Home / Financial Firm (Unknown - Insurer) / Determination 250614

Determination 250614

Declined cost of preventative works for recurring water ingress

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Water repeatedly entered a bedroom and the FSP declined to pay for preventative works the applicants carried out on its advice. AFCA ordered the FSP to locate the source of the damage and pay $1,000 for consequential loss.

Where the cause of storm damage is uncertain and the insurer directed the insured to carry out works, the insurer must locate the source and may compensate consequential loss under the Terms of Reference.

Issues

Subjects and remedies

home or building damagepay compensationreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 250614 Determination Page 1 of 9 Case number: 250614 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 30 January 2012 Background 1. The Applicants hold a Home Building Insurance Policy with the Financial Services Provider (FSP). The policy covers the building up to $519,646 and is not subject to an excess. 2. The dispute arises from two incidents. The first occurred on 13 February 2010 and resulted in stormwater run-off entering a wall cavity into the downstairs bedroom and onto a carpet. The FSP engaged a building assessor who stated there was a lack of controls in place to accommodate ground water that is entering from outside into the sub-floor area. The FSP paid for the resultant damage and the Applicant engaged a builder “G” to perform works to prevent a recurrence of the water inundation. 3. The second claim occurred on 25 March 2011 in which water entered the downstairs bedroom resulting in damage to the carpets and walls. The FSP again engaged an assessor who opined that the weep holes were lower than ground level to front elevation and side elevation of bedroom which would allow water ingress to cavity and contributed to damage sustained. As a result, the FSP paid for the resultant damage. 4. The FSP has declined to make any payment for the preventative measures required to be taken by the insured to avert any further water damage to the home. 5. The Applicants dispute the FSP declinature on the basis they took the steps the prior assessor suggested that they should take. The Applicants seek financial assistance from the FSP for the new works to prevent inundation damage. Summary of Applicants ’ position 6. The Applicants‟ rely on the assessment report dated 25 March 2011 from which I note the following: Determin ation Case No: 250614 Determination Page 2 of 9  The damage to lower bedroom has been occurring for quite some time and there may be issues with stormwater drainage to external wall area to lower bedroom.  The weep holes are lower than ground level to front elevation of bedroom, which would allow water ingress to cavity and contributed to damage sustained.  The issue should be rectified by the Applicants prior to any internal works being carried out. The assessor notes that if damage is present to timber wall frames once wall lining are removed that a variation request will be submitted. 7. The Applicants rely on the assessment report dated 15 February 2010 from which I note the following:  Inspection of the downstairs bedroom revealed that it was part of an extension built some time ago and is adjacent to the sub-floor area.  The sub-floor area had been dug out to create a storage area this excavation has been taken down below the footing of the main house with no visible evidence of a drainage system to collect ground wat that naturally flows to this area.  At the time of inspection there was water seeping through the bricks that would be below outside ground level.  Inspection of the outside of this wall revealed the outside ground level to be 700mm higher than the ground level of the sub-floor storage area.  The damage to the downstairs bedroom is from water.  The contributing factor to this is the lack of controls in place to accommodate ground water that is entering from outside into the subfloor area. 8. The Applicants rely on a report dated 3 May 2011 from their builder “G”. I note G provided the following information: “Our company carried out concrete works at [Applicants‟ address]. The work involved removing existing brick pavers, stepping stones set in with pebbled borders. This was on the eastern side of the residence and was not layed (sic) out in a way which stormwater would run out and away from the adjacent brick wall. The work we carried out as instructed by the owners of the property was to remove the existing footpath and stepping stone path and replace with a new concrete footpath which was to fall away from the eastern side of the house and to an adjoining stormwater system in the rear area of the house. The new footpath was layed (sic) out so that stormwater run-off would fall away from the house brickwall and across to the eastern boundary fence then fall out to the back yard area into a 90mm stormwater pipe and into adjoining stormwater pipes. All this work was carried out in a professional manner and completed as per the instructions we had been set to achieve.” 9. The Applicants were informed verbally by the assessor for the 17 February 2010 incident that the damage was caused by „surface water and drainage‟ but were never provided with his report. The Applicants accordingly spent Case No: 250614 Determination Page 3 of 9 $6,000 laying a new concrete path based on the verbal information provided by the first assessor. 10. On 28 March 2011 a second claim was made for further water damage occurring to the same room. The FSP‟s new assessor provided a different opinion as to the cause of damage. 11. The Applicants submit that the first report was misleading and caused a financial detriment to them. In particular, the first report from 2010 stated there was a problem with surface and ground water. The second report states a different reason for the inundation. 12. The crushed stone pathway was damaged by the water and is not the cause of water inundation, it is actually a separate claim. 13. As a result of the second report the Applicants must now remove part of the concrete pathway and have to engage an independent builder and plumber to rectify the problem at considerable cost to them. 14. The Applicants seek assistance with the costs to be incurred by them. Summary of FSP’ s position 15. The FSP relies on the following policy terms and conditions: “Storm If loss or damage is caused by a storm. For example, hail damages your roof or a storm in your local area may cause water to build up in your street gutters. Covered - Violent wind, cyclone or tornado - Thunderstorm, hail, rain or snow - Sudden, excessive run-off of water as a direct result of a storm in your local area.” 16. The FSP relies on its claim file records from which I note the following:  On 22 February 2010 the Applicants were told that the contributing factor to the damage was the lack of controls in place to accommodate ground water that is entering from outside into the sub-floor area. The Applicants were also told to have the matter attended to.  I note that the second assessor is questioned carefully by the FSP on 21 April 2011. The assessor was informed the damage was fixed and responded that the Applicant knew of the ongoing issue. However the assessor then states that “we do not know exactly where the water is entering however at our discretion whether we accept the internals or not.” Case No: 250614 Determination Page 4 of 9  After being informed of the first assessor‟s opinion, the second assessor advised the FSP that it may be a combination of issues. The Applicants have rectified one problem but there is still another issue. The only method to properly determine the issues would be a dye test.  The second assessor stated there was an issue with the weep holes as they should be situated higher. However, when told that the Applicants had inserted a hose in one of the weep holes with nothing occurring, the assessor noted that there was no guarantee there was an issue with the sub-drainage that the Applicant had repaired.  After being informed of the second assessor‟s opinion, the first assessor stated the builders have done preventative repairs to control the storm water run-off but that is not controlling the sub-surface water. The Applicants would need to excavate the side of the home and have waterproofing membrane installed to control subsurface water. The first assessor did not believe a dye test would assist. 17. The FSP submits that it has accepted resultant damage but the preventative measures in relation to the property are the responsibility of the Applicant. 18. The first report clearly states that the contributing factor to water ingress is the lack of controls in place to accommodate ground water entering from outside into the subfloor area. 19. The second report concurs with the first report and adds that there are weep holes lower than ground level to front elevation and side elevation of the bedroom which would allow water ingress to the cavity and contributed to damage sustained. 20. The preventative damage required to the property is not an insured event within the policy and accordingly the policy does not respond. 21. There is no evidence that the first assessor provided the wrong advice to the Applicants. It was for the builder G to responsibly advise the Applicants. The FSP has noted that the Applicants instructed G regarding the works. 22. The Applicants have not provided any documentation or independent assessment to disprove the assessors ‟ findings regarding the damage. Issue 23. Whether the FSP is required to make payment for the Applicants‟ consequential losses. Reasons for Determination 24. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. Case No: 250614 Determination Page 5 of 9 25. I have read each party‟s sub missions and materials and will only refer to the relevant submissions and materials raised. 26. I consider the following Terms of Reference relevant to this Determination: “8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: legal principles; applicable industry codes or guidance as to practice; good industry practice; and previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these) ... 9.3 Other compensation Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute ... Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial Services Provider Compensate the Applicant for non-financial loss but only where: An unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred; or In the case of a Dispute pertaining to an individual‟s privacy rights – injury has occurred to the Applicant‟s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: Consequential financial loss; or Non-financial loss, In a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability ... 9.6 Other types of damages Punitive, exemplary or aggravated damages may not be awarded.” 27. I consider the following policy terms and conditions relevant to a consideration of this claim: “Locating the cause of damage Case No: 250614 Determination Page 6 of 9 If a listed event causes loss or damage to your home and you need to confirm that it was confirmed by a listed event: Covered Under Buildings Insurance - The reasonable costs you have paid to find the cause of damage if we agree that the loss or damage was caused by a listed event. ... Meeting building regulations If a listed event causes loss or damage to your home and you need to meet current building regulations to rebuilt or repair part of your home that was damaged Covered under Buildings Insurance - The costs to meet current building regulations to repair or rebuild the part of your home that was damaged. Not covered - Costs to meet building regulations: - that were already in place when your home was built, renovated or altered. - for undamaged parts of your home – for example installing insulation in ceilings that were not damaged. ... General exclusions ... Faulty design or workmanship that you knew about or should have reasonably known about.” 28. There is no dispute regarding payme nt for the internal damage. The dispute centres on whether the Applicants are entitled to consequential loss as a result of the information provided by the first assessor, being works which failed to prevent a recurrence of the loss and requirement of additional works. 29. It is the FSP‟s contention that the reports did not provide incorrect inf ormation, it was the Applicants‟ responsibility to arrange works to prevent inundation and the Applicants‟ builder was responsible for performing the works. 30. The Applicants state that they were not provided with the first assessor‟s report until after the second event in 2011. The Applicants state they were verbally informed of the works which needed to be completed. That is, the damage was occurring from surface and ground water. 31. The first assessor report confirms the insured has been advised of the next steps in the process but then there is a statement that the insured was not aware of any repairs they are responsible for. I also note with concern that the first assessor provides only general information in the scope of works which is „lack of controls i n place to accommodate ground water that is Case No: 250614 Determination Page 7 of 9 entering from outside into the sub- floor area‟ . There are no suggested controls which should prevent the reoccurrence of the loss. 32. I further note that there is no statement from the first assessor stating his recall of the conversation with the Applicants which would rebut their submission they were informed it was a surface and ground water issue. 33. There are notes in the claim file records indicating that the Applicants were directed to attend to works by the FSP. The FSP did inform the Applicants that it was ground water entering from outside into the sub-floor area. 34. The Applicants have then engaged G and instructed him to perform works presumably to prevent surface run-off and/or ground water from this area inundating the property. This would explain the change to the fall of the path away from the home and supporting plumbing work. It is unclear from their submissions however what precisely the Applicants have instructed G to do. However, G does states “works... completed as per the instructions we had been set to achieve.” I do consider from the works performed by G and the amount expended by the Applicants that they undertook the works in good faith and in the belief that the works would prevent the recurrence of damage. 35. The second assessor has stated the cause of damage may be to do with issues with stormwater drainage to the external wall area to lower bedroom. Further that the weep holes are lower than ground level. The assessor considered that these works should be completed prior to internal works being carried out. 36. It becomes apparent from the claims file records that the assessors not only disagree as to the cause of the loss but that further investigation is required given there is uncertainty regarding the cause of the loss. This is reflected in the assessment reports which provide no firm scope of works to rectify the issue(s). I do not consider that the reports necessarily support one another, particularly given the statements by the assessor in the claim records that they are uncertain as to the cause of the loss. 37. I note that the Applicants believed that they were carrying out works at the direction of the assessor and/or FSP. The works directed surface run-off away from the building. Given that a new claim has arisen it now appears that the works have not affected the recurrence of water inundation. 38. It seems to me quite unreasonable to have required the Applicants to repair an issue at some expense and at the FSP‟s direction when the source of inundation had not been properly identified. It is for this reason the Applicants have sought financial assistance or compensation from the FSP. 39. The policy further allows for the costs to locate the cause of the damage for an insured event. There is no dispute between the parties that the damage occurs during heavy rainfall from stormwater run-off as well as potential ground water. An insured event is therefore causing the damage; it is the Case No: 250614 Determination Page 8 of 9 mechanism of the inundation which is still unknown. The Applicants are entitled to claim for the cost of locating the cause of the damage. 40. The damage would not be excluded as the Applicants could not reasonably be declared as being reasonably aware of the cause of the loss considering the assessors have not been able to firmly ide ntify the cause of the loss and in fact the claim records suggest that further testing may be required in order to do so. Further, the Applicants believed that they had fixed the issue. 41. I further note that the policy covers costs to meet building regulations to repair or rebuild part of the home that was damaged. Accordingly, if the timber walls are damaged, and the building was built to appropriate standards as of the time of construction, then the Applicants are entitled to this loss and any costs to meet current building regulations. 42. The claim file records provide reasons for concern given the high degree of uncertainty as to whether the cause of loss stated by the assessors, on which the declinature of the building damage was based, was actually correct. 43. Despite this the Applicants were still directed to conduct repairs for this mechanism of inundation. Given this, I consider the application of Terms of Reference 9.3 and 8.2 should be considered. 44. The policy does not provide an exclusion for consequential loss under the General Exclusions. Accordingly, it is open to me to consider the loss requested by the Applicants. 45. I consider that but for the statements made by the FSP the Applicants were unlikely to have undertaken the works they did. The works performed and the subsequent failure of these works to prevent a recurrence of the damage would cause a great deal of frustration and upset to the Applicants. I note that some accountability does rest with G for the works to be completed appropriately however there is no suggestion G has improperly performed the works. I am not minded to order the FSP bear the entire cost of the works because if the building works has ameliorated the occurrence of the damage then the Applicants have received a benefit from these works. 46. I consider a contribution in the order of $1,000 is fair and reasonable in all the circumstances. I should add that on 11 January 2012, I invited the FSP to respond as to whether an award under para 9.3 of the Terms of Reference might be made. On 12 January 2012, the FSP replied saying that it wished to make no further submission. Determination 47. On the basis of the available information, I determine that the FSP is required to locate the source of the damage arising from the insured event of storm. Case No: 250614 Determination Page 9 of 9 48. If the cause of damage is covered under the policy terms and conditions, the FSP will be responsible for meeting the cost of compliance with current building regulations, as to the area the subject of the damage. 49. The FSP make payment of $1,000 to the Applicants in compensation for their consequential loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.