it made reference to the fact that the issue in dispute was whether
its settlement offer of $68,376.47 was appropriate.
102. This amount was based on S’s quote dated 2 June 2011. BC’s report, which
was dated 14 June 2011, provided the additional information necessary that
the Panel considers allowed the FSP to determine the extent of its liability.
103. The Panel considers an allowance of three weeks from the date of BC’s
report would have allowed the FSP to determine the likely amount owing to
the Applicants. That is, the Panel accepts that the FSP should have been in
a position to determine the extent of its liability by 5 July 2011.
104. Accordingly, as the FSP exercised its discretion to cash settle the claim and
does not dispute that it was liable for the claim; the Panel considers it was
unreasonable for the FSP to have withheld payment of this amount from 5
July 2011 onwards.
105. The Panel understands that an argument available to the FSP is that it did
attempt to pay this amount but the Applicants continually rejected its offer.
However, it is unclear whether the FSP attemp ted to pay this amount without
any condition that it was only payable if the Applicants accepted it in full and
final settlement.
106. Based on the information to date, the Panel is inclined to accept this was
likely the case. In particular, in its email dated 29 November 2011, the
amount the FSP currently sought to rely on was set out as an “offer” rather
than payment of its liability.
107. In the Panel’s opinion, the Applicants were entitled to payment of the amount
found in this Determination as from 5 July 2011. From that date onwards, it
was unreasonable for the FSP to have withheld payment. Further, the
Applicants were deprived of the opportunity to accrue interest on this amount
or applying the monies for necessary repairs.
108. Accordingly, the Panel accepts that i nterest is payable on the amount owing.
BC’s fee
109. It is unclear if the FSP has made provision for the costs of this report. If it
has not, the Panel considers it is appropriate that this cost be added to the
final amount pursuant to clause 9.4 of the Terms of Reference which states:
“ 9.4 Applicant’s costs in pursuing the matter
FOS may decide that the Financial Services Provider contribute to the legal or
other professional costs or travel costs incurred by the Applicant in the course
Case No: 251708 Determination Page 15 of 15
of the Dispute. Unless exceptional circumstances apply, FOS will not require
the Financial Services Provider to contribute more than $3,000 to these
costs.”
110. For the sake of clarification, this amount is not subject to interest. The
reason being is that it is not a cost payable under the contract of insurance.
Instead, the Panel has allowed this cost pursuant to a discretion available to
it under clause 9.4 of the Terms of Reference.
Determination
111. On the basis of the available information the Panel determines that the FSP
do the following in full and final settlement of this building claim:
a) Pay to the Applicants the sum of $113,970,
b) Pay interest on the above amount sum in accordance with the Act from
5 July 2011 to the date when payment is affected, and
c) If it has not done so, t he FSP is to reimburse the costs of BC’s report
totalling $500.
112. In the event the Applicants accept this Determination, this amount should be
paid within 14 days of the FSP being notified of its acceptance unless it
requires a binding release to be signed first. In the event the FSP requires a
binding release to be signed, it should:
Ensure a release is sent to the Applicants within 7 days of being
notified of the Applicants’ acceptance of the Determination; and
Pay the above amount within 7 days after it has received an
appropriately signed release.