Denial of storm damage claim to garage roof
Summary
A homeowner's roughly 40-year-old garage roof lifted in a January 2011 wind event and the FSP denied the claim citing construction defect and wear. AFCA found the roof was not anchored to the standard of the time but the storm contributed, and ordered the FSP to cash settle 50% of the estimated repair cost.
Under TOR 8.2 fairness principles, AFCA considered it fair that each party contribute 50% toward repair, given the pre-existing construction defect and the storm event.
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 251068 Determination Page 1 of 4
Case number: 251068
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Storm - Wear and Tear – Gradual Deterioration - Defect in
Design – Terms of Reference 8.2 (TOR 8.2)
30 May 2012
Background
1. The Applicant held a home building insurance policy with the Financial
Services Provider (FSP) which was current at the time of the loss.
2. The Applicant lodged a claim with the FSP for damage to a garage caused
by a storm which had occurred on 31 January 2011.
3. The FSP denied the claim on the basis that the roof to the garage would not
have moved had it not been for wear, tear, gradual deterioration and a defect
in the design of the structure.
Summary of Applicant’s position
4. The Applicant says that the garage was constructed almost 40 years ago
and he could not possibly be aware of any defect in design or of the wear
and tear.
Summary of FSP’s position
5. The FSP says that the garage had been built without a sufficient amount of
anchorage points to the roof as required by the regulations at the time of
construction.
6. The FSP further says that the proximate cause of the damage was not the
insured event of storm.
7. The FSP relies on the following policy provisions contained within the
Product Disclosure Statement (PDS) which the Applicant does not dispute
receiving:
“ We do not insure you for any loss or damage that is caused by or arises
from:
defects in design, structure, materials or workmanship
...
Determination
Case No: 251068 Determination Page 2 of 4
wear and tear, gradual deterioration or fading ”
Terms of Reference 8.2
“8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although
FOS will not be b ound by these).”
Issue
8. Whether the FSP was entitled to deny the Applicant’s claim.
Reasons for decision
9. I am satisfied that a full exchange of information has taken place between
the parties and that each party has had the opportunity of addressing any
issues raised therein.
10. When submitting a claim for consideration, the burden of proof lies with the
Applicant to demonstrate on the balance of probabilities that the loss claimed
is as a result of an insured event, in this case a storm.
11. Once an insured event has been established, the onus transfers to the FSP
to show on the balance of probabilities that the loss claimed falls within an
exclusion of the policy.
12. Upon lodgement of the claim, the FSP appointed an assessor to attend the
Applicant’s property and rep ort on the extent and cause of the damage. The
assessor reported:
“On Monday the 31 st of January, 2011 the Melbourne Metropolitan area
experienced high winds and your insured’s advised our office that they were
at the situation of risk when they heard a loud bang.
...
At the time of our assessment we noted that the steel framed, steel deck roof
had appeared to have been blown up in the air and moved across the garage
roof. The brickwork at the front of the premises had collapsed as a result of
this.
...
We are concerned that the roof may not have been tied into the brickwork
satisfactorily and this could be a reason for the roof lifting.”
Case No: 251068 Determination Page 3 of 4
13. In light of this report, the FSP appointed an engineer to attend the
Applicant’s property and report on the cause of the damage. The engineer
detailed:
“It was indicated that the house and garage are approximately 40 years old
and the current owner has occupied the property for approximately 10 years.
...
The inspection of the roof showed that the timber purlins are supported at
mid-span by an open web steel truss, and along the east and west ends by a
timber waling plate. The truss and rear waling plate is supported by brick
piers, and the front waling plate appears to be supported by the corner
brickwork.
The inspection showed that no tie downs occur to tie down the open web steel
truss to the brickwork, and also to tie down the waling plates to the brickwork.
The south end of the truss has been displaced and is no longer bearing onto
the brickwork, and the same is evident of the southern section of the rear
waling plate.
...
Weather data collected by The Bureau of Meteorology indicates that the
maximum wind gust that occurred in Melbourne around the 31 January 2011
was 35km/h. A higher maximum wind gust of 57 km/h occurred the day prior,
and the maximum wind gust for the month was 74 km/h and occurred on the 7
January 2011. A wind gust of 74 km/h is equivalent to 40.0 knots.
...
The lifting and movement that has occurred of the garage roof is typical of
problems that can result from the roof being inadequate to resist normal loads
applied to the roof.
The roof is of lightweight construction and was not tied down into the
brickwork to resist normal uplift loads that can occur. A roof of lightweight
constructions is required to be tied down into the brickwork to resist normal
uplift loads that can occur on the roof.
In our opinion, the lifting and movement of the roof has not directly resulted
from the winds that occurred during January 2011. The recorded maximum
wind gust of 40.0 knots is not high, and would not be of sufficient strength to
directly result in the lifting and movement occurring, but has highlighted a pre-
existing problem with the roof.”
14. In a supplementary report, the engineer detailed:
“Our office has been able t o determine that the residence and garage were
constructed in 1962
...
The applicable Australian Standard for wind loads at the time the garage was
constructed was SAA Int 350 “Minimum Design Loads on Buildings” and was
first published in July 1952.
...
Item 29 on page 20 of SAA Int 350 states: “Anchorage. Roof framing shall be
anchored to wall framing and walls to footings so as to resist wind uplift and
Case No: 251068 Determination Page 4 of 4
sliding in excess of 50 per cent of the dead load resistance”... The roof framing
of the garage has not been anchored so as to resist wind uplift. ”
15. The Applicant has provided no evidence to rebut the allegations that the roof
to the garage was not constructed to the appropriate standards for the time.
As such, I accept that this was indeed the case.
16. However, I am concerned that the garage roof has remained in situ for
approximately 40 years, no doubt being subjected to strong, forceful winds
prior to the date of loss, without incident. I am of the view that had the only
cause of the loss been the lack of the integral anchoring then the roof would
have most likely moved at a far earlier stage. As such, I remain dissatisfied
that this was the proximate cause of the damage.
17. I am also of the view that the roof was moved by sufficiently strong enough
winds during a storm. Whilst the engineer does not suggest strong winds on
the date of the loss, the assessor accepts that there were strong winds . No
official meteorological data has been supplied by the FSP to suggest that a
storm did not occur.
18. I am mindful that the garage is aged and that in the 10 years that it has been
owned by the Applicant, no apparent maintenance has been carried out to
the structure. Had such maintenance taken place by a professionally
qualified individual then no doubt the lack of anchoring would have been
made apparent to the Applicant.
19. I acting in accordance with TOR 8.2 consider it fair and reasonable in the
circumstances that each party contribute 50% toward the cost of repairing
the structure. As no estimate for repairs has been obtained, it is my opinion
that the FSP should be allowed to obtain same and cash settle the Applicant
50% of the quoted costs.
Determination
20. On the basis of the available information, I determine that the FSP is
required to obtain an estimate for repairs and upon receipt of same, cash
settle the Applicant 50% of the estimated repair costs.
.